Sol_140P8623Q0005_Amd_0002.pdf
PDF 98 KB Posted
- Attached to
- LODGEPOLE VC ELECTRICAL PHASE 2 Federal contract opportunity
- Solicitation number
- 140P8623Q0005
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8623Q0005 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPG
San Francisco CA 94123 Building 201, Fort Mason
NPS, PWR - GOGA MABO
12/15/20220002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/01/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Electrical power wiring at Lodgepole Visitor Center, Sequoia and Kings Canyon National
Parks, Tulare County, California
The purpose of this Amendment 0002 is to answer vendor questions.
Question One: Are there as builds for the visitor center?
Answer One: As-Built drawings provided (See Section J - Att No. 009) Contractor to verify all information on As-Bults per the Scope of Work.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Liset Gomez
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8623Q0005/0002
Question Two: Are there AutocAD files available?
Answer Two: Attached is AutoCAD base floor plan
.dwg file. (See Section J - Att No. 010) NPS will not provide any other file format.
Question Three: Per Section J Att No. 002 paragraph 5. Underfloor cleaning. Replace all removed floor insulation. What is the quantity of insulation to be replaced?
Answer Three: All existing insulation that had been removed or is not installed per existing typical condition against sheathing shall be reinstalled or replaced with equivalent R rated insulation. Method of installation shall match existing condition. Contractor shall provide quantity of insulation to be replaced that was previously disturbed with previous construction work.
Question Four: Per the Standard Form 18 Section B
Period of Performance is 1/03/2023 to 3/31/2023.
There is a good chance there will still be snow piled around the building 3/31/2023 The exterior vents will not be accessible due to the snow. We will need access to the exterior vents to replace the missing floor insulation.
Answer Four: Interior access is available and preferred method to crawlspaces. Exterior foundation vents limited feasibility for person or material access. Crawlspace has a vapor barrier that will likely require repairs if contractors¿ access via exterior vent. Period of
Performance of 3/31/2023 will not be impacted by the weather. If there is any unforeseen circumstance needing exterior access, the park will remove snow in a select area with 14-day minimum notice.
Question Five: There are three conduits with junction boxes protruding through the floor on the north wall of the west room. Attached is a drawing (See Section J - Att No. 011) showing the approximate location of the junction boxes. These boxes are not on the plans. Do these boxes need power and which panel and circuit should be used?
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8623Q0005/0002
Answer Five: The contractor shall complete installation of all conduit and electrical wiring needed to energize fixtures.
Question Six: What extent of submittals is required on this project?
Answer Six: Reference project Specifications for
Submittal requirements and Attachment A of the specifications (See Section J - Att No. 012)
Question Seven: There were some unused materials left at the job site, can these items be used?
Answer Seven: Material is currently part of a previous contract. Please quote based on the assumption that this material will not be made available to the contractor. If there are any changes to this response, an additional amendment will be posted prior to RFQ closing date.
Question 8: The track lighting fixtures currently installed were missing some end connections, we tried to locate them but could not find any at the job-site, can we have a copy of the submittals that was furnished by the previous installer or the make and model of the fixtures so we can order end connectors as needed.
Answer 8: Attached is previous submittal cut sheets. Contractor to verify installed material with cut sheets (See Section J - Att No. 013).
Question 9: What portion of the work do we need to furnish warranty on.
Answer 9: Contractor to reference specification for warranty requirements.
Question 10: What time frame do we have to complete this project?
Answer 10: Contractor will have 60 days to complete the project after the Notice to Proceed is issued.
Period of Performance: 01/03/2023 to 03/31/2023
Change Item 00010 to read as follows(amount shown
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8623Q0005/0002 is the obligated amount):
00010 Lodgepole VC Electrical
Product/Service Code: Z1AZ
Product/Service Description: MAINTENANCE OF OTHER
ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Administrative Contract Specialist: Patty Payne
Phone: 559-730-6435 Email: patty_payne@nps.gov
Contracting Officer: Liset Gomez Phone: 415-
265-5650 Email: liset_gomez@nps.gov
Requestor: Brian Horton Phone: 559-565-3737
Email: brian_horton@nps.gov