SATPC0042784 Tab 04 4 SOW.pdf

PDF 87 KB Posted

Attached to
Isokinetic Probe and WCM2000 Probe Repair and Maintenance
Solicitation number
80NSSC26944150Q
Issued by

About this file

This is a Statement of Work (SOW) for repair and maintenance services on specialized cloud characterization instruments at NASA Glenn Research Center.

NASA Glenn Research Center requires contractor services to repair and maintain two unique pieces of scientific equipment: the SEA Isokinetic Probe 2 (IKP2), a water content measurement probe of which NASA owns the only two examples in the world, and the SEA WCM2000 water content system used to calibrate the Icing Research Tunnel (IRT). The contractor must provide services and items as outlined in Quote #2026-1573, including IKP maintenance (spare 5V or 28V power supplies, tip welding and machining, spare farm modules, and spare cable connectors), breaker box repair, a single element shroudless test rig, an extended ICD, a new Licor in custom enclosure, 220V variacs for IKP deice, and installation of dome and mast heaters on IKP2 Serial 1. The contractor shall receive government-owned property for repair, provide all specified services and items, and return the repaired equipment and new items to NASA. All milestones and deliverables are due by January 31, 2027, with the contractor required to provide evidence of procurement or completion for each deliverable. The work is restricted to Science Engineering Associates (SEA), as the instruments are unique to that company and servicing must be performed by SEA.

View the file

Other files

File Type Posted
SATPC0042784 Tab 06 RDSS..pdf PDF
SATPC0042784 Tab 07 Capability Statement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Isokinetic Probe and WCM2000 Probe Repair and Maintenance

Statement of Work

Scope

NASA Glenn Research Center has a number of specialized cloud characterization instruments from Science Engineering Associates (SEA). These are critical for both calibrating the Icing Research Tunnel (IRT) as well as for research purposes. The instruments are unique to SEA and servicing must be done by SEA.

Background

The SEA Isokinetic Probe 2 (IKP2) is a water content measurement probe that has been used in both wind tunnels and on aircraft. NASA owns the only two examples of this probe in the world.

The SEA WCM2000 water content system is the system used to calibrate the Icing Research Tunnel. It is a reliable and durable system that has well proven in both wind tunnels and aircraft.

Objective

The contractor shall conduct repair and maintenance on the IKP2 and WCM2000 system. The contractor shall also provide upgrades to our existing WCM system in the scope of new sensing heads, new power supply for heaters on the IKP2, and install heaters on IKP2 Serial 1.

Requirements

1. Provide services and items as outlined in Quote # 2026-1573.

a. IKP Maintenance

i. Spare Power supplies 5V or 28V

ii. Tip Welding and Machining

iii. Spare Farm Modules

iv. Spare Cable Connectors

b. Breaker Box Repair

c. Single Element Shroudless Test Rig

d. Extended ICD

e. New Licor in Custom Enclosure

f. 220V Variacs for IKP Deice

g. Install Dome and Mast Heater on IKP2

Contractor Tasks

The contractor shall:

1. Receive government owned property for repair

2. Provide services and items as outlined in Quote # 2026-1573

3. Return government owned property and new items

Milestones and Deliverables

Milestones Deliverables Date 1 Spare Power Supplies Provide evidence of procured

Spare Power Supplies By 1/31/2027

2 Tip Welding and Machining

Provide evidence of repaired tip By 1/31/2027

3 Spare Farm Modules Provide evidence of procured Spare Farm Modules

By 1/31/2027

4 Spare Cable Connectors

Provide evidence of procured Spare Cable Connectors

By 1/31/2027

5 Breaker Box Repair Provide evidence of repaired breaker box

By 1/31/2027

6 Single Element Shroudless Test Rig

Provide evidence of completed single element Shroudless Test Rig

By 1/31/2027

7 Extended ICD Provide evidence of completed Extended ICD

By 1/31/2027

8 New Licor in Custom Enclosure

Provide evidence of completed New Licor in Custom Enclosure

By 1/31/2027

9 220V Variacs for IKP Deice

Provide evidence of procured 220V Variacs for IKP Deice

By 1/31/2027

10 Install Dome and Mast Heaters on IKP2

Provide evidence of installed Dome and Mast Heaters on IKP2

By 1/31/2027

11 Deliver all items to

NASA

NASA receives all items By 1/31/2027

File details come from the government source that posted it. Updated .