Lodgepole Visitor Center Upgrades 2022
Scope of Work. All work to be performed per contract documents or local code / industry standard practice, whichever is most stringent.
1. Electrical power wiring under floor.
a. Verify all circuits are installed in accordance with the drawings
b. Verify all conduit is properly supported
c. Mark and label as required per contract documents
d. Pull all electrical wire to electrical panels
e. Verify all work previously performed is in accordance with the NEC
2. Electrical power wiring above the floor.
a. Complete installation of all conduit and electrical wiring needed to energize lighting fixtures per contract documents
b. Complete installation of all switches and cover plates
c. Remove all abandoned wiring visibly protruding from the walls and in the lobby where electrical panel had been removed
d. Remove and properly abandon fixtures and wiring to emergency lights above SPC desk where monitors are to be installed.
e. Install circuit for the UFO lights
f. Option: Install power wiring for the three monitors above the SPC desks. One duplex outlet for each monitor and a single (3) port RJ45 data outlet behind the middle monitor
3. Termination of power wiring.
a. Terminate / test all power and lighting circuits
b. Label all panels as required per contract documents
4. Exit signs.
a. Install all exit signs per the contract documents
b. Test for proper function
5. Underfloor cleaning.
a. Replace all removed floor insulation or replace with equivalent
b. Replace all screen supporting insulation
c. Clean floor area of all loose debris
d. Ensure all perimeter vents are closed and securely screened
6. Above floor cleaning.
a. HEPA vacuum clean all surfaces
b. Properly dispose of all waste and debris
7. Wall patch.
a. Patch drywall area in lobby and paint to match
8. Communication wiring.
a. Install communication wiring as indicated on drawing and terminate with a standard patch panel RJ45 receptacle as indicated
b. Test to verify industry standard data transmission
c. Label as required per contract documents
9. Documentation.
a. Provide as built sketches to identify final circuit routing and termination locations