Schomburg 8226263 Equip List.pdf

PDF 21 KB Posted

Attached to
Release Competitive Sealed Bidding IL|25-416CMS-BOPM4-P-84667
Contract number
25-416CMS-BOPM4-P-84667
Issued by
Illinois

About this file

This document is a material proposal from Schomburg & Schomburg Construction, Inc., located in Danville, Illinois, addressed to Mr. Chris Smith, Chief Engineer at Pinckneyville Correctional Center in Pinckneyville, Illinois. The proposal is specifically for material sourced from Wright Building Center in Murphysburg and is labeled as proposal number 11855, dated November 17, 2025. The company is a certified Woman-Owned Small Business (WOSB) as indicated by the certification logo.

The proposal details three specific material items with corresponding pricing: 4EA -1 SQ X .065 X 24' HREW AS13 at $118.00, 2 EA -2 zz_26SO_1184 48"X120" 16GA(.059)HR SHT CQ STRETCH LEVELE at $252.00, and 2 EA -3 zz_26SO_1185 48"X120" 3/4 - 9 F EXP FLAT HR at $301.00. The total proposed material cost is $671.00. The document invites the recipient to reach out with any questions and is signed by Danny Cash, suggesting an open and collaborative approach to the potential material procurement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .