SB1341-16-RQ-0124_Amendment001_03.18.2016.pdf
PDF 1 MB Posted
- Attached to
- VAMAS and WMRIF Support Services
- Solicitation number
- SB1341-16-RQ-0124
About this file
Solicitation Amendment SF30
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SB1341-16-RQ-0124_SOW.pdf | ||
| SB1341-16-RQ-0124_Clauses Provisions.pdf | ||
| SB1341-16-RQ-0124_EvalFactors QuoteInstrustions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Continuation Page
PAGE 2 OF 6 SB1341-16-RQ-0124/001
Continued from Block 14...
Evaluation Criteria and Quote Submission Instructions document has been included and attached to the solicitation.
2) A question was submitted stating, "Could the Government clarify what is needed in the request for a risk identification and mitigation plan?
The Government reviewed the requirement and determined that the evaluation of "identification and resolution of technical risk" under the Technical Approach evaluation factor and required submission under the Technical Quotation of "a risk identification and mitigation plan" was not required. The revised Evaluation Criteria and Quote Submission Instructions document deletes those items from the Technical Approach Evaluation Factor and the Technical Quotation required submissions.
3) The due date for receipt of quotes is hereby extended from 11:00 am Eastern on Tuesday, 22 March 2016 to 11:00 am Eastern on Thursday, 24 March 2016.
All other solicitation terms and conditions remain unchanged.
Attachment Page
PAGE 3 OF 6 SB1341-16-RQ-0124/001
EVALUATION CRITERIA
Versailles Project on Advanced Materials and Standards and
World Materials Institute Forum Support
The Government intends to award a single firm-fixed price purchase order resulting from this solicitation to the responsible quoter whose quotation, conforming to the solicitation will be most advantageous to the Government, price and other factors considered:
In addition to price, the following factors shall be used to evaluate quotations:
1. Technical Approach
2. Prior Experience
3. Key Personnel
4. Past Performance.
In determining best value, Technical Approach and Prior Experience are the most important factors and are equal in importance to each other. Key Personnel is less important than Technical Approach and Prior Experience; and Past Performance is the least important non-priced evaluation factor. Price is significantly less important than the non-priced evaluation factors.
TECHNICAL EVALUATION FACTORS
1. Technical Approach
NIST will evaluate the extent to which the Offeror’s quote demonstrates their ability to satisfy the requirements in the Statement of Work, ensure work quality, and on-time completion of tasks and deliverables.
2. Prior Experience
NIST will evaluate the extent of the quoter’s prior experience in working with international standards-setting committees and work groups in the area of materials science.
3. Key Personnel
NIST will evaluate the extent to which the Offeror’s quoted key personnel compare to the minimum qualifications as described in the statement of work.
4. Past Performance Evaluation of past performance shall be based on the references provided and/or the quoter’s recent and relevant procurement history with NIST or its affiliates. Past Performance will be evaluated to determine the overall quality of the product and service provided by the quoter. The Government will evaluate past performance based on Past Performance Surveys and by contacting appropriate references, including NIST references; if applicable. The Government may also consider information available from other sources. In the case of a quoter without a record of relevant past performance or for whom information on past performance is not available, the quoter will be evaluated neither favorably nor unfavorably.
PAGE 4 OF 6 SB1341-16-RQ-0124/001
PRICE
The quoted price will be evaluated. The evaluation will determine whether the prices are reasonable in relation to the solicitation requirements. Prices must be entirely compatible with the technical portion of the quotation.
The Government reserves the right to make an award to other than the lowest priced quoter or other than the quoter with the highest technical score if the Contracting Officer determines that to do so would result in the best value to the Government.
“Options”. The Government will evaluate quotations for award inclusive of the prices quoted for all option line items. The Government may determine that a quotation is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
PROPOSAL INSTRUCTIONS
Versailles Project on Advanced Materials and Standards and
World Materials Institute Forum Support
Quotation Preparation and Required Submissions Quotations are required to conform to solicitation provisions and be prepared in accordance with this section. To aid in evaluation, the quotation must be clearly and concisely written as well as being neat, indexed (cross-indexed as appropriate) and logically assembled. All pages of each part shall be appropriately numbered and identified with the name of the quoter, the date, and the solicitation number.
Quoters are not required to submit more than one copy of any portion of the quotation if the quotation is being submitted via email.
Each volume shall be clearly marked by volume number and title.
Overall Arrangement of the Quotation
I BUSINESS QUOTATION
(A) The business portion of the quotation consists of the following:
(i) Acceptance Period - The acceptance period for the quotation shall not be less than 120 days;
(ii) Concurrence with all terms and conditions of the solicitation. The quoter must state that they concur with all terms and conditions of the solicitation without change, exception, modification or addition. Exceptions must be clearly identified;
(iii) The Dun and Bradstreet Number for the quoter’s active registration at the System for Award Management, (www.SAM.Gov) website.
(iv) If the quoter’s representations and certifications do not reflect the NAICS code governing this solicitation, quoters must submit documentation of their business size under the NAICS code governing this solicitation.
(v) Signature Authority - The person signing the form must have the authority to commit the quoter to all of the provisions of the solicitation, fully recognizing that the Government
PAGE 5 OF 6 SB1341-16-RQ-0124/001
has the right, by terms of the solicitation, to make an award without further discussion if it so elects.
II TECHNICAL QUOTATION:
The technical proposal shall use 1” margins or larger, and at least a 12 point font size. Technical proposals shall include information that addresses each of the following areas, which correspond to the evaluation factors:
1. Technical Approach. The Offeror shall provide detailed information demonstrating their understanding of each task in the statement of work (i.e., five sub-tasks each for VAMAS and WMRIF support). Additionally, the contractor shall provide a draft schedule or process outlining how the contractor intends to meet all deliverables and deadlines, and a process for how the contractor intends to successfully interact with the various stakeholders of VAMAS and WMRIF in performing the required tasks.
2. Prior Experience. The Offeror shall provide detailed information on their organization’s experience working with international standards-setting committees and work groups in the area of materials science within the past five years. These committees and work groups include organizations such as VAMAS, WMRIF, American Society for Testing and Materials (ASTM), International Standards Organization (ISO), and the Committee of European Normalization (CEN). The Offeror shall explain their role or function in working with these organizations as well as any significant responsibilities held.
3. Qualifications of Key Personnel
The Offeror shall provide an organization chart of key personnel responsible for performing the tasks as specified in the statement of work. Information detailing education, professional credentials, certifications and work experience shall be included for each named member of the Offeror’s group. In instances where the Offeror does not have a current employee to fill a position, the Offeror shall submit a detailed plan on how those positions will be filled in order to ensure successful performance of all tasks in accordance with the Statement of Work.
4. Past Performance. The Offeror shall provide past performance information regarding all relevant contracts for the PAST FIVE YEARS with federal, state or local governments, and international and commercial customers. The information shall describe contracts of a similar type and scope as the current requirement. If the offer intends to use another firm for part of this requirement, that firm’s past performance information must also be provided. If the Offeror has no relevant past performance it must include a statement to that effect in its proposal. The government reserves the right to consider data obtained from sources other than those described by the Offeror in its proposal.
The description of each contract described in this section shall not exceed a half page. For each of the above listed contracts, the Offeror shall provide the following information:
Contract Number;
Description and relevance to solicitation requirements;
Period of Performance - Indicate by month and year the start and completion (or "ongoing") dates for the contract;
PAGE 6 OF 6 SB1341-16-RQ-0124/001
Name and address of the client with current telephone number and email address of a point of contact of the client responsible for this contract.
Contracting Office - If a Government contract (federal or state), identify the Procuring Contracting Officer, Administrative Contracting Officer, and Contracting Officer's Representative (COR), and their names and current telephone numbers and email address;
III PRICE QUOTATION:
The technical proposal shall use 1” margins or larger, and at least a 12 point font size. Price quotations shall include information that addresses each of the following areas:
1. Line Items 0001, 0003, and 0005. Offerors shall submit a firm fixed price for each line item.
Additionally, the Offeror shall include pricing information detailing a price breakdown for each SOW task/deliverable calculated by multiplying the quoted labor category hourly rate by the estimated number of hours required to complete that task/deliverable.
2. Line Items 0002, 0004, and 0006. Offerors shall provide a not-to-exceed ceiling for travel costs, and a breakdown of how that ceiling amount was derived. Travel shall be billed in accordance with the Federal Travel Regulations.
3. If applicable, Offerors shall provide a not-to-exceed ceiling for Other Direct Costs (ODC's) if any, such as visa costs, are required to complete the SOW requirements. If ODC’s are included in the quote, Offerors shall provide information regarding the need and nature of the ODC.
4. Offerors shall submit a summary table of pricing showing the quoted prices for all line items, as well as a total price for all quoted line items. Additionally, the contractor shall include a proposed payment schedule.
Descript: This amendment addresses contractor questions and updates the solicitation Evaluation Criteria and Quote Submission Instructions.
1) It was discovered that the price quote preparation information was not included in the initial posting of the Evaluation Criteria and Quote Submission Instructions. A revised ...See Continuation Page
| Descript1: |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 6 |
| DocNo: 001 |
| EffDate: MAR 18, 2016 |
| ReqNo: NB630000-16-00343 |
| ProjNo: |
| IssuedByCode: 000SB |
| IssuedBy: NATIONAL INST OF STDS AND TECHNOLOGY |
100 BUREAU DRIVE STOP 1640
BUILDING 301 ROOM B129
GAITHERSBURG MD 20899-1640
| AdminByCode: |
| AdminBy: |
| ContractorCode: |
| FacCode: |
| SolChg: Yes |
| AwdChg: Off |
| SolNo: SB1341-16-RQ-0124 |
| SolDate: MAR 10, 2016 |
| AwdNo: |
| AwdDate: |
| NoCopies: |
| Amended: Yes |
| OffrExt: Yes |
| OffrNoEx: Off |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| Header: |
| 15B. CONTRACTOR/OFFEROR: |
| Footer1: |
| signature: |
File details come from the government source that posted it. Updated .