SGL-164 Building Pad Specifications.pdf

PDF 541 KB Posted

Attached to
23WHM SGL 164 New Building Pad General
Solicitation number
6100060987
Issued by
Butler County, Pennsylvania

About this file

This document is a set of technical specifications and contract requirements for a state and local contract opportunity issued by the Pennsylvania Game Commission (PGC) to construct a new 50' x 70' stone building pad on State Game Lands #164 in Clearfield Township, Butler County. The scope of work includes expanding the existing PGC access road and parking area, providing miscellaneous erosion and sedimentation controls, and preparing the site for future construction of a storage building. Bids will be electronically opened on May 8, 2024 at 2:00 PM. The contract term will commence upon delivery of the purchase order to the contractor, estimated to be June 10, 2024, and terminate on June 30, 2024.

The technical specifications outline requirements for erosion and sedimentation control, seeding, excavation, compacted backfill, aggregate placement, and installation of incidental drainage components. The contract includes specific provisions for insurance, compliance with prevailing wage laws, performance and payment bonds, invoicing procedures, and offsets for state liabilities owed to the Commonwealth. Bidders must also comply with the Reciprocal Limitations Act and provide required certifications related to worker protection and investment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SGL #164 Building Pad Construction Contract No. PGC-164-23-01

PENNSYLVANIA GAME COMMISSION

STATE GAME LANDS No. 164

40’ X 60’ BUILDING PAD

Clearfoeld Township, Butler County

Table of Contents

Bid Notice

Terms and Conditions

Specifications

PA Prevailing Wages

Reciprocal Limitations Act

Workers Protection & Investment Cert

Technical Specifications

Project Drawings

(Provided Separately with Solicitation)

(Provided Separately with Solicitation)

4 Pages

7 Pages (Determination No. 24-04098)

4 Pages

1 Page

11 Pages

1 Drawings

PROJECT SPECIFICATIONS

The Contractor shall comply with the Contract Terms and Conditions provided with the Bid Documents including but not limited to the following:

INSURANCE REQUIREMENTS – In accordance with the Contract Terms and Conditions, the Contractor is required to have in place during the term of the Contract and any renewals or extensions thereof, the following types of insurance, issued by companies acceptable to the Commonwealth and authorized to conduct such business under the laws of the Commonwealth of Pennsylvania:

A. Worker's Compensation Insurance for all the Contractor's employees and those of any subcontractor, engaged in Work at the site of the project as required by law.

B. Public Liability and Property Damage Insurance to protect the Commonwealth, the Contractor, and any and all subcontractors from claims for damages for personal injury (including bodily injury), sickness or disease, accidental death and damage to property including the loss of use resulting from any property damage, which may arise from the activities performed under the Contract or the failure to perform under the Contract, whether such performance or non-performance be by the Contractor, by any subcontractor, or by anyone directly or indirectly employed by either. The minimum amounts of coverage shall be $250,000 per person and $1,000,000 per occurrence for bodily injury, including death, and $250,000 per person and $1,000,000 per occurrence for property damage. Such policies shall be occurrence rather than claims-made policies and shall not contain any endorsements or any other form designated to limit and restrict any action by the Commonwealth, as an additional insured, against the insurance coverage regarding Work performed for the Commonwealth.

Prior to commencement of the Work under the Contract and at each insurance renewal date during the term of the Contract, the Contractor shall provide the Commonwealth with current certificates of insurance. These certificates or policies shall name the Commonwealth AND Pennsylvania Game Commission as additional insured and shall contain a provision that the coverage's afforded under the policies will not be cancelled or changed until at least thirty (30) days written notice has been given to the Commonwealth.

COMPLIANCE WITH LAW – The Contractor shall comply with all applicable federal and state laws and regulations and local ordinances in the performance of the Contract.

WORKMANSHIP - All Work shall be performed in a Workmanlike manner and all materials and labor shall be in strict and entire conformity with the Drawings and Specifications.

INSPECTION AND CHANGES - All Work is subject to inspection and acceptance by the Pennsylvania Game Commission. Any Work rejected as defective or unsuitable shall be removed and replaced with suitable Work and materials at the sole cost of the Contractor to the complete satisfaction of the Game Commission.

Changes shall be in accordance with the Contract Terms and Conditions.

TEMPORARY SERVICES AND JOB CONDITIONS - The Contractor shall be responsible for providing all temporary facilities necessary to execute and protect the Work. The Contractor shall accept all conditions as found upon examination of the site and shall coordinate, plan, and execute the Work accordingly. The Contractor shall cooperate in the arrangements of the Work as necessary to least affect the administration or operations of existing buildings, facilities, and infrastructure. The Contractor shall keep the Work site clean at all times.

PREVAILING WAGE – Prevailing minimum wages do not apply to this project.

PAYMENT TERMS - A schedule of values is provided with the bid. Payment will be made monthly upon satisfactory completion of items listed on the Schedule of Values and in accordance with the Contract Terms and Conditions.

All payments due to the Contractor shall be processed after all Work has been inspected and approved by an agent of the Pennsylvania Game Commission. Payment will not be made for Work that is not progressing satisfactorily or for unsuitable or defective Work.

Payments may be withheld for failure to provide required documentation for the project including but not limited to required submittals / shop drawings and weekly submission of Certified Payrolls.

INVOICING – All Project invoices shall be submitted directly to:

Mr. Matthew Spotts, Architectural Designer Pennsylvania Game Commission 2001 Elmerton Avenue Harrisburg PA 17110 Office: 717-787-4250 Ext:73614 Email: matspotts@pa.gov

All invoices must be submitted in black and white with no color and shaded areas. Invoices must include the Purchase Order Number, Contractor’s SAP Vendor Number, and the Contractor’s name and address as listed on the Purchase Order. Payment items on invoices shall match the items on the Purchase Order. Failure to submit invoices that meet these requirements will result in delay of payment.

Please Note: Vendors are reminded NOT TO INCLUDE employer identification numbers, Social Security Numbers, bank account information, or other personally identifiable information on their invoices. That information is uniquely tied to the SAP Vendor Number and, for security purposes, should not be explicitly stated on an invoice.

CONTRACT TERM - The Contract shall commence upon delivery of Purchase Order to Contractor (estimated to be June 10, 2024) and shall terminate on June 30, 2024. Contract time is of the essence of the Project. All Work must be completed and accepted by this date.

mailto:matspotts@pa.gov

EXCISE TAXES, PENNSYLVANIA SALES TAX - The Commonwealth is exempt from all Excise Taxes. See Contract Terms and Conditions.

OFFSET PROVISION - The Contractor agrees that the Commonwealth may set off the amount of any state liability or other debt of the Contractor or its subsidiaries that is owed to the Commonwealth and not being contested on appeal against any payments due the Contractor under this or any other contract with the Commonwealth.

PERFORMANCE SECURITY / CONTRACT BONDS – Within 10 days after award of the purchase order, the Bidder to whom the Contract is awarded, shall provide Contract Performance Security and a Payment Bond in a form acceptable to the Commonwealth for the amounts listed below and in accordance with the Contract Terms and Conditions.

A Performance Bond at one hundred percent (100%) of the contract amount, conditioned upon the faithful performance of the contract in accordance with the plans, specifications and conditions of the contract.

A Payment Bond in an amount equal to one hundred percent (100%) of the contract amount.

Performance and Payment Bonds shall be executed by a surety company authorized to do business in the Commonwealth and listed on the current U.S. Dept. of Treasury, Bureau of Fiscal Service, Department Circular 570 (https://fiscal.treasury.gov/surety-bonds/list-certified-companies.html).

Bonds shall include a current Power of Attorney dated the same as the date of the bond. Bonds shall be made payable to the Commonwealth.

GUARANTY / WARRANTY – See Contract Terms and Conditions – all items are warranted for a period of one year following delivery by the Contractor and acceptance by the Commonwealth.

HOLD HARMLESS PROVISION - See Contract Terms and Conditions - The Contractor shall hold the Commonwealth harmless from and indemnify the Commonwealth against any and all third party claims, demands and actions based upon or arising out of any activities performed by the Contractor and its employees and agents under this Contract, provided the Commonwealth gives Contractor prompt notice of any such claim of which it learns.

ADDITIONAL PROVISIONS -

Contractor shall comply with the conditions listed below in accordance with the Contract Terms and Conditions:

A. Steel Products Procurement Act B. Prohibition Against the Use of Certain Steel and Aluminum Products (Trade

Practices Act) C. Reciprocal Limitations Act - The form GSPUR89 (Reciprocal Limitations Act

Requirements) is attached. The Contractor shall complete the applicable portions of pages 3 and 4 of the form and submit the completed pages within two days after the bid opening.

Project Name: SGL#164 Building Pad Construction

General Description: Provide cut and fill work associated with creating a new level stone building Pad for future location of New Structure. Work also includes miscellaneous E&S Controls and underground drain installation work.

Project Locality Clearfield Township

Awarding Agency: PA Game Commission

Contract Award Date: 5/7/2024

Serial Number: 24-04098

Project Classification: Building/Heavy/Highway

Determination Date: 4/23/2024

Assigned Field Office: Pittsburgh

Field Office Phone Number: (412)565-5300

Toll Free Phone Number: (877)504-8354

Project County: Butler County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 4/23/2024 Page 1 of 7

Project: 24-04098 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 8/1/2022 $41.40 $28.51 $69.91

Asbestos & Insulation Workers 8/1/2023 $42.40 $29.01 $71.41

Boilermakers 6/1/2016 $40.90 $27.61 $68.51

Bricklayer 12/1/2022 $35.28 $24.74 $60.02

Bricklayer 12/1/2023 $37.78 $25.24 $63.02

Carpenters - Piledriver/Welder 1/1/2023 $40.63 $21.22 $61.85

Carpenters - Piledriver/Welder 1/1/2024 $42.13 $21.97 $64.10

Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10

Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

7/1/2022 $37.67 $19.93 $57.60

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2023 $39.69 $19.93 $59.62

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2024 $41.49 $19.93 $61.42

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2025 $43.34 $19.93 $63.27

Cement Masons 6/1/2022 $32.57 $22.59 $55.16

Cement Masons 6/1/2023 $33.07 $23.59 $56.66

Drywall Finisher 6/1/2022 $32.00 $21.89 $53.89

Drywall Finisher 6/1/2023 $32.39 $23.75 $56.14

Drywall Finisher 6/1/2024 $34.01 $24.88 $58.89

Electricians & Telecommunications Installation Technician

12/26/2022 $48.31 $29.29 $77.60

Electricians & Telecommunications Installation Technician

12/22/2023 $48.61 $31.80 $80.41

Electricians & Telecommunications Installation Technician

12/27/2024 $51.76 $31.80 $83.56

Electricians & Telecommunications Installation Technician

12/26/2025 $55.06 $31.80 $86.86

Elevator Constructor 1/1/2023 $56.14 $42.83 $98.97

Elevator Constructor 1/1/2024 $58.55 $43.87 $102.42

Glazier 9/1/2021 $32.61 $27.19 $59.80

Glazier 9/1/2023 $35.65 $30.05 $65.70

Iron Workers 6/1/2022 $38.39 $34.27 $72.66

Iron Workers 6/1/2023 $38.89 $35.02 $73.91

Laborers (Class 01 - See notes) 1/1/2023 $25.82 $19.46 $45.28

Laborers (Class 01 - See notes) 1/1/2024 $26.82 $19.46 $46.28

Laborers (Class 01 - See notes) 1/1/2025 $27.32 $19.96 $47.28

Laborers (Class 01 - See notes) 1/1/2026 $27.82 $20.46 $48.28

Laborers (Class 02 - See notes) 1/1/2023 $25.97 $19.46 $45.43

Laborers (Class 02 - See notes) 1/1/2024 $26.97 $19.46 $46.43

Laborers (Class 02 - See notes) 1/1/2025 $27.47 $19.96 $47.43

Laborers (Class 02 - See notes) 1/1/2026 $27.97 $20.46 $48.43

Laborers (Class 03 - See notes) 1/1/2023 $28.97 $19.46 $48.43

Laborers (Class 03 - See notes) 1/1/2024 $29.97 $19.46 $49.43

Laborers (Class 03 - See notes) 1/1/2025 $30.47 $19.96 $50.43

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/23/2024 Page 2 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Laborers (Class 03 - See notes) 1/1/2026 $30.97 $20.46 $51.43

Laborers (Class 04 - See notes) 1/1/2021 $23.57 $19.32 $42.89

Landscape Laborer (Skilled) 1/1/2020 $21.64 $16.98 $38.62

Landscape Laborer (Skilled) 1/1/2023 $23.79 $18.28 $42.07

Landscape Laborer (Skilled) 1/1/2024 $24.79 $18.53 $43.32

Landscape Laborer (Skilled) 1/1/2025 $25.79 $18.78 $44.57

Landscape Laborer (Skilled) 1/1/2026 $26.79 $19.03 $45.82

Landscape Laborer (Tractor Operator) 1/1/2020 $21.94 $16.98 $38.92

Landscape Laborer (Tractor Operator) 1/1/2023 $24.09 $18.28 $42.37

Landscape Laborer (Tractor Operator) 1/1/2024 $25.09 $18.53 $43.62

Landscape Laborer (Tractor Operator) 1/1/2025 $26.09 $18.78 $44.87

Landscape Laborer (Tractor Operator) 1/1/2026 $27.09 $19.03 $46.12

Landscape Laborer 1/1/2020 $21.22 $16.98 $38.20

Landscape Laborer 1/1/2023 $23.37 $18.28 $41.65

Landscape Laborer 1/1/2024 $24.37 $18.53 $42.90

Landscape Laborer 1/1/2025 $25.37 $18.78 $44.15

Landscape Laborer 1/1/2026 $26.37 $19.03 $45.40

Millwright 6/1/2020 $41.68 $20.32 $62.00

Operators (Class 01 - see notes) 6/1/2022 $38.89 $23.69 $62.58

Operators (Class 01 - see notes) 6/1/2023 $40.69 $23.89 $64.58

Operators (Class 01 - see notes) 6/1/2024 $41.69 $24.39 $66.08

Operators (Class 02 -see notes) 6/1/2022 $32.82 $23.69 $56.51

Operators (Class 02 -see notes) 6/1/2023 $34.62 $23.89 $58.51

Operators (Class 02 -see notes) 6/1/2024 $35.62 $24.39 $60.01

Operators (Class 03 - See notes) 6/1/2022 $30.03 $23.69 $53.72

Operators (Class 03 - See notes) 6/1/2023 $31.83 $23.89 $55.72

Operators (Class 03 - See notes) 6/1/2024 $32.83 $24.39 $57.22

Painters Class 6 (see notes) 6/1/2022 $29.50 $22.82 $52.32

Painters Class 6 (see notes) 6/1/2023 $30.56 $24.01 $54.57

Painters Class 6 (see notes) 6/1/2024 $32.14 $24.93 $57.07

Painters Class 6 (see notes) 6/1/2025 $34.16 $25.81 $59.97

Pile Driver Divers (Building, Heavy, Highway) 1/1/2023 $58.70 $21.22 $79.92

Pile Driver Divers (Building, Heavy, Highway) 1/1/2024 $60.95 $21.97 $82.92

Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54

Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17

Piledrivers 1/1/2023 $39.13 $21.22 $60.35

Piledrivers 1/1/2024 $40.63 $21.97 $62.60

Piledrivers 1/1/2025 $41.88 $22.72 $64.60

Piledrivers 1/1/2026 $43.13 $23.47 $66.60

Plasterers 6/1/2022 $31.44 $19.74 $51.18

Plasterers 6/1/2023 $32.14 $20.54 $52.68 plumber 6/1/2022 $49.35 $21.77 $71.12 plumber 6/1/2023 $48.65 $25.87 $74.52 plumber 6/1/2024 $51.75 $25.87 $77.62

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/23/2024 Page 3 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total plumber 6/1/2025 $54.95 $25.87 $80.82 plumber 6/1/2026 $58.05 $25.87 $83.92 plumber 6/1/2027 $61.15 $25.87 $87.02

Pointers, Caulkers, Cleaners 12/1/2022 $35.47 $20.88 $56.35

Roofers 6/1/2022 $36.04 $19.13 $55.17

Roofers 6/1/2023 $37.00 $19.92 $56.92

Sheet Metal Workers 7/1/2021 $38.76 $30.00 $68.76

Sheet Metal Workers 7/1/2022 $39.50 $31.43 $70.93

Sheet Metal Workers 8/1/2023 $41.00 $32.94 $73.94

Sign Makers and Hangars 7/15/2022 $30.54 $24.35 $54.89

Sign Makers and Hangars 7/15/2023 $31.76 $24.63 $56.39

Sprinklerfitters 4/1/2023 $44.33 $28.04 $72.37

Sprinklerfitters 4/1/2024 $46.45 $28.62 $75.07

Steamfitters 6/1/2022 $44.15 $27.32 $71.47

Steamfitters 6/1/2023 $46.10 $28.37 $74.47

Stone Masons 12/1/2022 $38.56 $23.61 $62.17

Terrazzo Finisher 12/1/2022 $36.13 $18.03 $54.16

Terrazzo Mechanics 12/1/2022 $35.49 $20.32 $55.81

Tile Finisher 12/1/2022 $28.76 $17.34 $46.10

Tile Setter 12/1/2022 $35.64 $21.81 $57.45

Truckdriver class 1(see notes) 1/1/2023 $33.18 $22.21 $55.39

Truckdriver class 1(see notes) 1/1/2024 $34.93 $22.71 $57.64

Truckdriver class 1(see notes) 1/1/2025 $36.43 $23.21 $59.64

Truckdriver class 1(see notes) 1/1/2026 $37.93 $23.71 $61.64

Truckdriver class 2 (see notes) 1/1/2023 $33.64 $22.52 $56.16

Truckdriver class 2 (see notes) 1/1/2024 $35.39 $23.02 $58.41

Truckdriver class 2 (see notes) 1/1/2025 $36.89 $23.52 $60.41

Truckdriver class 2 (see notes) 1/1/2026 $38.39 $24.02 $62.41

Truckdriver class 3 (see notes) 1/1/2016 $28.23 $16.98 $45.21

Window Film / Tint Installer 10/1/2019 $25.00 $2.63 $27.63

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/23/2024 Page 4 of 7

Project: 24-04098 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter 1/1/2023 $38.60 $20.59 $59.19

Carpenter 1/1/2024 $40.10 $21.34 $61.44

Carpenter 1/1/2025 $41.35 $22.09 $63.44

Carpenter 1/1/2026 $42.60 $22.84 $65.44

Carpenter Welder 1/1/2023 $40.10 $20.59 $60.69

Carpenter Welder 1/1/2024 $41.60 $21.34 $62.94

Carpenter Welder 1/1/2025 $42.85 $22.09 $64.94

Carpenter Welder 1/1/2026 $44.10 $22.84 $66.94

Carpenters - Piledriver/Welder 1/1/2023 $40.63 $21.22 $61.85

Carpenters - Piledriver/Welder 1/1/2024 $42.13 $21.97 $64.10

Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10

Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10

Cement Finishers 1/1/2023 $34.14 $25.05 $59.19

Cement Finishers 1/1/2024 $35.14 $26.30 $61.44

Cement Finishers 1/1/2025 $35.94 $27.50 $63.44

Cement Masons 1/1/2020 $32.84 $21.10 $53.94

Electric Lineman 8/29/2022 $62.66 $28.08 $90.74

Electric Lineman 9/4/2023 $64.68 $29.01 $93.69

Electric Lineman 1/1/2024 $64.46 $29.23 $93.69

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

6/1/2020 $37.29 $32.87 $70.16

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

6/1/2023 $38.89 $35.02 $73.91

Laborers (Class 01 - See notes) 1/1/2023 $29.95 $25.50 $55.45

Laborers (Class 01 - See notes) 1/1/2024 $32.20 $25.50 $57.70

Laborers (Class 01 - See notes) 1/1/2025 $33.70 $26.00 $59.70

Laborers (Class 01 - See notes) 1/1/2026 $34.70 $27.00 $61.70

Laborers (Class 02 - See notes) 1/1/2023 $30.11 $25.50 $55.61

Laborers (Class 02 - See notes) 1/1/2024 $32.36 $25.50 $57.86

Laborers (Class 02 - See notes) 1/1/2025 $33.86 $26.00 $59.86

Laborers (Class 02 - See notes) 1/1/2026 $34.86 $27.00 $61.86

Laborers (Class 03 - See notes) 1/1/2023 $30.50 $25.50 $56.00

Laborers (Class 03 - See notes) 1/1/2024 $32.75 $25.50 $58.25

Laborers (Class 03 - See notes) 1/1/2025 $34.25 $26.00 $60.25

Laborers (Class 03 - See notes) 1/1/2026 $35.25 $27.00 $62.25

Laborers (Class 04 - See notes) 1/1/2023 $30.95 $25.50 $56.45

Laborers (Class 04 - See notes) 1/1/2024 $33.20 $25.50 $58.70

Laborers (Class 04 - See notes) 1/1/2025 $34.70 $26.00 $60.70

Laborers (Class 04 - See notes) 1/1/2026 $35.70 $27.00 $62.70

Laborers (Class 05 - See notes) 1/1/2023 $31.36 $25.50 $56.86

Laborers (Class 05 - See notes) 1/1/2024 $33.61 $25.50 $59.11

Laborers (Class 05 - See notes) 1/1/2025 $35.11 $26.00 $61.11

Laborers (Class 05 - See notes) 1/1/2026 $36.11 $27.00 $63.11

Laborers (Class 06 - See notes) 1/1/2023 $28.20 $25.50 $53.70

Laborers (Class 06 - See notes) 1/1/2024 $30.45 $25.50 $55.95

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/23/2024 Page 5 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Laborers (Class 06 - See notes) 1/1/2025 $31.95 $26.00 $57.95

Laborers (Class 06 - See notes) 1/1/2026 $32.95 $27.00 $59.95

Laborers (Class 07 - See notes) 1/1/2023 $30.95 $25.50 $56.45

Laborers (Class 07 - See notes) 1/1/2024 $33.20 $25.50 $58.70

Laborers (Class 07 - See notes) 1/1/2025 $34.70 $26.00 $60.70

Laborers (Class 07 - See notes) 1/1/2026 $35.70 $27.00 $62.70

Laborers (Class 08 - See notes) 1/1/2023 $32.45 $25.50 $57.95

Laborers (Class 08 - See notes) 1/1/2024 $34.70 $25.50 $60.20

Laborers (Class 08 - See notes) 1/1/2025 $36.20 $26.00 $62.20

Laborers (Class 08 - See notes) 1/1/2026 $37.20 $27.00 $64.20

Millwright 6/1/2020 $41.68 $20.32 $62.00

Millwright 6/1/2023 $45.50 $23.72 $69.22

Millwright 6/1/2024 $47.59 $23.72 $71.31

Millwright 6/1/2025 $49.72 $23.72 $73.44

Operators (Class 01 - see notes) 1/1/2023 $36.79 $23.58 $60.37

Operators (Class 01 - see notes) 1/1/2024 $38.59 $24.03 $62.62

Operators (Class 01 - see notes) 1/1/2025 $40.39 $24.23 $64.62

Operators (Class 02 -see notes) 1/1/2023 $36.53 $23.58 $60.11

Operators (Class 02 -see notes) 1/1/2024 $38.33 $24.03 $62.36

Operators (Class 02 -see notes) 1/1/2025 $40.13 $24.23 $64.36

Operators (Class 03 - See notes) 1/1/2023 $32.88 $23.58 $56.46

Operators (Class 03 - See notes) 1/1/2024 $34.68 $24.03 $58.71

Operators (Class 03 - See notes) 1/1/2025 $36.48 $24.23 $60.71

Operators (Class 04 - See notes) 1/1/2023 $32.42 $23.58 $56.00

Operators (Class 04 - See notes) 1/1/2024 $34.22 $24.03 $58.25

Operators (Class 04 - See notes) 1/1/2025 $36.02 $24.23 $60.25

Operators (Class 05 - See notes) 1/1/2023 $32.17 $23.58 $55.75

Operators (Class 05 - See notes) 1/1/2024 $33.97 $24.03 $58.00

Operators (Class 05 - See notes) 1/1/2025 $35.77 $24.23 $60.00

Operators Class 1-A 1/1/2023 $39.79 $23.58 $63.37

Operators Class 1-A 1/1/2024 $41.59 $24.03 $65.62

Operators Class 1-A 1/1/2025 $43.39 $24.23 $67.62

Operators Class 1-B 1/1/2023 $38.79 $23.58 $62.37

Operators Class 1-B 1/1/2024 $40.59 $24.03 $64.62

Operators Class 1-B 1/1/2025 $42.39 $24.23 $66.62

Painters Class 1 (see notes) 6/1/2022 $34.45 $22.82 $57.27

Painters Class 2 (see notes) 6/1/2019 $35.25 $20.06 $55.31

Painters Class 2 (see notes) 6/1/2023 $36.01 $24.01 $60.02

Painters Class 2 (see notes) 6/1/2024 $38.09 $24.93 $63.02

Painters Class 2 (see notes) 6/1/2025 $40.36 $25.81 $66.17

Painters Class 3 (see notes) 6/1/2022 $36.77 $22.82 $59.59

Painters Class 3 (see notes) 6/1/2023 $38.33 $24.01 $62.34

Painters Class 3 (see notes) 6/1/2024 $40.66 $24.93 $65.59

Painters Class 3 (see notes) 6/1/2025 $43.69 $25.81 $69.50

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/23/2024 Page 6 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Painters Class 4 (see notes) 6/1/2019 $28.20 $20.06 $48.26

Painters Class 5 (see notes) 6/1/2019 $22.91 $20.06 $42.97

Pile Driver Divers (Building, Heavy, Highway) 1/1/2023 $58.70 $21.22 $79.92

Pile Driver Divers (Building, Heavy, Highway) 1/1/2024 $60.95 $21.97 $82.92

Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54

Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17

Piledrivers 1/1/2023 $39.13 $21.22 $60.35

Piledrivers 1/1/2024 $40.63 $21.97 $62.60

Piledrivers 1/1/2025 $41.88 $22.72 $64.60

Piledrivers 1/1/2026 $43.13 $23.47 $66.60

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2022 $48.43 $40.28 $88.71

Truckdriver class 1(see notes) 1/1/2023 $33.18 $22.21 $55.39

Truckdriver class 1(see notes) 1/1/2024 $34.93 $22.71 $57.64

Truckdriver class 1(see notes) 1/1/2025 $36.43 $23.21 $59.64

Truckdriver class 1(see notes) 1/1/2026 $37.93 $23.71 $61.64

Truckdriver class 2 (see notes) 1/1/2023 $33.64 $22.52 $56.16

Truckdriver class 2 (see notes) 1/1/2024 $35.39 $23.02 $58.41

Truckdriver class 2 (see notes) 1/1/2025 $36.89 $23.52 $60.41

Truckdriver class 2 (see notes) 1/1/2026 $38.39 $24.02 $62.41

Truckdriver class 3 (see notes) 1/1/2019 $29.59 $19.82 $49.41

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/23/2024 Page 7 of 7

Department of General Services GSPUR-89 Rev. 11/06/12

RECIPROCAL LIMITATIONS ACT

REQUIREMENTS

Please Complete Applicable Portion of Pages 3 & 4 and Return with Bid.

NOTE: These Requirements Do Not Apply To Bids Under $10,000.00

I. REQUIREMENTS

A. The Reciprocal Limitations Act requires the Commonwealth to give preference to those bidders offering supplies produced, manufactured, mined or grown in Pennsylvania as against those bidders offering supplies produced, manufactured, mined or grown in any state that gives or requires a preference to supplies produced, manufactured, mined or grown in that state. The amount of the preference shall be equal to the amount of the preference applied by the other state for that particular supply.

The following is a list of states which have been found by the Department of General Services to have applied a preference for in-state supplies and the amount of the preference:

STATE PREFERENCE

1. Alaska 7% (applies only to timber, lumber, and manufactured lumber products originating in the state)

2. Arizona 5% (construction materials produced or manufactured in the state only)

3. Hawaii 10%

4. Illinois 10% for coal only

5. Iowa 5% for coal only

6. Louisiana 4% meat and meat products

4% catfish 10% milk & dairy products 10% steel rolled in Louisiana 7% all other products

7. Montana 5% for residents * 3% for non-residents*

*offering in-state goods, supplies, equipment and materials

8. New Mexico 5%

9. New York 3% for purchase of food only

10. Oklahoma 5%

11. Virginia 4% for coal only

12. Washington 5% (fuels mined or produced in the state only)

13. Wyoming 5%

B. The Reciprocal Limitations Act requires the Commonwealth to give preference to those bidders offering printing performed in Pennsylvania as against those bidders offering printing performed in any state that gives or requires a preference to printing performed in that state. The amount of the preference shall be equal to the amount of the preference applied by the other state for that particular category of printing.

The following is a list of states which have been found by the Department of General Services to have applied a preference for in-state printing and the amount of the preference:

STATE PREFERENCE

1. Hawaii 15%

2. Idaho 10%

3. Louisiana 3%

4. Montana 8%

5. New Mexico 5%

6. Wyoming 10%

C. The Reciprocal Limitations Act, also requires the Commonwealth to give resident bidders a preference against a nonresident bidder from any state that gives or requires a preference to bidders from that state or exclude bidders from states that exclude nonresident bidders. The amount of the preference shall be equal to the amount of the preference applied by the state of the nonresident bidder. The following is a list of the states which have been found by the Department of General Services to have applied a preference for in-state bidders and the amount of the preference:

STATE PREFERENCE

1. Alaska 5% (supplies only)

2. Arizona 5% (construction materials from Arizona resident dealers only)

3. California 5% (for supply contracts only in excess of $100,000.00)

4. Connecticut 10% (for supplies only)

5. Montana 3%

6. New Mexico 5% (for supplies only)

7. South Carolina 2% (under $2,500,000.00)

1% (over $2,500,000.00) This preference does not apply to construction contracts nor where the price of a single unit exceeds $10,000.

8. West Virginia 2.5% (for the construction, repair or improvement of any buildings

9. Wyoming 5%

STATE PROHIBITION

1. New Jersey For supply procurements or construction projects restricted to Department of General

Services Certified Small Businesses, New Jersey bidders shall be excluded from award even if they themselves are Department of General Services Certified Small Businesses.

D. The Reciprocal Limitations Act also requires the Commonwealth not to specify, use or purchase supplies which are produced, manufactured, mined or grown in any state that prohibits the specification for, use, or purchase of such items in or on its public buildings or other works, when such items are not produced, manufactured, mined or grown in such state. The following is a list of the states which have been found by the Department of General Services to have prohibited the use of out-of-state supplies:

STATE PROHIBITION

1. Alabama Only for printing and binding involving ”messages of the Governor to the Legislature“, all bills, documents and reports ordered by and for the use of the Legislature or either house thereof while in session; all blanks, circulars, notices and forms used in the office of or ordered by the Governor, or by any state official, board, commission, bureau or department, or by the clerks of the supreme court . . ./and other appellate courts/; and all blanks and forms ordered by and for the use of the Senate and Clerk or the House of Representatives, and binding the original records and opinions of the Supreme Court . . .

/and other appellate courts/

2. Georgia Forest products only

3. Indiana Coal

4. Michigan Printing

5. New Mexico Construction

6. Ohio Only for House and Senate bills, general and local laws, and joint resolutions; the journals and bulletins of the Senate and house of Representatives and reports, communications, and other documents which form part of the journals; reports, communications, and other documents ordered by the General Assembly, or either House, or by the executive department or elective state officers; blanks, circulars, and other work for the use of the executive departments, and elective state officers; and opinions of the Attorney General.

7. Rhode Island Only for food for state institutions.

*If the bid discloses that the bidder is offering to supply one of the above-listed products that is manufactured, mined, or grown in the listed state, it shall be rejected. Contractors are prohibited from supplying these items from these states.

II. CALCULATION OF PREFERENCE

In calculating the preference, the amount of a bid submitted by a Pennsylvania bidder shall be reduced by the percentage preference which would be given to a nonresident bidder by its state of residency (as found by the Department of General Services in Paragraph C above). Similarly, the amount of a bid offering Pennsylvania goods, supplies, equipment or materials shall be reduced by the percentage preference which would be given to another bidder by the state where the goods, supplies, equipment or materials are produced, manufactured, mined or grown (as found by the Department of General Services in Paragraphs A and B above).

THIS FORM MUST BE COMPLETED AND RETURNED WITH THE BID

III. STATE OF MANUFACTURE

All bidders must complete the following chart by listing the name of the manufacturer and the state (or foreign country) of manufacture for each item. If the item is domestically produced, the bidder must indicate the state in the United States where the item will be manufactured. This chart must be completed and submitted with the bid or no later than two (2) business days after notification from the Issuing Office to furnish the information. Failure to complete this chart and provide the required information prior to the expiration of the second business day after notification shall result in the rejection of the bid.

ITEM NUMBER NAME OF MANUFACTURER

STATE

(OR FOREIGNCOUNTRY)

OF MANUFACTURE

IV. BIDDER’S RESIDENCY

A. In determining whether the bidder is a nonresident bidder from a state that gives or requires a preference to bidders from that state, the address given on the first page of this invitation to bid shall be used by the Commonwealth. If that address is incorrect, or if no address is given, the correct address should be provided in the space below:

Correct Address:

B. In order to claim the preference provided under Section I.B., Pennsylvania resident bidders must complete the following or have such information on file with the Issuing Office:

1. Address of bidder’s bona fide establishment in Pennsylvania at which it was transacting business on the date when bids for this contract/requisition were first solicited:

2. a. If the bidder is a corporation:

(1) The corporation is or is not incorporated under the laws of the Commonwealth of Pennsylvania.

(a) If the bidder is incorporated under the laws of the Commonwealth of Pennsylvania, provide date of incorporation:

(b) If the bidder is not incorporated under the laws of the Commonwealth of Pennsylvania, it must have a certificate of authority to do business in the Commonwealth of Pennsylvania from the Pennsylvania Department of State as required by the Pennsylvania Business Corporation Law (15 P.S. §2001). Provide date of issuance of certificate of authority:

(2) The corporation is or is not conducting business in Pennsylvania under an assumed or fictitious name. If the bidder is conducting business under an assumed or fictitious name, it must register the fictitious name with the Secretary of the Commonwealth and the office of the prothonotary of the county wherein the registered office of such corporation is located as required by the Fictitious Corporate Name Act, as amended 15 P.S. §51 et seq. Corporate bidders conducting business under an assumed or fictitious name must provide date of registry of the assumed or fictitious name:

b. If the bidder is a partnership:

(1) The partnership is or is not conducting business in Pennsylvania under an assumed or fictitious name. If the bidder is conducting business under an assumed or fictitious name, it must file with the Secretary of the Commonwealth and the office of the prothonotary the county wherein the principal place of business is located as required by the Fictitious Name Act of May 24, 1945, P.L. 967, as amended 54 P.S. §28.1. Partnerships conducting business under an assumed or fictitious name must provide the date of filing of the assumed or fictitious name with the Secretary of the Commonwealth:

(2) The partnership is or is not a limited partnership formed under the laws of any jurisdiction other than the Commonwealth of Pennsylvania. If the bidder is an Out-of-state limited partnership, it must register with the Pennsylvania Department of State as required by the Act of July 10, 1981, P.L. 237, as amended, 59 Pa. C.S.A. §503. Out-of-state limited partnerships must provide the date of registry with the Pennsylvania Department of State:

c. If the bidder is an individual:

He or she is or is not conducting business under an assumed or fictitious name. If the bidder is conducting business under an assumed or fictitious name, he or she must file with the Secretary of the Commonwealth and the office of the prothonotary in the county wherein the principal place of business is located as required by the Fictitious Name Act of May 24, 1945, P.L. 967, as amended, 54 P.S. §28.1. Individuals conducting business under an assumed or fictitious name must provide the date of filing of the assumed or fictitious name with the Secretary of the Commonwealth:

WORKER PROTECTION AND INVESTMENT CERTIFICATION FORM

A. Pursuant to Executive Order 2021-06, Worker Protection and Investment (October 21, 2021), the Commonwealth is responsible for ensuring that every worker in Pennsylvania has a safe and healthy work environment and the protections afforded them through labor laws. To that end, contractors and grantees of the Commonwealth must certify that they are in compliance with Pennsylvania’s Unemployment Compensation Law, Workers’ Compensation Law, and all applicable Pennsylvania state labor and workforce safety laws including, but not limited to:

1. Construction Workplace Misclassification Act

2. Employment of Minors Child Labor Act

3. Minimum Wage Act

4. Prevailing Wage Act

5. Equal Pay Law

6. Employer to Pay Employment Medical Examination Fee Act

7. Seasonal Farm Labor Act

8. Wage Payment and Collection Law

9. Industrial Homework Law

10. Construction Industry Employee Verification Act

11. Act 102: Prohibition on Excessive Overtime in Healthcare

12. Apprenticeship and Training Act

13. Inspection of Employment Records Law

B. Pennsylvania law establishes penalties for providing false certifications, including contract termination; and three-year ineligibility to bid on contracts under 62 Pa. C.S. § 531 (Debarment or suspension).

CERTIFICATION

I, the official named below, certify I am duly authorized to execute this certification on behalf of the contractor/grantee identified below, and certify that the contractor/grantee identified below is compliant with applicable Pennsylvania state labor and workplace safety laws, including, but not limited to, those listed in Paragraph A, above. I understand that I must report any change in the contractor/grantee’s compliance status to the Purchasing Agency immediately. I further confirm and understand that this Certification is subject to the provisions and penalties of 18 Pa. C.S. § 4904 (Unsworn falsification to authorities).

Signature Date

Name (Printed)

Title of Certifying Official (Printed)

Contractor/Grantee Name (Printed)

BOP-2201

Published: 02/07/2022

TECHNICAL SPECIFICATIONS

The following stipulations, specifications and description of Work are defined and described as Technical Specifications and it is understood and agreed that everything herein contained is hereby made part of the Contract. Wherever any feature of the Work is not fully set forth in these Technical Specifications and is necessary for the completion of Work, it shall be understood that the same is governed by the rules of the best prevailing practice for that class of Work, as determined by the Pennsylvania Game Commission (PGC) and its representatives.

These Technical Specifications and any drawings, maps and/or plans forming a part thereof, will cover the furnishing of all labor, equipment, tools, materials, and related items necessary to perform the Work, as required under this Contract.

Section 1 – Summary of Work Section 2 – Erosion and Sedimentation Control Section 3 – Seeding Section 4 – Excavation Section 5 – Compacted Backfill Section 6 – Aggregate Section 7 – Incidentals

DRAWINGS

The following Drawings are included:

1-1 – Pad Construction Plan & Profiles

TECHNICAL SPECIFICATION SECTION NO. 1 - SUMMARY OF WORK

1.1 – SCOPE OF PROJECT

The intent of this project is to construct a new 50’ x 70’ stone building pad complete with expanding the existing PGC access road and parking area along with providing miscellaneous E&S controls. The building pad in in preparation for future construction of a Storage building to serve the Pennsylvania Game Commission (PGC). The site is in Clearfield Township, Butler County on State Game Lands #164. The scope of work is as outlined above and there are no connections or extensions of any utilities for the new Building Pad.

1.2 – WORK AREA

The work area for this project is on State Game Lands #164. The building site is in Clearfield Township, Butler County, mailing address 420 Game Reserve Road, Fenelton, PA 16034.

1.3 – WORK HOURS

The work hours at the project site are during regular PGC business hours which are Monday through Friday, 7:00AM to 3:30PM. Work during different hours must have prior written approval by the PGC. Requests for different working hours must be submitted in writing two days in advance.

1.4 – ACCESS TO WORK AREA

Access to the work area is from a paved public road, Game Reserve Road and accessed on gravel driveway. The Contractor may use any available space to store equipment or materials but must keep the access drive open to PGC vehicles.

1.5 – SITE LAYOUT AND PREPARATION

The PGC will stake out the four corners of the future new Storage Building at the initial job conference for the project. The PGC will also provide a grade stake to mark the finished building pad elevation during the initial job conference. The Contractor is responsible for any clearing and grubbing required for construction of the new building pad. The Contractor is also responsible for all the stone drive/ parking area around the new building pad and existing building as indicated on the drawing.

TS-1-1

1.6 – ROAD PERMITS AND BONDING

The Contractor shall coordinate, acquire, pay for, and maintain for the duration of the project any and all permits or bonds required by local municipalities and/or PennDOT to utilize public roads and infrastructure for heavy hauling and related construction activities. Responsibilities shall include any pre or post construction inspections and related reports if required. All costs related to permitting and bonding public roadways and infrastructure shall be included with and incidental to the Bid submitted by the Contractor and will not be paid for separately.

1.7 – PERMITS, LAWS AND REGULATIONS

The Contractor shall procure and pay for all permits, licenses, inspections, conveniences, or other approvals necessary for the execution of the contract. There was no Building Permit required by the PGC from the department of Labor &Industry. Local building code officials have no jurisdiction over this project.

The Contractor shall comply with all laws, ordinances, rules, orders and regulations relating to the performance of the work, the protection of adjacent property, the maintaining of surface passageways, safety measures, and/or other protective facilities.

All applicable Federal and State laws and regulations and regulations of all utilities, having jurisdiction over construction of the project shall apply to the contract throughout, and they shall be deemed to be included in the contract as a part, thereof, the same as though herein written out in full.

All regulations of the Occupational Safety and Health Act are in effect on this contract. It will be the Contractor’s responsibility to make himself aware of all appropriate County, State and Federal regulations that apply to this contract.

Any violations incurred from improper execution of the above provisions shall be paid for by the Contractor. Loss of time on the project from such violations will not be tolerated.

TS-1-2

TS-2-1

TECHNICAL SPECIFICATION SECTION No. 2 - EROSION AND

SEDIMENTATION CONTROL

2.1 -SCOPE

This work is implementing Erosion and Sedimentation control measures to protect the surrounding environment. Compliance is required with Chapter 102 of the Department of Environmental Protection’s regulations is also required.

2.2 - PROCEDURE

The Contractor shall install a 12-inch diameter silt sock around the disturbed site area. The silt sock shall be anchored with 1” x 1” x 3’ wood posts on 8-foot centers. The end of the silt sock shall be extended uphill so that water cannot flow around the barrier.

Failure to implement soil erosion and sediment pollution control measures may result in a cease-and-desist order, causing shutdown of work. No extension of time, nor additional compensation will be granted if such a shutdown should occur because of an act or neglect of the Contractor.

The Contractor may, with the approval of the Game Commission, perform temporary seeding operations to maintain finished graded areas until the optimum time for performing permanent seeding. Areas that will be surfaced by stone to serve as access areas and driveways do not need to be seeded.

Periodically remove accumulated sediments from control measures and dispose of them in suitable work areas. Erosion and Control measures are to remain in place indefinitely, unless otherwise directed by the Game Commission.

2.3 - MEASUREMENT AND PAYMENT

Lump Sum.

TS-3-1

TECHNICAL SPECIFICATION SECTION No. 3 – SEEDING

7.1 - SCOPE

This work is securing a satisfactory stand of grass at all disturbed areas which includes preparation of the seed bed, furnishing and placing lime and fertilizer, furnishing, and sowing of seed, mulching, and maintaining and tending the seeded areas. Prior to seeding, the importing of fill and topsoil is anticipated to restore the site to native appearance.

7.2 - APPLICABLE ACTS AND PUBLICATIONS

• Bulletin 15 - Approved Construction Materials, Pennsylvania Department of Transportation.

• Pub 408. - Specifications, Pennsylvania Department of Transportation.

7.3 - MATERIALS

A. Seed - Use PennDOT Formula “W” seed mix conforming to Section 804.2b of Pub. 408.

Deliver premixed seed in bags or other suitable containers, each fully labeled with the name, trademark, and warranty of the producer and with the mixture type and mix formula or composition.

Do not use seed which has become wet, moldy, or otherwise damaged in transit or storage, has a mix date older than 9 months prior to seeding, or has a test date older than 6 months prior to seeding.

B. Fertilizer - Fertilizer shall conform to the applicable act specified in Section 804.2 of Pub. 408.

Use dry formulation of 10-20-20-analysis.

a. Fertilizers shall be delivered in bags or other suitable containers, each fully labeled and bearing the name, trademark, and warranty of the producer.

C. Lime - Conform to section 804.2.(a).1 of Pub.408.

D. Mulches - Mulches shall be free from mature seedbearing stalks or roots of prohibited or noxious weeds as defined by law. Do not use mulches which are cut into lengths of less than 6 inches.

1. Mulches shall be either one or a combination of the following, shall contain no stems of tobacco, soybeans, or other coarse or woody materials.

2. Straw - Either wheat or oat straw, and reasonably free of viable seeds, well-cured to less than 20 percent moisture content by weight.

3. Wood Fiber - Use wood fiber meeting the requirements of Section 805.2(a).1.c of Pub. 408.

4. Pellet Mulch – Use pellet mulch meeting the requirements of Section 805.2(a).1. d of Pub. 408.

TS-3-2

E. Mulch Binders - Use one of the following mulch binders in accordance with section 805.2(b) of Pub. 408: Recycled Cellulose Fiber, Wood Fiber, Nonasphaltic Emulsion, Polyvinyl Acetate, or a Mixture of Recycled Cellulose Wood Fiber and Wood Fiber. Obtain binders from a producer listed in Bulletin 15.

F. Water - Water shall be fresh and free from injurious amounts of oil, acid, alkali, salts, or other materials harmful to the growth of grass.

7.4 - PROCEDURE

Follow the procedures specified below. The amounts of seed, lime, fertilizer, and mulch specified are the minimum acceptable. The Game Commission may, at its own expense, test the soils to determine if any modifications to the seed and soil requirements are necessary. Employ such modifications if they are deemed necessary, at no additional cost to the Game Commission, and accept full responsibility for obtaining a satisfactory stand of grass.

A. Preparation of Seed Bed by Shallow Tilling - After the areas to be seeded have been graded and approved by the Game Commission, thoroughly till the surfaces to a depth of 3 inches by raking, harrowing, or other approved means. Apply fertilizer and lime at a rate of 680 lbs. and 4,000 lbs.

per acre respectively, and make sure that they are worked thoroughly into the soil to a depth of 3 inches and the tillage operations are sufficient to ensure that the soil conditions are satisfactory for seeding. Smooth and bring the area to grade. Immediately prior to sowing, rake the soil to a depth of 3/4 inch. Rake in a direction parallel to the contour lines on the slope, and not uphill or downhill. Remove all sticks, stones, weeds, roots, and other objectionable materials appearing on the surface. Maintain the surface in a true and even condition during sowing of seed. The seeded surface must be as smooth as the surrounding grassed area.

B. Sowing - Sow the seed mixture on a still day at a rate specified in Section 5.3A of these Technical Specifications. Sow by hand or by approved sowing equipment in 2 applications, one-half the seed while the seeder is traveling in one direction and the other half while the seeder is traveling at right angle to the first direction. After sowing, rake, cultipack, or brush drag the surface very lightly, just deep enough to cover the seeds. Rake only in a direction parallel to the contour lines.

You may use hydroseeding or grain drilling, provided all methods and equipment are approved by the Game Commission. In case of hydroseeding, you may apply fertilizer and lime at the time of sowing. In case of grain drilling, you may apply fertilizer at the time of sowing, provided the fertilizer does not come in contact with the seed. Drill only in a direction parallel to the contour lines.

Do not sow seed on frozen or partially frozen ground.

C. Mulching - After sowing is completed, spread mulch uniformly over the entire seeded area at a rate of 3 tons (dry weight) per acre. The mulch shall be moist at the time of placement.

Apply wood fiber mulch hydraulically in accordance with the manufacturer's tank-mixing instructions. Wood fiber mulch may be incorporated into the slurry after the seed and soil

TS-3-3

supplements have been thoroughly mixed. Apply wood fiber mulch at a rate of 800 lbs. per acre unless otherwise indicated by the manufacturer.

On slopes 6:1 or flatter, apply pellet mulch by hand or using a mechanical spreader immediately after seeding, at a rate of 2,615 Lbs. per acre. Thoroughly wet pellet mulch with water without dislodging mulch.

To prevent loss or bunching by wind and to form a soil-binding mulch, anchor the moist mulch to the soil with a mulch binder. Use mulch binders at the following rates:

Recycled Cellulose Fiber - 775 Lbs./Acre Wood Fiber - 775 Lbs./Acre Mixture of Recycled Cellulose Fiber and Wood Fiber - 775 Lbs./Acre Nonasphaltic Emulsion - Manufacturer's Recommended Rate

Polyvinyl Acetate - Manufacturer's Recommended Rate Tackifier Product – Manufacturer’s Recommended Rate

On slopes where machinery cannot be used, retain the mulch in place by some suitable means which will not be detrimental to subsequent operations.

7.5 - MEASUREMENT AND PAYMENT

Lump Sum.

TS-4-1

TECHNICAL SPECIFICATION SECTION No. 4 - EXCAVATION

4.1- SCOPE

This work involves the removal, relocation and hauling any soil/fill material, as indicated on the Drawings, or designated by the Game Commission.

4.2 - PROCEDURE

A. General - Follow all guidelines set forth in the Construction Industry Standards, OSHA 2207, of the Occupational Safety and Health Administration, U.S. Department of Labor. Protect the work, adjacent buildings, and property.

The Contractor is required to contact the PA One Call System at 8-1-1 or 1-800-242-1776 (outside PA) prior to excavation operations at the site.

During excavation operations, keep the top surface graded for drainage. Do not over-excavate because unauthorized excavation and replacement of materials in the over-excavated areas will not be measured and paid for. Replace over-excavated work with concrete, gravel, earth, or other materials designated by, and at no additional cost to the Game Commission.

B. Excavation - Remove all materials to the limits shown on the Drawings or as necessary to remove foundations for the contract.

C. Disposal – Suitable excavated materials will be used for compacted fill material and final grading if suitable. The excavated materials will also be used to establish the finished grade around the new building. This project is intended use all cut material for fill and the balance of fill to be imported to the site.

4.3 - MEASUREMENT AND PAYMENT

This price and payment shall constitute full compensation for all excavation of soils to the required depths for the construction…

This is the start of the file's text. The full file is on GovTribe.