Schedule_A Updated.docx
DOCX document 66 KB Posted
- Attached to
- Computer Numerical Control (CNC) Milling Machine
- Solicitation number
- RFP 591 250000001554 1
- Issued by
- Grand Traverse County, Lansing City, Michigan
About this file
This is a Statement of Work (Schedule A) for Request for Proposal No. 250000001554 issued by the Michigan Department of Transportation (MDOT) for the one-time purchase of a Computer Numerical Control (CNC) milling machine. MDOT is seeking delivery and installation of one Hurco 3-Axis VMX Series High Performance Machining Center, Model VMX42i (or comparable approved alternate) with specifications including a 42" x 24" x 24" capacity, 24 hp, 12,000 rpm, 40 tool changer, dual 19" touch screen monitors, and Windows 10 IoT Enterprise Software-based controls with 3D solid graphics simulation and conversational programming capabilities. The unit must be delivered to the MDOT Construction & Technology Building at 8885 Ricks Road, Lansing, Michigan within 60 calendar days after receipt of order, with installation to be completed within 10 calendar days of delivery. MDOT will conduct final acceptance once the unit is operational and tested by MDOT machinists. The contractor must provide training at no cost to MDOT for 10 employees on unit use and maintenance, including conversational programming instruction available throughout the equipment's life.
The contractor must provide a minimum one-year warranty covering all components or the manufacturer's warranty, whichever is greater, beginning from the delivery date. Pricing is firm for the entire contract term, and the contractor must accept a trade-in of MDOT's existing Hurco VM2 milling machine (purchased November 2004) with the trade-in allowance amount to be indicated on Schedule B; pickup of the trade-in unit must be at no cost to MDOT. All shipping and delivery fees must be included in the quoted price with F.O.B. Destination terms. The unit must be new, latest production model, and free from defects, with all manufacturer-provided hardware and start-up components included. Technical support and service must be available during minimum hours of 8:00 a.m. to 5:00 p.m. Eastern Time, Monday through Friday. Payment will be processed through Electronic Funds Transfer (EFT) only, with invoices submitted to MDOT's designated contact, and the contract will be authorized through a standard purchase order.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Standard Contract Terms CNC Milling Machine.docx | DOCX document | |
| Proposal_Instructions_Confidential_Treatment_Vendor_Questions_Worksheet Updated.docx | DOCX document | |
| Schedule_B_Pricing Updated.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michigan.gov/MiProcurement
Michigan.gov/MiProcurement Schedule a – statement of work contract activities Request for Proposal (RFP) No. 250000001554 Computer Numerical Control (CNC) Milling Machine This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required.
The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.
IMPORTANT NOTE TO CONTRACTORS/BIDDERS: There are specific requirements for which acceptance must be simply acknowledged through a checkbox(es), and others that require further explanation. Click one checkbox and complete the entries as identified.
BACKGROUND
Michigan Department of Transportation (MDOT) is seeking a one-time purchase of a Hurco 3-Axis VMX Series High Performance Machining Center, Model VMX42i, or comparable alternate.
SCOPE
The Contractor must deliver, set up, and provide training on one (1) Hurco VMX42i 42" x 24" x 24", 24 hp, 12,000 rpm, 40 tool changer Machining Center or approved alternate (the “Unit”). Unit must be delivered to and set up in the MDOT Construction & Technology Building located at 8885 Ricks Road, Lansing, Michigan 48917.
REQUIREMENTS
1. General Requirements
1.1. Product Specifications
Bidder may offer alternates to the referenced, preferred make/model. If proposing an alternate, bidder must submit with its bid response the manufacturer’s product literature for the make and model being offered.
MDOT prefers a Hurco 3-Axis VMX Series High Performance Machining Center, Model VMX42i with the following features:
· 42" x 24" x 24", 24 hp, 12,000 rpm, 40 tool changer Machining Center
· Control capable of 3D solid graphics simulation
· Dual 19” Touch Screen Monitors
· 128 GB Solid State Hard Drive
· 64 GB Program Storage
· 2 GB Program Size
· Cycle Interrupt Capability
· Operating system based on Windows 10 IoT Enterprise Software
· Dynamic Variable Lookahead (10,000+ blocks)
· Fully Conversational & G-code programming capabilities
· Optional Offline Programming Software to match controller programming software The Unit must be new, must be the latest model in current production, and must be free from defects. Used or damaged products or components will not be accepted.
The Unit must be furnished with all hardware and components provided by the manufacturer for Start-Up.
The Unit must be installed by the Contractor’s authorized personnel.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
1.2. Training
The Contractor must provide training and/or demonstration of the use and maintenance of the Unit. Training will be provided for 10 MDOT employees.
MDOT will schedule training after the Unit has been accepted and is ready to be placed in service.
MDOT prefers training on conversational programming be available during the life of the Unit.
Training must be at no cost to MDOT.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
1.3. Warranties
The Contractor must provide a minimum one-year warranty covering the Unit and components OR manufacturer’s warranty, whichever is greater. The warranty shall start on the date the Unit is delivered to MDOT.
The State reserves the right to require additional warranties other than those identified by the Contractor in its response to this RFP.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
Bidder must provide detailed information requested below:
Describe any warranties included in the bid
Provide the length of the warranty:
Explain the process for reporting warranty issues:
Explain how any repairs or replacements are made, including timing, etc.:
If the warranty is provided through a third-party or manufacturer, the Contractor must confirm that the manufacturer’s warranty passes through to the State:
Provide the name, address, contact name, phone number and email address of the party responsible for the warranty:
1.4. Recall Requirements and Procedures
The Contractor must describe any recall procedures.
Bidder must provide detailed information as requested in the above requirement(s). If none, enter N/A.
1.5. Quality Assurance Program
The Contractor must describe their Quality Assurance Program(s).
Bidder must provide detailed information as requested in the above requirement(s):
1.6. Incentives – Trade-in
The Contractor must accept a trade-in of MDOT’s existing CNC milling machine (Hurco VM2 ). The machine was purchased in November 2004 and in poor condition. The dollar amount for the trade-in allowance must be indicated on Schedule B. The net price after a trade-in allowance will be considered when determining the low bid price for award.
The Contractor must arrange pickup of the trade-in machine and pickup must be at no cost to MDOT.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
1.7. Delivery
Delivery will be expected within 60 calendar days After Receipt of Order (ARO).
The Unit must be shipped F.O.B. Destination with all shipping and/or delivery fees included in the quoted price.
Delivery must be made at: Michigan Department of Transportation/Machine Shop
| Construction & Technology Bldg. |
| 8885 Ricks Road |
| Lansing, Michigan 48917. |
Delivery will be accepted between the hours of 6:30 am and 1:00 pm Eastern Time, Monday through Friday, except public holidays.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
The Contractor must indicate the delivery method (e.g., Contractor fleet, or other third-party carrier) it intends on utilizing in delivery of the Unit.
Bidder response: Describe delivery method
1.8. Installation
Installation will be expected within 10 calendar days of delivery of the Unit. Installation will be considered complete when the Unit is set up, power is connected, and the Unit is operational.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
2. Service Requirements
2.1. Technical Support, Repairs, and Maintenance
The Contractor must specify its Call Center/Contact telephone number for the State to contact the Contractor for technical support, repairs and maintenance. The Contractor must be available for calls and service during the hours of 8:00 a.m. to 5:00 p.m. Eastern Time, Monday through Friday at a minimum.
Provide contact telephone number:
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
3. Pricing
3.1. Price Term
Pricing is firm for the entire length of the Contract.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
4. Order Authorizing Document The appropriate authorizing document for the Contract will be a purchase order.
5. Acceptance
5.1. Acceptance, Inspection and Testing
Upon delivery, the Unit will be subject to a new unit check-in inspection by MDOT personnel for compliance with the Contract specifications and requirements, and product information. The Unit must be received in undamaged condition both physically and mechanically.
The MDOT Program Manager or designee will determine if the unit is approved or rejected.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
5.2. Final Acceptance
Final acceptance will be determined when the Unit is in operational condition and has been tested by MDOT machinist.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
6. Invoice and Payment
6.1. Invoice Requirements
All invoices submitted to the State must include: (a) date; (b) vendor-generated invoice number; (c) purchase order number; (d) quantity; (e) item description; (f) unit price; (g) and total price.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
6.2. Payment Methods
As required by MCL 18.1283, the State will only disburse payments under this Contract through Electronic Funds Transfer (EFT).
The Contractor is responsible for ensuring current banking information is entered in the State vendor website: www.michigan.gov/SIGMAVSS.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
6.3. Procedure
Invoices must be submitted via email to the MDOT, Carol Casteel, at CasteelC@michigan.gov.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):