This document is a solicitation for the Tray Ration Heater System (TRHS) and associated parts. It is a sole source solicitation for Other Than Full and Open Competition with a NAICS code of 333241 (500 employees).
The solicitation has a 5-year contract term with fixed-price, economic price adjustment (EPA) pricing. The Government has established a guaranteed minimum of $2,600,000 and a maximum of $25,760,000 for the 5-year period. Delivery is FOB Origin to CONUS and OCONUS locations, with a required delivery date of 90 days ARO for all items. Offerors must be registered in the System for Award Management (SAM) and have a CAGE code. Offers must be submitted electronically by the closing date of July 12, 2024 at 3:00 PM local time. The Government may evaluate offers and make award without discussions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10. FOR
INFORMATION
CALL:
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
RATING
2. CONTRACT No.
SPE3SE-24-R-0001
3. SOLICITATION No. 4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)X
2024 JUN 12
5. DATE ISSUED
1000181487
6. REQUISITION/PURCHASE No.
7. ISSUED BY 8. ADDRESS OFFER TO
NOTE : In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
11. TABLE OF CONTENTS
DESCRIPTION
25. PAYMENT WILL BE MADE BY
CODE
SOLICITATION
until (Hour) (Date)
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION NOT USABLE
STANDARD FORM 33 (Rev.9-97) Prescribed by GSA FAR (48 CFR) 53.214 (c)
OFFER (Must be fully completed by offeror ) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
AWARD (To be completed by Government)
16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
14. ACKNOWLEDGMENT OF AMEND-
MENTS (The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
12. In compliance with the above, the undersigned agrees, if this offer is accepted within period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
CONTRACT ADMINISTRATION DATA L INSTRS., CONDS., AND NOTICES TO OFFERORS
SPECIAL CONTRACT REQUIREMENTS M EVALUATION FACTORS FOR AWARD
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
(X) PAGE(S) SEC. DESCRIPTION PAGE(S)
SUPPLIES OR SERVICES AND PRICES/COSTS PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
I CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
DESCRIPTION/SPECS./WORK STATEMENT J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
PACKAGING AND MARKING PART IV - REPRESENTATIONS AND INSTRUCTIONS
DELIVERIES OR PERFORMANCE
K REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
AMENDMENT NO. DATEAMENDMENT NO. DATE
G
H
SEC.
B
A
C
E
D
F
(X)
FACILITY
CODE
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER SUCH
ADDRESS IN SCHEDULE
17. SIGNATURE
19. ACCEPTED AS TO ITEMS NUMBERED
23. SUBMIT INVOICES TO ADDRESS SHOWN IN22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
24. ADMINISTERED BY (If other than item 7) CODE CODE
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer )
26. NAME OF CONTRACTING OFFICER (Type or print) calendar days (60 calendar days unless a different
15A. NAME AND
ADDRESS
OF OFFER-
OR
10 U.S.C. 2304 (c) ( 41 U.S.C. 253 (c) () )
DLA TROOP SUPPORT
SUBSISTENCE FSE SUPPLY CHAIN
700 ROBBINS AVENUE
PHILADELPHIA PA 19111-5096
USA
See Continuation Sheet
Not Applicable 3:00PM 2024-Jul-12
MADELYN KANE DMK0103
A. NAME
Phone: 609-287-8233
FAX: 000-000-0000
B. PHONE/FAX (NO COLLECT CALLS)
Madelyn.Kane@dla.mil
C. EMAIL ADDRESS
X 1
X 3
X 9
X 9
X 9
X 9
X 10
X 11
X 11
X 24
X 34
X 38
15B. TELEPHONE NUMBER 18. OFFER DATE
28. AWARD DATE
20. AMOUNT
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) CALENDAR DAYS (%)30 CALENDAR DAYS (%)
21. ACCOUNTING AND APPROPRIATION
ITEM
SPE3SE
EXT.NUMBERAREA CODE
(4 copies unless otherwise specified)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 39 PAGES
CONTINUED ON NEXT PAGE
SPE3SE-24-R-0001
SECTION A - SOLICITATION/CONTRACT FORM
Standard Element has no Title
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020) FAR
SOLICITATION AND OFFER - FORM SF33
(CONTINUATION SHEET)
A-1
Note: Hand-carried, mailed, or facsimile offers are not acceptable forms of transmission of initial proposals or revisions to initial proposals.
E-mail offers are acceptable, and the suggested form of transmission, for submission of initial proposals. E-mail offers should be sent to the Contract Specialist, Madelyn Kane (Madelyn.Kane@dla.mil) and the Contracting Officer, Matthew Conroy (Matthew.conroy@dla.mil).
Note:
Offerors are advised that DLA Troop Support systems have certain email size and transmission limitations. Proposal submissions must be prepared accordingly. Individual email attachments should not exceed 5MB in size, and no individual email should exceed more than 10 MB per email (multiple email submissions may be necessary). When submitting multiple emails as a submission, label each email with a number (e.g., 1 of 8), accordingly. After transmitting an email submission, offerors should confirm receipt of all emails with the intended recipients.
It is an offeror's responsibility to ensure its entire proposal is received by the date and time specified; emails must be transmitted in sufficient time to ensure and confirm receipt by the Government. Offerors are advised that DLA Troop Support's email system may rely on several different servers and/or security firewalls. As a result, there may be a lag time between the date/time stamp the offeror sends an offer via email and the date/time stamp indicates the offer is received by the authorized email address. For the purposes of establishing the timeliness of a proposal, only the date/ time indicated by the authorized email address as having been received will be used. Any offer that is received by the authorized email address with a date/time stamp after the closing date/time of the subject solicitation will be considered late, regardless of the date/time when the email was sent or when initially received by Government servers. Late proposals will not be accepted or considered.
As directed by the Contracting Officer, e-mail may also be used during discussions/negotiations, if discussions/ negotiations are held, and for proposal revision(s), including Final Proposal Revision(s). The Contract Specialist, Madelyn Kane (Madelyn.Kane@dla.mil) and the Contracting Officer, Matthew Conroy (Matthew.conroy@dla.mil) may receive the e- mailed proposal revisions. If and when a request for proposal revision is issued, the date and time for receipt of proposal revisions, will be designated in that request. Submission of proposals and any revisions are subject to the terms of FAR 52.215-1.
Note: The Government reserves the right to evaluate offers and make award without discussions with offerors.
Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint.
However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary.
Note: Included in Section I are the full text versions of the Cyber Incidents clauses, DFARS 252.204-7008, mailto:Madelyn.Kane@dla.mil mailto:Matthew.conroy@dla.mil
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 39 PAGES
SPE3SE-24-R-0001
SECTION A - SOLICITATION/CONTRACT FORM (CONTINUED)
252.204-7009, and 252.204-7012.
A-2
CAUTION - CONTRACTOR CODE OF BUSINESS ETHICS
FAR Part 3.1002(a) requires all Government contractors to conduct themselves with the highest degree of integrity and honesty. Contractors should have a written code of business ethics and conduct. To promote compliance with such code of business ethics and conduct, contractors should have an employee business ethics and compliance training program and internal control system that is suitable to the size of the company and extent of its involvement in Government contracting, that facilitates timely discovery and disclosure of improper conduct in connection with Government contracts, and ensures corrective measures are promptly instituted and carried out. A contractor may be suspended and/or debarred for knowing failure by a principal to timely disclose to the Government, in connection with the award, performance, or closeout of a Government contract performed by the contractor or a subcontract awarded there under, credible evidence of a violation of federal criminal law involving fraud, conflict of interest, bribery, or gratuity violations found in title 18 of the United States Code or a violation of the False Claims Act. (31 U.
S.C. 3729-3733)
This solicitation and the resulting contract includes FAR clause 52.203-13 - CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT; contained elsewhere in the solicitation or contract. The contractor shall comply with the terms of the clause and have a written code of business ethics and conduct; exercise due diligence to prevent and detect criminal conduct; promote ethical conduct and a commitment to compliance with the law within their organization; and timely report any violations of federal criminal law involving fraud, conflict of interest, bribery or gratuity violations found in title 18 of the United States Code or any violations of the False Claims Act. (31 U.S.C.
3729-3733)
**NOTE: Offerors must be registered in the System for Award Management (www.SAM.gov). Those not registered in SAM may be considered non-responsible. Upon registration, a CAGE code will be assigned to the registered firm. This code must be placed in the box next to “code” in block 15A of the cover sheet.
All clauses incorporated in full text throughout the entire solicitation must be filled out as applicable.
FOB Origin terms are applicable to this solicitation.
Refer to Section L for contracting pricing and instructions on certified cost or pricing data.
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS
B-1 Items to be Supplied
A. Estimated Requirements
These estimated quantities are based on forecasts provided by the services. The Government is not obligated to order estimated quantities
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 39 PAGES
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS (CONTINUED)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 5 OF 39 PAGES
SPE3SE-24-R-0001
B. Delivery Schedule
The Tray Ration Heater System (TRHS) and associated parts will have an indefinite number of delivery orders.
Delivery is FOB Origin to CONUS and OCONUS locations. Required Delivery Date is 90 Days ADO for all items.
B-2 General Information
The effective term of the contract will contain five (5) consecutive tiered delivery periods. Each tier will be 365 days in length. The first delivery period will begin upon date of award, unless otherwise specified in the resultant contract.
This is a sole source solicitation, for Other Than Full and Competition . The North American Industry Classification System (NAICS) code under this solicitation is 333241 (500 employees).
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 6 OF 39 PAGES
B-3 Pricing
The effective period of the contract for Tier 1 will be from the effective date of award through 365 days. Tier 2 will begin after the 365th day of Tier 1 and will be the same length of 365 days. The same pattern will follow for Tiers 3,4, and 5. The performance period of the contract will end on the 365th day of Tier 5.
The resultant contract will contain Fixed Price, with Economic Price Adjustments (EPA) pricing terms. Pricing will differ per tier depending on the EPA calculated for that given line item. Failure to indicate an offer on all lines items could result in rejection of the offeror's entire proposal.
Note: Pricing must be made on an FOB Origin basis. Prices per delivery order will be based on the tier period an order is placed, not when an order is shipped or delivered. For example, if an order is placed during tier 2, but delivery is made during tier 3, then the prices in effect for that order will be the tier 2 price.
B-4 Indefinite Quantity Contract
This solicitation will result in an Indefinite-Quantity Contract (IQC), as provided in FAR Clause 52.216-22 Indefinite Quantity (OCT 1995). In an IQC, the Government awards a range of quantities rather than a single fixed quantity. The bottom of the range is the minimum (the IQC minimum quantity), which the Government is obligated to order, and which is all it is committed to order. The top of the range is the maximum (The IQC maximum quantity) which is the largest quantity the Government may order, and which the contractor agrees to provide if ordered. The Government may order a quantity within that range. Sometimes an estimated quantity is stated also, which may be the same as the minimum or the maximum, or it may be a quantity within the IQC range.
The resultant contract from this acquisition will utilize dollar values as the guaranteed minimum and maximum IQC ranges in accordance with FAR 16.504(a). The guaranteed minimum dollar value will be the total value of delivery orders the government orders under this resultant contract. The Government reserves the right to order any line item at any total quantity over five years to fulfill this obligation. The maximum dollar value of this acquisition will be the total value of delivery orders the Government can order under this resultant contract.
The IQC Dollar Values are below:
Guaranteed Minimum Dollar Value (Over a 5-year period): $2,600,000.00
Maximum Dollar Value (Over a 5-year period): $25,760,000.00
B-5 Economic Price Adjustment (EPA)
C09 Economic Price Adjustment - Department of Labor Index (APR 2024) (a) Warranties. The contractor
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 7 OF 39 PAGES
SPE3SE-24-R-0001
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS (CONTINUED)
warrants that --
(1) The base unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this procurement note; and
(2) Prices invoiced shall be computed in accordance with the terms of this procurement note.
(b) Definitions. As used throughout this procurement note --
(1) "Index", for the purpose of price adjustment under this procurement note, means the Producer Price Index(es) reported in the monthly publication entitled, “Producer Price Indexes”, published by the United States (U.S.)
Department of Labor (DOL), Bureau of Labor Statistics (BLS) for the following code number(s) and title(s):
TITLE INDEX #
US, PPI, Heating Equipment WPIP106
US, PPI, Fabricated Metal Products PPI332
US, PPI, Hardware PPI332510
; or the Employment Cost Index(es) reported in the quarterly publication entitled, “Employment Cost Indexes,” published by the United States (U.S.) Department of Labor (DOL), Bureau of Labor Statistics (BLS) for the following code number(s) and title(s): N/A
(2) "Base index" means the arithmetic average of the final version of the indexes published for the months, or quarters for ECI, preceding the closing date for receipt of proposals or the date required for receipt of final proposal revisions, if discussions were held.
(3) "Adjusting index" means the arithmetic average of the [ ] first published or [X ] final version of the index for the months, or quarters for ECI, prior to the month in which the adjusting contract modification is effective.
(4) "Base unit price" means the unit price applicable to a quantity of a contract line item established at contract award, exclusive of any price adjustment pursuant to this procurement note.
(5) “Adjustment period” means the period during which a particular adjustment to the unit price under this procurement note (calculated at the beginning of the adjustment period) will apply. The length of each adjustment period in months is the number of adjustments allowed per year in (c)(1) below divided by 12.
(c) Adjustments. Prior to the end of each adjustment period, the contracting officer will calculate the average of the adjusting indexes and any adjusted contract unit price(s) for the new adjustment period, and modify the contract accordingly. The contracting officer will make price adjustments in accordance with this procurement note by issuing a contract modification showing the base indexes, the adjusting indexes, the base unit price, the mathematical calculations, and the changed unit price(s). The price adjustment shall apply to orders issued after the effective date of the contract modification establishing the unit price for the adjustment period. The contracting officer will base the price adjustment(s) for each adjustment period on the percentage change between the average of the base indexes and the average of the adjusting indexes for the adjustment period, as applied to the base unit price.
(1) The contractor shall decrease its price in any particular adjustment period if the adjusting index is less than the base index. This contract allows one price adjustment at the beginning of each contract year, not including the first year of contract award, where awarded base unit prices will be utilized.
(2) Example of adjustment calculation:
Average of Base Indexes= 109.88* Average of Adjusting Indexes = 112.72* Less average of base indexes = 109.88
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 39 PAGES
SPE3SE-24-R-0001
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS (CONTINUED)
Change to average of indexes = 2.84 Divide change to average of indexes by average of base indexes = 2.84 / 109.88 = .02585 (2.585%)** Multiply by the base unit price = $50.00 x .02585 = $1.29*** = Unit Price Adjustment Adjusted unit price = $51.29 *In computing the base and adjusting indexes, the contracting officer will round the resulting figure to the second decimal place.
**The contracting officer will round this number to the fifth decimal place.
***The contracting officer will round all dollar figures to the nearest cent.
(d) Upward ceiling on economic price adjustment. No upward ceiling shall apply under this economic price adjustment procurement note, unless the BLS series is based on indices below the six-digit level. (An index “below the six-digit level” in BLS usage means an index with an identifier exceeding six-digits). For any BLS series that is below the six-digit level, the following ceiling shall apply: The contractor agrees that the aggregate of the increases in any contract unit price under the terms of this procurement note shall not exceed 10% (percent) of the original base unit price, except as provided hereafter.
(1) If at any time the contractor has reason to believe that within the near future a price adjustment under the terms of this procurement note will be required that will exceed the adjustment ceiling for any item, the contractor shall promptly notify the contracting officer in writing of the expected increase. The notification shall include a revised ceiling the contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the contracting officer.
(2) If an increase in the index would raise a contract unit price for an item above the current ceiling, the contracting officer may issue a contract modification to raise the ceiling. If the contracting officer does not raise the contract ceiling, the contracting officer will promptly notify the contractor in writing.
(e) Invoices. The basis for prices payable under this contract is the latest adjusted unit price incorporated into the contract as of the date of order.
(f) Retroactive adjustment. This paragraph applies only if the contracting officer selected “first published index” in paragraph (b)(3). If the Government has already paid for orders delivered during an adjustment period, the contractor may request a retroactive adjustment. The contracting officer will, base the retroactive adjustment on the difference between a higher final revised index applicable to an adjustment period and the index values used in calculating the unit price for that adjustment period, subject to the adjustment ceiling in paragraph (d) and under] the following conditions:
(1) The request for equitable adjustment clearly establishes that the unit price adjustment for the adjustment period would have been higher if the final revised index had been used;, and identifies all invoices and payments to which it applies cites the specific index differences relating to the requested adjustment, and provides a calculation of the total net price adjustment for items delivered during that adjustment period.
(2) The total dollar change for items delivered is $ ($500.00 unless otherwise stated) or more for the applicable adjustment period(s).
(3) The contracting officer received the contractor's written request within 45 days following publication of the final revised index. The contractor shall adjust its prices downward based on the difference between a lower final revised index applicable to an adjustment period and the index values used in calculating the unit price for that adjustment period, subject to the limitation in paragraph (f)(2).
(g) Revision of index. If any applicable index is discontinued or its method of derivation is altered substantially, or if the contracting officer determines that the index consistently and substantially fails to reflect market conditions, the
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 39 PAGES
SPE3SE-24-R-0001
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS (CONTINUED)
parties shall mutually agree upon an appropriate and comparable substitute. The contracting officer will modify the contract to reflect such substitute effective on the date the index was discontinued, altered, or began to consistently and substantially fail to reflect market conditions.
(h) Final invoice. The contractor shall include a statement on the final invoice confirming it has applied all decreases required by this procurement note to the amounts invoiced.
(i) Disputes. The “Disputes” clause of the contract applies to any dispute arising under this procurement note.
SECTION C - SPECIFICATIONS/SOW/SOO/ORD
See Line Item's PID/Packaging Text.
C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (MAR 2023)
SECTION D - PACKAGING AND MARKING
See Line Item's PID/Packaging Text.
SECTION E - INSPECTION AND ACCEPTANCE
52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR
52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984) FAR
SECTION F - DELIVERIES OR PERFORMANCE
52.211-16 VARIATION IN QUANTITY (APR 1984) FAR
As prescribed in 11.703(a), insert the following clause:
(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) of this clause.
(b) The permissible variation shall be limited to:
2 Percent increase 2 Percent decrease This increase or decrease shall apply to .*
(End of clause)
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989) FAR
52.242-15 STOP-WORK ORDER (AUG 1989) FAR
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR
52.247-29 F.O.B. ORIGIN (FEB 2006) FAR
https://www.acquisition.gov/far/part-11
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 39 PAGES
SECTION F - DELIVERIES OR PERFORMANCE (CONTINUED)
52.247-60 GUARANTEED SHIPPING CHARACTERISTICS (JAN 2017) FAR
(a) The offeror is requested to complete paragraph (a)(1) of this clause, for each part or component which is packed or packaged separately. This information will be used to determine transportation costs for evaluation purposes. If the offeror does not furnish sufficient data in paragraph (a)(1) of this clause, to permit determination by the Government of the item shipping costs, evaluation will be based on the shipping characteristics submitted by the offeror whose offer produces the highest transportation costs or in the absence thereof, by the Contracting Officer's best estimate of the actual transportation costs. If the item shipping costs, based on the actual shipping characteristics, exceed the item shipping costs used for evaluation purposes, the Contractor agrees that the contract price shall be reduced by an amount equal to the difference between the transportation costs actually incurred, and the costs which would have been incurred if the evaluated shipping characteristics had been accurate.
(1) To be completed by the offeror:
(i) Type of container: Wood Box [ ] Fiber Box [ ], Barrel [ ], Reel [ ], Drum [ ], Other (Specify) ;
(ii) Shipping configuration: Knocked-down [ ], Set-up [ ], Nested [ ], Other (specify) ;
(iii) Size of container: ” (Length), × ” (Width), × ” (Height) = Cubic Ft;
(iv) Number of items per container each;
(v) Gross weight of container and contents Lbs;
(vi) Palletized/skidded [ ] Yes [ ] No;
(vii) Number of containers per pallet/skid ;
(viii) Weight of empty pallet bottom/skid and sides Lbs;
(ix) Size of pallet/skid and contents Lbs Cube ;
(x) Number of containers or pallets/skids per railcar *
(A) Size of railcar
(B) Type of railcar
(xi) Number of containers or pallets/skids per trailer *
(A) Size of trailer Ft
(B) Type of trailer
* Number of complete units (line item) to be shipped in carrier's equipment.
(2) To be completed by the Government after evaluation but before contract award:
(i) Rate used in evaluation ;
(ii) Tender/Tariff ;
(iii) Item .
(b) The guaranteed shipping characteristics requested in paragraph (a)(1) of this clause do not establish actual transportation requirements, which are specified elsewhere in this solicitation. The guaranteed shipping characteristics will be used only for the purpose of evaluating offers and establishing any liability of the successful offeror for increased transportation costs resulting from actual shipping characteristics which differ from those used for evaluation in accordance with paragraph (a) of this clause.
SECTION G - CONTRACT ADMINISTRATION DATA
G-1 Contract Administration
Contract Administration will be performed by DLA Troop Support, Food Service Equipment and Field Feeding Division - FTRD.
G-2 Correspondence
All pertinent correspondence relative to this contract must be directed to DLA Troop Support, FTRD. Contractor's requests for acceptance of nonconforming supplies should be submitted to the administering Contracting Specialist and Contracting Officer for consideration. A copy of correspondence notifying the contractor of acceptance/ rejection of waiver/ deviation requests will be furnished by the Contracting Officer.
G-3 Invoices
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 39 PAGES
SPE3SE-24-R-0001
SECTION G - CONTRACT ADMINISTRATION DATA (CONTINUED)
See DFARS clause 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports (DEC 2018).
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H-1 Ordering
Orders will be placed with no less than a 90 day lead-time. The required delivery date will be established with the issuance of the delivery order. Failure to deliver the required quantities by the date set forth in the delivery order may result in termination of the contract by default.
Orders may be cancelled partially or in total within 15 days of order placement for any reason. Any cancellation after 15 days may only be accepted with the express consent of the contractor.
Prices will be based on an FOB Origin basis. Acceleration or delay of any delivery may only occur at no additional cost to the Government and with the consent of the contractor.
H-2 FIFO Requirements
Parts must be shipped on the First-in, First-out (FIFO) basis (or contractor's date of manufacture when receipted).
SECTION I - CONTRACT CLAUSES
52.202-1 DEFINITIONS (JUN 2020) FAR
52.203-3 GRATUITIES (APR 1984) FAR
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014) FAR
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020) FAR
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT - ALTERNATE I (NOV 2021) FAR
52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020) FAR
52.203-8 CANCELLATION, RECISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) FAR
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) FAR
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020) FAR
52.203-15 WHISTLEBLOWER PROTECTIONS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (JUN 2010)
FAR
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 39 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023) FAR
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS-REPRESENTATION (JAN 2017) FAR
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) DFARS
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT-RELATED FELONIES (JAN
2023) DFARS
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) DFARS
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011) FAR
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018) FAR
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020) FAR
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) FAR
52.204-20 PREDECESSOR OF OFFEROR (AUG 2020) FAR
As prescribed in 4.1804(d), insert the following provision:
(a) Definitions. As used in this provision -- Commercial and Government Entity (CAGE) code means --
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
Predecessor means an entity that is replaced by a successor and includes any predecessors of the predecessor.
Successor means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name.
The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.
(b) The Offeror represents that it [ ] is or [ ] is not a successor to a predecessor that held a Federal contract or grant within the last three years.
(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):
Predecessor CAGE code: (or mark “Unknown”).
Predecessor legal name: .
(Do not use a “doing business as” name).
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021) FAR
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) DFARS
252.204-7004 ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (JAN 2023) DFARS
252.204-7009 LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY CONTRACTOR REPORTED CYBER INCIDENT
INFORMATION (JAN 2023) DFARS
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (JAN 2023) DFARS https://www.acquisition.gov/far/part-4
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 39 PAGES
252.204-7014 LIMITATIONS ON THE USE OR DISCLOSURE OF INFORMATION BY LITIGATION SUPPORT CONTRACTORS (JAN
2023) DFARS
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (JUN 2023) DFARS
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (NOV 2021) FAR
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015) FAR
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A COUNTRY
THAT IS A STATE SPONSOR OF TERRORISM (MAY 2019) DFARS
52.210-1 MARKET RESEARCH (NOV 2021) FAR
52.211-5 MATERIAL REQUIREMENTS (AUG 2000) FAR
52.215-2 AUDIT AND RECORDS - NEGOTIATION (JUN 2020) FAR
52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997) FAR
52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA (AUG 2011) FAR
52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA - MODIFICATIONS (DEVIATION 2022-O0001)
(OCT 2021) FAR
(a) This clause shall become operative only for any modification to this contract involving a pricing adjustment expected to exceed $2 million on the date of execution of the modification, except that this clause does not apply to any modification if an exception under Federal Acquisition Regulation (FAR) 15.403-1(b) applies.
(b) If any price, including profit or fee, negotiated in connection with any modification under this clause, or any cost reimbursable under this contract, was increased by any significant amount because --
(1) The Contractor or a subcontractor furnished certified cost or pricing data that were not complete, accurate, and current as certified in its Certificate of Current Cost or Pricing Data;
(2) A subcontractor or prospective subcontractor furnished the Contractor certified cost or pricing data that were not complete, accurate, and current as certified in the Contractor's
Certificate of Current Cost or Pricing Data; or
(3) Any of these parties furnished data of any description that were not accurate, the price or cost shall be reduced accordingly and the contract shall be modified to reflect the reduction. This right to a price reduction is limited to that resulting from defects in data relating to modifications for which this clause becomes operative under paragraph (a) of this clause.
(c) Any reduction in the contract price under paragraph (b) of this clause due to defective data from a prospective subcontractor that was not subsequently awarded the subcontract shall be limited to the amount, plus applicable overhead and profit markup, by which --
(1) The actual subcontract price; or
(2) The actual cost to the Contractor, if there was no subcontract awarded, was less than the prospective subcontract cost estimate submitted by the Contractor; provided, that the actual subcontract price was not itself affected by defective certified cost or pricing data.
(d)(1) If the Contracting Officer determines under paragraph (b) of this clause that a price or cost reduction should be made, the Contractor agrees not to raise the following matters as a defense:
(i) The Contractor or subcontractor was a sole source supplier or otherwise was in a superior bargaining position and thus the price of the contract would not have been modified even if accurate, complete, and current certified cost or pricing data had been submitted.
(ii) The Contracting Officer should have known that the certified cost or pricing data in issue were defective even though the Contractor or subcontractor took no affirmative action to bring the character of the data to the attention of the Contracting Officer.
(iii) The contract was based on an agreement about the total cost of the contract and there was no agreement about the cost of each item procured under the contract.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 39 PAGES
SPE3SE-24-R-0001
SECTION I - CONTRACT CLAUSES (CONTINUED)
(iv) The Contractor or subcontractor did not submit a Certificate of Current Cost or Pricing Data.
(2)(i) Except as prohibited by subdivision (d)(2)(ii) of this clause, an offset in an amount determined appropriate by the Contracting Officer based upon the facts shall be allowed against the amount of a contract price reduction if --
(A) The Contractor certifies to the Contracting Officer that, to the best of the Contractor's knowledge and belief, the Contractor is entitled to the offset in the amount requested; and
(B) The Contractor proves that the certified cost or pricing data were available before the “as of” date specified on its Certificate of Current Cost or Pricing Data, and that the data were not submitted before such date.
(ii) An offset shall not be allowed if --
(A) The understated data were known by the Contractor to be understated before the “as of” date specified on its Certificate of Current Cost or Pricing Data; or
(B) The Government proves that the facts demonstrate that the contract price would not have increased in the amount to be offset even if the available data had been submitted before the “as of” date specified on its Certificate of Current Cost or Pricing Data.
(e) If any reduction in the contract price under this clause reduces the price of items for which payment was made prior to the date of the modification reflecting the price reduction, the Contractor shall be liable to and shall pay the United States at the time such overpayment is repaid --
(1) Interest compounded daily, as required by 26 U.S.C. 6622, on the amount of such overpayment to be computed from the date(s) of overpayment to the Contractor to the date the Government is repaid by the Contractor at the applicable underpayment rate effective for each quarter prescribed by the Secretary of the Treasury under 26 U.S.C. 6621(a)(2); and
(2) A penalty equal to the amount of the overpayment, if the Contractor or subcontractor knowingly submitted certified cost or pricing data that were incomplete, inaccurate, or noncurrent.
52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (DEVIATION 2022-O0001) (OCT 2021) FAR
(a) Before awarding any subcontract expected to exceed $2 million, on the date of agreement on price or the date of award, whichever is later;
or before pricing any subcontract modification involving a pricing adjustment expected to exceed $2 million, the Contractor shall require the subcontractor to submit certified cost or pricing data (actually or by specific identification in writing), in accordance with Federal Acquisition Regulation (FAR) 15.408, Table 15-2 (to include any information reasonably required to explain the subcontractor's estimating process such as the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data, and the nature and amount of any contingencies included in the price), unless an exception under FAR 15.403-1(b) applies. If the $2 million threshold for submission of certified cost or pricing data is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109
(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment.
(b) The Contractor shall require the subcontractor to certify in substantially the form prescribed in FAR 15.406-2 that, to the best of its knowledge and belief, the data submitted under paragraph (a) of this clause were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.
(c) In each subcontract that, when entered into, exceeds $2 million, the Contractor shall insert either --
(1) The substance of this clause, including this paragraph (c), if paragraph (a) of this clause requires submission of certified cost or pricing data for the subcontract; or
(2) The substance of the clause at 52.215-13, Subcontractor Certified Cost or Pricing Data --Modifications (DEVIATION 2022-O0001).
52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA - MODIFICATIONS (DEVIATION 2022-O0001) (OCT 2021)
(a) The requirements of paragraphs (b) and (c) of this clause shall --
(1) Become operative only for any modification to this contract involving a pricing adjustment expected to exceed $2 million on the date of execution of the modification; and
(2) Be limited to such modifications.
(b) Before awarding any subcontract expected to exceed $2 million, on the date of agreement on price or the date of award, whichever is later;
or before pricing any subcontract modification involving a pricing adjustment expected to exceed $2 million, the Contractor shall require the subcontractor to submit certified cost or pricing data (actually or by specific identification in writing), in accordance with Federal Acquisition Regulation (FAR) 15.408, Table 15-2 (to include any information reasonably required to explain the subcontractor's estimating process such as the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data, and the nature and amount of any contingencies included in the price), unless an exception under FAR 15.403-1(b) applies. If the $2 million threshold for submission of certified cost or pricing data is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109
(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment.
(c) The Contractor shall require the subcontractor to certify in substantially the form prescribed in FAR 15.406-2 that, to the best of its
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 39 PAGES
SPE3SE-24-R-0001
SECTION I - CONTRACT CLAUSES (CONTINUED)
knowledge and belief, the data submitted under paragraph (b) of this clause were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.
(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in each subcontract that exceeds $2 million on the date of agreement on price or the date of award, whichever is later.
52.215-14 INTEGRITY OF UNIT PRICES (NOV 2021) FAR
252.215-7010 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING
DATA -- BASIC (JAN 2023) DFARS
252.215-7011 REQUIREMENTS FOR SUBMISSION OF PROPOSALS TO THE ADMINISTRATIVE CONTRACTING OFFICER AND
CONTRACT AUDITOR (JAN 2018) DFARS
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (SEP 2023) FAR
252.219-7000 ADVANCING SMALL BUSINESS GROWTH (JUN 2023) FAR
52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES (DEC 2022) FAR
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015) FAR
52.222-26 EQUAL OPPORTUNITY (SEP 2016) FAR
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) FAR
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) FAR
52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020) FAR
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) FAR
52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021) FAR
52.223-6 DRUG-FREE WORKPLACE (MAY 2001) FAR
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (JUN 2020) FAR
52.223-20 AEROSOLS (JUN 2016) FAR
52.223-21 FOAMS (JUN 2016) FAR
252.223-7009 PROHIBITION OF PROCUMENT OF FLOURINATED AQUEOUS FILM-FORMING FOAM FIRE-FIGHTING AGENT FOR
USE ON MILITARY INSTALLATIONS (OCT 2023) FAR
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008) FAR
252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM - BASIC (JAN 2023) DFARS
252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM — ALTERNATE I (JAN 2023) DFARS
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 16 OF 39 PAGES
SPE3SE-24-R-0001
252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (MAR 2022) DFARS
252.225-7008 RESTRICTION ON ACQUISITION OF SPECIALTY METALS (MAR 2013) DFARS
252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (APR 2022) DFARS
(a) Definitions. As used in this clause --
“Component” means any item supplied to the Government as part of an end product or of another component.
“End product” means supplies delivered under a line item of this contract.
"Qualifying country" means a country with a reciprocal defense procurement memorandum of understanding or international agreement with the United States in which both countries agree to remove barriers to purchases of supplies produced in the other country or services performed by sources of the other country, and the memorandum or agreement complies, where applicable, with the requirements of section 36 of the Arms Export Control Act (22 U.S.C. 2776) and with 10 U.S.C. 2457. Accordingly, the following are qualifying countries:
Australia
Austria
Belgium
Canada
Czech Republic
Denmark
Egypt
Estonia
Finland
France
Germany
Greece
Israel
Italy
Japan
Latvia
Lithuania
Luxembourg
Netherlands
Norway
Poland
Portugal
Slovenia
Spain
Sweden
Switzerland
Turkey
United Kingdom of Great Britain and Northern Ireland.
“Structural component of a tent” --
(1) Means a component that contributes to the form and stability of the tent (e.g., poles, frames, flooring, guy ropes, pegs); and
(2) Does not include equipment such as heating, cooling, or lighting.
“United States” means the 50 States, the District of Columbia, and outlying areas.
“U.S.-flag vessel” means a vessel of the United States or belonging to the United States, including any vessel registered or having national status under the laws of the United States.
(b) The Contractor shall deliver under this contract only such of the following items, either as end products or components, that have been
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 17 OF 39 PAGES
SPE3SE-24-R-0001
SECTION I - CONTRACT CLAUSES (CONTINUED)
grown, reprocessed, reused, or produced in the United States:
(1) Food.
(2) Clothing and the materials and components thereof, other than sensors, electronics, or other items added to, and not normally associated with, clothing and the materials components thereof. Clothing includes items such as outerwear, headwear, underwear, nightwear. footwear, hosiery, handwear, belts, badges, and insignia.
(3)(i) Tents and structural components of tents;
(ii) Tarpaulins; or
(iii) Covers.
(4) Cotton and other natural fiber products.
(5) Woven silk or woven silk blends.
(6) Spun silk yarn for cartridge cloth.
(7) Synthetic fabric, and coated synthetic fabric, including all textile fibers and yarns that are for use in such fabrics.
(8) Canvas products.
(9) Wool (whether in the form of fiber or yarn or contained in fabrics, materials, or manufactured articles).
(10) Any item of individual equipment (Federal Supply Class 8465) manufactured from or containing fibers, yarns, fabrics, or materials listed in this paragraph (b).
(c) This clause does not apply --
(1) To items listed in section 25.104(a) of the Federal Acquisition Regulation, or other items for which the Government has determined that a satisfactory quality and sufficient quantity cannot be acquired as and when needed at U.S. market prices;
(2) To incidental amounts of cotton, other natural fibers, or wool incorporated in an end product, for which the estimated value of the cotton, other natural fibers, or wool --
(i) Is not more than 10 percent of the total price of the end product; and
(ii) Does not exceed the threshold at Defense Federal Acquisition Regulation Supplement 225.7002-2(a);
(3) To waste and byproducts of cotton or wool fiber for use in the production of propellants and explosives;
(4) To foods, other than fish, shellfish, or seafood, that have been manufactured or processed in the United States, regardless of where the foods (and any component if applicable) were grown or produced. Fish, shellfish, or seafood manufactured or processed in the United States and fish, shellfish, or seafood contained in foods manufactured or processed in the United States shall be provided in accordance with paragraph (d) of this clause;
(5) To chemical warfare protective clothing produced in a qualifying country; or
(6) To fibers and yarns that are for use in synthetic fabric or coated synthetic fabric (but does apply to the synthetic or coated synthetic fabric itself), if --
(i) The fabric is to be used as a component of an end product that is not a textile product. Examples of textile products, made in whole or in part of fabric, include ¾
(A) Draperies, floor coverings, furnishings, and bedding (Federal Supply Group 72, Household and Commercial Furnishings and Appliances);
(B) Items made in whole or in part of fabric in Federal Supply Group 83, Textile/leather/furs/apparel/findings/tents/flags, or Federal Supply Group 84, Clothing, Individual Equipment and Insignia;
(C) Upholstered seats (whether for household, office, or other use); and
(D) Parachutes (Federal Supply Class 1670); or
(ii) The fibers and yarns are para-aramid fibers and continuous filament para-aramid yarns manufactured in a qualifying country.
(d)(1) Fish, shellfish, and seafood delivered under this contract, or contained in foods delivered under this contract --
(i) Shall be taken from the sea by U.S.-flag vessels; or
(ii) If not taken from the sea, shall be obtained from fishing within the United States; and
(2) Any processing or manufacturing of the fish, shellfish, or seafood shall be performed on a U.S.-flag vessel or in the United States.
252.225-7013 DUTY-FREE ENTRY (NOV 2023) DFARS
252.225-7021 TRADE AGREEMENTS - BASIC (OCT 2023) DFARS
https://www.acq.osd.mil/dpap/dars/dfars/html/current/225_70.htm
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 18 OF 39 PAGES
SPE3SE-24-R-0001
252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS, TANTALUM, AND TUNGSTEN (JAN 2023) DFARS
252.225-7054 PROHIBITION ON USE OF CERTAIN ENERGY SOURCED FROM INSIDE THE RUSSIAN FEDERATION (JAN 2023)
252.225-7055 REPRESENTATION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (MAY 2022) DFARS
252.225-7056 PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (JAN 2023) DFARS
252.225-7057 PREAWARD DISCLOSURE OF EMPLOYMENT OF INDIVIDUALS WHO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .