ELECTRICAL FLOOR PLANS - AREA B.pdf

PDF 342 KB Posted

Attached to
Metal Fabrication Equipment
Solicitation number
6100049057
Issued by
Clearfield County, Manns Choice Borough, Pennsylvania

About this file

This document appears to be an electrical floor plan for Area B of the Construction of Building 6 project for the Pennsylvania Department of General Services. The plan details the electrical layout, including the location of various electrical equipment and fixtures such as panels, receptacles, lighting, and mechanical equipment connections. Key details include the conduit routing, circuit designations, and equipment specifications. The document also includes general notes regarding the installation, coordination, and requirements for the electrical work. No additional information about the contract opportunity or procurement process is provided in the document.

View the file

Other files

File Type Posted
BOP-1304 Request to Advertise 9-27-19.pdf PDF
SCI Forest - Preliminary Load Calculation.pdf PDF
Terms & Conditions.pdf PDF
Specifications 9.25.19.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F F F

F

F

F

J

F

F

F

F

J

F

F M

F

FFF

F

F

F

F

F

F

F

F

F

F P

F P

F

F F

J

J

F

J

F

F

J

GFI GFI GFI GFI GFI

J

J

J

J

J

J

J G

FIG

FI

G

FI

GFI

G

FI

GFI

G

FI

G

FI

G

FI G

FI

B

32 32.1 33 34

A

C

D

E

F

G

G.5

35 36 37 38 39 40 41 42 43

HP6-37,39,41

EWH 6-1

RP6C-20

RP6C-20

RP6C-20

RP6C-19

RP6C-19

RP6C-19

RP6C-19

RP6C-18

RP6C-18

RP6C-18 RP6C-18RP6C-17

RP6C-17

RP6C-17

RP6C-16

RP6C-16

RP6C-16

RP6C-16

HP6-38,40,42

EWH 6-2

RP6C-21

RP6C-21 RP6C-21

RP6C-22 RP6C-22 RP6C-22 RP6C-22RP6C-19

WG WG

WG

WG

RP6C-23

RP6C-23

RP6C-23

RP6C-23

WG

WG WG

WG

WG

WG

RRP6A-35

AD 6-1

WG

WG

WGWGWG

WG

WG

WG

WG

WG

WG

PP6W RP6C

TS

T

T

PLOW STAGING BAY

TEAR DOWN BAY

PAINT BOOTH DRYING BOOTH

SAND BLASTING BOOTH

PALLET STORAGE

FORKLIFT STORAGE

PALLET STORAGE

PALLET STORAGE

WELDING STATIONS

1 2 3 4

PLASMA CUTTER GAS WELDERS

PALLET STORAGE

IRON WORKER

BRAKE PRESS

HEAVY DUTY LIFT SYSTEM

BAND SAW

SHEAR

DRILL PRESS?

MILL

BENDER

EX

EX

EXEX

EX

EX

RP6A-6

RP6A-6

RP6A-6

RP6A-6

RP6A-31

RP6A-33

RP6A-16

RP6A-16

RP6A-9

WR1

WG

WG

RP6C-1,3

EXISTING OVERHEAD

DOOR AND CONTROLS

EXISTING OVERHEAD

DOOR, AIR CURTAIN

AND CONTROLS

MDS6-3

A

A

R

E

HP6 - 61,63,65

WHEEL REFINISHING UNIT

(EXISTING TO REMAIN)

EX

B

MDS6-6

RP6A-19 2

2 2

C

RP6C

6 6

HP62

EXISTING EXIT

SIGN (TYP.)

EXISTING LIGHT

FIXTURE (TYP.)

EXISTING SMOKE

DETECTOR (TYP.)

EXISTING

RECEPTACLE (TYP.)

EXISTING FIRE ALARM

DEVICE (TYP.)

T

EXISTING OVERHEAD

DOOR, AIR CURTAIN

AND CONTROLS

A

B C

MDS6-7

HP6-44,46,48

HP6-50,52,54

HP6-43,47,49

AD 6-1

CORD REEL (TYP.) CORD REEL (TYP.)

G

Q P

NEW 480V/3PH 225A

MCB PANEL

EQUIPMENT MOUNTED

JUNCTION BOX (TYP.)

E

E

E

F F P

JACK STANDS?F

L

L

R

O

O

K

K

M

M

J

J

N

N

PP UUUPU

Q

AIR CURTAIN

HP6-8,10,12

DRAWN BY: DATE:

CHECKED BY: SCALE:

DRAWING NO.

COMMONWEALTH OF PENNSYLVANIA

DEPARTMENT OF GENERAL SERVICES

HARRISBURG, PENNSYLVANIA

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412-287-7333

Professional's Signature Date Professional's Signature Date

KEY PLAN

AE WORKS

1/8" = 1'-0"

AEW 04/19/2019

AEW

E-1.2

ELECTRICAL FLOOR PLANS - AREA B

SCI FOREST - COMPLETE CONSTRUCTION

OF BUILDING 6

286 Woodland Drive Marienville, PA 16239

PROJECT NO. DGS A-0377-001 PHASE 2

FOR CONSTRUCTION

1/8" = 1'-0"E-1.2

1 ELECTRICAL NEW WORK PLAN - AREA B

ELECTRICAL SHEET GENERAL NOTES

1 FINAL LOCATION OF ALL EQUIPMENT SHALL BE DETERMINED IN THE FIELD AND SHALL

BE INSTALLED AS DIRECTED BY THE ARCHITECT OR CLIENT'S AGENCY. WHERE

STRUCTURAL OPENINGS ARE NOT AVAILABLE, THE CONTRACTOR SHALL CORE DRILL

WALLS AND FLOORS AS REQUIRED TO PERMIT PASSAGE OF CONDUITS. THE

ELECTRICAL CONTRACTOR SHALL PROVIDE A MARKED-UP PLAN WITH LOCATION

PENETRATIONS FOR REVIEW AND APPROVAL OF THE STRUCTURAL ENGINEER

BEFORE ROUGH-IN BEGINS.

2 RECEPTACLES FOR ALL EQUIPMENT SHALL BE COMPLETE WITH PLUGS FOR THIS

EQUIPMENT. THE ELECTRICAL CONTRACTOR SHALL VERIFY NEMA CONFIGURATIONS

OF PLUGS AND RECEPTACLES FOR EQUIPMENT IN THE SPACE.

3 THE CONTRACTOR SHALL MAKE EVERY EFFORT TO MAKE ALL FEEDER RUNS

CONTINUOUS (NO CABLE BREAKS). IF SPLICING CABLES IN BOXES BECOMES

NECESSARY, USE O.Z.G. TYPE "XW" CABLE TAPS, OR APPROVED EQUAL, AND TAPE

EACH TAP IN APPROVED MANNER.

4 THE MECHANICAL CONTRACTOR SHALL PROVIDE DISCONNECT SWITCHES, VFD'S. OR

COMBINATION STARTERS FOR ALL OF THEIR UNITS. THE ELECTRICAL CONTRACTOR

SHALL RECEIVE THESE ITEMS FROM THE MECHANICAL CONTRACTOR FOR

INSTALLATION BY THE ELECTRICAL CONTRACTOR.

5 THE ELECTRICAL CONTRACTOR SHALL COORDINATE CONDUIT PENETRATIONS FOR

ROOFTOP EQUIPMENT WITH MECHANICAL AND ROOFING CONTRACTORS. IF

PROVISIONS ARE NOT IN PLACE FOR THESE PENETRATIONS THE ELECTRICAL

CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING OWN PENETRATIONS AND

CONTRACTING THE ROOF CONTRACTOR FOR SEALING THE ROOF PENETRATIONS.

6 REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION OF ALL MECHANICAL

EQUIPMENT.

7 PROVIDE CONDUIT AND WIRING AS REQUIRED TO MEET CIRCUITING SHOWN TO

CONFORM TO NEC REQUIREMENTS.

8 PROVIDE EQUIPMENT GROUND CONDUCTOR IN ALL RACEWAYS. REFER TO

PANELBOARD SCHEDULES.

9 REFER TO EQUIPMENT CONNECTION SCHEDULE FOR ELECTRICAL REQUIREMENTS

AND CIRCUIT DESIGNATIONS.

10 ROUTE CONDUIT HIGH AGAINST STRUCTURE AND OFFSET UP BETWEEN JOISTS

WHERE NECESSARY TO AVOID DUCT WORK AND HVAC SYSTEM.

11 VERIFY AND COORDINATE EXACT ELECTRICAL REQUIREMENTS OF ALL EQUIPMENT

WITH MANUFACTURER'S RECOMMENDATIONS PRIOR TO INSTALLATION OF

EQUIPMENT.

12 EXISTING ELECTRICAL DEVICES, INCLUDING BUT NOT LIMITED TO, OUTLETS, FIRE

ALARM DEVICES, LIGHT FIXTURES AND DISCONNECT SWITCHES SHALL REMAIN IN

PLACE UNLESS NOTED OTHERWISE. PROVIDE PROTECTIVE COVERS ON SMOKE

DETECTORS DURING CONSTRUCTION.

13 FINAL LOCATIONS OF ELECTRICAL CONNECTIONS SHALL BE COORDINATED WITH

EQUIPMENT MANUFACTURER, DOC AND FINAL EQUIPMENT LAYOUT.

ELECTRICAL KEYNOTES

1 EXISTING JUNCTION BOX AND CIRCUIT FOR CONNECTION TO SECURITY SYSTEM.

2 RELOCATE EXISTING DEVICES AND EXTEND WIRING TO NEW LOCATIONS.

COORDINATE WITH FINAL LOCATIONS OF NEW EQUIPMENT.

3 PROVIDE A JUNCTION BOX, CONDUIT AND CIRCUIT FOR SECURITY CAMERA

CONNECTION SIMILAR TO EXISTING.

4 CEILING MOUNTED CORD REEL AND OUTLETS. REFER TO EQUIPMENT CONNECTION

SCHEDULE AND PROVIDE CEILING MOUNTED LOCKABLE SINGLE RECEPTACLE AT

EACH LOCATION FOR POWER CONNECTION TO CORD REELS.

5 EQUIPMENT MOUNTED JUNCTION BOX WITH DIRECT CONNECTION TO EQUIPMENT

WITH LFMC. HOMERUN CIRCUIT SHALL BE RUN UNDERGROUND. COORDINATE

CONDUIT STUB UP LOCATIONS IN FIELD WITH EQUIPMENT LAYOUT AND

CONNECTION POINT.

6 WATER HEATER (GAS) RECEPTACLES IN WEATHER PROOF IN-USE TYPE METALLIC

ENCLOSURES.

DESCRIPTION DESCRIPTION

Sheets
E-1.2 - ELECTRICAL FLOOR PLANS - AREA B

File details come from the government source that posted it. Updated .