This statement of work outlines requirements for an Allen Bradley 14x22 Cart #2 Servo Driver Replacement project for NASA Langley Research Center. The contractor shall provide specific Allen Bradley parts including a KINETIX 5700 REGEN BUS SUPPLY 200A PEAK, KINETIX 5500/5700 DC INPUT CONNECTOR, KINETIX 5700 200A LINE FILTER, KINETIX 5700 DUAL AXIS ISOLATOR, KINETIX 5700 275MM DC BUS BAR, KINETIX 5500 FR1,2 CONTROL POWER ISOLATOR, KINETIX 5700 DUAL AXIS ISOLATOR, KINETIX 5700 SINGLE AXIS ISOLATOR, KINETIX 5500 FR3 CONTROL POWER, RJ45 ETHERNET MEDIA, K5700 CONNECTOR KIT AFE 275MM, 140G 160A FRAME MOLDED CASE CIRCUIT BREAKER, AB MCS E CONTACTOR 116A, AC/DC DIN MNT PS 480W, and MCB SUPPLEMENTARY PROTECTOR. The place of performance is NASA Langley Research Center and the estimated lead time for the project is 30 days.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements NASA Langley Research Center has a requirement for the ALLEN BRADLEY 14x22 Cart #2 Servo Driver Replacement, see below

2. Characteristics, Scope, and Specs The contractor shall provide the following items

Part # Description Qty

AB2198RP200 KINETIX 5700 REGEN BUS SUPPLY 200A

PEAK

AB2198TCON24VDCIN36 KINETIX 5500/5700 DC INPUT CONNECTOR 1

AB2198DBR200F KINETIX 5700 200A LINE F 1

AB2198D020ERS3 KINETIX 5700 DUAL AXIS I 1

AB2198BARCON275DC200 KINETIX 5700 275MM DC BUS BAR 1

AB2198H040PT K5500 FR1,2 CONTROL POWE 1

AB2198D057ERS3 KINETIX 5700 DUAL AXIS I 1

AB2198S086ERS3 KINETIX 5700 SINGLE AXIS 1

AB2198H070PT K5500 FR3 CONTROL POWER 2

AB1585JM8CBJM0M15 RJ45 ETHERNET MEDIA 3

AB2198KITCONRP200 K5700 CONNECTOR KIT AFE 275MM 3

AB140GJ6F3D15 140G 160A FRAME MOLDED C 1

AB100E116KJ11 AB MCS E CONTACTOR 116A 1

AB1606XLS480E3 AC/DC DIN MNT PS 480W 1

AB1492SPM3D010 MCB SUPPLEMENTARY PROTECTOR 1 A 1

3. Place of Performance

ATTN:

NASA Langley Research center

4. Period of Performance

The estimated lead time is 30 days aro