RFQ IFB RFP
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODEFACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF.
DATE . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
OFFER
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
17a CONTRACTOR/
OFFEROR.
CODE
8 (A)
SIZE STANDARD:
NAICS:
% FOR:SET ASIDE:UNRESTRICTED OR
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
10. THIS ACQUISITION IS
EDWOSB
SMALL BUSINESS PROGRAM
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PAGE 3 OF 54 SB134118RQ0065
****Offerors: Please ensure your SAM.gov record reflects your small business status for the NAICS code listed in block 10.****
0001 Base: Annual & Semi Annual preventive maintenance.
Provide labor, material, equipment and travel to perform one six-month (semi-annual) and one yearly (annual) preventative maintenance (including but not limited to testing, lubricating and adjustments) of transformers and network protectors at NIST Boulder campus per the Performance Work Statement and attached supporting documents.
FOB : Destination Period of Performance: 04/01/2018 to 03/31/2019
1.00 YR
NTE NTE
0004 Base: Repair line item. Provide labor, material and equipment to perform authorized repair and or replacement services and or install new and re-test transformers, network protectors, and associated equipment at the NIST Boulder campus.
Labor Rate (hourly), during normal business hours:
Labor Rate (hourly), outside normal business hours:
This is a Government funded line item for work approved by the CO only.
FOB : Destination Period of Performance: 04/01/2018 to 03/31/2019
1.00 YR
0005 Optional Line Item: The Contractor shall provide pricing for the cost of performing additional preventive maintenance on Transformers. The Contractor shall provide, a Firm Fixed Unit price under this Line Item. These are optional services which may be exercised multiple times any time during the applicable performance period.
FOB : Destination Period of Performance: 04/01/2018 to 03/31/2019
1.00 EA
OPT
1001 Option Year 1: Annual & Semi Annual preventive maintenance. Provide labor, material, equipment and travel to perform one six-month (semi-annual) and one yearly (annual) preventative maintenance (including but not limited to testing, lubricating and adjustments) of transformers and network protectors at NIST Boulder campus.
FOB : Destination Period of Performance: 04/01/2019 to 03/31/2020
1.00 YR
NTE NTE/OPT
1004 Option Year 1: Repair line item. Provide labor, material and equipment to perform authorized repair and or replacement services and or install new and re-test
PAGE 4 OF 54 SB134118RQ0065
transformers, network protectors, and associated equipment at the NIST Boulder campus.
Labor Rate (hourly), during normal business hours:
Labor Rate (hourly), outside normal business hours:
This is a Government funded line item for work approved by the CO only
FOB : Destination Period of Performance: 04/01/2019 to 03/31/2020
OPT
1005 Option Year 1: Optional Line Item. The Contractor shall provide pricing for the cost of performing additional preventive maintenance on Transformers. The Contractor shall provide, a Firm Fixed Unit price under this Line Item. These are optional services which may be exercised multiple times any time during the applicable performance period.
FOB : Destination Period of Performance: 04/01/2019 to 03/31/2020
1.00 EA
OPT
2001 Option Year 2: Annual & Semi Annual preventive maintenance. Provide labor, material, equipment and travel to perform one six-month (semi-annual) and one yearly (annual) preventative maintenance (including but not limited to testing, lubricating and adjustments) of transformers and network protectors at NIST Boulder campus.
FOB : Destination Period of Performance: 04/01/2020 to 03/31/2021
OPT
2002 Option Year 2: Contractor shall take oil samples and have them tested per job plans. This CLIN is only exercised every 3 years.
FOB : Destination Period of Performance: 04/01/2020 to 03/31/2021
1.00 YR
NTE NTE/OPT
2004 Option Year 2: Repair line item. Provide labor, material and equipment to perform authorized repair and or replacement services and or install new and re-test transformers, network protectors, and associated equipment at the NIST Boulder campus.
Labor Rate (hourly), during normal business hours:
Labor Rate (hourly), outside normal business hours:
PAGE 5 OF 54 SB134118RQ0065
This is a Government funded line item for work approved by the CO only
FOB : Destination Period of Performance: 04/01/2020 to 03/31/2021
OPT
2005 Option Year 2: Optional Line Item. The Contractor shall provide pricing for the cost of performing additional preventive maintenance on Transformers. The Contractor shall provide, a Firm Fixed Unit price under this Line Item. These are optional services which may be exercised multiple times any time during the applicable performance period.
FOB : Destination Period of Performance: 04/01/2020 to 03/31/2021
1.00 EA
OPT
3001 Option Year 3: Annual & Semi Annual preventive maintenance. Provide labor, material, equipment and travel to perform one six-month (semi-annual) and one yearly (annual) preventative maintenance (including but not limited to testing, lubricating and adjustments) of transformers and network protectors at NIST Boulder campus.
FOB : Destination Period of Performance: 04/01/2021 to 03/31/2022
1.00 YR
NTE NTE/OPT
3004 Option Year 3: Repair line item. Provide labor, material and equipment to perform authorized repair and or replacement services and or install new and re-test transformers, network protectors, and associated equipment at the NIST Boulder campus.
Labor Rate (hourly), during normal business hours:
Labor Rate (hourly), outside normal business hours:
This is a Government funded line item for work approved by the CO only
FOB : Destination Period of Performance: 04/01/2021 to 03/31/2022
1.00 YR
OPT
3005 Option Year 3: Optional Line Item. The Contractor shall provide pricing for the cost of performing additional preventive maintenance on Transformers. The Contractor shall provide, a Firm Fixed Unit price under this Line Item. These are optional services which may be exercised multiple times any time during the applicable performance period.
FOB : Destination Period of Performance: 04/01/2021 to 03/31/2022
1.00 EA
OPT
PAGE 6 OF 54 SB134118RQ0065
Option Year 4: Annual & Semi Annual preventive maintenance. Provide labor, material, equipment and travel to perform one six-month (semi-annual) and one yearly (annual) preventative maintenance (including but not limited to testing, lubricating and adjustments) of transformers and network protectors at NIST Boulder campus.
FOB : Destination Period of Performance: 04/01/2022 to 03/31/2023
1.00 YR
OPT
4003 Option Year 4: Partial discharge testing. CLIN exercised every 5 years.
FOB : Destination Period of Performance: 04/01/2022 to 03/31/2023
1.00 YR
NTE NTE/OPT
4004 Option Year 4: Repair line item. Provide labor, material and equipment to perform authorized repair and or replacement services and or install new and re-test transformers, network protectors, and associated equipment at the NIST Boulder campus.
Labor Rate (hourly), during normal business hours:
Labor Rate (hourly), outside normal business hours:
This is a Government funded line item for work approved by the CO only
FOB : Destination Period of Performance: 04/01/2022 to 03/31/2023
1.00 YR
OPT
4005 Option Year 4: Optional Line Item. The Contractor shall provide pricing for the cost of performing additional preventive maintenance on Transformers. The Contractor shall provide, a Firm Fixed Unit price under this Line Item. These are optional services which may be exercised multiple times any time during the applicable performance period.
FOB : Destination Period of Performance: 04/01/2022 to 03/31/2023
1.00 EA
OPT
4006 Option Year 4: Contractor shall perform infrared scan on all transformers per job plan. This option is only performed every 5 years.
FOB : Destination Period of Performance: 04/01/2022 to 03/31/2023
Table of Contents
PAGE 7 OF 54 SB134118RQ0065
Statement of Work
Wage Determination 15-5415 7.25.2017
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JAN 2017)
Addendum to 52.212-1
52.212-2, Evaluation--Commercial Items
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016)
52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JUL 2016)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MANAGEMENT (JUL 2016)
52.204-20 PREDECESSOR OF OFFEROR (JUL 2016)
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (JAN 2017)
52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS (JAN 2017)
52.212-4 I CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS (JAN 2017)--ALTERNATE I (JAN 2017)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL
ITEMS (JAN 2017)
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984)
52.237-3 CONTINUITY OF SERVICES (JAN 1991)
52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS-REPRESENTATION (NOV 2015)... 43
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER
ANY FEDERAL LAW (FEB 2016)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES (APR 2012)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)
1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)
1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
1352.233-70 AGENCY PROTESTS (APR 2010)
1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)
1352.237-75 KEY PERSONNEL (APR 2010)
1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
NIST LOCAL-04BILLING INSTRUCTIONS
NIST LOCAL-36TRAVEL NOTE
NIST LOCAL-39MARKING/PACKING INSTRUCTIONS
Past Performance Questionnaire
PAGE 8 OF 54 SB134118RQ0065
CLAUSES
Statement of Work
STATEMENT OF WORK
TRANSFORMER PREVENTIVE MAINTENANCE (PM) & REPAIRS
12/21/2017
BACKGROUND / OVERVIEW: The National Institute of Standards and Technology (NIST) has a requirement to perform the necessary activities to provide a preventative maintenance and repair / replacement program for transformers, and partial discharge test of medium voltage conductors per the written requirements in this section and the attached documents.
The Contracting Officer’s Representative (COR) will coordinate with the contractor on all activities required throughout the duration of this contract. The contractor will only work with the COR and the Contracting Officer (CO) on all matters pertaining to the contract and the desired result. The contractor will supply and maintain onsite (while work is being performed) a single point of contact which has full authority in all matters concerning this contract.
The contractor will supply all management, supervision, labor, materials and equipment required for the successful completion of the contract for the entire length of this contract. The contractor shall schedule work as to cause the least amount of interference with site operations. Work schedules shall be subject to the approval of the Government. The contractor shall request permission in writing, to interrupt any electrical utility service, a minimum of fourteen calendar days prior to the desired date of interruption and schedule all electrical interruptions on weekends.
Many research laboratories operate continually. Any disruption may cause severe loss of valuable information. Prior to any disconnect of power or shutdown of a system / system component, or the generation of undue vibrations or noise levels, the COR must be notified a minimum of fourteen days prior, to ensure each office or laboratory occupant(s) affected can be notified prior to the activity if it is determined the activity may disrupt the area so ongoing work is not disrupted. Special arrangements may be necessary prior to work of this nature and will be coordinated through the COR and building occupants.
Entrance into laboratories is normally not required. If entrance into the area is required, the contractor shall contact the COR or his/her designee a minimum of fourteen days prior, and arrangements with the owner / occupant to ensure work to be performed will not disrupt or damage technical experiments / projects in the specified area will be coordinated. If an emergency callback is required, all scheduling is at the discretion of the COR.
Note: See the attached General Requirements document for detailed information of performing work on the NIST, Boulder site.
PAGE 9 OF 54 SB134118RQ0065
OBJECTIVE(S) / SCOPE / TASK(S): The contractor shall provide NIST with preventative maintenance of our electrical distribution system for transformers, and to perform a partial discharge test on our medium voltage distribution lines. The specific work to be performed will be provided in the Maximo individual job plans for transformers, and network protectors. There are currently Fifty-six transformers included. Fifty of the transformers are oil type and six (6) are dry type.
The contractor shall provide to the Government the preventative maintenance activities as described in the attachment(s) within the time frame and for the agreed upon cost. All work shall be completed as scheduled in a timely fashion in accordance with the frequencies described for each activity. The scope will also include optional repair and replacement services.
Contract Line Item Numbers (CLINS): 0001, 1001, 2001, 3001, 4001: NIST has various types of transformers. Under CLINs 0001, 1001, 2001, 3001 and 4001, the contractor shall be required to perform preventive maintenance on the transformers two times a year per the supplied job plans one six-month (semi- annual) preventive maintenance then one annual preventive maintenance and a five-year preventative maintenance on transformers and network protectors per the schedule below and associated job plans.
CLIN 0001 – Base Year – Perform one six-month (semi-annual) and one yearly (annual) preventative maintenance per attached Transformer Job Plans.
CLIN 0004- Base Year - Repair Line Item any work performed under this CLIN shall be authorized by the Contracting Officer. Provide labor, material and equipment to perform authorized repair and/or replacement services and/or install and purchase of new transformer, switch gear and electrical feeds for all electrical systems on our medium and high voltage system at NIST boulder.
Optional CLIN 0005 - Base Year- This CLIN is for additional preventive maintenance for transformers added due to expansion or remodeling of facilities. These are optional services which may be exercised multiple times, anytime during the applicable performance period.
CLIN 1001 – Option Year One – Perform one six-month (semi-annual) and one yearly (annual) preventative maintenance according to attached Transformer Job Plans.
CLIN 1004- Option Year One- Repair Line Item any work performed under this CLIN shall be authorized by the Contracting Officer. Provide labor, material and equipment to perform authorized repair and/or replacement services and or install new transformer, switch gear and electrical feeds for all electrical systems on our medium and high voltage system at NIST boulder.
Optional CLIN 1005- Option Year One-This CLIN is for additional preventive maintenance for equipment added due to expansion or remodeling of facilities. These are optional services which may be exercised multiple times, anytime during the applicable performance period.
CLIN 2001 – Option Year Two - Perform one six-month (semi-annual) and one yearly (annual) preventative maintenance according to attached Transformer Job Plans.
CLIN 2002-Option Year Two- Contractor shall take oil samples of all oil filled transformers and have them tested per job plans.
CLIN 2004- Option Year Two- Repair Line Item any work performed under this CLIN shall be authorized by the Contracting Officer. Provide labor, material and equipment to perform authorized repair
PAGE 10 OF 54 SB134118RQ0065
and/or replacement services and or install new transformer, switch gear and electrical feeds for all electrical systems on our medium and high voltage system at NIST boulder.
Optional CLIN 2005-Option Year Two- This CLIN is for additional preventive maintenance for equipment added due to expansion or remodeling of facilities. These are optional services which may be exercised multiple times, any time during the applicable performance period.
CLIN 3001 – Option Year Three – Perform one six-month (semi-annual) and one yearly (annual) preventative maintenance according to attached Transformer Job Plans.
CLIN 3004- Option Year Three- Repair Line Item any work performed under this CLIN shall be authorized by the Contracting Officer. Provide labor, material and equipment to perform authorized repair and/or replacement services and or install new transformer, switch gear and electrical feeds for all electrical systems on our medium and high voltage system at NIST boulder.
Optional CLIN 3005-Option Year Three- This CLIN is for additional preventive maintenance for equipment added due to expansion or remodeling of facilities. These are optional services which may be exercised multiple times, any time during the applicable performance period.
CLIN 4001 – Option Year Four - Perform one six-month (semi-annual) and one five-year preventative maintenance per attached Transformer Job Plans.
CLIN 4003- Option Year Four- the contractor shall perform partial discharge tests once in option year 4 of the contract. The partial discharge test shall be performed on the cable circuits identified with numbers 1 through 65 by the Facility Maintenance Division Boulder (FMD-B) Electrical Engineer per the attached site single-line drawing. The work shall be performed while the medium voltage circuits and equipment remain in service and energized.
CLIN 4004- Option Year Four- Repair Line Item any work performed under this CLIN shall be authorized by the Contracting Officer. Provide labor, material and equipment to perform authorized repair and/or replacement services and or install new transformer, switch gear and electrical feeds for all electrical systems on our medium and high voltage system at NIST boulder.
Optional CLIN 4005-Option Year Four- This CLIN is for additional preventive maintenance for equipment added due to expansion or remodeling of facilities. These are optional services which may be exercised multiple times, any time during the applicable performance period.
CLIN 4006- Option Year Four- Contractor shall perform infrared scan on all transformers per job plan.
This option is only performed every 5 years.
Note: The contractor shall be responsible for pulling the fuses to deenergize the transformer distribution power prior to performing the preventative maintenance. For further detail, refer to the attached Transformer Equipment List and Transformer Job Plan(s).
As part of the requirements of these line items, after testing, the contractor shall provide to NIST a comprehensive report that identifies numerically and graphically the magnitude of partial discharge detected for each circuit and each cable section tested. The report shall provide commentary regarding the significance of the partial discharge detected and shall also provide conclusions and recommendations for corrective action as appropriate. The report shall be due to the COR by the end of the month following the month tested. In addition, the test report shall include the following:
PAGE 11 OF 54 SB134118RQ0065
(1) Test Results.
(2) Description of circuits and cable sections tested.
(3) Identification of the test equipment used.
(4) Date work was performed.
(5) Identification of the person that performed the tests.
The purpose for this testing is to develop data that will assist in assessing the condition of our medium voltage cable systems. Data collected during this testing must be of a nature that will enable data trending to assess degradation over time.
CLINS 0004, 1004, 2004, 3004, 4004: Any work performed under these line items shall be authorized by the CO prior to being initiated. The contractor shall submit a quote, along with a detailed description of the work to be completed. The quote will then be evaluated for price reasonableness. The CO will approve the work based on the quote and concurrence from the COR. The contractor exceeds the amount approved by the CO at their own risk. The quote will include labor (at the hourly rate established in the contract) and material and equipment (at cost, plus direct handling fees that may be charged) to perform authorized repair and/or replacement services and or install new transformer, switch gear and electrical feeds for all electrical systems on our medium and high voltage system at NIST Boulder and NIST Fort Collins. The government will not pay any markup, overhead or profit, on subcontractor invoices. FAR 52.212-4, Alternate I, applies to these CLINS.
Normal business hours are Monday through Friday, 7:00am to 5:00pm, except federal holidays.
Optional CLINS 0005, 1005, 2005, 3005, 4005: These CLINs are for additional transformers added due to expansion of facilities. These are optional services which may be exercised multiple times, any time during the applicable performance period.
INSPECTIONS AND TESTS: NIST will provide a written copy of all transformers and job plans for all transformers that are included. NIST will provide a list of transformers that are due for maintenance on the first day of the month in the month that the preventive maintenance is due. The contractor shall have until the last day of the month that the PM’s were issued to complete the preventive maintenance. All reports must be due to the COR within 30 days after preventive maintenance or testing is completed.
All equipment shall be operated, inspected, tested, and maintained with consideration to ensure.
(1) Minimal disruption to research laboratories and their environmental controls.
(2) Minimal disruption to building occupants.
(3) Minimal disruption to other building systems.
(4) To ensure efficient and safe operation always.
(5) To ensure compliance to all minimum specifications.
Walk through inspections will be conducted on a routine basis without notification to the contractor. IF the COR/Inspector documents any out of compliance conditions with the specifications, the COR will notify the POC for contractor clearly detailing the nonconformance.
The contractor shall provide back to the COR in writing what the contractor shall do to remedy the nonconformance along with a timeframe in which another inspection can be scheduled to review the specific condition.
PAGE 12 OF 54 SB134118RQ0065
January 9, 2015 11:19:23 AM MST
1 / 2
Job Plan List
Job Plan : JP-XMR-A-DRY Description : Annual-XMR-Master-CONTRACT
Task Sequence
Task Task Description Task Long Description
0 0 SAFETY SAFETY: WHEN TAKING VOLTAGE OR CURRENT MEASUREMENTS,
USE THE PROPER EQUIPMENT IN AN APPROVED MANNER.
0 1 OBTAIN PM Obtain PM from COR. The PM may be issued in a handheld device or paper.
0 3 SCHEDULE THE PM Schedule the PM with the COR. NO equipment will be shut down without scheduling with the COR.
0 5 REVIEW Review all steps in PM.
Review safety requirements for this equipment and space.
Review manufacturer's instructions and equipment history record, if available.
0 7 EQUIPMENT SHUTDOWN SAFETY If shut-down is necessary; de-energize, tag, and lock out electrical circuits to motors, pumps, control circuits, etc and de-energize pressure in lines before working on equipment. Ensure that the people affected have been notified (COR to notify) and associated equipment's operation will not be affected.
0 9 CHECK WITH OPERATING OR AREA PERSONNEL Check with operating or area personnel for any deficiencies.
0 10 CHECK AND RECORD SECONDARY VOLTAGE CHECK AND RECORD SECONDARY VOLTAGE OF TRANSFORMER
UNDER LOAD. READINGS SHOULD BE TAKEN BETWEEN PHASES
AND FROM PHASE TO NEUTRAL. RECORD THE TIME EACH
READING WAS TAKEN . WHEN TRANSFORMERS ARE CONNECTED
IN PARALLEL, THE SECONDARY VOLTAGES SHOULD BE EQUAL.
IF TRANSFORMER VOLTAGE APPEARS TO BE ABOVE OR BELOW AN
ACCEPTABLE LEVEL (115-120V) NOTIFY THE COR FOR APPROVAL
TO MAKE TAP CHANGES. MAKE THE NECESSARY ADJUSTMENTS,
(TAP CHANGES) TO SET THE TRANSFORMER OUTPUT VOLTAGE AS
CLOSE TO THIS LEVEL AS POSSIBLE.
0 20 EXAMINE EXTERIOR EXAMINE EXERIOR OF THE TRANSFOMER FOR ANY DAMAGE,
CRACKS, RUST OR LEAKS; CHECK AROUND THE GASKETS,
PRESSURE RELIEF DEVICE AND THE COOLING FINS.
0 30 VISUAL AND MECHANICAL INSPECTION A: INSPECT FOR PHYSICAL DAMAGE, PROPER INSTALLATION, ANCHORAGE AND GROUNDING
B: CLEAN INTERIOR AND ALL BUSHING AND INSULATOR
PAGE 13 OF 54 SB134118RQ0065
January 9, 2015 11:19:23 AM MST
2 / 2
SURFACES AS APPLICABLE.
C: CHECK TIGHTNESS OF ACCESSIBLE BOLTED ELECTRICAL
JOINTS.
D: VERIFY PROPER AUXILIARY DEVICE OPERATION SUCH AS FANS
AND INDICATOR SET POINTS.
0 60 TEST AND CHECK TRANSFORMER VAULT VENTILATION TEST AND SET TRANSFORMER VAULT FAN AND HIGH
TEMPERATURE LIMIT CONTROLS.
A. ROOM TEMPERATURE SETTING @70 DEG F OR 21 DEG C.
B. HIGH LIMIT (ALARM) @ 100 DEG F OR 37 DEG C.
C. CHECK LOCAL ALARM FOR PROPER OPERATION.
0 70 SERVICE VAULT EXHAUST FAN CHECK TENSION, CONDITION AND ALIGNMENT OF BELTS, ADJUST
AS NECESSARY. LUBRICATE MOTOR/ PULLY ASSEMBLY ON VAULT
FAN.
0 90 CLEAN EXTERIOR TRANSFORMER CLEAN EXTERIOR OF TRANSFORMERS, SWITCHGEAR AND VAULT
FLOOR.
0 999 COMPLETE PM COMPLETE THE PM ON HANDHELD OR PAPER; NOTING
CONDITION, SUSPECT PROBLEMS, PARTS USED,GAUGE/ METER
READINGS, ETC.
NOTIFY COR IF ANY EQUIPMENT REQUIRES REPLACEMENT AND
NOTE ON PM.
Number of Records: 13
PAGE 14 OF 54 SB134118RQ0065
January 9, 2015 11:24:47 AM MST
1 / 2
Job Plan : JP-XMR-SA-DRY Description : Semi-A XMR-Master-CONTRACT
Task Task Description Task Long Description
0 0 SAFETY SAFETY: WHEN TAKING VOLTAGE OR CURRENT MEASUREMENTS,
USE THE PROPER EQUIPMENT IN AN APPROVED MANNER.
0 1 OBTAIN PM Obtain PM from COR. The PM may be issued in a handheld device or paper.
0 3 SCHEDULE THE PM Schedule the PM with the COR. NO equipment will be shut down without scheduling with the COR.
0 5 REVIEW Review all steps in PM.
Review safety requirements for this equipment and space.
Review manufacturer's instructions and equipment history record, if available.
0 7 EQUIPMENT SHUTDOWN SAFETY If shut-down is necessary; de-energize, tag, and lock out electrical circuits to motors, pumps, control circuits, etc and de-energize pressure in lines before working on equipment. Ensure that the people affected have been notified (COR to notify) and associated equipment's operation will not be affected.
0 9 CHECK WITH OPERATING OR AREA PERSONNEL Check with operating or area personnel for any deficiencies.
0 10 CHECK AND RECORD SECONDARY VOLTAGE CHECK AND RECORD SECONDARY VOLTAGE OF TRANSFORMER
UNDER LOAD. READINGS SHOULD BE TAKEN BETWEEN PHASES
AND FROM PHASE TO NEUTRAL. RECORD THE TIME EACH
READING WAS TAKEN . WHEN TRANSFORMERS ARE CONNECTED
IN PARALLEL, THE SECONDARY VOLTAGES SHOULD BE EQUAL.
IF TRANSFORMER VOLTAGE APPEARS TO BE ABOVE OR BELOW AN
ACCEPTABLE LEVEL (115-120V) NOTIFY THE COR FOR APPROVAL
TO MAKE TAP CHANGES. MAKE THE NECESSARY ADJUSTMENTS,
(TAP CHANGES) TO SET THE TRANSFORMER OUTPUT VOLTAGE AS
CLOSE TO THIS LEVEL AS POSSIBLE.
0 20 EXAMINE EXTERIOR EXAMINE EXERIOR OF THE TRANSFOMER FOR ANY DAMAGE,
PRESSURE RELIEF DEVICE AND THE COOLING FINS.
PAGE 15 OF 54 SB134118RQ0065
January 9, 2015 11:24:47 AM MST
2 / 2
B. HIGH LIMIT (ALARM) @ 100 DEG F OR 37 DEG C.
C. CHECK LOCAL ALARM FOR PROPER OPERATION.
0 70 SERVICE VAULT EXHAUST FAN CHECK TENSION, CONDITION AND ALIGNMENT OF BELTS, ADJUST
AS NECESSARY. LUBRICATE MOTOR/ PULLY ASSEMBLY ON VAULT
FAN.
0 90 CLEAN EXTERIOR TRANSFORMER CLEAN EXTERIOR OF TRANSFORMERS, SWITCHGEAR AND VAULT
FLOOR.
0 999 COMPLETE PM COMPLETE THE PM ON HANDHELD OR PAPER; NOTING CONDITION,
SUSPECT PROBLEMS, PARTS USED,GAUGE/ METER READINGS, ETC.
NOTIFY COR IF ANY EQUIPMENT REQUIRES REPLACEMENT AND
NOTE ON PM.
Number of Records: 12
PAGE 16 OF 54 SB134118RQ0065
January 9, 2015 10:46:17 AM MST
1 / 3
Job Plan : JP-XMR-5YRDRY Description : 5yr-DRY-xmr-master CONTRACT
Task Task Description Task Long Description
0 0 SAFETY SAFETY: WHEN TAKING VOLTAGE OR CURRENT
MEASUREMENTS, USE THE PROPER EQUIPMENT IN AN
APPROVED MANNER.
0 1 OBTAIN PM Obtain PM from COR. The PM may be issued in a handheld device or paper.
0 3 SCHEDULE THE PM Schedule the PM with the COR. NO equipment will be shut down without scheduling with the COR.
0 5 REVIEW Review all steps in PM.
Review safety requirements for this equipment and space.
Review manufacturer's instructions and equipment history record, if available.
0 7 EQUIPMENT SHUTDOWN SAFETY If shut-down is necessary; de-energize, tag, and lock out electrical circuits to motors, pumps, control circuits, etc and de-energize pressure in lines before working on equipment. Ensure that the people affected have been notified (COR to notify) and associated equipment's operation will not be affected.
0 9 CHECK WITH OPERATING OR AREA PERSONNEL Check with operating or area personnel for any deficiencies.
0 10 CHECK AND RECORD SECONDARY VOLTAGE CHECK AND RECORD SECONDARY VOLTAGE OF TRANSFORMER
UNDER LOAD. READINGS SHOULD BE TAKEN BETWEEN
PHASES AND FROM PHASE TO NEUTRAL. RECORD THE TIME
EACH READING WAS TAKEN . WHEN TRANSFORMERS ARE
CONNECTED IN PARALLEL, THE SECONDARY VOLTAGES
SHOULD BE EQUAL.
IF TRANSFORMER VOLTAGE APPEARS TO BE ABOVE OR BELOW
AN ACCEPTABLE LEVEL (115-120V) NOTIFY THE COR FOR
APPROVAL TO MAKE TAP CHANGES. MAKE THE NECESSARY
ADJUSTMENTS, (TAP CHANGES) TO SET THE TRANSFORMER
OUTPUT VOLTAGE AS CLOSE TO THIS LEVEL AS POSSIBLE
Perform Infrared Scan on transformer and record findings.
0 20 EXAMINE EXTERIOR EXAMINE EXERIOR OF THE TRANSFOMER FOR ANY DAMAGE,
PRESSURE RELIEF DEVICE AND THE COOLING FINS.
PAGE 17 OF 54 SB134118RQ0065
2 / 3
0 30 VISUAL AND MECHANICAL INSPECTION A: INSPECT FOR PHYSICAL DAMAGE, PROPER INSTALLATION, ANCHORAGE AND GROUNDING
B: CLEAN INTERIOR AND ALL BUSHING AND INSULATOR
SURFACES AS APPLICABLE.
C: CHECK TIGHTNESS OF ACCESSIBLE BOLTED ELECTRICAL
JOINTS.
D: VERIFY PROPER AUXILIARY DEVICE OPERATION SUCH AS
FANS AND INDICATOR SET POINTS.
E: Perform Infrared scan on transformer.
0 40 ELECTRICAL TEST A: PERFORM INSULATION RESISTANCE TESTS WINDING-TO-
WINDING AND WINDING-TO- GROUND.
B: PERFORM DIELECTRIC ABSORPTION TEST WINDING-TO-
WINDING AND WINDING-TO-GROUND FOR TEN ( 10 ) MINUTES.
THE POLARIZATION INDEX WILL BE COMPUTED.
C: PERFORM TURNS RATIO TEST BETWEEN PRIMARY AND
SECONDARY WINDINGS WITH TRANSFORMER SET ON
NOMINAL POSITION.
RECORD AND REPORT ALL RESULTS OF TESTING.
0 50 PARTIAL DISCHARGE TESTING OF MEDIUM VOLTAGE
CABLE
1) IT SHOULD BE NOTED THAT ALL MEASUREMENTS ARE
PERFORMED ON ENERGIZED CABLE, THEREFORE, NO DE-
ENERGIZATION OF " MV " CABLE WILL BE REQUIRED TO
PERFORM THIS TESTING. IT SHOULD BE FURTHER NOTED THAT
ALL ON-LINE PARTIAL DISCHARGE TESTING IS TO BE
PERFORMED AS NON-DESTRUCTIVE AND NON-INVASIVE.
2) AFTER THE DISCHARGES ARE MEASURED, THE RESULTS
WILL BE CATEGORIZED UTILIZING THE FOLLOWING CRITERIA.
CLASSIFICATION RESULT
RECOMMENDATION
A ( GREEN ) NO SIGNIFICANT PD NO ACTION
REQUIRED
B (YELLOW) SIGNIFICANT PD RE-TEST IN 12-18
MONTHS
( WITHIN BASELINE FINDINGS)
PAGE 18 OF 54 SB134118RQ0065
3 / 3
C (RED) EXCESSIVE PD REPAIR/
REPLACE
CABLE/
COMPONENT
B. HIGH LIMIT (ALARM) @ 100 DEG F OR 37 DEG C.
C. CHECK LOCAL ALARM FOR PROPER OPERATION.
0 70 SERVICE VAULT EXHAUST FAN CHECK TENSION, CONDITION AND ALIGNMENT OF BELTS,
ADJUST AS NECESSARY. LUBRICATE MOTOR/ PULLY
ASSEMBLY ON VAULT FAN.
0 80 REPLACE FILTERS REPLACE INTAKE AIR FILTERS FOR VAULT.
0 90 CLEAN EXTERIOR TRANSFORMER CLEAN EXTERIOR OF TRANSFORMERS, SWITCHGEAR AND
VAULT FLOOR.
0 100 REMOVE WEEDS AND TRASH REMOVE WEEDS AND TRASH AROUND TRANSFORMER AND
PAD. VEGETATION (EXCEPT WELL TRIMMED SOD) SHOULD
NOT BE CLOSER THAN 36" FROM PAD.
0 998 COMPLETE " NEW EQUIPMENT REPORT FORM" COMPLETE NEW EQUIPMENT REPORT FORM FOR DATA THAT
APPLIES TO THIS PIECE OF EQUIPMENT. SEE EXAMPLE FORM
AND CLASSIFICATION & ATTRIBUTE TABLES; PROVIDDED BY
YOUR COR
0 999 COMPLETE PM COMPLETE THE PM ON HANDHELD OR PAPER; NOTING
CONDITION, SUSPECT PROBLEMS, PARTS USED,GAUGE/ METER
READINGS, ETC.
NOTIFY COR IF ANY EQUIPMENT REQUIRES REPLACEMENT
AND NOTE ON PM.
Number of Records: 18
PAGE 19 OF 54 SB134118RQ0065
Wage Determination 15-5415 7.25.2017 WD 15-5415 (Rev.-5) was first posted on www.wdol.gov on 08/01/2017
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-5415 Daniel W. Simms Division of | Revision No.: 5 Director Wage Determinations| Date Of Revision: 07/25/2017 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: Colorado
Area: Colorado County of Boulder **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 16.23 01012 - Accounting Clerk II 18.19 01013 - Accounting Clerk III 20.35 01020 - Administrative Assistant 26.31 01035 - Court Reporter 19.59 01041 - Customer Service Representative I 12.50 01042 - Customer Service Representative II 14.07 01043 - Customer Service Representative III 15.34 01051 - Data Entry Operator I 15.40 01052 - Data Entry Operator II 16.79 01060 - Dispatcher, Motor Vehicle 21.31 01070 - Document Preparation Clerk 16.01 01090 - Duplicating Machine Operator 16.01 01111 - General Clerk I 14.67 01112 - General Clerk II 15.99 01113 - General Clerk III 17.95 01120 - Housing Referral Assistant 21.75 01141 - Messenger Courier 13.82 01191 - Order Clerk I 16.01 01192 - Order Clerk II 17.46 01261 - Personnel Assistant (Employment) I 17.29 01262 - Personnel Assistant (Employment) II 19.35 01263 - Personnel Assistant (Employment) III 21.56 01270 - Production Control Clerk 26.91 01290 - Rental Clerk 15.53 01300 - Scheduler, Maintenance 17.15 01311 - Secretary I 17.15 01312 - Secretary II 19.19 01313 - Secretary III 21.75 01320 - Service Order Dispatcher 17.39 01410 - Supply Technician 26.31 01420 - Survey Worker 17.77 01460 - Switchboard Operator/Receptionist 14.28 01531 - Travel Clerk I 13.55 01532 - Travel Clerk II 14.20
PAGE 20 OF 54 SB134118RQ0065
01533 - Travel Clerk III 15.19 01611 - Word Processor I 15.57 01612 - Word Processor II 17.47 01613 - Word Processor III 19.55 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 26.19 05010 - Automotive Electrician 21.10 05040 - Automotive Glass Installer 19.75 05070 - Automotive Worker 19.75 05110 - Mobile Equipment Servicer 17.61 05130 - Motor Equipment Metal Mechanic 22.42 05160 - Motor Equipment Metal Worker 19.75 05190 - Motor Vehicle Mechanic 22.42 05220 - Motor Vehicle Mechanic Helper 16.41 05250 - Motor Vehicle Upholstery Worker 19.36 05280 - Motor Vehicle Wrecker 19.75 05310 - Painter, Automotive 21.10 05340 - Radiator Repair Specialist 19.75 05370 - Tire Repairer 14.98 05400 - Transmission Repair Specialist 22.42 07000 - Food Preparation And Service Occupations 07010 - Baker 14.52 07041 - Cook I 14.14 07042 - Cook II 16.36 07070 - Dishwasher 10.89 07130 - Food Service Worker 11.39 07210 - Meat Cutter 15.13 07260 - Waiter/Waitress 10.65 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 19.06 09040 - Furniture Handler 15.90 09080 - Furniture Refinisher 19.06 09090 - Furniture Refinisher Helper 15.90 09110 - Furniture Repairer, Minor 18.10 09130 - Upholsterer 19.06 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 11.43 11060 - Elevator Operator 12.62 11090 - Gardener 18.58 11122 - Housekeeping Aide 12.62 11150 - Janitor 12.62 11210 - Laborer, Grounds Maintenance 14.67 11240 - Maid or Houseman 10.08 11260 - Pruner 13.16 11270 - Tractor Operator 17.30 11330 - Trail Maintenance Worker 14.67 11360 - Window Cleaner 14.05 12000 - Health Occupations 12010 - Ambulance Driver 18.67 12011 - Breath Alcohol Technician 20.66 12012 - Certified Occupational Therapist Assistant 23.57 12015 - Certified Physical Therapist Assistant 22.69 12020 - Dental Assistant 18.55 12025 - Dental Hygienist 41.72 12030 - EKG Technician 28.12 12035 - Electroneurodiagnostic Technologist 28.12 12040 - Emergency Medical Technician 18.67 12071 - Licensed Practical Nurse I 19.81 12072 - Licensed Practical Nurse II 22.16 12073 - Licensed Practical Nurse III 24.70 12100 - Medical Assistant 16.78 12130 - Medical Laboratory Technician 18.46 12160 - Medical Record Clerk 17.22 12190 - Medical Record Technician 19.27 12195 - Medical Transcriptionist 19.92 12210 - Nuclear Medicine Technologist 43.14 12221 - Nursing Assistant I 11.78
PAGE 21 OF 54 SB134118RQ0065
12222 - Nursing Assistant II 13.25 12223 - Nursing Assistant III 14.46 12224 - Nursing Assistant IV 16.23 12235 - Optical Dispenser 20.96 12236 - Optical Technician 18.46 12250 - Pharmacy Technician 16.19 12280 - Phlebotomist 16.66 12305 - Radiologic Technologist 29.54 12311 - Registered Nurse I 29.98 12312 - Registered Nurse II 36.67 12313 - Registered Nurse II, Specialist 36.67 12314 - Registered Nurse III 43.96 12315 - Registered Nurse III, Anesthetist 43.96 12316 - Registered Nurse IV 53.17 12317 - Scheduler (Drug and Alcohol Testing) 27.05 12320 - Substance Abuse Treatment Counselor 20.63 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 22.34 13012 - Exhibits Specialist II 27.68 13013 - Exhibits Specialist III 33.85 13041 - Illustrator I 24.27 13042 - Illustrator II 27.95 13043 - Illustrator III 34.20 13047 - Librarian 34.23 13050 - Library Aide/Clerk 15.88 13054 - Library Information Technology Systems 30.92 Administrator 13058 - Library Technician 17.64 13061 - Media Specialist I 22.30 13062 - Media Specialist II 24.95 13063 - Media Specialist III 27.82 13071 - Photographer I 18.54 13072 - Photographer II 20.74 13073 - Photographer III 25.70 13074 - Photographer IV 34.57 13075 - Photographer V 41.82 13090 - Technical Order Library Clerk 18.16 13110 - Video Teleconference Technician 19.03 14000 - Information Technology Occupations 14041 - Computer Operator I 17.81 14042 - Computer Operator II 19.93 14043 - Computer Operator III 22.21 14044 - Computer Operator IV 24.69 14045 - Computer Operator V 28.56 14071 - Computer Programmer I (see 1) 24.31 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 17.81 14160 - Personal Computer Support Technician 24.69 14170 - System Support Specialist 29.69 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 35.58 15020 - Aircrew Training Devices Instructor (Rated) 43.06 15030 - Air Crew Training Devices Instructor (Pilot) 49.15 15050 - Computer Based Training Specialist / Instructor 35.58 15060 - Educational Technologist 34.29 15070 - Flight Instructor (Pilot) 49.15 15080 - Graphic Artist 25.65 15085 - Maintenance Test Pilot, Fixed, Jet/Prop 42.28 15086 - Maintenance Test Pilot, Rotary Wing 42.28 15088 - Non-Maintenance Test/Co-Pilot 42.28 15090 - Technical Instructor 24.03 15095 - Technical Instructor/Course Developer 29.39
PAGE 22 OF 54 SB134118RQ0065
15110 - Test Proctor 19.40 15120 - Tutor 19.40 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 10.17 16030 - Counter Attendant 10.17 16040 - Dry Cleaner 13.15 16070 - Finisher, Flatwork, Machine 10.17 16090 - Presser, Hand 10.17 16110 - Presser, Machine, Drycleaning 10.17 16130 - Presser, Machine, Shirts 10.17 16160 - Presser, Machine, Wearing Apparel, Laundry 10.17 16190 - Sewing Machine Operator 14.04 16220 - Tailor 14.92 16250 - Washer, Machine 11.31 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 22.17 19040 - Tool And Die Maker 26.10 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 16.46 21030 - Material Coordinator 26.91 21040 - Material Expediter 26.91 21050 - Material Handling Laborer 17.36 21071 - Order Filler 13.44 21080 - Production Line Worker (Food Processing) 16.46 21110 - Shipping Packer 16.72 21130 - Shipping/Receiving Clerk 16.72 21140 - Store Worker I 12.22 21150 - Stock Clerk 16.94 21210 - Tools And Parts Attendant 16.46 21410 - Warehouse Specialist 16.46 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 28.53 23019 - Aircraft Logs and Records Technician 22.49 23021 - Aircraft Mechanic I 27.10 23022 - Aircraft Mechanic II 28.53 23023 - Aircraft Mechanic III 29.70 23040 - Aircraft Mechanic Helper 19.22 23050 - Aircraft, Painter 25.80 23060 - Aircraft Servicer 22.49 23070 - Aircraft Survival Flight Equipment Technician 25.80 23080 - Aircraft Worker 24.13 23091 - Aircrew Life Support Equipment (ALSE) Mechanic 24.13 I 23092 - Aircrew Life Support Equipment (ALSE) Mechanic 27.10
II
23110 - Appliance Mechanic 22.34 23120 - Bicycle Repairer 16.48 23125 - Cable Splicer 33.63 23130 - Carpenter, Maintenance 19.40 23140 - Carpet Layer 22.45 23160 - Electrician, Maintenance 27.39 23181 - Electronics Technician Maintenance I 24.35 23182 - Electronics Technician Maintenance II 26.02 23183 - Electronics Technician Maintenance III 27.62 23260 - Fabric Worker 21.04 23290 - Fire Alarm System Mechanic 25.49 23310 - Fire Extinguisher Repairer 19.53 23311 - Fuel Distribution System Mechanic 25.81 23312 - Fuel Distribution System Operator 20.87 23370 - General Maintenance Worker 19.47 23380 - Ground Support Equipment Mechanic 27.10 23381 - Ground Support Equipment Servicer 22.49 23382 - Ground Support Equipment Worker 24.13 23391 - Gunsmith I 19.42 23392 - Gunsmith II 22.45 23393 - Gunsmith III 25.49 23410 - Heating, Ventilation And Air-Conditioning 24.60
PAGE 23 OF 54 SB134118RQ0065
Mechanic 23411 - Heating, Ventilation And Air Contidioning 25.90 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 24.72 23440 - Heavy Equipment Operator 22.34 23460 - Instrument Mechanic 28.48 23465 - Laboratory/Shelter Mechanic 23.99 23470 - Laborer 13.87 23510 - Locksmith 23.07 23530 - Machinery Maintenance Mechanic 28.05 23550 - Machinist, Maintenance 23.39 23580 - Maintenance Trades Helper 17.98 23591 - Metrology Technician I 28.48 23592 - Metrology Technician II 29.99 23593 - Metrology Technician III 31.21 23640 - Millwright 25.49 23710 - Office Appliance Repairer 22.29 23760 - Painter, Maintenance 18.26 23790 - Pipefitter, Maintenance 26.08 23810 - Plumber, Maintenance 24.12 23820 - Pneudraulic Systems Mechanic 25.49 23850 - Rigger 25.49 23870 - Scale Mechanic 22.45 23890 - Sheet-Metal Worker, Maintenance 21.26 23910 - Small Engine Mechanic 21.68 23931 - Telecommunications Mechanic I 32.77 23932 - Telecommunications Mechanic II 34.49 23950 - Telephone Lineman 25.67 23960 - Welder, Combination, Maintenance 21.05 23965 - Well Driller 25.27 23970 - Woodcraft Worker 25.49 23980 - Woodworker 19.42 24000 - Personal Needs Occupations 24550 - Case Manager 15.93 24570 - Child Care Attendant 12.32 24580 - Child Care Center Clerk 15.59 24610 - Chore Aide 12.01 24620 - Family Readiness And Support Services 15.93 Coordinator 24630 - Homemaker 16.29 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 28.84 25040 - Sewage Plant Operator 27.58 25070 - Stationary Engineer 28.84 25190 - Ventilation Equipment Tender 20.24 25210 - Water Treatment Plant Operator 27.58 27000 - Protective Service Occupations 27004 - Alarm Monitor 22.91 27007 - Baggage Inspector 13.34 27008 - Corrections Officer 25.70 27010 - Court Security Officer 27.27 27030 - Detection Dog Handler 21.32 27040 - Detention Officer 25.70 27070 - Firefighter 29.40 27101 - Guard I 13.34 27102 - Guard II 21.32 27131 - Police Officer I 31.71 27132 - Police Officer II 35.25 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 13.99 28042 - Carnival Equipment Repairer 15.20 28043 - Carnival Worker 10.44 28210 - Gate Attendant/Gate Tender 16.58 28310 - Lifeguard 11.73 28350 - Park Attendant (Aide) 18.43 28510 - Recreation Aide/Health Facility Attendant 13.53 28515 - Recreation Specialist 19.70
PAGE 24 OF 54 SB134118RQ0065
28630 - Sports Official 14.76 28690 - Swimming Pool Operator 17.58 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 23.50 29020 - Hatch Tender 23.50 29030 - Line Handler 23.50 29041 - Stevedore I 21.91 29042 - Stevedore II 25.48 30000 - Technical Occupations 30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 40.65 30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 28.02 30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 30.87 30021 - Archeological Technician I 19.40 30022 - Archeological Technician II 21.70 30023 - Archeological Technician III 26.89 30030 - Cartographic Technician 26.41 30040 - Civil Engineering Technician 27.07 30051 - Cryogenic Technician I 27.53 30052 - Cryogenic Technician II 29.50 30061 - Drafter/CAD Operator I 18.45 30062 - Drafter/CAD Operator II 20.65 30063 - Drafter/CAD Operator III 23.84 30064 - Drafter/CAD Operator IV 31.50 30081 - Engineering Technician I 18.44 30082 - Engineering Technician II 20.69 30083 - Engineering Technician III 23.15 30084 - Engineering Technician IV 28.69 30085 - Engineering Technician V 35.09 30086 - Engineering Technician VI 42.45 30090 - Environmental Technician 24.08 30095 - Evidence Control Specialist 24.12 30210 - Laboratory Technician 23.30 30221 - Latent Fingerprint Technician I 27.53 30222 - Latent Fingerprint Technician II 29.50 30240 - Mathematical Technician 26.62 30361 - Paralegal/Legal Assistant I 19.46 30362 - Paralegal/Legal Assistant II 24.11 30363 - Paralegal/Legal Assistant III 29.49 30364 - Paralegal/Legal Assistant IV 35.68 30375 - Petroleum Supply Specialist 29.50 30390 - Photo-Optics Technician 26.62 30395 - Radiation Control Technician 29.50 30461 - Technical Writer I 26.26 30462 - Technical Writer II 32.12 30463 - Technical Writer III 38.86 30491 - Unexploded Ordnance (UXO) Technician I 25.83 30492 - Unexploded Ordnance (UXO) Technician II 31.25 30493 - Unexploded Ordnance (UXO) Technician III 37.46 30494 - Unexploded (UXO) Safety Escort 25.83 30495 - Unexploded (UXO) Sweep…