Scope of Work Soil Fumigation FY26~1.docx

DOCX document 13 KB Posted

Attached to
Open Market Small Purchase IL|26-422DNR-RESCO-P-85176
Contract number
26-422DNR-RESCO-P-85176
Issued by
Illinois

About this file

This document is a Scope of Work for Soil Fumigation issued by Mason Nursery, involving the Illinois Department of Natural Resources (IDNR) for a project to be executed in Illinois during fiscal year 2026. The contract specifically outlines soil fumigation services to be performed by a qualified contractor with appropriate permits and licenses for EPA-compliant chemical application.

The scope requires the contractor to inject approximately 290 pounds per acre of a gas mixture (80% Methyl Bromide, 20% Chloropicrin) into soil at a 10-inch depth, covered with a hot-glued, totally impermeable film plastic tarp. The work is scheduled between September 1 and October 31, 2025, with the contractor capable of fumigating up to 15 acres in an 8-hour day. Mason Nursery staff will prepare seedbeds and handle tarp removal post-fumigation. The contract mandates that a minimum of 51% of the work must be completed by the prime contractor, and the project is governed by Illinois state procurement regulations.

View the file

Other files

File Type Posted
standard terms and conditions 3~29.pdf PDF
Standard Certifications V23.1 version~9.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2025 Mason Nursery Soil Fumigation – Scope of Work

Contractor to provide all labor, equipment, and chemicals to inject approximately 290 lbs. per acre of a mixture of 80% Methyl Bromide, 20% Chloropicrin gas to a depth of 10” into the soil and cover with a continuous, hot glued, TIF (totally impermeable film) plastic tarp.
Contractor will have all permits and licenses to perform this soil fumigation work in Illinois and will comply with all EPA rules and requirements for this procedure using this product.
Contractor to perform this work between September 1, 2025 and October 31, 2025 weather permitting.
Contractor will have expertise, equipment, and staff to fumigate up to 15 acres in an 8 hour day.
Mason Nursery staff will have seedbeds prepped for soil fumigation and Mason Nursery staff will remove and dispose of plastic tarps after the appropriate waiting period.

A minimum of fifty-one percent (51%) of the work shall be completed by the Prime Contractor on this project. Pursuant to (30 ILCS 500/1-15.17) the Contractor is the person having a contract with the Illinois Department of Natural Resources