RFI_Responses_to_SB1341.docx

DOCX document 15 KB Posted

Attached to
Ground Water Study
Solicitation number
SB1341-17-RQ-0193
Issued by

About this file

Amendment 1 - Response to RFI to include site visit information.

View the file

Other files

File Type Posted
FormSF1449.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Responses to SB1341-17-CQ-0193 for Ground Water Study Amendment 1 13 July 2017

1. The proposal indicates that a pre-proposal site visit is required. How do we arrange this site visit?

There will be one site visit for this project. The site visit is scheduled for Monday, July 17, 2017 at 10:00am MT. Those participating in this site visit shall send their company name, name of attendees, and title to patricia.bullington@nist.gov no later than 9:00am MT Monday, July 17, 2017 for access to the site.

1. How long has the excess water condition existed?

Indeterminable, but the situation has been present for at least four plus years.

1. Have there been any previous studies done, and if so, can the information be provided?

None.

1. Are utility maps available for the site and can they be provided?

Maps are available but may be out of date or have abandoned utilities still on them.

1. Is the condition present year around or intermittently?

Present year round.

1. Is there a basement or crawl space under Building 1?

There are sub-levels below grade and the auditorium in the Lobby extends down past grade.

1. When was Building 1 constructed, and what was the prior land use.

1953 and unknown.

1. Is there a page limit on the proposal?

The technical proposal shall not exceed 10 pages. Any pages received beyond 10 will not be reviewed and will not be considered as part of the technical proposal. The 10 pages includes any cover pages, charts, pictures, etc.

1. We noticed on page 6 under 1.3 Special Requirements, that a pre-proposal site visit is required. Is there a scheduled time for this, or is there someone we should contact to set this up?

See response to question 1.

File details come from the government source that posted it. Updated .