SAQMMA16R0133.pdf
PDF 104 KB Posted
- Attached to
- Removal & Replacement of Vehicle Barrier
- Solicitation number
- SAQMMA16R0133
About this file
Solicitation Document
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAQMMA16R0133-A001.pdf | ||
| SAQMMA16R0133-A001-Site_Plan.pdf | ||
| SAQMMA16R0133-A001_QandA_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
SAQMMA16R0133 SEALED BID (IFB)
X NEGOTIATED (RFP)
2. TYPE OF SOLICITATION 3. DATE ISSUED
03/28/2016
RATING
IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
CODE LMAQM
OFFICE OF ACQUISITION MANAGEMENT (A/LM/AQM)
PO BOX 9115, ROSSLYN STATION
US DEPARTMENT OF STATE
ARLINGTON, VA 22219
7. ISSUED BY 8. ADDRESS OFFER TO
9. FOR INFORMATION EMAIL: a. NAME
Tracie N. Hardy
b. TELEPHONE NO. (Include area code)(NO COLLECT CALLS)
703-875-6897
c. EMAIL hardytn@state.gov
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
11. The Contractor shall begin performance within ______ calendar days and complete it within ______ calendar days after receiving award, X notice to proceed. This performance period is X mandatory negotiable. ( (See __.)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).
X YES NO
12b. CALENDAR DAYS
Sealed offers in original and ____ copies to perform the work required are due at the place specified in item 8 by __13:00:00__ (hour) local time __04/27/2016 __ (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
a.
b. An offer guarantee is, X is not required.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.
d.
Offers providing less than ____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
13. ADDITIONAL SOLICITATION REQUIREMENTS:
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA - FAR (48 CFR) 53.236-1(e)
SAQMMA16R0133
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CONTACT: DUNS:
CODE FACILITY CODE
The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
17.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY
FISCAL OPERATIONS BRANCH CHIEF (OBO/RM/FM/FO)
SEE SPECIAL INVOICE SUBMISSION INSTRUCTIONS
ARLINGTON, VA 22209
27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No futher contractual document is necessary.
30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
John Hite 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 4-85) BACK
Table of Contents
Section Description Page Number
B Supplies or Services and Prices/Costs
1.1 TYPE OF CONTRACT
C Descriptions/Specifications/Statement of Work
1.2 STATEMENT OF WORK
D Packaging and Marking
1.3 PLACE OF DELIVERY
1.4 PACKING AND MARKING
E Inspection and Acceptance 52.246-2 Inspection of Supplies - Fixed-Price (Aug 1996) 52.246-12 Inspection of Construction (Aug 1996)
1.5 QUALITY ASSURANCE
1.6 INSPECTION BY GOVERNMENT
1.7 DEFINITIONS
F Deliveries or Performance 52.242-15 Stop-Work Order (Aug 1989) 52.242-17 Government Delay of Work (Apr 1984)
G Contract Administration Data
02INV OFFICE OF OVERSEAS BUILDING OPERATIONS INVOICE INSTRUCTIONS
G-002 CONTRACT ADMINISTRATION DATA
652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)
I Contract Clauses 52.242-14 Suspension of Work (Apr 1984) 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) 52.211-12 Liquidated Damages - Construction (Sept 2000) 52.202-1 Definitions (Nov 2013) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-7 Anti-Kickback Procedures (May 2014) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2015) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data - Modifications (Aug 2011) .28 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data - Modifications (Oct 2010) 52.216-7 Allowable Cost and Payment (Jun 2013) 52.219-8 Utilization of Small Business Concerns (Oct 2014) 52.222-19 Child Labor--Cooperation with Authorities and Remedies (Feb 2016) 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Apr 2015) 52.222-29 Notification of Visa Denial (Apr 2015) 52.222-35 Equal Opportunity for Veterans (Oct 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014) 52.222-37 Employment Reports on Veterans (Feb 2016) 52.222-50 Combating Trafficking in Persons (Mar 2015) 52.223-6 Drug Free Workplace (May 2001) 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving (Aug 2011) 52.225-5 Trade Agreements (Feb 2016) 52.225-13 Restrictions on Certain Foreign Purchases (June 2008) 52.225-14 Inconsistency Between English Version and Translation of Contract (Feb 2000) 52.228-3 Workers' Compensation Insurance (Defense Base Act) (July 2014) 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas (Apr 1984) 52.228-5 Insurance - Work on a Government Installation (Jan 1997) 52.228-11 Pledges of Assets (Jan 2012) 52.228-13 Alternative Payment Protections (July 2000)
52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.229-6 Taxes - Foreign Fixed-Price Contracts (Feb 2013) 52.232-8 Discounts For Prompt Payment (Feb 2002) 52.232-11 Extras (Apr 1984) 52.232-17 Interest (May 2014) 52.232-18 Availability Of Funds (Apr 1984) 52.232-22 Limitation Of Funds (Apr 1984) 52.232-24 Prohibition of Assignment of Claims (May 2014) 52.232-25 Prompt Payment (Jul 2013) 52.232-27 Prompt Payment for Construction Contracts (May 2014) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Jul 2013) 52.233-1 Disputes (May 2014) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.236-21 Specifications and Drawings for Construction (Feb 1997) 52.236-26 Preconstruction Conference (Feb 1995) 52.242-13 Bankruptcy (July 1995) 52.243-1 Changes - Fixed-Price (Aug 1987) 52.243-4 Changes (June 2007) 52.245-1 Government Property (Apr 2012) 52.245-2 Government Property Installation Operation Services (Apr 2012) 52.245-9 Use and Charges (Apr 2012) 52.246-17 Warranty of Supplies of a Noncomplex Nature (June 2003) 52.246-19 Warranty of Systems and Equipment under Performance Specifications or Design Criteria (May 2001) 52.246-21 Warranty of Construction (Mar 1994) 52.246-23 Limitation of Liability (Feb 1997) 52.246-25 Limitation of Liability - Services (Feb 1997) 52.247-63 Preference for U.S.-Flag Air Carriers (June 2003) 52.248-1 Value Engineering (Oct 2010) 52.248-3 Value Engineering--Construction (Oct 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012) 52.249-8 Default (Fixed-Price Supply and Service) (Apr 1984) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.204-14 Service Contract Reporting Requirements (Jan 2014) 52.215-13 Subcontractor Certified Cost or Pricing Data - Modifications (Oct 2010) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013)
652.243-70 NOTICES (AUG 1999)
652.229-70 EXCISE TAX EXEMPTION STATEMENT FOR CONTRACTORS WITHIN THE
UNITED STATES (JUL 1988)
652.229-71 PERSONAL PROPERTY DISPOSITION AT POSTS ABROAD (AUG 1999)
652.242-73 AUTHORIZATION AND PERFORMANCE (AUG 1999)
652.225-71 SECTION 8(a) OF THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED
(AUG 1999)
52.228-15 Performance and Payment Bonds - Construction (Oct 2010) 52.217-7 Option for Increased Quantity - Separately Priced Line Item (Mar 1989) 52.209-1 Qualification Requirements (Feb 1995) 52.244-6 Subcontracts for Commercial Items (Feb 2016)
52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.216-25 Contract Definitization (Oct 2010)
K Representations, Certifications, and Other Statements of Offerors or Respondents 52.250-2 SAFETY Act Coverage Not Applicable (Feb 2009) 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran--Representation and Certifications (Oct 2015) 52.236-28 Preparation of Proposals - Construction (Oct 1997)
652.228-70 DEFENSE BASE ACT - COVERED CONTRACTOR EMPLOYEES (FEB 2015)
52.204-8 Annual Representations and Certifications (Feb 2016) 52.203-11 Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions (Sept 2007) 52.204-3 Taxpayer Identification (Oct 1998) 52.209-5 Certification Regarding Responsibility Matters (Oct 2015) 52.225-18 Place of Manufacture (Mar 2015)
652.225-70 ARAB LEAGUE BOYCOTT OF ISRAEL (AUG 1999)
52.222-22 Previous Contracts and Compliance Reports (Feb 1999) 52.222-25 Affirmative Action Compliance (Apr 1984)
L Instructions, Conditions, and Notices to Offerors and Respondents 52.204-16 Commercial and Government Entity Code Maintenance (Jul 2015) 52.215-1 Instructions to Offerors - Competitive Acquisition (Jan 2004) 52.237-1 Site Visit (Apr 1984)
652.206-70 ADVOCATE FOR COMPETITION/OMBUDSMAN (FEB 2015)
1.10 INSTRUCTION TO OFFERORS
52.216-1 Type of Contract (Apr 1984) 52.233-2 Service of Protest (Sept 2006)
M Evaluation Factors for Award
1.11 EVALUATION OF PROPOSALS
001 Active Anti-Ram Vehicle Barriers 3.00 EA Doc Ref No:
Delivery Date
FOB:
01/31/2017 Destination
002 Barrier Removal 3.00 EA The Contractor shall remove the three (3) existing Delta vehicle barriers in accordance with the Statement of Work.
Doc Ref No:
Delivery
Date
FOB:
01/31/2017 Destination
003 Barrier Installation 3.00 EA The Contractor shall install three (3) new Electro-Mechanical vehicle barriers their controls, and support equipment in accordance with the Statement of Work.
Doc Ref No:
Delivery
Date
FOB:
01/31/2017 Destination
004 Value Added Tax (VAT) 1.00 LT Doc Ref No:
Delivery Date
FOB:
01/31/2017 Destination
005 Defense Base Act (DBA) Insurance 1.00 LT Effective July 22, 2012, the Department of State does not have a Department-wide contract for DBA insurance.
Contractors may continue using DBA policies until they expire. Contractors requiring new DBA insurance may purchase new insurance policies directly from any Department of Labor (DOL) approved insurance provider. Approved providers can be found at the DOL website http:// www.dol.gov/owcp/dlhwc/lscarrier.htm
The Contractor shall provide proof of insurance no later than ten (10) days after contract award.
Doc Ref No:
Delivery
Date
FOB:
01/31/2017 Destination
006 Shipping to US Consulate Almaty, Kazakhstan 1.00 LT Doc Ref No:
Delivery Date
FOB:
01/31/2017 Destination
1.1 TYPE OF CONTRACT
This is a firm-fixed price contract. The Government will not pay additional sums due to any escalation in the cost of materials, equip-
SAQMMA16R0133
Line Item Summary
Solicitation Number:
SAQMMA16R0133
Contract Number: Title: Vehicle Barrier Replacement - Kazakhstan
Date of Solicitation:
03/23/2016
Line Item No. Description Quantity Unit Unit Price Total Cost ment or labor, or the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results re-quired. The Government will also not adjust the contract price due to fluctuations in the currency exchange rates. The Government may make changes in the contract price or time to complete only due to changes made by the Government in the work to be per-formed, or by delays caused by the Government.
Section C- Descriptions/Specifications/Statement of Work
1.2 STATEMENT OF WORK
STATEMENT OF WORK
REMOVAL & REPLACEMENT
OF VEHICLE BARRIERS
1.1 General: Remove the three (3) sets of existing Delta vehicle barriers at the main entry gate, main exit gate and the back gate and all their support equipment, and replace them with three (3) new Electro-Mechanical vehicle barriers and their controls, and support equipment at the American Consulate General in Almaty, Kaza-khstan. These barriers shall protect perimeter vehicle access/egress points or Compound Access Control (CACs) by limiting their vulnerability during the passage of vehicular traffic. Performance criteria for vehicle barrier systems involve functional requirements, power system and control circuits.
1.2 Functional Requirements: The vehicle arrest system shall provide a clearly visible device, such as a sig-nal light or a drop arm, to indicate the barrier’s status to the approaching driver. The normal operating time for the system to move the barrier component into its final secure position shall not exceed 3 to 4 seconds. The sys-tem shall include an emergency override mode that shall permit the barrier to be fully engaged in 0.75 seconds or less. The width of the barrier shall be capable of protecting up to12 ft. wide (3.7 meter) driveway or garage ramp. The barriers must meet impact tests identified in SD-STK-02.01, which specifies perpendicular barrier impact by a 15,000 lb (6810 kg) vehicle as K indicates vehicle velocity during crash test; and L indicates max-imum allowed penetration of the barrier by the vehicle. The barriers should meet all DOS/DS requirements and DOS/OBO standards and specifications. The must be K12 = 50 mph (80 kph) crash rated.
The system shall have two standard control circuits: a slave or local control for the guard at the gate, and a mas-ter or remote control for the Marine Security Guard (MSG) booth. Both sets of controls shall include status in-dicator lights for power and barrier position.
• The system shall provide an emergency override and secure switch to the local guard. The emergency over-ride switch for the local guard control shall not be equipped with reset capability. The local guard control shall include an annunciator, which shall be triggered whenever the barrier remains in the no secure posi-tion for a range of 0.0 to 60 seconds. The local control shall not be provided with a reset switch for this fea-ture.
• A remote master control shall be used at all posts. The remote master control shall have an override switch and reset button for the local emergency override feature. The remote master control panel shall have either an annunciator or a signal light triggered by the local control annunciator. The MSG booth alarm, however, shall include a silencer for the audible annunciator, if applicable. The annunciator shall disarm automatic-ally when the override switch is used. The remote master control shall also have a reset switch for the local control annunciator.
The Contractor shall provide written inspection/maintenance guidance and this guidance shall include compon-ent manuals. At a minimum this shall include:
• Inspection/maintenance procedures (what to check, locations, steps to follow)
• Special safety precautions
• Listing of parts/components requiring inspection/maintenance together with frequency of the inspection/ maintenance.
• Identification of specific maintenance materials or products (e.g., type of grade of oil and other fluids, size and types of filter, etc.)
• Identification of any special tools that shall be available before inspection/maintenance can be performed.
Every active vehicle barrier system shall include the following items:
• Remote control panel with annunciator, override and reset;
• Electro-mechanical control unit;
• Power off operation;
• Emergency fast operation;
• Sump pump (in ground units only);
• Export packaging;
• Installation, operation, and maintenance manual;
• Spare parts kit (per manufacturer’s recommended list);
• Traffic lights and drop arm (parking gate)
• Extra local/slave panels
• Extra master/remote panels
• Tool kit (for maintenance).
• Environmental enclosures.
• For areas that experience freezing temperatures a heating system should be included which prevents the build-up of ice in the barrier. Additional rust proofing may be added.
3.0 REQUIREMENTS.
The contractor is to complete the following tasks as part of this project.
3.1 Site Visit and Project Planning.
Prior to ordering the barriers and within one (1) month from the issuance of the Notice to Proceed (NTP), the contractor must visit the site to verify the site specific requirements and to produce a detailed and an accurate site survey. The Contractor shall take all necessary steps to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work, including but not limited to (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and roads; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site.
Upon returning from the site visit, the contractor must present the OBO Vehicle Barrier Program with the site survey and the contractor proposed implementation plan and the project schedule Plan for approval.
3.2 Barriers and Materials delivery to Post.
1. Within two (2) weeks from the approval of the implementation plan, the contactor must order the barriers and present the government with estimated time of shipping.
2. While post may assist the contractor with the customs clearance, and if required a city permit, it is the con-tractor’s responsibility to insure the delivery of the barriers and all materials to Post and obtains, if re-quired, the city permit.
3.3 Demolition and Disposal
3.3.1 The contractor must remove the existing vehicle barriers located at the main entry, exit gate and the back gate. This includes the removal of all the concrete foundations, reinforcing steel rebar(s), and aggregate materi-als as required to install the new equipment.
3.3.2 The contractor must remove all hydraulic lines, electrical wiring, and control wiring connecting each barrier back to the hydraulic pumping units, power distribution panels, and if necessary, to the control pan-els.
3.3.3 The contractor must remove the hydraulic pumping unit, hydraulic fluid, associated concrete foundation, reinforcing steel rebar(s)/mesh, and all electrical and control wiring. All unused conduits must be cut back be-low the floor level, capped, and abandon in-place, as a minimum. Note: the existing conduit runs connecting the HPU to the power distribution panel, slave controller in the guard station, and barrier control panel in Post One and equipment room may be reused, as required per the design.
3.3.4 The contractor must remove the enclosure that house the hydraulic pumping unit, if installed.
3.3.5 The contractor must remove all existing traffic light.
3.3.6 The contractor must remove all existing ground loop detectors.
3.3.7 The contractor must remove the vehicle barrier drainage water sump pump system including all associ-ated electrical wiring, conduit, and drain piping as connected underground and back to the vehicle barrier. This includes all discharge lines from the sump pump back to the storm drain(s).
3.3.8 The contractor must remove water drainage piping as required for the rerouting flow of drainage water through and/or around the vehicle barrier construction sites.
3.3.9 The contractor must move and/or reroute all existing utilities (i.e. water, sewage, gas, electric, commu-nication, data, etc.), which are or maybe affected by the installation of the new barrier equipment, so that they are outside of the construction area.
3.3.10 Notice of Construction and/or Repair (See 6.23) for any gas line must be submitted to the local oil and gas commission before the start of any construction or repairs. Construction and/or repairs must be under the authority and supervision of the local oil and gas commission.
3.3.11 Notice of Construction and/or Repair (See 6.21) for any electrical utility lines must be submitted to the local electric cooperative before the start of any construction or repairs. Construction and/or repairs must be un-der the authority and supervision of the local electric cooperative.
3.3.12 The contractor must identify and immediately bring to the attention of the government project represent-ative any anomalies of concern.
3.4 Installation
3.4.1 The contractor must install three (3) electro - mechanical wedge vehicle barriers located at the main entry gate, the main exit gate and the back gate, as required per the design and manufacture instructions and specifications.
3.4.2 The contractor must install the concrete foundation, reinforcing steel rebar(s), and aggregate materials, as required per the design, and manufacture instructions and specifications for the installation of the electric wedge vehicle barrier, controls, and support equipment (i.e. traffic lights, vehicle detector systems, etc.)
3.4.3 The contractor must install the Barrier Control Panel (BCP) and Battery Backup Panel (BBP) per the design, and manufacture instructions and specifications.
3.4.4 The contractor must fabricate and install the unistrut frame, and associated concrete foundation, if used, that supports the BCP and BBP per the design, and manufacturer instructions and specifications.
3.4.5 The contractor must install all electrical and control wiring, conduit, conduit fittings, and pull boxes as required between the Electric wedge vehicle barrier, traffic lights, IR detectors, and loop detector system back to the Barrier Control Panel (BCP) and Battery Backup Panel (BBP) per the design, and manufacture instruc-tions and specifications.
3.4.6 The contractor must install all rack mounted equipment, fiber, electrical and control wiring, wire and fiber fittings, conduits, and conduit fittings required between the BCP and BBP and the power distribution pan-els, barrier control panel, fiber panel, CAC slave control station, and post 1 per the design, and manufacture in-structions and specifications.
3.4.7 The contractor must install the vehicle Stop/Go signal light assemblies, associated concrete foundation, all electrical wiring, conduit, and conduit fittings as connected underground and back to the BCP for the Elec-tric wedge vehicle barrier per the design, and manufacture instructions and specifications.
3.4.8 The contractor must install the vehicle IR detector system, associated concrete foundation, all electrical wiring, conduit, and conduit fittings as connected underground and back to the BCP for the Electric Wedge vehicle barriers per the design, and manufacture instructions and specifications.
3.4.9 The contractor must install the vehicle loop detector system, associated concrete foundation, all electrical wiring, conduit, and conduit fittings as connected underground and back to the BCP for the Electric Wedge vehicle barriers per the design, and manufacture instructions and specifications.
3.4.10 The contractor must install the vehicle barrier drainage water piping (4” and 1-1/2” diameter) from the Electric Wedge vehicle barrier to the nearest water drainage or sewer system per the design, and manufacture instructions and specifications.
3.4.11 The contractor must identify and immediately bring to the attention of the government project represent-ative any anomalies of concern.
3.5 Site Condition and Clean-Up
3.5.1 The contractor must maintain the site in a safe and secure condition at all times.
3.5.2 The contractor must maintain the site in a neat and clean condition at all times.
3.5.3 The contractor must remove and dispose of all waste materials including old barriers and equipment, concrete, aggregate materials, reinforcing steel rebar(s), conduit, piping, and all electrical wiring associated with the removal and installation process as identified in Sections 3.1 and 3.2 above.
3.5.4 The contractor must return the construction site back into the same condition or better, as it was found prior to the start of the project.
3.6 Project Time Line
3.6.1 The contractor must provide a construction schedule which defines the timelines for the major project activities (i.e. project mobilization, demolition, barriers installation, cable/conduit installation, equipment in-stallation, concrete curing, start-up, testing, etc.) for the removal of the existing system and installation of a new fully operational vehicle barrier system.
3.6.2 The schedule must reflect a total elapsed time not to exceed 5 weeks per barrier for the installation of the barrier, from the time the personnel and equipment arrival at site to turn-over of barrier system to post.
3.6.3 The contractor will have access to the site 6 days a week, 10 hours per day. All work outside of this time frame will require prior approval from the government project representative.
(a) The Department of State observes the following days* as holidays:
New Year Holiday
Orthodox Christmas
Birthday of Martin Luther King, Jr
President’s Day
Women’s Day (March 8)
Nauryz/Spring Equinox (March 21)
Nauryz (March 22)
Nauryz (March 23)
Unity Day (May 2)
Victory Day (May 9)
Defender’s Day (May 10)
Memorial Day
Independence Day
Capital Day (July 6)
Constitution Day (August 30)
Labor Day
Kurban-Ait (September date TBD)
Columbus Day
Veterans Day
Thanksgiving Day
Ist President’s Day (December 1)
Independence Day (December 16)
Independence Day (December 19)
Christmas Day
*Any other day designated by Federal law, Executive Order or Presidential Proclamation.
When any such day falls on a Saturday, the preceding Friday is observed; when any such day falls on a Sunday, the following Monday is observed. Observance of such days by Government personnel shall not be cause for additional period of performance or entitlement to compensation except as set forth in the contract. If the Con-tractor's personnel work on a holiday, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, unless authorized pursuant to an overtime clause elsewhere in this contract.
4.0 CONTRACTOR FURNISHED EQUIPMENT
The contractor must provide the following equipment:
4.1 The Contractor must provide three [3] DS approved Electric Wedge vehicle barriers with built-in sump sys-tem.
4.2 The Contractor must provide the Battery Control Panel (BCP) for each barrier.
4.3 The Contractor must provide the Battery Backup Panel (BBP) for each barrier.
4.4 The Contractor must provide all rack mounted barrier and gate control panels (slave and master panels) for the CAC and Post 1for each barrier.
4.5 The Contractor must provide all rack mounted panels, power supplies, media converters, and fittings re-quired for the fiber conversion for each barrier.
4.6 The Contractor must provide the unistrut materials and hardware for the construction of the support struc-ture for the BCP and BBP per the design for each barrier.
4.7 The Contractor must provide the Stop/Go signal lights, support posts, and support bases for each barrier.
4.8 The Contractor must provide the IR vehicle detector sensors, support posts, and mounting brackets for each barrier.
4.9 The Contractor must provide the spray paint, safety yellow [if applicable].
4.10 The Contractor must provide the spray paint, gloss black [if applicable].
4.11 The Contractor must provide all of the PVC and Rigid conduit, conduit fittings, water drainage piping, electrical pull boxes, fiber cable, electrical wiring, control wiring, and miscellaneous parts associated with the installation of the new barriers.
4.12 The Contractor must provide the reinforcing steel rebar(s) required for the foundation installation of each vehicle barrier per the design, and manufacture instructions and specifications.
5.0 CONTRACTOR FURNISHED MATERIALS.
The contractor must provide the following materials:
5.1 The contractor must provide all concrete and aggregate materials required for the foundation installation of each barrier per the design, and manufacture instructions and specifications.
5.2 The contractor must provide all concrete and aggregate materials required for the foundation installation of the BCP and BBP for each barrier per design, and manufacture instructions and specifications.
5.3 The contractor must provide all concrete and aggregate materials required for the foundation installation of the vehicle detector circuits, and the Stop/Go signal light assemblies per design, and manufacture instructions and specifications.
5.4 The contractor must provide all concrete and aggregate materials required for the foundation installation of the conduit and electrical pull boxes per the design.
5.5 The contractor must provide all concrete and aggregate materials required for the foundation installation of the drain lines per the design.
5.6 The contractor must provide all concrete, aggregate materials, and materials of construction (i.e. piping, conduit, wire, conduit fittings, etc.) as required for moving and/or rerouting utilities as defined in Section 3.1.10 through 3.1.13 above.
5.7 The contractor must provide all concrete and aggregate materials, and materials of construction (i.e. piping, conduit, wire, conduit fittings, etc.) as required to reroute and repair utility lines damaged during the demolition and installation of the new vehicle barrier systems (refer to Section 3.1.10 through 3.1.12 above).
5.8 The contractor must provide all reinforcing steel mesh and/or rebar(s) required for the foundation installa-tion of all barrier support equipment and systems, except as defined in Section 4.12 above, per the design, and manufacture instructions and specifications.
5.9 The contractor must provide a dumpster(s) as required for the cleanup and disposal of all waste materials.
5.10 The contractor must provide any and all excavation and installation equipment required (i.e. forklift, front loader, excavator with hoe ram and bucket attachments, handheld breaker hammer, arc welding equipment, cut-ting torch, ground tamper, wheel barrow(s), powered saw for concrete cutting, steel rake(s), pick axe(s), flat head shovel(s), spade shovel(s), push broom(s), water hose w/spray attachments, pressure washer, large hand-held grinder with cutoff and masonry wheels, electrical extension cord(s), concrete vibrator(s), chain slings, etc.) .
5.11 The contractor must provide any and all excavation materials (i.e. masonry blocks, lumber for formwork, concrete to concrete expansion joints, plastic sheeting for concrete curing, string line, nails, expandable spray foam, etc.).
5.12 The contractor must provide any and all small handheld tools, drills, drill bits, wrenches, screwdrivers, knockout punch set, hole saw kit, fish tape, grease guns, etc. as required for the installation project.
5.13 The contractor must provide well covers as required for the project installation. The well and covers must meet or exceed a 25 ton load capacity.
5.14 The contractor must provide vehicle blocking barrier(s) as required for ensuring construction site safety and security. The blocking barrier(s) must be approved by the Post RSO or PSO.
5.15 The contractor must provide pedestrian fencing and/or netting as needed/required for pedestrian safety and access control.
5.16 The contractor must provide a construction site Portable Restroom as required for contractor personnel un-less access to post restrooms is permitted.
5.17 The contractor must identify and immediately bring to the attention of the government project representat-ive any anomalies of concern.
6.0 CONTRACTOR RESPONSIBILITIES.
The contractor must conform to the following:
6.1 The contractor is totally responsible for ensuring that a fully functional vehicle barrier system is installed per the requirements of the design, and the manufacture guidelines and installation specifications.
6.2 The contractor is responsible for ensuring the safety of the workers and site personnel during the project.
6.3 The contractor must verify and be responsible for all dimensions and conditions at the job site.
6.4 The contractor must verify that the foundation concrete will be placed directly into neat excavations. And where sides of the excavation are not stable the contractor must provide shoring. Type and method of shoring must be at the contractor’s option subject to approval by the government project representative. All concrete work must be done according to barrier manufacturer’s specifications.
6.5 The contractor must ensure the excavation site is kept dry at all times.
6.6 The contractor must ensure the concrete is laboratory designed, machine mixed, producing minimum of 3,000 PSI (20.68 MPA) at 7 days via independent/certified testing lab.
6.7 The contractor must ensure the cement is tested Portland cement conforming to ASTM C150, Type II Only.
6.8 The contractor must ensure the aggregates conform to ASTM C33 & B GRADE per standard specifica-tions. Maximum size of aggregate must be 1-1/2 inches (38mm).
6.9 The contractor must ensure that all reinforcing steel they provide is deformed bars conforming to ASTM A615, grade 60 (60,000 PSI or 413.7MPA).
6.10 The contractor must ensure that all hooks and bends conform to ACI STANDARD 318 latest revision. In-side diameter of hooks and bends must be at least six (6) bar diameters.
6.11 The contractor must provide spacer bars, chairs, spreaders, blocks, etc. as required to positively hold the steel in place before concrete is poured.
6.12 The contractor must ensure the concrete is conveyed from the mixer to final deposit by methods that will prevent separation and loss.
6.13 The contractor must ensure the concrete is thoroughly consolidated by suitable means during placement and must be thoroughly worked around reinforcement and embedded fixtures and corners of forms.
6.14 The contractor must ensure the concrete is maintained above 50°F (10°C) and in a moist condition for at least seven (7) days after placement. And that adequate equipment must be provided for heating concrete mater-ials and protecting concrete during freezing or near freezing weather.
6.15 The contractor must ensure that where exterior wall face requires shoring and/or forming, the forms must be substantial and sufficiently tight to prevent leakage, and that forms must not be removed until the concrete is seven (7) days old.
6.16 The contractor must ensure that backfilling will be done by depositing and tamping into place clean sand or pouring lean concrete to 95% percent compaction. Water jetting must not be allowed.
6.17 The contractor must ensure that conduit and pipes of aluminum, other than above grade support posts, are not allowed.
6.18 The contractor must ensure that construction joints that are not indicated on the drawings must not be al-lowed. Where a construction joint is to be made, the surface of the concrete must be thoroughly cleaned and all laitance and standing water removed.
6.19 The contractor must be responsible for the protection of all adjacent areas against damage and must repair all damaged areas to match existing improvements.
6.20 The contractor must be responsible for the protection of all electrical lines and/or wiring located in the ad-jacent areas against damage and must repair all damaged electrical lines and/or wiring.
6.21 The contractor must be responsible for notifying the local electric cooperative before the start of any con-struction and/or repairs of electrical utility lines.
6.22 The contractor must be responsible for the protection of all water, gas, and sewage lines located in the ad-jacent areas against damage and must repair all damaged water, gas and/or sewage lines.
6.23 The contractor must be responsible for notifying the local Oil and Gas Commission before the com-mencement of any construction and/or repairs of gas lines.
6.24 The contractor must be responsible for determining the location of underground power lines, water, gas, and sewer mains to prevent damage during construction. It is critical to protect City utilities from ‘dig-ins”, which could result in death, injury and considerable liability.
6.25 The contractor must keep the construction area clean at all times and at completion of work remove all surplus materials, equipment and debris leaving the premises in a clean condition acceptable to the owner or owners representative.
6.26 The contractor must perform damage restoration improvements as associated with the vehicle barrier sys-tem installation.
6.27 The contractor must identify and immediately bring to the attention of the government project represent-ative any anomalies of concern.
7.0 DELIVERABLES
7.1 Prior to the start of work and within five (5) days of award, the Contractor shall submit a Safety Plan to the COR for approval. The Safety plan should include measures to prevent hazardous or unsafe work environments for Contractor and Government employees. Performance of any work shall not proceed until the Safety Plan is approved by the government.
At the time of award, the Contractor shall submit a Quality Control Plan (QCP). The QCP shall outline the pro-cedures used to identify, prevent, and ensure non-reoccurrence of defective services.
7.2 The contractor must provide daily written progress reports to the government project representative.
7.3 The contractor must provide daily verbal progress reports as requested by the government project represent-ative.
7.4 The contractor must provide verbal notice, to the government project representative, two week in advance of the delivery of any and all materials and equipment to site.
7.4 The contractor must provide written notice to the government project representative, three weeks in ad-vance, of the need of access to the site of any additional construction personnel after the start of the project.
This also pertains to delivery personnel who will need to be on site for an extended period of time, more than simply dropping off materials (i.e. operators of rental equipment, driver of the concrete delivery truck, etc.)
7.5 The contractor must identify and immediately bring to the attention of the government project representat-ive any anomalies of concern.
Description Quantity Delivery Date Deliver To Bonds/Insurance 1 10 days after award Contracting Officer Safety Plan 1 10 days after award COR Quality Assurance/Control Plan
1 10 days after award COR
Construction Schedule 1 10 days after award COR Submittal Register 1 10 days after award COR Bios on Personnel 1 10 days after award COR Inspection Reports 1 7 days after end of weekly period being reported
COR
Payment Request 1 Last calendar day of each month
COR
Updates to Construction Schedule
1 Weekly COR
Request for Final Accept-ance
1 5 days before inspection COR
8.0 ADDITIONAL INFORMATION.
8.1 Throughout the installation process there will be a government project representative on site to oversee and assist the contractor with any anomalies or areas of concern.
8.2 The contractor, upon completion of the project must provide OBO with a final set of the as built drawings.
8.3 The contractor, upon completion of the project must remand all documentation for the project as required by post Regional Security Officer and/or Post Security Officer.
8.4 The contractor must surrender any/all documentation, pertaining to the project, to the government project representative as requested and/or required by the project representative.
Section D- Packaging and Marking
1.3 PLACE OF DELIVERY
All deliverables shall be delivered to the following address:
US CONSULATE ALMATY, KAZAKHSTAN
1.4 PACKING AND MARKING
Materials delivered to the site shall be export packed for surface shipment and marked as follows:
US CONSULATE ALMATY, KAZAKHSTAN Samal-2, 97 Zholdasbekov Street, Almaty, Kazakhstan, 050051
Section E- Inspection and Acceptance
52.246-2 Inspection of Supplies - Fixed-Price (Aug 1996)
(a) Definition. "Supplies," as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this con-tract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection sys-tem and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.
(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.
(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and con-venient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Govern-ment inspections or tests made at other than the Contractor's or subcontractor's premises; provided, that in case of rejection, the Gov-ernment shall not be liable for any reduction in the value of inspection or test samples.
(e)(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.
(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes re-inspection or retest necessary.
(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.
(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance cor-rected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.
(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or (2) terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery sched-ule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.
(i)(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time--
(i) When Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract; and
(ii) When the supplies will be ready for Government inspection.
(2) The Government's request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor's plant, nor more than 7 workdays in other instances.
(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract.
Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.
(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet con-tract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.
(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor (1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor's plant at the Contracting Officer's election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Con-tractor fails to meet such delivery schedule, or (2) within a reasonable time after receipt by the Contractor of notice of defects or non-conformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to re-quire correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor's plant and return to the original point when that point is not the Contractor's plant. If the Contractor fails to perform or act as required in paragraph (l)(1) or (l)(2) of this clause and does not cure such failure within a peri-od of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.
(End of clause)
52.246-12 Inspection of Construction (Aug 1996)
(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .