Amendment_002.pdf
PDF 1 MB Posted
- Attached to
- Fourier Transform Infrared Analyzer Spectrophotometer Federal contract opportunity
- Solicitation number
- SB1341-15-RQ-0894
About this file
Amendment 002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_001.pdf | ||
| SB1341-15-RQ-0894_Attachment_II.docx | DOCX document | |
| Combined_Synopsis_Solicitation.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Attachment Page
PAGE 2 OF 3 SB1341-15-RQ-0894/002
1.) The factory testing and factory test report is hereby removed from the solicitation in its entirety.
2.) Required submission # 1 is hereby amended as follows:
FROM:
Documentation and product literature, which clearly demonstrates that the equipment being quoted meets or exceeds the specifications, identified herein;
The quoter must supply data to support the performance requirements provided in its documentation and product literature. Specifically the quoter must support the following:
• Detection limit of 50 ppb for CO2 in nitrogen or synthetic air (20.9% O2 / N2 balance).
Demonstrated by the Absorbance height at 2361.2 ± 0.5 cm-1 (the λmax for CO2) of a 50 ppb CO2 NIST provided standard being at least 2.0 times more than the peak-to-peak noise in the spectral region of 2351 to 2371 cm-1.
• Detection limit of 10 ppb for CH4 in nitrogen or synthetic air (20.9% O2 / N2 balance).
Demonstrated by the Absorbance height at 3085.9 ± 0.5 cm-1 (the λmax for CH4) of a 10 ppb CH4 NIST provided standard being at least 2.0 times more than the peak-to-peak noise in the spectral region of 3076 to 3096 cm-1.
• The signal-to-noise ratio (S/N) improves as the function of the square root of the number of scans co-added (N). The relationship of S/N to N shall be demonstrated by reporting the S/N (in the region 2900 to 3100 cm-1) at 0.5, 1.0, 1.5, and 2.0 hours of co-adding the spectra of nitrogen. The improvement in S/N shall increase a minimum of 1.8 times from 0.5 to 2 hours of co-adding (the expected improvement is 2.0 times).
For each performance requirement, the Contractor must supply the data collection parameters which, at a minimum, must be gas cell pathlength, resolution, number of scans, apodization, and total acquisition time.
TO:
Documentation and product literature, which clearly demonstrates that the equipment being quoted meets or exceeds the specifications, identified herein;
The quoter must supply data to support the performance requirements provided in its documentation and product literature. Specifically the quoter must support the following:
• Detection limit of 50 ppb for CO2 in nitrogen or synthetic air (20.9% O2 / N2 balance).
Demonstrated by the Absorbance height at 2361.2 ± 0.5 cm-1 (the λmax for CO2) of a 50 ppb CO2 being at least 2.0 times more than the peak-to-peak noise in the spectral region of 2351 to 2371 cm-1.
• Detection limit of 10 ppb for CH4 in nitrogen or synthetic air (20.9% O2 / N2 balance).
Demonstrated by the Absorbance height at 3085.9 ± 0.5 cm-1 (the λmax for CH4) of a 10 ppb CH4 being at least 2.0 times more than the peak-to-peak noise in the spectral region of 3076 to 3096 cm-1.
Attachment Page
PAGE 3 OF 3 SB1341-15-RQ-0894/002
• The signal-to-noise ratio (S/N) improves as the function of the square root of the number of scans co-added (N). The relationship of S/N to N shall be demonstrated by reporting the S/N (in the region 2900 to 3100 cm-1) at 0.5, 1.0, 1.5, and 2.0 hours of co-adding the spectra of nitrogen. The improvement in S/N shall increase a minimum of 1.8 times from 0.5 to 2 hours of co-adding (the expected improvement is 2.0 times).
| Descript: The purpose of this amendment is to remove the factory testing and factory test report from the solicitation and amend required submission # 1 in accordance with the attachment provided herein. |
| Descript1: |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 3 |
| DocNo: 002 |
| EffDate: AUG 26, 2015 |
| ReqNo: NB646030-15-00717 |
| ProjNo: |
| IssuedByCode: 000SB |
| IssuedBy: NATIONAL INST OF STDS AND TECHNOLOGY |
100 BUREAU DRIVE STOP 1640
BUILDING 301 ROOM B129
GAITHERSBURG MD 20899-1640
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolChg: Yes |
| AwdChg: Off |
| SolNo: SB1341-15-RQ-0894 |
| SolDate: AUG 12, 2015 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| Header: |
| 15B. CONTRACTOR/OFFEROR: |
| Footer1: |
| signature: |
File details come from the government source that posted it. Updated .