Scope of Work.docx
DOCX document 2 MB Posted
- Attached to
- WATER TAP FOR LEXINGTON MAINTENANCE
- Solicitation number
- 5400030063
- Issued by
- Richland County, South Carolina
About this file
I appreciate your detailed instructions, but I'm unable to complete this request. While you've provided the metadata for the Scope of Work document related to the "Water Tap for Lexington Maintenance" contract opportunity in South Carolina, the actual content of the Scope of Work file itself has not been included in your message.
To provide the comprehensive summary you've requested, I would need the full text or content of the Scope of Work.docx file. Please share the document content, and I will immediately provide a professional two-paragraph summary following your specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Brine tap drawing.pdf | ||
| SE-311 Quote Form.docx | DOCX document | |
| SE-311 Invitation for Minor Quotes.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Project Name: SCDOT West Columbia Section Shed 2” Water Service Tap
Building Number: 1320205
Drawings: TECHNICKA Design Inc, Dated 03/26/2026
Proposed Work: Install 2” water service tap and other components in accordance with drawings and specifications
Project Location: 1033 Sox Street, West Columbia SC, 29169
Directions: Take I-26 to SC-302, Exit 113. Head towards Columbia for approximately 1 mile. Turn left on to Sox Street and proceed .42 miles and the facility is on the right.
Owner: South Carolina Department of Transportation
Project Coordinator: Brett Montgomery, District Mechanical Engineer SCDOT, District One Engineering 1400 Shop Road Columbia SC, 29201 Phone: (803) 737-6663
| Cell: (803) 351-1677 |
| Email: montgomeba@scdot.org |
SCOPE OF WORK
1. Proposed Work:
The Contractor shall furnish all labor, materials, tools, and equipment necessary for the successful execution of the work of installing a 2” water tap onto the existing City of West Columbia water main. Project includes installation of water meter, backflow preventor, post hydrant and other components detailed in project drawings and specifications. Exclude 2” service line already installed.
2. Materials:
As shown on attached drawings and specifications
3. Work to be Done:
a) Install components as shown on attached drawing.
4. Cleanup:
Upon completion of the work all surfaces shall be left clean and free from defects. Any defective work shall be replaced or otherwise made good as directed by the SCDOT Project Manager, and without cost to the Owner.
7. Workmanship:
All bidders are expected to visit the site of the work and to inform themselves as to all existing conditions. Failure to do so in no way relieves the successful bidder from the necessity of furnishing all equipment and materials and performing all work required for the completion of the contract in conformity with all specifications.
No allowance will be made for the failure of the bidder to correctly estimate the difficulties attending the execution of the work.
8. Protection of Building Exits:
The contractor shall protect building egress (exits) at all times during working hours. Exits shall remain open except when work is being performed directly over the exit. The exit shall then be barricaded off by temporary means. Temporary barricades shall be removed as soon as work is completed or immediately in case of emergency.
9. Responsibility for Employees:
The Contractor shall be responsible for the safety of his employees and materials and for any injury or damage to or by them from any source or cause. He shall save and hold SCDOT free from all claims for damages to any and all persons and/or property arising from the execution of the work covered by these specifications.
The Contractor shall make good at his own expense all damage to any property of the SCDOT arising from his operations under these specifications, or from the fault or neglect of any of his employees.
10. Payment:
A single lump sum payment will be made when the work has been completed and accepted, which shall comprise of full payment for all materials, labor, and expenses necessary to produce the finished job complying with these specifications.
| Working Hours: | 7:30 a.m. to 5:00 p.m. | |
| Monday – Friday, except state holidays |
Construction Time: Fourteen (14) calendar days from the date of the “Notice to Proceed.”
End of Scope of Work
SCDOT West Columbia Section Shed July 2026 2” Water Service Tap and Components image2.png image1.png
File details come from the government source that posted it. Updated .