UNIT
MEAS.
QTY Subtotal
LS 1
6.Above floor cleaning.
Description:
a.HEPA vacuum clean all surfaces b.Properly dispose of all waste and debris
7.Wall patch.
Description:
Price Schedule 12/1/2022 Client:
National Park Service Sequoia Kings Canyon National Parks a.Verify all circuits are installed in accordance with the drawings b.Verify all conduit is properly supported c.Mark and label as required per contract documents d.Pull all electrical wire to electrical panels e.Verify all work previously performed is in accordance with the NEC
Project:
Lodgepole VC Electrical
DESCRIPTION
1.Electrical power wiring under floor.
Description:
2.Electrical power wiring above the floor.
Description:
a.Complete installa on of all conduit and electrical wiring needed to energize lighting fixtures per contract documents b.Complete installa on of all switches and cover plates c.Remove all abandoned wiring visibly protruding from the walls and in the lobby where electrical panel had been removed d.Remove and properly abandon fixtures and wiring to emergency lights above a.Terminate / test all power and ligh ng circuits b.Label all panels as required per contract documents
3.Termina on of power wiring.
Description:
4.Exit signs.
Description:
a.Install all exit signs per the contract documents b.Test for proper func on a.Replace all removed floor insula on or replace with equivalent b.Replace all screen suppor ng insula on c.Clean floor area of all loose debris d.Ensure all perimeter vents are closed and securely screened
5.Underfloor cleaning.
Description:
RFQ 140P8623Q0005
Section J - Att No. 001
S $Total With Option
Without OptionTotal a.Patch drywall area in lobby and paint to match
8.Communica on wiring.
Description:
a.Install communica on wiring as indicated on drawing and terminate with a standard patch panel RJ45 receptacle as indicated b.Test to verify industry standard data transmission 9.Documenta on.
Description:
a.Provide as built sketches to iden fy final circuit rou ng and termination locations
2.Electrical power wiring above the floor. OPTION BID ITEM
Install power wiring for the three monitors above the SPC desks. One duplex outlet for each monitor and a single (3) port RJ45 data outlet behind the middle monitor