This document provides instructions for calculating self-performed work for a federal contract opportunity to replace windows in Building A at a Veterans Affairs medical center. The solicitation requires offerors to estimate the total price, profit, material costs, total estimated cost of contract performance for personnel, and total estimated cost of self-performed work incurred for the offeror's personnel or personnel of other SDVOSB concerns. Offerors must ensure their percentage of estimated self-performed work is at least 50% to comply with limitations on subcontracting provisions. The opportunity is a solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 for a windows replacement project at a specific building on a medical center campus.

View the file

Other files

File Type Posted
Building A Floor Plans.zip ZIP file
36C25922B0001 0004.docx DOCX document
Repair Building A Windows Pre Bid Walk 2 Sign In.pdf PDF
36C25922B0001 0003.docx DOCX document
Site Visit Attendance.pdf PDF
36C25922B0001 0002.docx DOCX document
36C25922B0001 0001.docx DOCX document
Project Drawing 1.pdf PDF
Wage Determination CO 20220015 07 08 2022 Adams.pdf PDF
36C25922B0001_1.docx DOCX document
Supporting Documents.zip ZIP file
Attachment A - OSHA form - pdf.pdf PDF
Specifications 554-22-146.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)

OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price$ __________
b) Subtract profit$ __________
c) Subtract cost of materials$ __________

d) Offeror’s total estimated cost of contract performance for personnel (a-b-c =d) $ __________

e) Offeror’s total estimated self-performed cost of contract performance incurred for personnel of the Offeror’s or personnel of other SDVOSB concerns (Self-Performed) $ __________

f) Offeror’s percentage of estimated self-performed work (e/d X 100 = %) __________%

I certify the above representations are true and correct to the best of my knowledge.

___________________________________________________________
(Signature and Typed Name of Authorized Representative)Date