Serv M25-046 VJ Tech CT PM Contract- PWS.pdf

PDF 347 KB Posted

Attached to
VJ Tech Computed Tomography System Preventative Maintenance Federal contract opportunity
Solicitation number
FA812626Q0029
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Performance Work Statement Summary

This Performance Work Statement (PWS) outlines requirements for preventative maintenance and software upgrades of a VJ Tech Computed Tomography System (model VJT-CABCT450-225-Ti) at the Oklahoma City Air Logistics Complex (OC-ALC) on Tinker Air Force Base. The contract requires a five-year commitment consisting of one base year with four option years. The contractor must perform four preventative maintenance visits per year, including appropriate lubrication of bearing components, X-ray coolant system inspections and fluid replacement (every other visit), high-voltage X-ray electrical cable inspection and lubrication (every other visit), complete system safety component inspection (one visit annually), and complete system door operation inspection (one visit annually). Additionally, the contractor must provide and install all available software updates annually for Volex, Vi5, and MyVG Volume Graphics, maintain the current version of Volume Graphics VG Studio Max with nine specified modules, provide 40 hours of remote technical support annually by qualified professionals, and offer emergency on-site support as needed.

The contractor must meet extensive qualifications including federal radiation worker compliance, maintenance and repair training and certification from Commet® and X-Ray Works® for X-ray tube heads, Commet® certified maintainer status, VJ Technologies® certified maintainer status, authorized Volume Graphics® distributor status, authorized Volex® distributor status, ASNT Non-film radiography level III certification with minimum 5,000 cumulative CT-specific hours on VJT systems with balanced application/technique and CT design/maintenance experience, and design rights to the VJT-CABCT450-225-Ti system. Upon contract completion, the contractor must provide calibration services meeting ISO 17025 standards, detailed service reports within five business days of each maintenance visit including labor breakdowns, and maintain documentation compliance with OC-ALC Operating Instruction 21-203. The contractor must respond to corrective action requests within two business days, provide a PM schedule within ten business days of award, notify the COR seven business days prior to each scheduled PM visit, and use only new parts and materials unless otherwise authorized. Additional requirements address environmental compliance, hazardous materials management, safety and health planning, tool control accountability, Foreign Object Damage and Dropped Object Prevention training certification, and compliance with multiple Air Force instructions and Tinker AFB procedures.

View the file

Other files for this federal contract opportunity

Other files attached to VJ Tech Computed Tomography System Preventative Maintenance, newest first.
File Type Posted
WageDeterminationRev28 2015-5315.pdf PDF
Serv M25-046 VJ Tech CT PM Contract Appendix C.pdf PDF
Serv M25-046 VJ Tech CT PM Contract Appendix A.pdf PDF
Solicitation - FA812626Q0029.pdf PDF
VJ Tech CT PM - JA_Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

PERFORMANCE WORK STATEMENT

FOR

PREVENTITIVE MAINTENANCE

OF

VJ TECH COMPUTED TOMOGRAPHY SYSTEM

PREPARED BY:

OC-ALC/OBCA

January 21, 2026

Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each contractor and government employee.

Section One

1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform Preventative Maintenance and Software Upgrades for the VJ Tech Computed Tomography System at the Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is listed in Appendix A.

1.1.1 The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.

1.2 Requested Services: The Contractor shall provide a 5 year contract, one (1) base year with four (4) option years for Preventative Maintenance (PM) service on the VJT-CABCT450-225-Ti X-ray Computed Tomography System. The Contractor shall provide the VG Studio Max Package, Upgrade Existing Software and perform four (4) PMs per year on the equipment listed within the Appendix A. The Contractor shall demonstrate to the Contracting Officer Representative (COR) identified Government Technical Point of Contact, that the equipment is fully operational before leaving Tinker AFB.

Preventive maintenance shall include at minimum:

• Appropriate lubrication of all system bearing components at OEM required interval.

• Every other visit must include an X-ray coolant system inspection and fluid replacement at OEM require interval.

• Every other visit must include an inspection and lubrication of all high voltage X-ray electrical cables.

• One visit will include a complete inspection of all system safety components.

• One visit will include a complete inspection of system door operation.

Software Updates:

• The Contractor shall provide and install all available software updates annually for Volex, Vi5, and MyVG Volume Graphics.

• The Contractor shall provide and maintain the most current version of Volume Graphics VG Studio Max annually, including the following modules:

o Coordinate Measurement, Nominal/Actual Comparison, Fixture Simulation, PMI Extension for CAD Import, Porosity/Inclusion Analysis, Reverse Engineering Tools, Structural Mechanics, Simulation Volume Meshing and Wall Thickness Analysis.

Technical support:

• The Contractor shall provide 40 hours of remote technical support by qualified professionals, which may include, but is not limited to, assistance with technique approach, system operation, system automation, maintenance, and software integration.

• The Contractor shall provide Emergency On-Site Support.

1.3 Preventive Maintenance (PM): The objective of PM is to protect equipment capability and investment by removing causes of failure, performing routine maintenance and providing adjustment to compensate for normal wear before failure occurs. The Contractor shall perform all PM’s IAW the OEM specifications. The Contractor shall perform four (4) PMs for per year on each item listed in Appendix A. The Contractor shall provide a copy of the PM schedule to the Contracting Officer Representative (COR) within ten (10) business days after contract award. The Contractor shall notify the COR seven (7) business days prior to each scheduled PM visit (CDRL A001, Preventive Maintenance DI-SESS-80294B).

1.4 Calibration: The Contractor shall provide commercial calibration and certification on the equipment listed within Appendix A (CDRL A002, Calibration DI-SESS-80294B).

1.4.1 The calibration of the equipment and the associated calibration certificate must meet International Organization for Standardization (ISO) 17025 requirements. The Contractor shall place a calibration sticker on the equipment listed within the Appendix A.

1.5 Certificate of Traceability: The Contractor shall provide to the COR, a Calibration Certificate of Traceability for one (1) each VJ Tech Computed Tomography System. The Calibration Certificate shall meet ISO 17025. The certificate shall include the following information as a minimum:

a. The title, e.g. “Calibration Report” or “Calibration Certificate”.

b. The name and address of the laboratory and the location of where the calibration was completed if it is different from the equipment location of Bldg. 3001, Post W-43, OC-ALC, Tinker Air Force Base (AFB), Oklahoma (OK).

c. Unique identification of the calibration report or certificate (e.g., the serial number) on each page as an identifier to ensure the page is recognized as a part of the calibration report or certificate. Each page of the calibration report or certificate shall also be numbered, if applicable, as page one (1) of XX pages. The end of the report or certificate shall be annotated clearly on the last page “End of the Calibration Report/Certificate”.

d. The name and address of the customer. Note: A requirement for the name and address may be waived with customer coordination/concurrence.

e. Identification of the method used to perform the calibration of the equipment. Note: The calibration report or certificate shall identify the method used in a manner similar to the following examples: A calibration procedure number; an American Society for Testing and Materials (ASTM), International Electro-technical Commission (I EC) or other standard specification, or a narrative description of the method used (i.e. compared with laboratory standard X at 10 points (between 10% and 100% of full scale).

f. A description of the condition of the equipment and an unambiguous identification of items calibrated.

g. The date of the receipt of calibration items where this is critical to the validity and application of the results and the dates the calibration was performed.

h. Reference to the sampling plan and procedures used by the laboratory or other bodies where these are relevant to the validity or application of the results. Note: The calibration report of certificate might not reference a sampling plan as sampling plans rarely apply to calibration; sampling plans normally are used in testing laboratories.

i. The calibration results with, where appropriate, the units of measurement. Note: Units of measurement would be appropriate if needed by the User (calibration factors, correction factors, etc.) to operate the Test, Measurement and Diagnostic Equipment (TMDE).

j. The printed names and functions as well as the legible signatures or equivalent identification of the persons authorizing the calibration report or certificate.

k. Where relevant, a statement to the effect that the results relate only to the items calibrated.

l. The conditions (e.g., environmental) under which the calibrations were completed which may have an influence on the measurement results.

m. The uncertainty of measurement or a statement of compliance with an identified metrological specification or clauses thereof. Note: A calibration report or certificate which contains a statement of compliance to the original manufacturer’s specifications (with any exceptions or limitations noted) may satisfy this requirement.

n. Evidence that the measurements are traceable to the National Institute of Standards Technology (NIST). This evidence shall be so stated on the calibration report or certificate.

1.6 Completion of Calibration Services: The Contractor, upon completion of the calibration services, shall demonstrate to the COR and Government Subject Matter Expert (SME) that all aspects of the system are calibrated and are properly functioning IAW the manufacturer’s specifications, industry standards and this PWS.

1.7 Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO. Long lead items greater than five

(5) business days must be identified and provide sufficient documentation supporting the delay.

1.8 Service Report: Upon completion of any maintenance the Contractor shall provide a draft, written Service Report to the COR and SME. The Contractor shall provide, by email, the final service report within 5 business days to the COR. At a minimum, the final service report shall contain the following information (CDRL A003, Service Report DI-SESS-80294B).:

• Company Name

• Requested service date

• Contract #

• Equipment ID #

• Description of Services provided

• Additional Services recommended (if any)

• Printed Name and Signature of Technician who performed the Services (electronic signatures are acceptable)

• Printed Name and Signature of on-site SME or COR (electronic signatures are acceptable)

• Start and Completion dates

• Complete Breakdown of the Labor Cost (hours and rate)

• Materials and Parts used

• Details of any other charges

• Printed Name and Signature stating only new parts and materials were used (electronic signatures are acceptable)

• Written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order. (electronic signatures are acceptable)

1.9 Quality Assurance: According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The COR will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor during the period of this contract will be subject to review by the CO or COR.

1.10 Corrective Action Report (CAR)/Complaint Contractor Response Time: The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive actions in relation to the submitted CAR or Customer Complaint.

1.11 Maintenance Documentation: The Contractor shall notify the Government Subject Matter Expert (SME) upon completion of each PM, IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.

1.12 Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.

1.13 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 0600 AM to 1600 PM. If work hours are required outside the hours stated, the Contractor shall contact the COR for approval from the CO. Upon approval from the CO, the Government Subject Matter Expert (SME) or COR must be present with the Contractor.

1.13.1 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.

1.14 Special Qualifications: The Contractor shall provide personnel with the following special qualifications:

• The Contractor must be a qualified radiation worker, compliant with federal regulation for radiation workers.

• The Contractor must be qualified to work on both Commet(R) and X-Ray Works(R) X-ray tube heads. This qualification must include maintenance and repair training from Commet(R) and X-Ray Works(R).

• The Contractor must be a commit(R) certified maintainer.

• The Contractor must be a VJ Technologies(R) certified maintainer.

• The Contractor must be an authorized Volume Graphics(R) distributor.

• The Contractor must be a Volex (R) authorized distributor.

• The Contractor must have and maintain ASNT Non-film radiography level III certified staff with no less than 5000-hour cumulative CT specific experience on VJT systems. This experience must include both application / technique development, and CT design and/or CT maintenance, with no more than a 70/30 or 30/70 split.

• The Contractor must have and maintain rights to the design of VJT-CABCT450-225-Ti.

Upon Award of Contract the CO will provide any documentation from this section to the COR.

1.15 Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and COR, in writing, within ten (10) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak, and understand English fluently (CDRL A005, Contractor Roster, DI-MGMT-81596)

1.15.1 The Contractor and Contractor personnel shall be required to identify themselves as contractor personnel by introducing themselves or being introduced as Contractor personnel. The Contractor personnel shall also display distinguishing badges or other visible identification for meetings with Government personnel or while performing work for the OC-ALC on Tinker AFB.

The Contractor and Contractor personnel shall identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.16 Listing of Contractor Employees: The Contractor shall provide an initial listing of names and position titles of employees who will come to Tinker Air Force Base to the COR within five

(5) business days after the contract award date. Within ten (10) business days, the Contractor shall also provide an updated listing of personnel to the COR when employees affecting the work of this contract change status or position (CDRL A005, Contractor Roster, DI-MGMT-81596)

1.16.1 The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force (AF), either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the AF if such employment would be contrary to the policies contained in Air Force Instruction (AFI) 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty CORs who are providing surveillance on any contracts/sub-contracts awarded to the Contractor. All contract personnel, depending on particular condition, occasion, or place or job assignment shall be required to wear professional and suitable attire. All Contractor personnel shall conduct themselves in a professional and courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of contractor personnel in performance of this PWS shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning the conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.

1.17 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Manual (DAFMAN) 32-7002, “Environmental Compliance and Pollution Prevention”, Tinker AFB procedures per Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to DAFMAN 32-7002, “Environmental Compliance and Pollution Prevention” and OC-ALCI 32- 101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil <http://www.e-publishing.af.mil> for downloading or ordering.”

1.18 Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” by official correspondence. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification (CDRL A007, Environmental Compliance, DI-MISC-81274.

The Contractor shall not store chemicals or hazardous material (HAZMAT) on Tinker AFB.

Contractors shall be compliant with HAZMAT management procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to DAFMAN 32-7002, “Environmental Compliance and Pollution Prevention”. The Contractor shall maintain a log of all HAZMAT that is used on base. This usage log shall be provided to the COR monthly, the last business day of each month, or when the required work is completed. The COR will forward the records to the Unit Environmental Coordinator (UEC) no later than the fourth (4th) day of the following month or the first (1st) subsequent business day(CDRL A007, Environmental Compliance, DI-MISC- 81274.

1.19 Safety Data Sheet (SDS) and Labeling: Upon COR receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.

1.19.1 The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the COR, ten (10) calendar days after contract award date all Safety Data Sheets (SDSs). The Contractor shall receive approval from the COR prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012): product identifier; signal word; hazard statement(s); precautionary statement(s);

pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The COR will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the COR if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as government employees (CDRL A007, Environmental Compliance, DI-MISC-81274.

1.20 Air Quality Recordkeeping: Upon COR receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.

1.20.1 The Contractor shall be responsible for specific recordkeeping and reporting requirements, when applicable, mandated by Tinker Air Force Base Facility-Wide Operating Permit IAW OC- ALCI 32-101. The COR will contact the Unit Environmental Coordinator (UEC) for environmental requirements. The Contractor shall submit all applicable records on a monthly basis to the COR no later than the third (3rd) day of the month following the reporting period. If the third (3rd) day of the month is a weekend or holiday, the logs are required by the last business day 'PRIOR' to the (third) 3rd. The COR will forward the records to the UEC no later than the fourth (4th) day of the following month or the first subsequent business day. Contractor shall maintain a signed copy of the form(s) required per OC-ALCI 32-101 on site for one (1) year (CDRL A007, Environmental Compliance, DI-MISC-81274.

1.21 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the contractor may certify “NO Hazardous Waste Generation” by official correspondence. This certification shall be provided to the COR within ten (10) days after award.

Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification (CDRL A007, Environmental Compliance, DI-MISC-81274.

1.21.1 The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers IAW TAFB

HWMP.

1.21.2 The Contractor shall be responsible for the Initial Accumulation Point (IAP) within the Contractor assigned space. The IAP shall be under the direct control of the Contractor who generates the waste. Before accumulation begins, the Contractor shall ensure appropriate hazard labels are affixed to government furnished waste containers as specified in 49 Code of Federal Regulation (CFR) 172.400. Management procedures for IAPs include written weekly inspections and reporting. When the container has been filled, the Contractor shall seal the container, mark the Certified Filled Date on the container label using an indelible pen, place the container at a designated pick-up location, and call the Hazardous Waste Management Facility (HWMF) at 734- 3285 for pick-up service. The Contractor shall ensure the HWMF picks up the container within three (3) calendar days after the Certified Filled Date. If container is not picked up within three (3) calendar days, Contractor shall notify the COR who will notify 76 MXSG/MXDEU, OC-ALC Environmental Engineering Section.

1.21.3 The Contractor shall perform written weekly inspections using Tinker AFB IMT Form 487, Initial Accumulation Point Management Aid. Weekly denotes once per working week. The Contractor shall submit Tinker AFB IMT Form 487 on a monthly basis to the COR no later than the third (3rd) day of the month following the reporting period. If the third (3rd) day of the month is a weekend or holiday, the logs are required by the last business day 'PRIOR' to the third (3rd).

The COR will forward the form(s) to the UEC no later than the fourth (4th) day of the following month or the first (1st) subsequent business day. Contractor shall maintain a signed copy of the form(s) on site for one (1) year.

1.22 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Waste Water Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). Notice of intent documentation shall be provided to the COR within ten (10) days after award. The COR will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP or sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer (CDRL A007, Environmental Compliance, DI-MISC-81274.

1.23 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental spills to the COR and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows (CDRL A007, Environmental Compliance, DI-MISC-81274:

1.23.1 One (1) copy to the CO, two (2) copies to the COR, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:

1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.)

and whether 911 was called and which agencies responded.

1.24 Environmental Training: Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.

1.24.1 Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements and an annual refresher classes, updates the person on changes to those rules. This training can be obtained through creditable training institutions or companies. All training will be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance).

RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm, http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000, and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the COR for approval within ten (10) calendar days after contract award date. Once written approval is received from the COR, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the COR within thirty (30) calendar days after contract award date. Annual refresher training certificates for the supervisor and employees managing the initial accumulations points (IAPs) shall be provided to the COR, within ten (10) calendar days after each option year renewal. The COR will forward a copy of the certificates to the UEC (CDRL A007, Environmental Compliance, DI-MISC-81274.

1.25 Forms, Technical Orders (T.O.), AFI, Air Force Material Command Instructions (AFMCI), and Publications: The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via the internet at www.e-publishing.af.mil. In the event a form or publication is not available online, the COR will provide the form, instruction, or publication to the Contractor upon the Contractor’s written request (e-mail is acceptable). In the event, laws, regulations, T.O.’s, AFI’s, or AFMCI’s change during the term of this contract, the Contractor shall be required to comply as the changes come into effect. Contractors delivering or handling official United States Air Force (USAF) records shall comply with the applicable records management regulations in AFI 33-322, Chapter 3, in its entirety.

1.26 OC-ALC Security and OPSEC training: All Contractor personnel working on base in the OC-ALC shall be required to read the OC-ALC Security and OPSEC briefings. The COR will ensure the Security and OPSEC briefings are available for review by the Contractor. The Contractor shall provide the COR with a report within five (5) business days after receiving the briefings. The report shall contain the employee’s name and the date of review. These requirements are IAW AFI 16-1404, “Information Security Program”, Chapter 6, Paragraph 6.2-6.2.3, 6.4- 6.4.4.; DoDI 5220.22 “Industrial Security”, Section 9, Paragraph 9.2(6).; AFI 10-701, “Operations Security”, Chapter 4, Paragraph 4.4. and OC-ALC 16-1404, “OC-ALC Security”, Paragraph 7.

1.27 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this PWS.

1.28 Foreign Object Damage (FOD) and Dropped Object Prevention: Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 http://www.e-publishing.af.mil/ missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-2650, AFMC Supplement 1, paragraph 9.2., and A4.4.4. (Initial)/A4.4.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training by viewing the Digital Versatile Disc (DVD) provided by the COR.

1.28.1 The Contract Manager shall provide written certification to the COR for each employee prior to the employees starting work in the OC-ALC shops. The certification shall have the title of the training, the name of the person who received the training, and the date of the training. Every 36 Months, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide written certification to the COR.

1.29 Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supplement 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1. and 14.5.3. The Contractor shall provide the completed MXRIWRS Form 032 prior to performing work in the OC-ALC industrial areas. The MXRIWRS Form 032 is available from the COR. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the COR within five (5) business days after PM actions. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor personnel shall immediately notify the COR of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The COR will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the COR. The CM shall ensure each employee on the job site receives a briefing from the COR about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC-ALC Industrial Areas.

1.30 Privately Owned Motor Vehicles (POV): Contractor and Contractor’s personnel shall comply with the directives pertaining to the operation of POVs on Tinker AFB, per AFMAN 31- 116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24- 302, in its entirety for the operation of POVs within Tinker AFB.

1.31 Visitors Pass: The Contractor shall contact the COR seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The COR will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.

1.32 Foreign Nationals: The Contractor shall notify the COR before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.

1.33 Safety and Health on Government Installations: While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and DAFMAN 91-203, “AIR FORCE OCCUPATIONAL FIRE AND HEALTH STANDARDS”, as established by this contract and Appendix C. The Contractor shall notify the CO, COR, and Government Contract Administrator (CA) within one (1) business day of any injuries that occur to contractor personnel while they are on the installation. The Contractor shall notify the CO, COR, and Government CA within one (1) business day of damage to Government property or equipment during the execution of the contract.

1.34 Communicating Hazards of Workplace (CHOW): Contractor’s onsite representative communicates all hazards being introduced to the worksite by the Contractor. This is accomplished prior to commencement of work and refreshed daily during performance, IAW Contractor’s Site Safety Plan.

1.35 Safety and Health Plan: The Contractor shall be responsible for compliance with the OSHA Public Law 91-596. The Contractor shall submit a Safety and Health Plan (SHP) and corresponding site safety checklist to the CO and the COR (see Appendix C) (CDRL A008, Safety and Health Plan, DI-ENVR-81375.

1.36 Combating Trafficking in Persons: IAW DFARS PGI 222.17, the COR shall pursue, as appropriate, the following methods of monitoring the Contractor’s performance regarding trafficking in persons such that non-compliances with FAR clause 52.222-50 are brought to the immediate attention of the Contracting Officer:

a. Keep the lines of communication open with the Contractor. At the Post-Award conference, remind the Contractor of his contractual responsibilities to notify the government if the Contractor receives notification of any alleged violations to this policy or if actions have been taken against the Contractor employees, subcontractor’s or subcontractor employees pursuant to the clause.

b. When appropriate, encourage Contractor to complete Human Trafficking Awareness Training.

c. Encourage the Contractor to take steps to investigate and eliminate slavery and human trafficking in their supply chains and to publish information for consumer awareness.

d. Periodically access the Department of State’s Trafficking in Person (TIP) website for updates and to view the latest reports. http://www.state.gov/g/tip

1.37 Speak Up for Safety: Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.

A safe workplace is everyone's business. As part of the contract team, military, civilian and contractor personnel are empowered to Speak Out for Safety (S.O.S.) when they observe an unsafe act.

Government personnel are empowered to intercede in events that pose imminent danger to personnel or catastrophic damage to property.

http://www.state.gov/g/tip

1.38 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.

1.39 Training – General (including but not limited to): The Government COR will provide training via slides, video, or classroom prior to the Contractor performing work at the OC-ALC.

The Government will be responsible for all approved costs associated with the training identified below. The COR will document training on and maintain copies of the completed AF IMT 1151, Training Attendance and Rating, as part of the contract surveillance file. The Government will add or remove training as required per Air Force Regulation.

he Contractor shall contact the COR prior to work being performed in order to accomplish the required training or to verify the required training as listed below has been completed (CDRL A009, Training Certification, DI-PSSS-81524:

Deliverables

Document Identifier

DID Title PWS Reference

CDRL 001 DI-SESS-80294B Preventive Maintenance 1.3 CDRL 002 DI-SESS-80294B Calibration 1.4 CDRL 003 DI-SESS-80294B Service Report 1.8 CDRL 005 DI-MGMT-81596 Contractor Roster 1.15 CDRL 006 DI-MGMT-80442 Accountability of Property 1.29 CDRL 007 DI-MISC-81274 Environmental Compliance 1.19 CDRL 008 DI-ENVR-81375 Safety and Health Plan 1.35 CDRL 009 DI-PSSS-81524 Training Verification 1.39

Contractor Required Courses Course Number FOD and DOP Awareness Training Course Initial CHPMAS0000400SU AFMC FOD and DOP Awareness Training Refresher CHPMAS0001301CB Initial Fire Safety and Prevention Training CTESAF0000100SU Refresher Fire Safety and Prevention Training, Computer Based Training

(CBT)

CTEMAS0002900CB

OC-ALC Environmental Accountability/Solid Waste Training, CBT MTEMAS9713800BR OC-ALC Human Factors Training, CBT MTEPDV9775100BR Environmental Management Systems (EMS) - General Awareness Training MTEENV9733070BR

Section Two

Performance Assessment

The Contractor shall be aware that in the absence of any contract requirement from the Service Summary (SS) does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Contractor shall ensure the following SS requirements are accomplished:

Service Summary (SS) Table 2-1

SS PERFORMANCE OBJECTIVE PWS

PARA.

PERFORMANCE

THRESHOLD

SS 1

Requested Services: The Contractor shall provide a 5 year contract, one (1) base year with four (4) option years for Preventative Maintenance (PM) service on the VJT- CABCT450-225-Ti X-ray Computed Tomography System. The Contractor shall provide the VG Studio Max Package, Upgrade Existing Software and perform four (4) PMs per year on the equipment listed within the Appendix A. The Contractor shall demonstrate to the Contracting Officer Representative (COR) identified Government Technical Point of Contact, that the equipment is fully operational before leaving Tinker AFB.

Preventive maintenance shall include at minimum:

• Appropriate lubrication of all system bearing components at OEM required interval.

• Every other visit must include an X-ray coolant system inspection and fluid replacement at OEM require interval.

• Every other visit must include an inspection and lubrication of all high voltage X-ray electrical cables.

• One visit will include a complete inspection of all system safety components.

• One visit will include a complete inspection of system door operation.

Software Updates:

• The Contractor shall provide and install all available software updates annually for Volex, Vi5, and MyVG Volume Graphics.

1.2 100% Compliance

PARA.

PERFORMANCE

THRESHOLD

• The Contractor shall provide and maintain the most current version of Volume Graphics VG Studio Max annually, including the following modules:

o Coordinate Measurement, Nominal/Actual Comparison, Fixture Simulation, PMI Extension for CAD Import, Porosity/Inclusion Analysis, Reverse Engineering Tools, Structural Mechanics, Simulation Volume Meshing and Wall Thickness Analysis.

Technical support:

• The Contractor shall provide 40 hours of remote technical support by qualified professionals, which may include, but is not limited to, assistance with technique approach, system operation, system automation, maintenance, and software integration.

• The Contractor shall provide Emergency On- Site Support.

SS 2

Preventive Maintenance (PM): The objective of PM is to protect equipment capability and investment by removing causes of failure, performing routine maintenance and providing adjustment to compensate for normal wear before failure occurs.

The Contractor shall perform all PM’s IAW the OEM specifications. The Contractor shall perform four (4) PMs for per year on each item listed in Appendix A. The Contractor shall provide a copy of the PM schedule to the Contracting Officer Representative (COR) within ten (10) business days after contract award. The Contractor shall notify the COR seven (7) business days prior to each scheduled PM visit (CDRL A001, Preventive Maintenance

DI-SESS-80294B).

1.3 100% Compliance

SS 3

Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO.

Long lead items greater than five (5) business days must be identified and provide sufficient documentation supporting the delay.

1.7 100% Compliance

SS 4

Service Report: Upon completion of any maintenance the Contractor shall provide a draft, written Service Report to the COR and SME. The

1.8 100% Compliance

PERFORMANCE

THRESHOLD

Contractor shall provide, by email, the final service report within 5 business days to the COR. At a minimum, the final service report shall contain the following information: (CDRL A003, Service Report DI-SESS-80294B)

• Company Name

• Requested service date

• Contract #

• Equipment ID #

• Description of Services provided

• Additional Services recommended (if any)

• Printed Name and Signature of Technician who performed the Services (electronic signatures are acceptable)

• Printed Name and Signature of on-site SME or COR (electronic signatures are acceptable)

• Start and Completion dates

• Complete Breakdown of the Labor Cost

(hours and rate)

• Materials and Parts used

• Details of any other charges

• Printed Name and Signature stating only new parts and materials were used (electronic signatures are acceptable)

• Written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order. (electronic signatures are acceptable).

SS5

Maintenance Documentation: The Contractor shall notify the Government Subject Matter Expert (SME) upon completion of each PM or similar requirement, IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.

1.10 100% Compliance

SS6

Corrective Action Report (CAR)/Complaint Contractor Response Time: The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive actions in relation to the submitted CAR or Customer Complaint.

1.11 100% Compliance

PERFORMANCE

THRESHOLD

SS7

Special Qualifications: The Contractor shall provide personnel with the following special qualifications:

• Contractor must be a qualified radiation worker, compliant with federal regulation for radiation workers.

• Contractor must be qualified to work on both Commet(R) and X-Ray Works(R) X-ray tube heads. This qualification must include maintenance and repair training from Commet(R) and X-Ray Works(R).

• Contractor must be a commit(R) certified maintainer

• Contractor must be a VJ Technologies(R) certified maintainer

• Contractor must be an authorized Volume Graphics(R) distributer

1.14 100% Compliance

SS8

Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and COR, in writing, within ten (10) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak, and understand English fluently. (CDRL A005, Contractor Roster, DI-MGMT-81596)

1.15 100% Compliance

SS9

Listing of Contractor Employees: The Contractor shall provide an initial listing of names and position titles of employees who will come to Tinker Air Force Base to the COR within five (5) business days after the contract award date. Within ten (10) business days, the Contractor shall also provide an updated listing of personnel to the COR when

1.16 100% Compliance

PERFORMANCE

THRESHOLD

employees affecting the work of this contract change status or position. (CDRL A005, Contractor Roster, DI-MGMT-81596)

SS10

Foreign Object Damage (FOD) and Dropped Object Prevention: Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-2650, AFMC Supplement 1, paragraph 9.2., and A4.4.4. (Initial)/A4.4.5.

(Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training by viewing the Digital Versatile Disc (DVD) provided by the COR.

The Contract Manager shall provide written certification to the COR for each employee prior to the employees starting work in the OC-ALC shops. The certification shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide written certification of training to the COR prior to the employees starting work in the OC-ALC shops. Every 36 Months, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide written certification to the COR.

1.28 100% Compliance

SS11

Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supplement 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1. and 14.5.3.

The Contractor shall provide the completed MXRIWRS Form 032 prior to performing work in the OC-ALC industrial areas. The MXRIWRS Form

1.29 100% Compliance

PERFORMANCE

THRESHOLD

032 is available from the COR. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the COR within five (5) business days after PM, etc.) actions. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor personnel shall immediately notify the COR of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The COR will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the cor.

The CM shall ensure each employee on the job site receives a briefing from the COR about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC-ALC Industrial Areas.

SS12

Visitors Pass: The Contractor shall contact the COR seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The COR will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty

(30) calendar days

1.32 100% Compliance

SS13

Safety and Health Plan: The Contractor shall be responsible for compliance with the OSHA Public Law 91-596. The Contractor shall submit a Safety and Health Plan (SHP) and corresponding site safety checklist to the CO and the COR (see Appendix C)

1.35 100% Compliance

SECTION THREE

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

3.1. Government Furnished Property (GFP).

3.1.1. Government Property Repair/Maintenance (or Similar Requirement) On Base.

Note: Same as Government Property Incidental to Government Installation or Site.

Government Property Repair/Maintenance On-Base is not considered GFP in accordance with (IAW) Federal Acquisition Regulation (FAR) Parts 45 and 52.245 plus supplements. The Government Organizations responsible (76 MSXG) for Government Property Repair/Maintenance On-Base will be responsible for the Government Property inventory, record keeping, reporting requirements (including Report of Survey), and disposal during the performance of this contract.

3.2. Government Furnished Services…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .