This document is a Preliminary Electrical Load Analysis for the SCI Forest - B6 project. The analysis covers the electrical loads for various equipment and systems, including air curtains, booths, hydraulic equipment, metalworking machinery, and extraction systems. The document provides details on the amperage, voltage, and kilowatt-volt-ampere (kVA) requirements for the different electrical loads. It also includes information on the existing electrical service capacity and connected loads, as well as the estimated new electrical loads. The document notes that the exact loads will need to be confirmed once the basis of design equipment specifications are provided.

The document does not contain any information about a state or local contract opportunity. It appears to be an internal technical document related to the electrical design requirements for the SCI Forest - B6 project.

View the file

Other files

File Type Posted
BOP-1304 Request to Advertise 9-27-19.pdf PDF
ELECTRICAL FLOOR PLANS - AREA B.pdf PDF
Terms & Conditions.pdf PDF
Specifications 9.25.19.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preliminary Electrical Load Analysis

SERVICE - 480/277V,3PH,4W - 2000A MDP

Project : 19001 - SCI Forest - B6 Date: 5/8/2019

Amps

@480/3PH

kVA

1600.00 1328.64

130.36 108.25

40.34 33.50

37.58 31.21

159.24 132.24

112.69 93.58

480.22 398.78

1119.78 929.87

QTY FLA Total FLA V/PH PH kVA

4 6 24 120 1 2.88

6 6 36 120 1 4.32

1 3.5 3.5 480 3 2.91

1 36 36 480 3 29.93

1 45.5 45.5 480 3 37.83

1 27 27 480 3 22.45

1 24 24 208 3 8.65

1 5 5 480 3 4.16

3 20 60 120 1 7.20

1 30 30 208 3 10.81

6 15 90 120 1 10.80

8 40 320 208 3 115.29

1 223.60 223.6 480 3 185.90

1 6.90 6.9 208 1 1.44

Phase 1 - OH Door Air Curtain 1 5.06 5.06 480 3 4.21

1 4.80 4.8 208 3 1.73

1 21.00 21 480 3 17.46

567.68 471.40

552.10 458.47

Amps

@480/3PH

kVA

140.00 116.26

98.68 81.94

53.00 44.01

291.68 242.21

260.42 216.26

TOTAL:

Final Remaining Electrical Capacity:

A - Sand Blast Booth:

B - Paint Booth:

C - Dry Booth Cure Chamber:

TOTAL @480/3PH:

Remaining Electrical Capacity:

New Electrical loads:

R - Bender

L - 13' Hydraulic Shear

M - 13' Hydraulic Press Brake

K - Iron Worker

N - Drill Press

O - Milling Machine

S - Fume Extractor

Q - Plasma Cutter

U - Handheld Grinder 4.5"

P - Mig Welder (portable)

Phase 1 - Overhead Door

Phase 1 - Motorized Gate

NOTE:

(1) 80% of 2000A main circuit breaker used unless 100% rated breaker is installed. Owner to confirm.

(2) Values obtained from the existing drawings

(3) Load information provided by owner. kVA/W calculations were adjusted for standard voltage rating and # of phase. Where the phase values are not clear, 3ph is assumed. Exact load will be confirmed after basis of design equipment specifications are provided. These loads exclude Paint booth, Dry booth cure chamber and Sand blast booth.

Item E and F - confirm electrical requirment and identify which one is the column lift being changed to 220/3PH. Item F - identify location.

Item S - identify location.

Item U and P - clarify how many will be used at one time to determine the number of outlets. Currently showing 4 outlets for each item.

(1) Existing Electrical Service Capacity:

(2) Existing Connected loads:

Lighting:

Elevator:

Receptacles:

Mechanical:

Miscellaneous:

TOTAL:

Available Electrical Capacity:

(3) New Electrical Load:

DESCRIPTION

F - MCH13

E - MCHW18

T - Wheel Refinishing Unit:

J - TF1420 saw