Drawings for sample task order.pdf
PDF 4 MB Posted
- Solicitation number
- SB1341-11-RP-0060
About this file
Drawings for Sample Task Order
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FINAL TECHNICAL SPECIFICATION NBSR-AP-2.docx | DOCX document | |
| FINAL SAMPLE TASK ORDER.docx | DOCX document | |
| FINAL TECHNICAL SPECIFICATION NBSR-CSP-1.docx | DOCX document | |
| FINAL 4 FBO POST.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
35 BLIND FLANGE FOR 6” PIPE, SCH 80,
150#
CARBON STEEL 1
34 SLIP-ON FLANGE FOR 4” SCH. 40
PIPE, FF, 150#
CARBON STEEL 8
33 4” SCH. 40 SEAMLESS PIPE, ASTM
NO. A106-WPB
CARBON STEEL 33’
32 4” FLANGED LONG RADIUS 90º
ELBOW, CLASS 125
CAST IRON 1
31 6”X4” FLANGED REDUCING ELBOW CAST IRON 1
30 4”X3” FLANGED REDUCER, CLASS
CAST IRON 2
29 4” SCH. 40, 90º ELBOW, LR BW, ASTM
NO. A234-WPB
CARBON STEEL 3
28 4”X4”X4” SCH. 40 TEE, BWE CARBON STEEL 1
27 1” BALL VALVE 1
26 4” FLANGED DIAPHRAM VALVE,
GRINNELL – SAUNDER CO.
25 4”X3” CENTRIFUGAL PUMP, 400 GPM
@ 80’ HEAD. 9”ø IMP, 15 HP 220/440 V 60 Hz 38.6/19.3 AMP 3 PH ALLIS –
CHALMERS INDUCTION MOTOR
CAST IRON 1
24 4” – 300# THREADED PIPE ORIFICE
FLANGE – TUBE TURN
CARBON STEEL 2
23 ORIFICE PLATE FOR H2O @ 400 GPM
IN 4” SCH. 4- PIPE
CARBON STEEL 1
22 5 – 4 X 1 THEDOLET, 3000 LBS. CARBON STEEL 2
21 1” ø X 2.5” LONG BLANCK PIPE
NIPPLE
CARBON STEEL 4
20 1”ø STRAIGHT 90º ELBOW, 150 LBS MALLEABLE IRON 2 19 1”ø BALL VALVE, 400 PSI BRONZE 2 18 1”ø THERMAL WELL STAINLESS STEEL 1
17 LOEWR GRID PLATE E-04-002
SHT. 12 OF 12
16 UPPER GRID PLATE E-04-002
SHT. 11 OF 12
15 FUEL ACCESS CANISTER SECTION E-04-002
SHT. 10 OF 12
14 6” DIA. SIGHT GLASS E-04-002
SHT. 9 OF 12
13 FUEL CANISTER SECTION E-04-002
SHT. 8 OF 12
12 FUEL CANISTER SECTION
ASSEMBLY
E-04-002
SHT. 7 OF 12
11 PIPE SUPPORT JACK STAND E-04-002
SHT. 6 OF 12
10 PLEXIGLASS CANISTER PIPE
SUPPORT
E-04-002
SHT. 5 OF 12
9 SUPPORT STAND E-04-002
SHT. 4 OF 12
8 SURGE TANK E-04-002
SHT. 3 OF 12
7 HEAT EXCHANGE 1
6 1.5” PIPE CPVC Schedule 80 ~14’ 5 FEMALE ADAPTERS CPVC Schedule 80 2 4 90° ELBOWS CPVC Schedule 80 4 3 MALE ADAPTERS CPVC Schedule 80 2
2 BALL VALVE 1.5” F/F BRASS 2
1 PIPE NIPPLES ASTM A106B 4
ITEM DISCRIPTION MATERIAL DWG. NO. QTY.
BILL OF MATERIALS
A A
B B
C C
D D
E E
F F
G G
H H
ISSUE DATE:
SHEET SIZE:SHEET OF
NATIONAL INSTITUTE OF STANDARD & TECHNOLOGY
REACTOR RADIATION DIVISION
GAITHERSBURG, MARYLAND 20899
FOR
DRAWING NO.
CHECKED BY:
DESIGNED BY:
DATE:
DRAWN BY:
DATE:
REVISION:
APPROVED BY:
DATE:
DIV 856
REACTOR ENGINEERING
DATE:
SCALE:
GENERAL NOTES:
1. BREAK SHARP CORNERS.
2.MACHINED SURFACE ROUGHNESS 125 rms OR BETTER.
3. DIMENSIONS AND TOLERANCES ARE IN INCHES
TOLERANCES:
(Unless otherwise specified)
DECIMALS:`0.005
FRACTIONS: `0.015
ANGLES:`1/2~
1:1 1 12
E-04-002
E shmuel 5/26/2005
FUEL ELEMENT
HYDRAULIC TEST
GENERAL ASSEMBLY
NOTE:
THIS DWG. IS REPLACING DWG. NO. E-004-002 SHEET 1 AND 2 OF12.
FOR THE ASSEMBLY DETAILS SEE DWG. NO. FROM BILL OF MATERIALS.
253026411
22 19 21 20 11
1 17
/8
85 1/4
13 1/4
/8
24 1/2
12 1/2 7
/2
1/
File details come from the government source that posted it. Updated .