SB1341-15-RQ-0839-001.pdf
PDF 1 MB Posted
- Attached to
- Compact High Brightness X-Ray Source
- Solicitation number
- SB1341-15-RQ-0839
About this file
Amendment 001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Continuation Page
PAGE 2 OF 3 SB1341-15-RQ-0839/001
Continued from Block 14...
The amended Statement of Work supersedes all previous versions.
All other solicitation terms and conditions, including the due date for receipt of quotes, remain unchanged.
Attachment Page
PAGE 3 OF 3 SB1341-15-RQ-0839/001
Question 1:
The SOW states ” X-ray optic tilt axis must be computer controllable through Labview interface.” Can you specify with how much it should be able to tilt (degrees)? Also, is it enough that e.g. stepper motor controllers in principle are controllable through LabView or must fully automatic tilt algorithms be developed where the tilt is adjusted while the optics remain aligned to the X-ray source?
Response 1:
The X-ray optic tilt axis range is whatever range is required for function and alignment of the specific supplied optics. The motor must be controllable by NIST’s Labview program and the vendor must supply instructions for interfacing the motor controller with Labview (see modified SOW).
Question 2:
Does “Intensity must be stable with less than or equal to 5% drift over 24 hrs.” refer to intensity in the focus after the optics?
Response 2:
The intensity is at the focus after the optics (see modified SOW).
Question 3:
Does “Apparent source position must be stable to within +/- 20 um in 24 hrs.” refer to in the focus after the optics?
Response 3:
The position is the position of the beam at the focus after the optics (see modified SOW).
Question 4:
If vendors would like to give several options in their quotation on how to have the product configured, should vendors prepare several quotes – or can we give options in the same quote?
Response 4:
Vendors may submit multiple quotes to present multiple solutions.
Question 5:
Can vendors add more line items, to the quote, than the 7 you have listed?
Response 5:
No. Vendors shall provide pricing based off the line items provided in the solicitation.
Question 6:
Regarding the required submissions, are there any specific format vendors should follow (form or so) or is it up to vendors on how to structure quotes?
Response 6:
Vendors may follow the format suggested by the FAR provision 52.212-1 or the CAR provision 1352.215-70, or may submit a quote in the format of their choosing. Regardless of the format used, the quote should be logically organized and consistent within itself.
Descript: The purpose of this amendment is to post responses to contractor questions and incorporate an amended Statement of Work.
...See Continuation Page
| Descript1: |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 3 |
| DocNo: 001 |
| EffDate: AUG 27, 2015 |
| ReqNo: NB642020-15-02454 |
| ProjNo: |
| IssuedByCode: 000SB |
| IssuedBy: NATIONAL INST OF STDS AND TECHNOLOGY |
100 BUREAU DRIVE STOP 1640
BUILDING 301 ROOM B129
GAITHERSBURG MD 20899-1640
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolChg: Yes |
| AwdChg: Off |
| SolNo: SB1341-15-RQ-0839 |
| SolDate: AUG 20, 2015 |
| AwdNo: |
| AwdDate: |
| NoCopies: |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| Header: |
| 15B. CONTRACTOR/OFFEROR: |
| Footer1: |
| signature: |
File details come from the government source that posted it. Updated .