Section_J_-Att_No__002_Scope_of_Work.pdf
PDF 1 MB Posted
- Solicitation number
- 140P8623Q0079
About this file
This document outlines the scope of work for hazardous waste removal and transportation services at Sequoia and Kings Canyon National Parks in California. The contractor will be responsible for handling various hazardous waste streams in compliance with all applicable state and federal regulations from August 2023 through June 2024. Services include coordinating waste inventories, performing field analysis, packaging and labeling wastes, preparing manifests, transporting wastes to approved disposal facilities, and providing documentation to track custody from origin to final disposition. The contractor must have capabilities for drum, box, bag and various container types; be licensed and qualified for hazardous materials transportation; and deliver wastes to treatment, storage and disposal facilities. The related federal contract opportunity is solicitation number 140P8623Q0079 from the National Park Service Pacific West Region within the Department of the Interior for these hazardous waste services at Sequoia and Kings Canyon National Parks.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8623Q0079.pdf | ||
| Section_J_-_Att_No__004_Experience_and_PP_Form.pdf | ||
| Section_J_-_Att_No__003_SCA_WD_2015-5657_Tulare_County.pdf | ||
| Section_J_-_Att_No__001.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
SEQUOIA AND KINGS CANYON NATIONAL PARKS
HAZARDOUS WASTE REMOVAL AND TRANSPORT FOR SEQUOIA
AND KINGS CANYON NATIONAL PARK, THREE RIVERS,
CALIFORNIA
PART 1: GENERAL
1.1 DESCRIPTION
Project Location: Ash Mountain accessed through the Ash Mountain Entrance on Highway
198 in the southwest corner of the park, northeast of the Three Rivers community. Address of pick-up location is Ash Mountain 47050 Generals Hwy., Three Rivers, CA 93271.
The contractor must have the ability to handle our fluctuating waste streams, provide data managing our waste profiles, and cradle to grave tracking to ensure compliance.
Contractor shall provide personnel, labor, transportation, test equipment, packaging, materials, and documentation required to legally transport hazardous waste. Contractor shall ensure that hazardous waste is properly segregated, safely packaged, labeled, documented, loaded and placarded in accordance with state and federal regulations. Contractor shall be licensed and up to date meeting all state and federal regulations for hazardous materials/waste transportation.
Contractor must ensure that all SEKI waste streams are properly managed in accordance with state and federal laws.
Deliverables:
Hazardous Waste Identification and Classification
Contractor shall coordinate an inventory of hazardous waste to be manifested with the Park
Hazardous Materials Coordinator prior to shipment.
Contractor shall prepare waste profiles for NOS authorized representative to review and sign.
Contractor shall be prepared to perform field waste analysis and have the knowledge and equipment to do so.
Contractor shall provide service within two weeks of request for shipment on a coordinated date with Parks Hazardous Materials Coordinator.
RFQ No. 140P8623Q0079 Section J -Att No. 002 SOW
Contractor must ensure DOT packaging requirements from 49 CFR 173, 178, and 179 are met for the hazardous waste.
Contractor shall provide a variety of packaging to include not limited to: 55 gal drums, 30 gal drums, 4’x 4’ over pack boxes, 85 gal over pack drums, 6 mil bags, 15 and 20 gallons drums, 5 and 7 gallon buckets, lab packs etc.
Preparing Hazardous Waste Manifests
Contractor shall prepare the Uniformed Hazardous Wase Manifest properly listing all wastes to be shipped from the inventory in part 1 above prior to shipment and make available for NPS.
Upon loading wastes and prior to departure, contractor will provide a Generator Copy of the manifest and copies of any additional completed and signed documents.
Treatment, storage, or Disposal of Hazardous Waste
Contractor shall ensure that hazardous waste manifested transported from SEKI is delivered to an appropriate disposal site.
Contractor shall assist in the return TSDF copy of waste disposition to NPS authorized representative in a timely manner.
Security
All packaging, labeling, and placarding will be inspected by authorized NPS employee.
All shipment documentation including manifests, work orders, bills of lading, inventories, lab packs, and land disposal restrictions, will be inspected by authorized NPS representative.
All shipments will be inspected and approved by authorized NPS representative prior to transport.
Period of Performance
Contract is for removal from approximately August 14, 2023 through June 30, 2024.
All work activities with the NPS on site will be conducted between the hours of 0800 – 1600.
RFQ No. 140P8623Q0079 Section J -Att No. 002 SOW
File details come from the government source that posted it. Updated .