Drawings for sample task order.pdf

PDF 4 MB Posted

Attached to
On-Site Welding Repairs and Off-Site Welding Services
Solicitation number
SB1341-11-RP-0060
Issued by

About this file

Drawings for Sample Task Order

View the file

Other files

File Type Posted
FINAL TECHNICAL SPECIFICATION NBSR-AP-2.docx DOCX document
FINAL SAMPLE TASK ORDER.docx DOCX document
FINAL TECHNICAL SPECIFICATION NBSR-CSP-1.docx DOCX document
FINAL 4 FBO POST.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

35 BLIND FLANGE FOR 6” PIPE, SCH 80,

150#

CARBON STEEL 1

34 SLIP-ON FLANGE FOR 4” SCH. 40

PIPE, FF, 150#

CARBON STEEL 8

33 4” SCH. 40 SEAMLESS PIPE, ASTM

NO. A106-WPB

CARBON STEEL 33’

32 4” FLANGED LONG RADIUS 90º

ELBOW, CLASS 125

CAST IRON 1

31 6”X4” FLANGED REDUCING ELBOW CAST IRON 1

30 4”X3” FLANGED REDUCER, CLASS

CAST IRON 2

29 4” SCH. 40, 90º ELBOW, LR BW, ASTM

NO. A234-WPB

CARBON STEEL 3

28 4”X4”X4” SCH. 40 TEE, BWE CARBON STEEL 1

27 1” BALL VALVE 1

26 4” FLANGED DIAPHRAM VALVE,

GRINNELL – SAUNDER CO.

25 4”X3” CENTRIFUGAL PUMP, 400 GPM

@ 80’ HEAD. 9”ø IMP, 15 HP 220/440 V 60 Hz 38.6/19.3 AMP 3 PH ALLIS –

CHALMERS INDUCTION MOTOR

CAST IRON 1

24 4” – 300# THREADED PIPE ORIFICE

FLANGE – TUBE TURN

CARBON STEEL 2

23 ORIFICE PLATE FOR H2O @ 400 GPM

IN 4” SCH. 4- PIPE

CARBON STEEL 1

22 5 – 4 X 1 THEDOLET, 3000 LBS. CARBON STEEL 2

21 1” ø X 2.5” LONG BLANCK PIPE

NIPPLE

CARBON STEEL 4

20 1”ø STRAIGHT 90º ELBOW, 150 LBS MALLEABLE IRON 2 19 1”ø BALL VALVE, 400 PSI BRONZE 2 18 1”ø THERMAL WELL STAINLESS STEEL 1

17 LOEWR GRID PLATE E-04-002

SHT. 12 OF 12

16 UPPER GRID PLATE E-04-002

SHT. 11 OF 12

15 FUEL ACCESS CANISTER SECTION E-04-002

SHT. 10 OF 12

14 6” DIA. SIGHT GLASS E-04-002

SHT. 9 OF 12

13 FUEL CANISTER SECTION E-04-002

SHT. 8 OF 12

12 FUEL CANISTER SECTION

ASSEMBLY

E-04-002

SHT. 7 OF 12

11 PIPE SUPPORT JACK STAND E-04-002

SHT. 6 OF 12

10 PLEXIGLASS CANISTER PIPE

SUPPORT

E-04-002

SHT. 5 OF 12

9 SUPPORT STAND E-04-002

SHT. 4 OF 12

8 SURGE TANK E-04-002

SHT. 3 OF 12

7 HEAT EXCHANGE 1

6 1.5” PIPE CPVC Schedule 80 ~14’ 5 FEMALE ADAPTERS CPVC Schedule 80 2 4 90° ELBOWS CPVC Schedule 80 4 3 MALE ADAPTERS CPVC Schedule 80 2

2 BALL VALVE 1.5” F/F BRASS 2

1 PIPE NIPPLES ASTM A106B 4

ITEM DISCRIPTION MATERIAL DWG. NO. QTY.

BILL OF MATERIALS

A A

B B

C C

D D

E E

F F

G G

H H

ISSUE DATE:

SHEET SIZE:SHEET OF

NATIONAL INSTITUTE OF STANDARD & TECHNOLOGY

REACTOR RADIATION DIVISION

GAITHERSBURG, MARYLAND 20899

FOR

DRAWING NO.

CHECKED BY:

DESIGNED BY:

DATE:

DRAWN BY:

DATE:

REVISION:

APPROVED BY:

DATE:

DIV 856

REACTOR ENGINEERING

DATE:

SCALE:

GENERAL NOTES:

1. BREAK SHARP CORNERS.

2.MACHINED SURFACE ROUGHNESS 125 rms OR BETTER.

3. DIMENSIONS AND TOLERANCES ARE IN INCHES

TOLERANCES:

(Unless otherwise specified)

DECIMALS:`0.005

FRACTIONS: `0.015

ANGLES:`1/2~

1:1 1 12

E-04-002

E shmuel 5/26/2005

FUEL ELEMENT

HYDRAULIC TEST

GENERAL ASSEMBLY

NOTE:

THIS DWG. IS REPLACING DWG. NO. E-004-002 SHEET 1 AND 2 OF12.

FOR THE ASSEMBLY DETAILS SEE DWG. NO. FROM BILL OF MATERIALS.

253026411

22 19 21 20 11

1 17

/8

85 1/4

13 1/4

/8

24 1/2

12 1/2 7

/2

1/

File details come from the government source that posted it. Updated .