S02 SELF-PERFORMED CALCULATIONS.docx
DOCX document 25 KB Posted
- Solicitation number
- 36C25922B0001
About this file
This document provides instructions for calculating self-performed work for a federal contract opportunity to replace windows in Building A at a Veterans Affairs medical center. The solicitation requires offerors to estimate the total price, profit, material costs, total estimated cost of contract performance for personnel, and total estimated cost of self-performed work incurred for the offeror's personnel or personnel of other SDVOSB concerns. Offerors must ensure their percentage of estimated self-performed work is at least 50% to comply with limitations on subcontracting provisions. The opportunity is a solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 for a windows replacement project at a specific building on a medical center campus.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Building A Floor Plans.zip | ZIP file | |
| 36C25922B0001 0004.docx | DOCX document | |
| Repair Building A Windows Pre Bid Walk 2 Sign In.pdf | ||
| 36C25922B0001 0003.docx | DOCX document | |
| Site Visit Attendance.pdf | ||
| 36C25922B0001 0002.docx | DOCX document | |
| 36C25922B0001 0001.docx | DOCX document | |
| Project Drawing 1.pdf | ||
| Wage Determination CO 20220015 07 08 2022 Adams.pdf | ||
| 36C25922B0001_1.docx | DOCX document | |
| Supporting Documents.zip | ZIP file | |
| Attachment A - OSHA form - pdf.pdf | ||
| Specifications 554-22-146.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)
OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS
At the time of proposal Offeror’s are required to complete.
| a) Offeror’s total proposed price | $ __________ | ||
| b) Subtract profit | $ __________ | ||
| c) Subtract cost of materials | $ __________ |
d) Offeror’s total estimated cost of contract performance for personnel (a-b-c =d) $ __________
e) Offeror’s total estimated self-performed cost of contract performance incurred for personnel of the Offeror’s or personnel of other SDVOSB concerns (Self-Performed) $ __________
f) Offeror’s percentage of estimated self-performed work (e/d X 100 = %) __________%
I certify the above representations are true and correct to the best of my knowledge.
| ________________________________________________ | ___________ |
| (Signature and Typed Name of Authorized Representative) | Date |
(Title of Authorized Representative)
File details come from the government source that posted it. Updated .