SATPC0033380 TAB 04 4 SOW..pdf

PDF 269 KB Posted

Attached to
ALLEN BRADLEY 14x22 Cart #2 Servo Driver Replacement
Solicitation number
80NSSC24851594Q
Issued by

About this file

This statement of work outlines requirements for a servo driver replacement project at NASA Langley Research Center. The contractor shall provide several Allen-Bradley parts including a 2198-D020-ER3 dual axis-inverter, 2198-S086-ERS3 43 Arms continuous output current module, 2198-KITCON-RP200 connector kit, 2198-H070-P-T control power connector, and a 2198-D057-ERS3 servo drive. The contractor must also supply three Allen Bradley 1585j-m8cbjm-0m15 Ethernet media connectors. The place of performance is NASA Langley Research Center. The estimated period of performance to complete this project is 30 days from award of the related federal contract opportunity, solicitation number 80NSSC24851594Q for the ALLEN BRADLEY 14x22 Cart #2 Servo Driver Replacement issued by the National Aeronautics and Space Administration Shared Services Center.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements NASA Langley Research Center has a requirement for the ALLEN BRADLEY 14x22 Cart #2 Servo Driver Replacement, see below

2. Characteristics, Scope, and Specs The contractor shall provide the following items Part Number Item Description Quantity 2198-D020-ER3 Allen-Bradley 2198-D020-

ER3 Kinetix 5700 dual axis-inverter

2198-S086-ERS3 Allen-Bradley 2198-S086- ERS3 43 Arms continuous, 86 Arms Peak Output Current Module

2198-KITCON-RP200 Allen-Bradley 2198- KITCON-RP200 Kinetix 5700 Connector Kit

2198-H070-P-T Allen-Bradley 2198-H070- P-T Control power connector

1585j-m8cbjm-0m15 Allen Bradley 1585j-m8cbjm-0m15 Ethernet Media, RJ45, Standard, Straight Male, 8 conductors (4-pair)

2198-D057-ERS3 Allen-Bradley 2198-D057- ERS3 Kinetix 5700 Servo Drive

3. Place of Performance

NASA Langley Research center

4. Period of Performance

The estimated lead time is 30 days aro

File details come from the government source that posted it. Updated .