S02_Attachment - Investigative Studies One lines.pdf

PDF 2 MB Posted

Attached to
Z1DA--PN: 636A6-22-103, Replace Fire and Isolation Panels (DM) Design-Build
Solicitation number
36C26322R0046
Issued by

About this file

This is a solicitation for design-build construction services to replace fire and isolation panels at the Des Moines VA Medical Center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23 is seeking to replace aging fire and isolation panels to improve safety and reliability. Offerors should provide design and construction services to upgrade the fire and isolation panels while minimizing disruption to medical center operations. The solicitation number is 36C26322R0046 and responses are due by the date specified in the amendments. Pricing will be evaluated along with technical qualifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7M

6M

Main Hospital Clinical Addition Dietetics/Admin/SPD Administration Canteen/Library Domiciliary Vacant Quarters Behavioral Health Annex (Primary Care) Linen Processing/Shops Warehouse/Shops Chiller Plant/Boiler Plant Community Living Center (NHCU) Transformer Building Garage Tractor Shed Paint Shop Engineering Shops Parking Garage Generator Generator Primary Switchgear Primary Switchgear Switchgear Building

1W 6M 7M

NTSG-101

VICINITY PLAN1

Cover Sheet

SITE

Des Moines, Iowa Project Number: 636A6-19-302

UPGRADE ELECTRICAL SYSTEM FOR DES MOINES

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

G-101

A

Fi le

P at h

Field Investigation and Studies

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E firm POC: Bryan Hanneman

Electrical Condition Assessment - Des Moines VA Medical Center

3600 36th St., Des Moines, IA 50310

636A6-19-302

Project Director

Revisions: Date:

FIELD INVESTIGATION AND STUDIES 10/30/20

--/--/-- BDH AGJ

SYMBOLS - LIGHTINGSYMBOLS - POWER

CONNECTION

CONTINUATION

SEPARABLE CONNECTOR OR CONNECTION

FOR DRAWOUT ASSEMBLIES

FUSED DISCONNECT, 100AMP FUSE

GROUND

DELTA - WYE TRANSFORMER CONNECTION

DIGITAL METER

SURGE PROTECTIVE DEVICE

VARIABLE FREQUENCY DRIVE

KILOWATT HOUR METER

VOLTMETER SELECTOR SWITCH

AMMETER SELECTOR SWITCH

VOLTMETER

AMMETER

CIRCUIT BREAKER,

150 AMPS, 3 POLE (2 POLE)

SWITCH

DISCONNECT SWITCH

SPECIAL RECEPTACLE

PANELBOARD WITH NO MAIN

BREAKER, 100 AMP LUGS ONLY OLD

PANEL NUMBER M3A

SURGE (LIGHTNING) ARRESTOR

AUTOMATIC TRANSFER SWITCH

E = EMERGENCY FEED

N = NORMAL FEED

L = LOAD

MULTI-FUNCTION DIGITAL UTILITY METER

NEUTRAL CONNECTION TO GROUND

DIESEL ENGINE GENERATOR UON

KIRK-KEY INTERLOCK

RELAY

CONTRACTOR

PHOTOCELL

ELECTRICAL MOTOR

KWH

RECEPTACLES

RECESSED SIMPLEX

RECESSED DUPLEX

RECESSED QUAD

JUNCTION BOXES

RECESSED IN WALL, UON

RECESSED IN FLOOR, UON

SWITCHES

DISCONNECT SWITCH

MOTOR-RATED SWITCHm

POWER DEVICES GENERAL INFORMATION

LP-X

GF

PANELBOARD - CIRCUIT

ANY RECEPTACLE LISTED ABOVE

2'X4' FIXTURE, UON

EMERGENCY FIXTURE, UON

(NOTE: ALL FIXTURES NOTED ON PLAN WITH

HALF-SHADE INDICATE EMERGENCY)

1'X4' FIXTURE, UON

2'X2' FIXTURE, UON

DOWNLIGHT OR SPOTLIGHT, UON

EXIT SIGNS, WALL: ARROW INDICATES EGRESS

(NOTE: ALL LIGHTS TO BE MOUNTED 12 INCHES

ABOVE DOOR, UON)

PHOTOCELL

WALL MOUNTED FIXTURE

EMERGENCY WALL MOUNTED FIXTURE

FIXTURE TYPE

F1E

LP-1

10'-0" a

'E' DENOTES EMERGENCY FIXTURE

SWITCH 'LEG'

THE SWITCH WITH SAME LETTER

OPERATES THIS FIXTURE

3a,3b

SWITCH 'LEG'

DESIGNATION

DEMARCATION

D: DIMMER

TM: TIMER

OC: OCCUPANCY SENSOR

3: 3-WAY

4: 4-WAY

EP: EXPLOSION PROOF

NOTES:

1. NO DEMARCATION OR SWITCH 'LEG'

INDICATES THAT THE SWITCH CONTROLS

ALL OF THE FIXTURES WITHIN THE SAME

ROOM

2. ADDITIONAL DEMARCATIONS SEPARATED

BY A COMMA "," INDICATE ADDITIONAL

SWITCHES WITHIN A COMMON OUTLET

BACKBOX.

LIGHTING FIXTURES

FIXTURE GENERAL INFORMATION

CONTROL DEVICES GENERAL INFORMATION

TOGGLE SWITCH

VFD

VS

AS

• REFER TO FIXTURE SCHEDULE FOR FIXTURE

TYPE INFORMATION

SURFACE SIMPLEX

SURFACE DUPLEX

SURFACE QUAD

EF-X

LP-X

GF

J

EQUIPMENT IDENTIFICATION

ANY JUNCTION BOX LISTED ABOVE

SYMBOL MODIFIER(S)

SYMBOL MODIFIER(S)

PANELBOARD - CIRCUIT NUMBER

PANELBOARD - CIRCUIT

FIXTURE MOUNTING HEIGHT

(IF APPLICABLE)

• 120V, NEMA 5-20R, UON

SYMBOLS - ONE-LINE DIAGRAM

DM

J

M

J

EF-X

HL-X

GF

M

EQUIPMENT IDENTIFICATION

MECHANICAL EQUIPMENT CONNECTION

SEE MECHANICAL EQUIPMENT

SCHEDULE FOR CONNECTION

INFORMATION

SYMBOL MODIFIER(S)

PANELBOARD - CIRCUIT

REMOTE DISCONNECT SWITCH:

SEE MECHANICAL EQUIPMENT

SCHEDULE FOR ADDITIONAL

INFORMATION

EQUIPMENT CONNECTIONS

MECHANICAL EQUIPMENT CONNECTION. PROVIDE

DISCONNECT / STARTER / VFD AS INDICATED ON

MECHANICAL EQUIPMENT PLAN AND SCHEDULES

N

G

WIRING RACEWAY TYPES

LADDER TYPE CABLE TRAY

EXPOSED CONDUIT - SINGLE LINE

CONCEALED CONDUIT - SINGLE LINE

UNDERGROUND DUCTBANK

CONDUIT ROUTED VERTICALLY

K

SYMBOLS - GROUNDING / LIGHTNING

PROTECTION

AIR TERMINAL

GROUND ROD

GROUND TEST WELL

GROUNDING COUNTERPOISE/CONDUCTOR

BURIED, BARE CABLE (EXTERIOR)

COPPER, #4/0 AWG MINIMUM, UON

GROUND BAR

MGB, TMGB, TGB = TELECOM GROUNDING

MPG = LAB MULTIPOINT GROUND (AND STATIC)

BOLTED GROUND CONNECTION

EXOTHERMIC WELDED CONNECTION

SYMBOL MODIFIERS

AC

C

GFI

IG

SW: XX

WP

WPIU

XX" AFF

XX" AFP

ABOVE COUNTER MOUNTING

RECESSED IN CEILING

GROUND FAULT CIRCUIT INTERRUPTER

ISOLATED GROUND

CONTROLLED BY SWITCH LABELED "XX"

WEATHERPROOF, WITH GFI

WEATHERPROOF IN USE, WITH GFI

MOUNT XX" AFF

MOUNT XX" AFP

SYMBOLS - POWER

EQUIPMENT

571S1

• ELECTRICAL EQUIPMENT INCLUDING, BUT NOT

LIMITED TO, TRANSFORMERS, SWITCHBOARDS AND

PANELBOARDS ARE DRAWN TO SCALE IN THE

PLANS AND ARE CALLED OUT WITH A UNIQUE

IDENTIFIER.

• COORDINATE JUNCTION BOX INSTALLATION

WITH NEARBY EQUIPMENT.

MFM

SEE NOTE 2

LEGEND NOTES

SPD

DOWN CONDUCTOR

PUSH BUTTON

EMERGENCY POWER OFF (EPO)E

ABBREVIATIONS

A AMPERES

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AIC AMPERES INTERRUPTING CAPACITY

AWG AMERICAN WIRE GAUGE

BFG BELOW FINISHED GRADE

COMM COMMUNICATION

C CONDUIT

CR CONTROL RELAY

CU COPPER

DC DIRECT CURRENT

DEPT DEPARTMENT

EBC EQUIPMENT BONDING CONDUCTOR

EC EMPTY CONDUIT

EF EXHAUST FAN

EMT ELECTRICAL METALLIC TUBING

ETR EXISTING TO REMAIN

EX EXISTING

FT FEET OR FOOT

GFI GROUND FAULT INTERRUPTER

GND GROUND

HZ HERTZ

K KILO

KCMIL THOUSAND CIRCULAR MILS

MAX MAXIMUM

MCB MAIN CIRCUIT BREAKER

MDP MAIN DISTRIBUTION PANEL

MEGB MAIN ELECTRICAL GROUND BUS

MIN MINIMUM

MLO MAIN LUGS ONLY

N NEUTRAL CONDUCTOR

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURER'S

ASSOCIATION

NF NOT FUSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

P POLE

PB PANELBOARD

PMH PAD MOUNTED HIGH-VOLTAGE SWITCHGEAR

PR PAIR

PVC POLYVINYL CHLORIDE

QTY QUANTITY

RGS RIGID GALVANIZED STEEL CONDUIT

RM ROOM

RMC RIGID METAL CONDUIT

SPD SURGE PROTECTIVE DEVICE

SPST SINGLE POLE SINGLE THROW

SES SERVICE ENTRANCE SWITCHGEAR

ST SHUNT TRIP

SW SWITCH

T OR TX TRANSFORMER

TGB TELECOMMUNICATIONS GROUND BUS

TMGB TELECOMMUNICATIONS MAIN GROUND BUS

TYP TYPICAL

UL UNDERWRITERS' LABORATORIES

UON UNLESS OTHERWISE NOTED

V VOLTS

VA VOLT AMPERES

VFD VARIABLE FREQUENCY DRIVE

W WIRE OR WATT

XFMR TRANSFORMER

Z IMPEDANCE

1. SYMBOLS ORIENTATION DOES NOT IMPLY DEVICE OR EQUIPMENT

ORIENTATION UNLESS NOTED AS SUCH. SEE REFLECTED CEILING

PLANS FOR LIGHT FIXTURE POSITIONS AND ORIENTATIONS.

2. SYMBOL SIZE DOES NOT IMPLY EQUIPMENT SIZE, UNLESS

OTHERWISE NOTED.

3. MOUNTING HEIGHT INDICATED IN LEGEND AND ON THE DRAWINGS

SHALL BE THE DISTANCE MEASURED FROM THE CENTER OF THE

DEVICE TO THE FINISHED FLOOR.

4. NOT ALL SYMBOLS ON THIS SHEET ARE USED AS PART OF THIS

PROJECT.

EMERGENCY LIGHTS WITH BATTERY PACKS

EQUIPMENT IDENTIFIER

PANEL NUMBER

LOCATION IN BUILDING

FLOOR

BUILDING NUMBER

SYMBOL - TELECOMMUNICATIONS

TELECOMMUNICATIONS RACK

WALL MOUNTED TELEPHONE OUTLET BOX

MOUNT 48" AFF UON

CARD READER

100A

MTR

100A 5-3-1

0A

(M3A)

C

A B

SHEET E3

150A(2P)

SHEET E3

100A

M

TRANSFORMER, DELTA (Δ) WYE(Y) CONNECTED,

225,000 VOLT-AMP CAPACITY, 6% IMPEDANCE

CONTINUED ON SHEET E-703

AT MATCH NUMBER 4

CONTINUED FROM SHEET E-703

FROM MATCH NUMBER 7

MOTOR STARTER/DISCONNECT

MOTOR STARTER

NON-FUSED DISCONNECT

PANELBOARD WITH 100 AMP MAIN

BREAKER NEW PANEL NUMBER 5-3-1

EN

L

G

PC

C

R

METER

PAD MOUNT XFMR. T-BLADE SWITCH

CHILLER STARTER PANEL

V

A

GF = GROUND FAULT INTERRUPTER (GFI)

WP = GFI WITH WEATHERPROOF IN USE COVER

SYMBOL MODIFIERS

PC

W

CR

Electrical Symbols, Abbreviations, and General Notes

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-001

A

Fi le

P at h

Field Investigation and Studies

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E firm POC: Bryan Hanneman

Electrical Condition Assessment - Des Moines VA Medical Center

3600 36th St., Des Moines, IA 50310

636A6-19-302

Project Director

Revisions: Date:

FIELD INVESTIGATION AND STUDIES 10/30/20

--/--/-- BDH AGJ

MH #7

100A

MTR

100A 5-3-1

0A

(M3A)

225KVA, 6%

C

A B

SHEET E-603

150A(2P)

SHEET E-603

100A

SYMBOL

LEGEND

DESCRIPTION

S H

E E

T E

-6

A

C

B

A

C B

SHEET E-6047

MH #16

MH #15

S H

E E

T E

-6

A

C

B

A

C B

SHEET E-612

A

C B

SHEET E-608 8

353C10-25A

ELX-30A

353C14-65A

353C14-65A

13.2KV/480-277V

1000KVA, 5.79% IMP

353C10-25A

1600M

A

C B

SHEET E-602

353C17-140A

13.2KV/480-277V

1500KVA, 5.62% IMP

S H

E E

T E

-6

A

C

B

353C17-140A

S H

E E

T E

-6

A

C

B

ELX-30A

A

C B

SHEET E-60637

ELX-30A

600/5

15KV METAL CLAD SWITCHGEAR

600/5

15KV METAL CLAD SWITCHGEAR

CABLE SPLICE (TYP.)

MH #17

A

C

B

25A

FUTURE

FDR.#3

36TH ST. SERVICE

DOUGLAS AVE. SERVICE

A

C

B

25A

S H

E E

T E

-6

A

C B

SHEET E-6089

25A

60 62 S

H E

E T

E -6

PAD MOUNT

PAD MOUNT PAD MOUNT

PAD MOUNT

PAD MOUNTPAD MOUNT

PAD MOUNT

PAD MOUNT

PAD MOUNT

PAD MOUNT

PAD MOUNT

PAD MOUNT

TO MEC

36TH STREET POLE

(FH212)

600A LOAD

BREAK SWITCH

SEL

351-7

UTILITY

PT'S

50/51

600A LOAD

BREAK SWITCH

600A LOAD

BREAK SWITCH 3-1/C #2/0; 4"C.

60 FT.

CBL-016

3-1/C #2/0; 4"C.

60 FT.

CBL-001

3- 1/

C

2/ 0;

(3 )2

"C

FT

C B

L-

3-1/C #2/0; 4"C.

280 FT.

CBL-015

3-1/C #2/0; 4"C.

275 FT.

CBL-015

4-600MCM; 4"C.

55 FT.

3-1/C #2/0; (3)2"C.

125 FT.

CBL-013

3-1/C #2/0; (3)2"C.

250 FT.

CBL-013

300KVA, 5.29% IMP

13.2KV/480-277V

(SUBST. 3-1)

3-1/C #2/0; 4"C. '

150 FT.

CBL-015

300KVA, 4.55% IMP

13.2KV/208-120V

(3)4-500MCM

40 FT.

3-1/C #2/0; 4"C.

50 FT.

CBL-006

3-1/C #2/0; (3)2"C.

145 FT.

CBL-007

(4)4-600MCM; 4-4"C.

40 FT.

(6)4-500MCM; 6-3"C.

75 FT.

(6)4-600MCM; 6-3 1/2"C.

45 FT.

500KVA, 4.72% IMP

13.2KV/208-120V

1500KVA, 5.68% IMP

13.2KV/480-277V

750KVA, 5.97% IMP

13.2KV/208-120V

3-1/C #2/0; EXISTING 4"C.

90 FT.

CBL-005

3- 1/

C

2/ 0;

(3 )2

"C

FT

C B

L-

3-1/C #2/0; (3)2"C.

105 FT.

(6)4-500MCM; 6-3"C.

105 FT.

300KVA, 5.29% IMP

13.2KV/480-277V

300KVA, 5.48% IMP

13.2KV/208-120V

4-500MCM; 4"C.

65 FT.

600A LOAD

BREAK SWITCH

600A LOAD

BREAK SWITCH

3-1/C #2/0; (3)2"C.

365 FT.

CBL-012

SEL

351-7

UTILITY

PT'S

UTILITY

PT'S 600A LOAD

BREAK SWITCH

TO MEC

34TH STREET POLE

(AG211)

300KVA

13.2KV/208-120V

(2)4-600MCM; 2-4"C.

70 FT.

3-1/C #2/0; (3)2"C.

445 FT.

CBL-011

(2)4-500MCM; 2-4"C.

245 FT.

500KVA, 4.79% IMP

13.2KV/480-277V

500KVA, 4.72% IMP

13.2KV/208-120V

3-1/C #2/0; 4"C.

20 FT.

CBL-011

3-1/C #2/0; (3)2"C.

695 FT.

CBL-009

3-1/C #2/0; (3)2"C.

250 FT.

CBL-008

(4)4-600MCM; 4-4"C.

260 FT.

CHILLER STARTER PANEL

METER

PANELBOARD WITH 100 AMP MAIN BREAKER

NEW PANEL NUMBER 5-3-1

PANELBOARD WITH NO MAIN BREAKER, 100 AMP LUGS ONLY OLD

PANEL NUMBER M3A

TRANSFORMER, DELTA ( ) WYE(Y) CONNECTED,

225,000 VOLT-AMP CAPACITY, 6% IMPEADANCE

PAD MOUNT XFMR. T-BLADE SWITCH

SURGE (LIGHTNING) ARRESTOR

NON-FUSED DISCONNECT

FUSED DISCONNECT, 100AMP FUSE

MOTOR STARTER

MOTOR STARTER/DISCONNECT

CIRCUIT BREAKER, 150 AMPS, 3 POLE (2 POLE)

MOTOR

CONTINUED FROM SHEET E-602.03 FROM MATCH NUMBER 7

CONTINUED ON SHEET E-602.03 AT MATCH NUMBER 4

NOTES:

1. PANELBOARDS DO NOT SHOW ALL BREAKERS, ONLY BREAKERS FOR

MAJOR FEEDERS.

2. GROUND WIRES FOR CIRCUITS ARE NOT SHOWN.

3. ALL CIRCUIT LENGTHS ARE APPROXIMATE.

PAD MOUNT

SHEET E-610 70

PAD MOUNT

SHEET E-61171

(TO 11_AT_ATS-EMERGENCY)

3-1/C #2/0; (3)2"C.

780 FT.

SHEET E-61172

(TO 11_AT_ATS-LIFE SAFETY)

11_SP_SEC XFMR 11-1

00_TX_11-1

00_TX_T12-1

(12_SB_SWBD 12-1)

00_TX_T1W-3

(01W_SB_SWBD 1W-3)

00_TX_T1W-1

(0 1W

_S G

_S W

G R

W

-1

00_TX_T1W-2

(0 1W

_S B

_S W

B D

W

-2

00_TX_T4-1

(0 4_

S B

_S W

B D

-1

00_TX_P1

(28_PB_MDP-1)

00_TX_T1-1

(01_SB_SWBD 1-1)

00_TX_T1-2

(01_AT_ATS 1-1)

00_TX_T3-1

(03_SB_SWBD 3-1)

(0 5_

P B

_P N

L 5-

B -4

00_TX_T5-1

00_TX_T6M-1

(0 6M

_S B

_M D

P

M -1

(13_SB_SWBD 13-1)

(0 7_

M T_

M

TS

M

-1

00_TX_T7M-1

00_TX_T13-1

00_UT_FH212

00_LB_FH212

FDR #2

00_LB_FH212

FDR #1

00_UT_AG211

00_LB_AG211

FDR #2

00_LB_AG211

FDR #1

(2)4-500 MCM

& #1/0 GND.

150 FT.

3-1/C #2/0

40 FT.

3-1/C #2/0; (4)2"C.

660 FT.

3-1/C #2/0

270 FT.

(3)4-500MCM; 3-3"C.

12 FT.

(3)4-500MCM; 4"C.

240 FT.

3-1/C #2/0; (3)2"C.

105 FT.

*UNDER

CONSTRUCTION

85 FT.

*UNDER

CONSTRUCTION

90 FT.

2500KVA, 5.58% IMP

13.2KV/408-277V

500KVA, 4.72% IMP

13.2KV/208-120V

NTSE-601

ONE-LINE DIAGRAM1

SITE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-601

A

Fi le

P at h

Field Investigation and Studies

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E firm POC: Bryan Hanneman

Electrical Condition Assessment - Des Moines VA Medical Center

3600 36th St., Des Moines, IA 50310

636A6-19-302

Project Director

Revisions: Date:

FIELD INVESTIGATION AND STUDIES 10/30/20

--/--/-- BDH AGJ

One-line Diagram Manholes - 15kV Switchgear

10 HP

(04_MC_4-MCC-1E)

SHEET E-608

3Ø, 3W

ENNE

S H

E E

T E

-6

(W3A)

(W3B)

(WBA)

SHEET E-60711

(NWBDP2)

L

L

M

VFD

M

VFD

30 100

SHEET E-609

(5WB)

(WBB)

(5WA)

(W4A)

(NWBDP1)

70 225

300 400

(W4B)

(W2A)

(W2B)

10 HP

(00_TX_T1W-2)

(00_TX_T1W-1)

SHEET E-60143

S

H E

E T

E -6

S H

E E

T E

-6

S H

E E

T E

-6

1 2

S H

E E

T E

-6

L

S H

E E

T E

-6

SHEET E-60957

E N

50 HP 50 HP

F

T.

F

T.

3- #3

; 1 "C

3- #3

; 1 "C

800250 800

SHEET E-601

800 800 250 250 800

15 HP

M

60 HP

7.5 HP5 HP 7.5 HP

1 1

3Ø,3W

1 1

30 15 20 20

SPARE

M

30 20

3- #3

/0 ; 2

"C

3- #3

; 1

/4 "C

3- #3

/0 ; 2

"C

1-CU3

7.5 HP60 HP 7.5 HP 7.5 HP

20 HP

F

T.

F

T.

F

T.

1- A

C -1

40 HP

15 HP

1- A

C -3

1- A

C -2

1- C

1- C

7.5 HP

1 1

7.5 HP 5 HP

5020 350

M

50 40 60 20 2020

1- C

3 HP

3- #1

2;

/4 "C

20 HP15 HP20 HP 50 HP

F

T.

F

T.

3- #6

; 1 "C

3- #8

; 1 "C

F

T.

3-

#6 ; 1

"C

3- #3

; 1

/4 "C

50 30

10050 20

EN

6-500MCM; 2-3"C

M

L

SHEET E-609 47

(00_TX_T1W-3)

SHEET E-60144

S H

E E

T E

-6

S H

E E

T E

-6

(0 1W

_A T_

A

TS

W

-6

50 51

S H

E E

T E

-6

S H

E E

T E

-6

52 53

250 600 600800 400

#1/0 GEC

EN

L

SHEET E-60959

58SHEET E-607

(01W_SB_SWBD-1W-4E)

(0

1W _S

B _S

W B

D -1

W -4

E

(01W_SB_SWBD-1W-4E)

EQUIPMENT BRANCHOPTIONAL STANDBY

M MM M

MMMMMM M

MMM M

MM M

M

M

M M

M

M

M

M

MCB-E1A

NOT CONNECTEDM

E1B

M

SUPPLY FAN 1-AC-3RETURN FAN 1-AC-3

01W_SB_SWBD 1W-1

BLDG 1W, ROOM B120

01W_AT_ATS

1W-11

ROOM B120

400 AMP

01W_EB_

ATS 1W-11

ROOM B120

ENCLOSED

CIRCUIT BKR.

01W_AT_

ATS 1W-1

ROOM B120

600 AMP; 3-POLE

01W_AT_

ATS 1W-12

ROOM B120

600 AMP; 3-POLE

01W_EB_1-B-19E

ROOM B120

01W_TX_

T1W-B-2 (BOTTOM)

ROOM B120

225KVA, 3.8%

480/208-120V

01W_EB_1-B-20

ROOM B120

01W_TX_T1W-B-1

(TOP)

ROOM B120

225KVA, 3.8%

480/208-120V

01W_PB_

1W-3-1E

ROOM 3317A

01W_PB_

1W-3-2E

ROOM 3317A

01W_PB_

1W-B-2E

ROOM B103

01W_PB_

1W-B-3E

ROOM B103

01W_PB_

1W-B-6E

ROOM B201

01W_PB_

1W-5-1E

ROOM 5272A

01W_PB_

1W-5-2E

ROOM 5272A

01W_PB_

1W-B-7E

ROOM B201

01W_PB_

1W-2-1E

ROOM 2329A

01W_PB_

1W-2-2E

ROOM 2329A

01W_PB_

1W-4-1E

ROOM 4323A

01W_PB_

1W-4-2E

ROOM 4323A

01W_SB_SWBD 1W-3

BLDG 1W, ROOM B120

01W_SB_SWBD 1W-2

BLDG 1W, ROOM B120

01W_MC_1W-MCC-2

BLDG 1W, ROOM B126A

01W_AT_ATS FP 1,1W,2

ROOM B105

1W-1 STAIRWAY

100 AMP

01W_EB_1,1W,2 FP

ROOM B120

01W_PB_

1W-B-18

ROOM B120

01W_MC_1W-MCC-1

BLDG 1W, ROOM B122

01W_PB_1W-P-4

BLDG 1W, ROOM 6000

PENTHOUSE

(01W_SB_SWBD-1W-4E)

(01W_SB_SWBD-1W-4E)

(0 1W

_A T_

A

TS

W

-7

(0 1W

_A T_

A

TS

W

-8

(0 1W

_A T_

A

TS

W

-9

(0 1W

_A T_

A

TS

W

-2

(0 1W

_A T_

A

TS

W

-3

(0 1W

_A T_

A

TS

W

-4

(0 1W

_A T_

A

TS

W

-5

4-

M

C M

G

N D

1/ 2"

C

FT

3-3/0 & #4 GND.; 2"C

15 FT.

(02_PB_2-B-11E&

02_PB_2-B-12E)

(2)4-350 MCM & 3 GND.; 2-3"C

5 FT.

(2)4-350 MCM & #1/0 GND.; 2-3"C

5 FT.(2

)4 -3

M

C M

; 2 -3

"C

F T.

(2 )4

-3

M C

M

G N

D ; 2

-3 "C

F

T.

(2)4-350 MCM & #1/0 GND.; 2-3"C

25 FT.

(2)4-350 MCM; 2-3"C

25 FT.

(2 )4

-3

M C

M ; 2

-3 "C

F

T.

(02_PB_2-B-6E(A) &

02_PB_ 2-B-6E(B))

(2)4-300 MCM &

#1 GND; 2-3"C

6 FT.

4-

M

C M

;4 "C

FT

2-1-10-E

ROOM 1006

1.5 HP

EX. FAN

ROOM B120

(2)4-350 MCM & #1/0 GND.; WIREWAY

5 FT.

(0 5_

P B

_5 -B

-5 E

E

LE

V

A

TO

R

4- 4/

G N

D

1/

2" C

F

T.

3-

0M C

M

G N

D

1/

2" C

F

T.

4-

0M C

M

G N

D

1/

2" C

F

T.

3-

M

C M

G

N D

1/ 2"

C

F T.

(2 )4

-5

M C

M

G N

D ; 2

-3 "C

FT

4- 3/

G N

D

2" C

F

T.

650 TON

CHILLER

562 FLA

3810 LRA

C O

N D

E N

S E

R W

A

TE

R P

U M

P N

O .6

C O

N D

E N

S E

R W

A

TE

R P

U M

P N

O .7

C H

IL

LE

D W

A

TE

R R

E C

IR

C

. P U

M P

N O

.8

C H

IL

LE

D W

A

TE

R R

E C

IR

C

. P U

M P

N O

.1

C H

IL

LE

D W

A

TE

R R

E C

IR

C

P U

M P

N O

.1

C O

N D

E N

S E

R W

A

TE

R P

U M

P N

O .1

B

LD

G

W B

O O

S

TE

R W

A

TE

R P

U M

P (5

H P

S P

A R

E S

IZ

E

S P

A R

E S

IZ

E

S P

A R

E S

IZ

E

S P

A R

E S

IZ

E

3- #6

M I

0?

F T.

(3 )4

-3

M C

M

G N

D ; 2

-3 "C

F

T.

(2 )3

-3

M C

M

1/

G

N D

2-

3" C

F

T.

3-

M

C M

G

N D

1-

1/

2"

FT

01W_MO_FP 1,1W,3

FIRE PUMP

60HP

300 TON

CHILLER

234HP

BLDG. 2

FREIGHT

ELEV.

CONTROL

PANEL

TO

N

TO

W

E R

S P

A R

E S

IZ

E

S P

A R

E S

IZ

E

S P

A R

E S

IZ

E

S P

A R

E S

IZ

E

3- #1

2;

/4 "C

FT

3- #1

2;

/4 "C

FT

3- #1

2;

/4 "C

FT

3- #1

2;

/4 "C

FT

3- #1

2;

/4 "C

FT

C H

IL

LE

D W

A

TE

R P

U M

P N

O .1

(B

LD

G

. 3

C H

IL

LE

D W

A

TE

R P

U M

P N

O .1

(B

LD

G

. 2

V E

N

TI

LA

TI

O N

U N

IT

C H

IL

LE

D W

A

TE

R P

U M

P P

-3 0-

(B

LD

G

. 4

C H

IL

LE

D W

A

TE

R P

U M

P P

-3 1-

(B

LD

G

. 4

C H

IL

LE

D W

A

TE

R P

U M

P N

O .3

(P E

N T.

S U

R G

IC

A

L S

U

IT

E

3-#8; 3/4"C

100 FT.

3-

0M C

M ; 3

"C

F T.

3- #6

; 1 "C

FT

3- #1

0;

/4 "C

F

T.

3- #8

; 1 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

FT

3- #1

2;

/4 "C

F

T.

3- #8

; 3 /4

"C

F T.

3- #1

0;

/4 "C

F

T.

HWP1/HWp2

PUMPS PENTHOUSE

ROOM 6000

#4 12

FT

#1 /0

FT

4- 3/

G N

D

2" C

F

T.

(2)4-250 MCM & #3 GND; 2 - 2 1/2"C

200 FT.

3-500 MCM & #1 GND; 3"C

8 FT.

01W_TX_T1W-B-3

ROOM B120

150KVA, 4.0%

480/208-120V

4-

M

C M

; 3

/2 "C

FT

01W_AT_

ATS 1W-10

ROOM B120

225 AMP

4-POLE

BYPASS

(2)4-#3/0 & #6 GND

30 FT.

800 AF

600 AP

SPARE

SPARE

(2)4-600 MCM & #1/0 GND.

5 FT.

4- #4

/0

G N

D

2" C

FT

4- #4

/0

G N

D

1/

2" C

F

T.

SPARE

4-500 MCM; 3 1/2"C

65 FT.

4-

M

C M

FT

3- #4

FT

3- #4

FT

4-

M

C M

; 3 "C

F

T.

800 AF

600 AP

800 AF

400 AP

4-

M

C M

FT

#1

FT

S

P A

R E

01W_NFD_600A

DISC. PANEL NDP

ROOM 6000

PENTHOUSE

(2 )3

-3

M C

M

1/

G

N D

F T.

M

01W_NFD_CT-2

ROOF

PENTHOUSE

01W_MO_CT-2

ROOF

PENTHOUSE

V

FD

3- #8

1/

G

N D

F T.

3- #8

G N

D

F

T.

01W_CC_VFD-CT-2

ROOM 6000

PENTHOUSE

3- #8

G N

D

FT

50SPARE

01W_SP_1W-3-2E

ROOM 3317A

4- #4

/0

G N

D

FT

4- #4

/0

G N

D

FT

01W_SP_1W-B-3E

ROOM B103

4- #4

/0

G N

D

FT

4- #4

/0

G N

D

FT

01W_SP_1W-B-7E

ROOM B120

01W_SP_1W-2-1E, 1W-2-2E

ROOM 2329A

4- #4

/0

G N

D

FT

4- #4

/0

G N

D

FT

4- #2

/0

G N

D

FT

4- #2

/0

G N

D

FT

01W_SP_1W-4-1E

ROOM 4323A

FE

E

D S

NTSE-602

ONE-LINE DIAGRAM1

1W

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-602

A

Fi le

P at h

Field Investigation and Studies

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E firm POC: Bryan Hanneman

Electrical Condition Assessment - Des Moines VA Medical Center

3600 36th St., Des Moines, IA 50310

636A6-19-302

Project Director

Revisions: Date:

FIELD INVESTIGATION AND STUDIES 10/30/20

--/--/-- BDH AGJ

One-line Diagram - Building 1W

CRITICAL BRANCH

SHEET E-607

SHEET E-607

(TOTAL)

29 SHEET E-604

SHEET E-60828

(CWPP)

150 100

200 350

SHEET E-602

SHEET E-609 27

(03-PB_3-B-3E)

(02-PB_2-1-1E)

SHEET E-608

SHEET E-60715

(W1C)

31 HP

(W1A)

(W1B)

(W1C)

(CWDP)

(W1D) (CWB)

(01_PB_1-1-6E)

(01_PB_1-2-3E)

SHEET E-604

SHEET E-604

(EWDP)

(EWB)

100 350

Y

(02_MC_2-MCC-1)

(02_PB_2-B-1E)

V A

C U

U M

P U

M P

(04-PB_ 4-1-7E & 8E)

10 HP

V A

C U

U M

P U

M P

A

IR

IN

TA

K E

1.5 HP

SHEET E-60813

(EWPP)

10 HP

SHEET E-602

SHEET E-609 18

E

L

N

Y

SHEET E-604 16

SHEET E-605

(01-PB_1-B-1E)

(01_PB_1-1-7E)

SHEET E-609

SHEET E-602

(CW2) (CW3)

(CW4)

(CW5)

(MWB)

(MWBDP)

100 125

(EMP)

(04_PB_4-1-5E)

SHEET E-608 24

R V

-8

7.5 HP

S H

E E

T E

-6

1 HP

PENTHOUSE RM. 6000

2 HP

A C

-8

5 HP5 HP 5 HP 2 HP

1- C

-1

S U

R G

E R

Y

-A C

-1

5 HP5 HP 7.5 HP 20 HP

SHEET E-607

(MWBPP)

Y

70 70

30 40 15

(BLDG 2 ELEV)

EQUIPMENT BRANCH

20 20 20 20

20 20 20 30 60

(E-BW1)

E

L

N

E

L

N

SURGERY AREA PANELS 4TH FLOOR

303030 30 30 30 30 30 30 30 30

LIFE SAFETY BRANCH

175 125

(E1)

(E1-1)

(E2)

(E2-1)

(01W-SB_SWBD 1W-2)

(01W-SB_SWBD 1W-4E)

(01W-SB_SWBD 1W-2)

(01W-SB_SWBD 1W-4E)

(01W-SB_SWBD 1W-2)

(01W-SB_SWBD 1W-4E)

MM MMM M M M M

MMMM

MM

M M

M M M

M

M

01W_PB_

1W-B-8E

ROOM B201

01W_AT_

ATS 1W-4

ROOM B201

400 AMP BYPASS

3-POLE

01W_PB_

1W-1-1E

ROOM 1303

01W_PB_

1W-B-5E

ROOM B201

01W_PB_

1W-1-2E

ROOM 1303

01W_PB_

1W-1-3E

ROOM 1303

01W_PB_

1W-1-4E

ROOM 1303

01W_PB_

1W-3-8E

ROOM 3218

01W_PB_

1W-3-7E

ROOM 3218

01W_PB_

1W-3-6E

ROOM 3343

01W_PB_

1W-3-5E

ROOM 3343

01W_PB_

1W-3-4E

ROOM 3317

01W_PB_

1W-B-1E

ROOM B103

01W_PB_

1W-2-3E

ROOM 2329A

01W_PB_

1W-3-3E

ROOM 3317A

01W_PB_

1W-4-3E

R00M 4323A

01W_PB_

1W-5-3E

ROOM 5272A

01W_PB_

CYSTO A

ROOM C406W

01W_PB_

CYSTO B

ROOM C406W

01W_PB_

ISO 1-A

ROOM C402W

01W_PB_

ISO 1-B

ROOM C402W

01W_PB_

ISO 2-A

ROOM 4203

01W_PB_

ISO 2-B

ROOM 4203

01W_PB_

ISO 3-A

ROOM C404W

01W_PB_

ISO 3-B

ROOM C404W

01W_PB_

ISO 4-A

ROOM C404W

01W_PB_

ISO 4-B

ROOM C404W

01W_PB_

ISO 5-A

ROOM C404W

01W_PB_

ISO 5-B

ROOM C404W

01W_PB_

1W-P-1E

ROOM 6000

01W_PB_

1W-P-2E

ROOM 6000

01W_PB_

1W-B-14E

ROOM B201

01W_PB_

1W-B-10E

ROOM B201

01W_PB_

1W-B-11E

ROOM B201

01W_PB_1W-B-13E

ROOM B201

01W_AT_ATS 1W-3 ROOM

B201

400 AMP

3-POLE

01W_PB_1W-B-12E

ROOM B201

01W_PB_1W-P-6E

ROOM 6000

01W_PB_1W-B-4E

ROOM B201

01W_PB_1W-B-9E

ROOM B201

01W_TX_T1W-B-4E

75KVA, 4.5%?

480V/208-120V

ROOM B126B

01W_PB_ 1W-B-15E

ROOM B122

01_PB_

1-B-33E(B)

ROOM B409

01_PB_

1-B-33E(A)

ROOM B409

01_PB_

1-B-33E(C)

ROOM B409

3-#10; 3/4"C

32 FT.

3-#10; 3/4"C

32 FT.

3-#12; 3/4"C

18 FT.

4-#4/0 & #4 GND.; 3"C

9? FT.

3-#1/0 & #6 GND; 2"C

250 FT.

3-#2 & #6 GND.

150 FT.

4-#2 & #6 GND.; 1 1/2"C

155 FT.

4-#6 & #6 GND.; 1"C

290 FT. (.2015+j.0271)

4-#6 & #8 GND.; 1"C

70 FT.

ROLL FILTER

MECH. RM.

AIR DRYER

SURGICAL

4-#2 & #6 GND.; 1 1/2"C

160 FT.

4-#2 & #6 GND.; 1 1/2"C

30 FT.

3- #4

/0

G N

D ; 3

"C

FT

3-600 MCM & #2 GND; 2-3"C

25 FT.

3-#4/0 & #4 GND

260 FT.

3-#1/0 & #6 GND; 1 1/2"C

375? FT. (.048+j.0203)

3-500 MCM & #1/0 GND; 2 1/2"C

150 FT.

PARALLEL FEED

WITH UPS#1

01W_TX_T1W-B-5E

225 KVA, 6%

480V/208-120V

ROOM B126B

4-#2; 1 1/2"C

165 FT.

3-#3/0;

125 FT.

3-#4/0; 3"C

60 FT.

3-600 MCM; 4"C

130 FT.

4-#2 & #6 GND.; 1 1/2"C

85 FT.

4-#2 & #6 GRD; 1 1/2"C

50? FT.

(2)4-600 MCM & #1 GND.

35 FT.

2 HP

EAST

2 HP

WEST

DUMB WAITERS

BLDG. #1W

3-#10; 3/4"C

20 FT.

3-#2 & #6 GND.; 1 1/4"C

100 FT.

3-#2 & #6 GND; 1 1/4"C

100 FT.

3-#2 & #6 GND.; 1 1/4"C

40 FT.

S E

R V

IC

E

E

LE

V A

TO

R

B

LD

G

1W

P A

S S

E N

G E

R E

LE

V

A

TO

R

B

LD

G

1W

A H

U #2

B

LD

G #1

R M

3- #1

FT

3-600 MCM & #4 GND.; 3"C

35 FT.

3-#6; 1 1/4"C

80? FT.

3-#2 & #4 GND.; 2"C

60 FT.

3-#2; 1 1/4"C

125 FT.

4- #4

/0

G N

D ; 3

"C

FT

4-#2; 1 1/2"C

165 FT.

4-#2; 1 1/2"C

170 FT.

4-#2 & #6 GND.; 1 1/2"C

270 FT.

4-#2 & #6 GND.; 1 1/2"C

25 FT.

AHU#1

BLDG.1

RM.017

S U

R G

E R

Y A

IR

C

O M

P R

E S

S O

R

C O

M P

R E

S S

O R

A

IR

TE

M

P E

R A

TU

R

E

S U

R G

E R

Y C

H

IL

LE

D

W A

TE

R

R E

TU

R

N P

U M

P S

C O

N D

E N

S A

TE

P

U M

P S

E T

C O

N D

E N

S A

TE

P

U M

P S

E T

1W-P-3E-A

PENTHOUSE

ROOM 6000

1W-P-3E

PENTHOUSE

ROOM 6000

3-#4/0; 3"C

55 FT.

2- #2

/0 ; 1

"C

F T.

3- #4

; 1 "C

F

T.

3-#4; 1 1/4"C

3 FT.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

1.5 HP P2 1.5 HP P3 1.5 HP P41.5 HP P1

3- #1

0;

/4 "C

F

T.

3- #8

; 3 /4

"C

F T.

3- #1

2;

/4 "C

FT

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

FT

3- #1

2;

/4 "C

FT

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

0;

/4 "C

F

T.

3- #8

; 1 "C

F

T.

2/50

M

01W_AT_ATS 1W-2

ROOM B201

260 AMP BYPASS

4 POLES

01W_TX_

XFMR 1W-B-14E

ROOM B126B

75 KVA, 4.5%

480V/208-120V

(01W_PB_1W-B-16E

TRANSFORMER)

(01_PB_1-B-2E

TRANSFORMER)

3-#1/0 & #6 GND.

335 FT.

SPARE?

3-#2

? FT.

3-#1

320 FT.

V A

C U

U M

P U

M P

M

SPARE

225 225

01W_SP_1W-B-1E

4- #2

G

N D

FT

(2 )3

4/

0;

/2

C

F T.

01_NFD_UPS #1

ROOM B409

3-#1

45 FT.

4-#4/0 & #4 GND.

18 FT.

01_CC_UPS #1

ROOM B409

4-#4/0 & #4 GND.

2 FT.

4-#4/0 & #4 GND.

18 FT.

01W_CC_1W

FRT ELEV-4

ROOF

01W_MO_1W

FRT ELEV-4

ROOF

PENTHOUSE

25 HP

2- #2

G

N D

F T.

3- #2

G

N D

FT

01W_FD_1W

FRT ELEV-4

ROOM 6000

01W_SP_1W FRT ELEV-4

ROOM 6000

01W_CC_1W

PASS ELEV 3-1

ROOF

2- #2

G

N D

F T.

3- #2

G

N D

F T.

3- #2

G

N D

FT

01W_FD_1W

PASS ELEV-3

ROOM 6000

01W_MO_1W

PASS ELEV-3

ROOF

PENTHOUSE

25 HP

01W_TX_

PASS ELEV-3

ROOM 6000

30KVA, 3.6%

480/230-120V?

3-#2 & #4 GND.

? FT.

4-#2

3 FT.

4-#2 & #6 GND.

? FT.

SHEET E-60??E11C RM 138

BLDG 1W

01W_TX_

FRT ELEV-4?

ROOM 6000

? KVA, IMP%

? V

01W_SP_

1W PASS ELEV-3

ROOM 6000

3-#3

? FT.

225 225 225

4- #4

/0

4/

G

N D

FT

4- #4

/0

G N

D

FT

4-#2 & #6 GND.; 2"C

40 FT.

4-#2

3 FT.

4-#3/0 & #6 GND.; 2"C

130 FT.

4-#3/0 & #6 GND.

3 FT.

4-#4/0

3 FT.

4-#4/0

3 FT.

4- #2

G

N D

FT

4-#2 & #6

GND.

? FT.

4-#2 & #6 GND.

12 FT.

3-#6 & #10 GND.

4 FT.

4-#6 & #10 GND.

? FT.

4-#2 & #6 GND.

12 FT.

01W_SP_4-3E TAP

ROOM 4323A

4- #2

G

N D

FT

01W_ECB_

PB CYSTO

ROOM 6000

2-#2/0 & #6 GND.

6 FT.

2-#2/0

6 FT.

3-#4

6 FT.

3-#4

6 FT.

3- #4

; 1 "C

F

T.

3-#4

6 FT.

3- #4

; 1 "C

F

T.

3- #4

; 1 "C

F

T.

3-#4

6 FT.

3- #4

; 1 "C

FT

3-#4

25 FT.

SHEET E-60-3 69

(UPS #2)

S H

E E

T E

-6 0-

(U P

S

1)

01_CC_UPS #2

ROOM B409

01_NFD_UPS #2

ROOM B409

?3-#1

40 FT.

NTSE-603

ONE-LINE DIAGRAM1

1W

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-603

A

Fi le

P at h

Field Investigation and Studies

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E firm POC: Bryan Hanneman

Electrical Condition Assessment - Des Moines VA Medical Center

3600 36th St., Des Moines, IA 50310

636A6-19-302

Project Director

Revisions: Date:

FIELD INVESTIGATION AND STUDIES 10/30/20

--/--/-- BDH AGJ

Building 1W

1.5 HP

SHEET E-604

S H

E E

T E

-6

(A1B)

(B)

(1P1)

(1L2)

(A)

(1L3)

(1P3) (EMP3)(EMP1) (M11B)

70 50

(MDP1)

225 50

SHEET E-602

SHEET E-609

E

L

N

3 HP

S H

E E

T E

-6

L

E N

N

125 400 600

3- #4

; 1

/4 "C

3- #1

0;

/4 "C

3- #1

0;

/4 "C

TO LIGHTING RISERS

S C.E.

33 34

C.W.

400 400 600 200 200

3/4HP 3/4HP

SUMP PUMPS

#1

P U

M P

S O

U

TH

Z O

N E

E X

H . F

A N

F

T

F

T

F

T

1 HP 15 HP

S H

E E

T E

-6

20 70

3HP

N .W

. A

TT

IC

SHEET E-603

(01_PB_1W-B-5E)

(EMP2)(EMP4)

(C13D)

(C12D)

(B)

(C13A)

(C12A)

(C12B)

(C13B)

SHEET E-603

(01_PB_1W-B-8E)

3-#2; 1 1/4"C

(C11D)

1 HP

R E

TU

R

N F

A N

H E

A T

P U

M P

H E

A T

P U

M P

1.5 HP 1 HP 2 HP 2 HP 1 HP

(C11A)

(C11B)

E X

H A

U S

T

FA

N C

. W A

R D

S

D A

Y R

O O

M

E X

H A

U S

T

FA

N

C

E X

H . F

A N

C

1.5HP

A C

U N

IT

A C

5HP

16SHEET E-603

(C11C)

(01_PB_1W-B-14E)

25SHEET E-603

(E11C)

(C14C)

(B3D)

(C13C)

P U

M P

E X

H . F

A N

N O

. 1 -A

C

(C12C)

3/4 HP

1.5 HP

R E

FA

N

BLDG. NO. 1 PENTHOUSE RM. 5500

3- #1

0;

/4 "C

3- #6

; 1 "C

3- #8

; 1

/4

3- #1

0;

/4

"C

3- #1

0;

/4 "C

3- #4

; 1

/4 "C

3- #1

0;

"C

3- #1

0;

/4 "C

3- #1

0;

/4 "C

F

T

15 HP

S P

A R

E

1 11

S P

A R

E

1 1

20 20 20

1 1

S P

A R

E

S P

A R

E

1.5 HP

PUMPS

FA

N

#1

P U

M P

#1

P U

M P

A .C

. U N

IT

E A

S T

ZO

N

E

#1

P U

M P

N O

R

TH

Z O

N E

COND.

STEAM

F

T

F

T

F

T

7.5 HP10 HP 1 HP 15 HP 1.5 HP

F

T

25 HP

40 FT.

#8

3- #8

; 3 /4

"C

3- #1

0;

/4 "C

3- #8

; 3 /4

"C

FT

FT

50 15 50

3- #8

; 3 /4

"C

FT

1-MCC-4

C O

M P

R E

S S

O R

C O

M P

R E

S S

O R

3 HP

3 HP

1 1

A .H

.U . N

O . 2

A .H

.U . N

O . 1

F

T

F

T

7.5 HP 5 HP

1 2

20 70 20 S H

E E

T E

-6

S H

E E

T E

-6

3- #1

0;

/4 "C

3- #1

0;

/4 "C

3- #1

0;

/4 "C

3- #1

0;

/4 "C

3- #1

0;

/4 "C

3- #1

0;

/4 "C

0F

T

3- #1

2;

/4 "C

FT

20 10

S P

A R

E7

FI

N

T U

B E

R A

D R

E

TU

R N

T O

P P

U M

P

FI

N

T U

B E

R A

D R

E

TU

R N

B O

TT

O

M P

U M

P

P U

M P

L E

FT

O R

A L

E V

A C

P

U M

P R

IG

H

T

C H

IL

LE

D W

A

TE

R P

U M

P R

IG

H

T

C H

IL

LE

D W

A

TE

R

F

T

F

T

F

T

F

T

F

T

F

T

3 HP3 HP 5 HP

O R

A L

E V

A C

P

U M

P L

E

FT

F

T

5 HP

1 1

20 20

1 1

(0 1W

_P B

_1 W

-B -1

5E

(0 1_

P B

_1 -B

-3 E

(EMP4)

225 225

#1/0 GEC

(A)

#1/0 GEC

#1/0 GEC

1 1 1 1 1 1

10HP

S

IZ

E

S P

A R

E S

IZ

E

S P

A R

E S

IZ

E

S P

A R

E S

IZ

E

S P

A R

E S

IZ

E

S P

A R

E S

IZ

E

C O

IL

P

U M

P

?F

T 3-

#1 2;

/4

"C

5KVA

208/120V

A

-2 P

OPTIONAL STANDBY EQUIPMENT BRANCH CRITICAL BRANCH

(1P2)

(1L1)

S H

E E

T E

-6

S H

E E

T E

-6

S H

E E

T E

-6

S H

E E

T E

-6

S H

E E

T E

-6

(0 1_

A T_

A

TS

-1 -3

(0 1_

A T_

A

TS

-1 -4

225 100

0225 225

0A

/2 P

100A/1P

(0 1E

_S B

_S W

B D

W

-4 E

(01W_SB_SWBD 1W-2)

(01W_SB_SWBD-1W-4E)

(ZONE #14 PUMP)

(01_PB_1W-B-5E)

(0 0_

TX

_T

1- 1)

#8

(1EMP)

M

MM MMM M

M

M MMM

MM

MMMM M M M

M

M

MM

M

MM M M M M

M M

MMM M

M M

M M

M M

M

01W_AT_ATS 1W-5

ROOM B201

400 AMP

01_SB_SWBD 1-1

ROOM B408

01_AT_ATS 1-2

ROOM B408

400A

01_PB_1-1-37

ROOM 1833 01_PB_1-B-34

ROOM B803

01_FD_1-1-40

ROOM B803

01_TX_T-7

ROOM B803

150KVA, 5.1%

480/277-208V

01_FD_MP

ROOM B803

01_PB_1-1-40

ROOM 1833

01_TX_ATS 1-2

ROOM B408

150KVA, 5.5%

480/208-120V

01_PB_1-B-14E

ROOM B408

01_PB_1-1-28E

ROOM 1413

01_PB_1-1-27E

ROOM 1413

01_PB_1-B-29(A)

ROOM B401A

01_PB_1-B-29(B)

ROOM B401A

01_PB_1-1-30E

CORRIDOR C1725

01_PB_1-B-8

ROOM B454

01_MC_1-MCC-2

ROOM B454

01_PB_

1-B-6

ROOM B442

01_PB_

1-B-7

ROOM B442

01_ PB_

GUARD

SHACK #1

(30TH ST.)

01_PB_

1-B-10E

ROOM B402

1-B-12E

CRAWL

SPACE B

WING

01_PB_

1-1-9E

ROOM 1714

COOLING

TOWER AHU

01_PB_1-B-3E

ROOM B401

01_PB_

1-4-2E

ROOM 4508

1-B-13E

CRAWL

SPACE A

WING

1-B-11E

CRAWL

SPACE C

WING

NORTH

HANDICAPPED

ELEVATOR

40HP

01_PB_1-3-8E

ROOM 3400

01_PB_1-3-1E

ROOM 3516A

01_PB_1-B-31E(A)

ROOM B401A

01_PB_1-B-31E(B)

ROOM B401A

1-3-6E

OLD ROOM 391

(NEW ROOM

3645)

01_PB_1-1-6E

ROOM 1366

01_PB_1-2-11E

ROOM 2708

01_PB_1-2-6E

ROOM 2708

1_PB_1-2-8E

ROOM 2708

01_PB_1-2-1E

ROOM 2518

01_PB_1-2-9E

ROOM 2601

01_PB_1-1-16E

ROOM 1283

01_PB_1-1-1E

ROOM 1510

01_PB_1-B-2E

ROOM B401

ISOLATION PNL

ROOM 171

(NEW ROOM 1744)

01_PB_1-1-10E

ROOM 1714

01_PB_1-4-1E

ROOM 4306

01_PB_1-3-5E

ROOM 3306

01_PB_1-3-4E

ROOM 3306

01_PB_1-2-3E

ROOM 2312

01_PB_1-1-7E

ROOM 1366

01_PB_QO LOAD

CENTER

ROOM 1354A

RETURN

AIR FAN

#11

01_ MO_

SOUTH

HANDICAPPED

ELEVATOR

40HP

1-B-21

ROOM B422

01_PB_1-1-23E

ROOM C1740

01_PB_1-1-25E

ROOM C1740

01_EB_ ATS

1-2 ECB

ROOM B408

01_PB_1-B-32-E

ROOM B408

01_PB_1-1-26E

ROOM 1714

1-1-2E

ROOM 1510

1-1-3E

ROOM 1510

01_TX_1-B-32-E

ROOM B408

30KVA, 5.8%

480/277-208V

01_MO_ELEV #1

ROOM ?

25? HP

TE

M

P E

R A

TU

R

E A

IR

C

O M

P R

E S

S O

R

ZO

N

E

P

U M

P

4-#3/0; 2"C

150 FT.

3- #4

; 1

/4 "C

5?

F T

3- #1

0;

/4 "C

F

T.

3- #1

0;

/4 "C

F

T.

3- #1

0;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

FT

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

S U

P P

LY

F

A N

1- S

F1

C O

N

TR

O L

C O

M P

R E

S S

O R

C O

N D

E N

S A

TE

P

U M

P S

3-500 MCM & #2 GND.; 3"C

255 FT.

3-300 MCM & #2 GND.

6 FT.

3-#2; 1 1/4"C

195 FT.

3-#4; 1"C

65 FT.

3-#4; 1"C

135? FT.

3-#2; 1 1/4"C

150 FT.

3-#1/0; 2"C

100? FT.

3-#4; 1"C

110 FT.

3-#4; 1"C

105 FT.

3-#2 & #6 GND.

140 FT.

3-#3/0 & #4 GND.;

2 1/2"C

75? FT.

4-#2/0; 1 1/2"C

200? FT.

4-#3/0; 2"C

35 FT.

3- #3

G N

D

1/

4" C

F

T.

1- #2

G

N D

; 1

/2 "C

FT

3- #1

/0 ; 2

"C

FT

4- #2

; 1

/4 "C

FT

(2 )4

-3

M C

M

/0 G

N D

2-

3" C

FT

. 4-

#3 /0

G

N D

2"

C

FT

4- #2

; 1

/4 "C

FT

4-500 MCM; #2

GND.; 3 1/2"C

6 FT.

4- #6

; 1 "C

F

T.

4- #1

/0 ; 2

"C

FT

4-#4/0 & #4 GND.; 2"C

160 FT.

4- #3

/0

G N

D

2" C

F

T.

4-#3/0 & #4 GND.; 2"C

226 FT.

4-

M

C M

G N

D

1/

2" C

FT

EXHAUST

FAN #11

01_MO_

AHU #1-AC11

ROOM 1563

(2)4-250 MCM & #1/0 GND.

6 FT.

3-#1/0; 2"C

160 FT.

3-#1/0; 2"C

100 FT.

3-#1/0; 2"C

54 FT.

4- #1

/0 ; 2

"C

F T.

4- #2

G

N D

2"

C

F T.

4- #1

/0

G N

D

2" C

F

T.

4-

#1 /0

G

N D

2"

C

F T.

4- #1

G

N D

1/ 2"

C

F T.

4- #1

; 1

/2 "C

F

T.

4-#1/0 & #6 GND.;

1 1/4"C

7 FT.

4- #1

/0

G N

D

2" C

F

T.

4-

#1 /0

G

N D

2"

C

F T.

LIFE

SAFETY

BRANCH

S

H E

E T

E -6

(0 1_

A T_

A

TS

-1 -5

3- #4

/0

G N

D

F

T.

(2 )4

3/

F T.

(3)4-400 MCM & #2/0 GND.

220 FT.

4- #3

/0

F T.

600 400

(2 )3

-3

M C

M

G N

D

F

T.

4-#4/0 & #4 GND.

52 FT.

3-

M

C M

G

N D

FT

01_TX_T-6

ROOM B803

112.5KVA, 5.5%

480/277-208V

4- #3

/0

3/

G

N D

FT

4- #2

/0

G N

D

FT

4-

#2 /0

G

N D

F T.

5 (2

)4

3/

G

N D

F T.

4- #3

/0

G N

D

FT

4-#4/0 & #4 GND.

42 FT.

3- #6

G

N D

FT

3- #6

G

N D

FT

SPARE

3- #1

2;

/4 "C

4- #3

/0 ; 2

"C

F T.

4- #3

/0 ; 2

"C

F T.

SUPPLY FAN

1-AC-13

3- #2

FT

01_TX_ T-B-1E

ROOM B401

150 KVA, 5%

480/208-120V

1-MCC-1

ROOM B410

01_MC_1-MCC-3

ROOM B208B

01_EB_ELEV #1

ROOM ?

01_SP__ELEVATORS 1&2

3-#2; 1 1/4"C

01_MO_ELEV #2

ROOM ?

25? HP

01_EB_ELEV #2

ROOM ?

01_PB_1-B-34E

ROOM B401

300 225

SPARE?

3-#4/0 & #4 GND.

260 FT.

01_TX_T-B-2E

ROOM B401

150 KVA, 2.4%

480/208-120V

SPARE

3-500 MCM;

6 FT.

3- #1

/0

G N

D

F

T.

4-#2; 1 1/4"C

? FT.

3-#3/0 & #4 GND.

2 FT.

2-#10; 3/4"C

? FT.

3-#3/0; 2"C

125 FT.01_FD_

SOUTH

HANDICAPPED

ELEVATOR

ROOM ?

01_MCP_

AHU #1

-AC11

ROOM 1563

V

FD

01_FD_MSU

ROOM B803

3- #1

/0

G N

D

F

T.

01_CC_MSU

ROOM B803

3- #1

/0

G N

D

F

T.

4-#4/0 & #6 GND.

5 FT.

01_FD_1-B-32E

ROOM B410

4-#4/0 &

#4 GND.

6 FT.

4-#4/0 &

#6 GND.

190 FT.

3-#3/0 & #6 GND.

215 FT.

4-#2 &

#6 GND.

2 FT.

4-#2 & #0 GND.

2 FT.

4-#1/0 & #6 GND.

4 FT.

#? GND.

3 FT.

3-#1/0 & #6 GND.

2 FT.

3-#1/0 & #4 GND.

3 FT.

4-#1/0 & #6 GND.

7 FT.

4-#1/0 & #6 GND.

7 FT.

4-#1/0 & #6 GND.

7 FT.

4-#1/0 &

#6 GND.;

5 FT.?

4-#1/0 &

#6 GND.;

7 FT.

3- #1

FT

?FT.

4- #3

/0

3/

G

N D

FT

4-#4/0 & #4 GND.

? FT.

NTSE-604

ONE-LINE DIAGRAM1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-604

A

Fi le

P at h

Field Investigation and Studies

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E firm POC: Bryan Hanneman

Electrical Condition Assessment - Des Moines VA Medical Center

3600 36th St., Des Moines, IA 50310

636A6-19-302

Project Director

Revisions: Date:

FIELD INVESTIGATION AND STUDIES 10/30/20

--/--/-- BDH AGJ

Building 1

(01W_PB_1W-B-13E)

SHEET E-603

(E11A)

(E11D) (E11B)

(E1DP)

100100

A M

P B

U S

D U

C T

- S O

U

TH

R

IS

E R

SHEET E-604 33

18 FT.

4-#2; 2"C

(D2E)

(B1D)

A M

P B

U S

D U

C T

- C E

N

TR

A L

W E

S T

R

IS

E R

(B2D) (N12C1)

(N14C) (N14C1)

(LP2)(DE3)

SPARE

IRV13

(A2A)

ROOM 391

1-3-7

C E

N

TR

A L

E A

S T

R

IS

E R

(C1C)

(C3C)

(N12D)

A M

P B

U S

D U

C T

- N O

R

TH

R

IS

E R

(C4C)

(A1A) (A1A)

PORTABLE XRAY

CCU

(A2B)

ROOM 391

(A3A)

1-3-12

(A3B)

#6

VFD

VFD

AHU #9

7.5 HP

1RF7

3 HP

1AC7

10 HP

125125

S H

E E

T E

-6

(0 1W

_S B

_S W

B D

W

-4 E

NE

L

N E

L

CRITICAL/LIFE SAFETY BRANCH

S H

E E

T E

-6

EQUIPMENT BRANCH

S H

E E

T E

-6

OPTIONAL STANDBY

#1/0 GEC #2 GEC

#1/0 GEC

(N11C1) (N11C2)

LIFE SAFETY BRANCH

SHEET E-604

SHEET E-604

S H

E E

T E

-6

S H

E E

T E

-6

(01_SB_SWBD 1-1)

(01_SB_SWBD 1-1)

(0 1W

_S B

_S W

B D

W

-4 E

(0 1W

_A T_

A

TS

-1 W

-9

(0 1_

S B

_S W

B D

-1

CABLE TO BUS CONNECTION

M

M

M

M

200150

150100

50 50

#1/0 GEC#1/0 GEC

#1/0 GEC

#1/0 GEC

SHUT OFF

ATS 1-3 & 1-4

ON EP 501

LIGHTING

1ST FLOOR1ST FLOOR

FIRE/SMOKE DAMPERS

225225

N E

L

BIO MED SERVER

1-B-18E

100100

ROOM B413

01_PB_1-3-2(B)

ROOM 3516A

01_PB_1-3-2(A)

ROOM 3516A

01_PB_1-3-3

ROOM 3516A

01_PB_1-4-3

ROOM 4306

01_PB_1-4-4

ROOM 4306

01_PB_1-2-5

ROOM 2312

01_PB_1-2-4

ROOM 2312

01_PB_1-1-5

ROOM 1366

01_PB_1-1-14

ROOM 1234

01_PB_1-1-13

ROOM 1234

01_PB_1-4-5

ROOM C401

01_PB_1-3-9

ROOM 3400

01_PB_1-1-17

ROOM 1283

01_PB_1-2-10

ROOM 2601

01_PB_1-B-4

ROOM B402

01_PB_1-2-12

ROOM C2700

01_PB_1-2-7

ROOM 2708

01_PB_1-1-11

ROOM 1714

01_PB_1-1-11(A)

ROOM 1714

01_PB_1-1-12E

ROOM 1714

01_PB_1-1-4E

ROOM 1510

01_PB_1-1-15E

ROOM 1283

01_PB_1-1-29E

ROOM 1413

01_PB_1-B-1E

ROOM B401

01_PB_1-B-15E

ROOM B413A

(0 1_

S B

_S W

B D

-1

)SHEET E-604 7

(01_SB_SWBD 1-1)

01_PB_1-1-20E

ROOM 1716

01_PB_1-1-24E

ROOM 1716

01_PB_1-B-23E

ROOM B716

01_PB_

1-2-13E(A)

ROOM 2640

01_PB_1-3-10E

ROOM 3645

01_PB_

1-2-13E(B)

ROOM 2640

01_PB_1-1-21E

ROOM 171601_PB_1-1-39E

ROOM 1833

01_PB_1-3-11E

ROOM 3645

01_PB_1-B-24E

ROOM B716

01_FD_

1-B-19E

ROOM B413A

01_PB_1-B-20E

ROOM B413A

01_PB_1-1-18E

ROOM 1716

01_PB_1-B-22 (A) &

01_PB_1-B-22 (B)

ROOM B716

01_PB_1-2-14(A) &

01_PB_1-2-14(B)

ROOM 2640

01_PB_

1-3-13E

ROOM 3645

01_PB_1-1-22E (A) &

01_PB_1-1-22E (B)

ROOM 1716

01_TX_T-2

ROOM B803

15KVA, 4.6%

480/208-120V 01_TX_T1-4-7E

ROOM 4518

15KVA, 4.6%

480/208-120V

01_TX_T1-2-1

ROOM 2640

15KVA, 4.6%

480/208-120V

01_TX_T1-1-33E

ROOM 1638

15KVA, 4.6%

480/208-120V

01_PB_1-4-7E

ROOM 4518

01_PB_1-B-33E

ROOM B803

01_PB_1-B-32E

ROOM B803

01_PB_1-1-19E

ROOM 171601_PB_1-4-6E

ROOM 4518

01_PB_1-2-15E

ROOM 2640

01_PB_1-1-32E

ROOM 1638

01_PB_1-2-16E

ROOM 2640

01_PB_1-1-33E

ROOM 1638

01_EB_ATS

1-5 ECB

ROOM B408

01_TX_1-5 ATS

ROOM B408

75KVA

480V/208-120V

01_AT_ ATS 1-5

ROOM B408

01_PB_1-1-34E

ROOM 1510

01_PB_1-1-38E

ROOM 1833

01_PB_1-2-2

ROOM 2518

(01_SB_SWBD 1-1)

01_EB_1-1-17

ROOM B402

01_EB_ECB 0268

ROOM B402

3- #3

G

N D

1/ 2"

C

F T.

3- #2

G

N D

1/ 2"

C

FT

3- #3

G

N D

; 1

/2 "C

FT

3-#1 & #6 GND.; 1 1/2"C

10 FT.

3-#4/0 & #4 GND.; 2"C

10 FT.

3-#4/0 & #2 GND.; 2 1/2"C

10? FT.

3-500 MCM & #2 GND.; 3 1/2"C

10 FT.

3-#4/0 & #6 GND.; 2 1/2"C

10 FT.

3-500 MCM & #2 GND.; 3 1/2"C

20 FT.

(2)4-#3/0; 3"C

52 FT. 4-3/0; 2 1/2"C

45 FT.

3-350 MCM & #4 GND.; 3"C

6 FT.

(2)4-500 MCM & #3/0 GND.; (2)4"C

5 FT.

32SHEET E-604

(01_SB_SWBD 1-1)

(CBC)

(2)4-350 MCM & #2/0 GND.; (2)3"C

230 FT.

4-500 MCM & #1 GND.; 3 1/2"C

115 FT.

(2)4-350 MCM & #2/0 GND.; (2)3"C

160 FT.

01_TX_ T-B-3E

ROOM B401

75KVA, 3.2%

480/208-120V

3-#1/0 & #6 GND.; 2"C

250 FT.

4-#4/0 & #4 GND.; 2"C

6 FT.

01_TX_ T1-B-2

ROOM B413A

150KVA

480V/208-120V

01_TX_T1-B-3

ROOM B413A

75KVA, 2.5%

480V/208-120V

3-#1 & #2 GND.

60 FT.

01_EB_

1-B-16E

ROOM B413A

ENCLOSED

CIRCUIT BKR.

01_EB_

1-B-17E ROOM

B413A

ENCLOSED

CIRCUIT BKR.

01_EB_

1-B-18E ROOM

B413A

ENCLOSED

CIRCUIT BKR.

4-500 MCM & #2 GND.

130 FT.

01_AT_ ATS 1-3

ROOM B413A

400A BYPASS

4-POLE

01_AT_ ATS 1-4

ROOM B413A

225A BYPASS

4-POLE

4-500 MCM & #2 GND.

150 FT.

225 225

4-#6 & #10 GND.

135 FT.

4-#6 & #10 GND.

40 FT.

4-#1 & #6 GND.

58 FT.

4-#1/0 & #8 GND.

2 FT.

4-#1/0 & #6 GND.

130 FT.

4-#1/0 & #6 GND.

40 FT.

4-#4/0 & #4 GND.

57 FT.

4-#3/0 & #6 GND.

2 FT.

4-#4/0 & #3 GND.

6 FT.

3-#4/0 & #3 GND.

45 FT.

3-#4/0 & #2 GND.

? FT.

4-500 MCM &

#2 GND.

300 FT.

(01_FB_1-1-40)

SPARE?

4-#1/0 & #6 GND.

90 FT.

3-#3/0 & #6 GND.

130 FT.

4-#1/0 & #6 GND.

96 FT.

4-#1/0 & #6 GND.

152 FT.

01_TX_ T1-B-1

ROOM B413A

225KVA, 3.5%

480V/208-120V

(2)4-#3/0

184 FT.

4-600 MCM & #1 GND.

127 FT.

4-#4/0 &

#4 GND.

94 FT.

4-#3/0 &

#6 GND.

82 FT.

4-#4/0 &

#4 GND.

3 FT.

4-#4/0 &

#4 GND.

62 FT.

225 225 225 225

4-#4/0 &

#4 GND.

3 FT.

4-#4/0 &

#4 GND.

3 FT.

4-#4/0 & #4 GND.

102 FT.

3-#2 & #6 GND.; 1 1/4"C

8 FT.

4-500 MCM; 3 1/2"C

100 FT.

01_SP_CENTRAL EAST LIGHTING BUS

ROOM 1283/B402

3- #2

G

N D

FT

. 22

2 FT.

4-#1 & #6 GND.; 2 1/2"C

15 FT.

4-#4/0 & #6 GND; 2"C

10 FT.

4-#3/0 & #6 GND.; 2 1/2"C

5 FT.

4-#3/0 & #6 GND.; 2 1/2"C

5 FT.

4- #3

/0 ; 2

/2

"C

F T.

01_FD_1-1-13,14

ROOM 1366

4-#3/0; 2 1/2"C

3 FT.

01_SP_CENTRAL WEST LIGHTING BUS

ROOM 1366

CABLE TO BUS CONNECTION

01_SP_SOUTH LIGHTING BUS

ROOM 1510

4-#3/0; 2 1/2"C

14 FT.

4-#1/0 & #6 GND.; 2"C

7 FT.

4-#1/0 & #6 GND.; 2"C

7 FT.

4-#2 & #1 GND.; 1 1/4"C

16 FT.

4-#4/0 & #6 GND.; 2"C

14 FT.

4-#4/0; 2 1/2"C

12 FT.

4-#4/0

4 FT.

4-#4/0; 1 1/4"C

49? FT.

4-#2 & #0 GND.

? FT.

?10 FT.

4-#1/0 & #6 GND.

? FT.

?10 FT.

?10 FT.

CABLE TO BUS CONNECTION

01_SP_NORTH LIGHTING BUS

ROOM 1714 3-#10; 3/4"C

6 FT.

3-#2; 2"C

6 FT.

4-#2 & #6 GND.; 2"C

25 FT.

4-#4; 1 1/4"C

4-#6; 1 1/4"C

80 FT.

4-#2; 2"C

12 FT.

4-#8; 1"C

4-#3; 1 1/4"C

3-#4

2 FT.

01_EB_1-2-12?

5 225

01_PB_1-3-14

ROOM 3645

4-#4/0 & #4 GND.

35 FT.

01_EB_1-3-14

ROOM 2708

4-#4/0 & #4 GND.

3 FT.

01_PB_1-1-41E

ROOM ?

3- #2

G

N D

FT

225225225

4-#3/0 & #6 GND.

90 FT.

225225 225

4-#2 &

#6 GND.

3 FT.

3-#6 & #10 GND.

6 FT.

4-#8 & #10 GND.

4 FT.

40200

01_FD_HWHP

ROOM B803

01_CC_HWHP

ROOM B803

?-#? & #? GND.

? FT.

3-#3/0

& #6 GND.

60 FT.

3-#10 & #8 GND.

10 FT.

4-#6 & #10 GND.

4 FT.

4-#6 & #8 GND.

10 FT.

3-#10 & #10 GND.

6 FT.

4-#1/0 & #6 GND.

7 FT.

4-#1/0 & #6 GND.

6 FT.

4-#4/0

4 FT.

225 225

NTSE-605

ONE-LINE DIAGRAM1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-605

A

Fi le

P at h

Field Investigation and Studies

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E firm POC: Bryan Hanneman

Electrical Condition Assessment - Des Moines VA Medical Center

3600 36th St., Des Moines, IA 50310

636A6-19-302

Project Director

Revisions: Date:

FIELD INVESTIGATION AND STUDIES 10/30/20

--/--/-- BDH AGJ

EQUIPMENT BRANCH

SHEET E-609

SHEET E-601

E

L

N

MDU

DISTRIBUTION PANEL

CHILLER

DIMPLEX

AC-1

CHILLER

ACH-1

AHU-1

LCCGAC DACC

CB1

SFB

3#

G

3/ 4"

C

25KAIC

4#2, #8 G, IN 1 1/4" C.

(2)#14, #12G., 3/4" C.

ERB CONTROL RM

ERB EXAM RM

C

(2)#14, #12G., 3/4" C.

SQUARE D

#361

OR EQUAL

(TYP. OF 3)

3#

G

3/ 4"

C

3#

G

3/ 4"

C

3#

G

3/ 4"

C

3#10, #12G., 3/4" C.

3#

G

3/ 4"

C

15A

3#

G

3/ 4"

C

20A

3#

G

3/ 4"

C

20A

30A

S W

IT

C

H P

R O

V

ID

E D

B Y

M A

N U

F.

4# 8, G

1" C

45A 25A

480/277V

3Ø, 4W, 400A MCB

25KAIC MIN

20A80A

(01W-SB_SWBD 1W-4E)

01_PB_1-1-8E

ROOM 1714

01_EB_

XFMR 1-2 SEC

ROOM B408

01_EB_

ECB_CB-1

ROOM 1818

01_PB_ 1-1-35E

ROOM 1818

(00-TX_T1-2)

01_PB_

CT 1735

ROOM 1735A

ECB_SPECIAL

PROCEDURES

ROOM 1746

EB_

X RAY 1741

ROOM 1741

01_EB_

1-1-8E,6

ROOM 1354A

01_PB_

CT 1734

ROOM 1734

EB_

X RAY 1747A

ROOM 1747A

01_PB_SPECIAL

PROCEDURES

ROOM 1744

J-BOX IN CRAWL SPACE

BELOW ROOM 1714

(2)3-350 MCM; 2-3"C

125? FT.

(2)- 4-350 KCM, & 1#1 GND., 3" EMT.

? FT.

RACEWAYS TO BE ROUTED

OVERHEAD THROUGH ADDITION TO

PANEL MRH (1-1-35E)

400A W/ LUGS FOR 2-350

KCMIL/PH EQUAL TO SQ D "LC"

600A FRAME

PROVIDE 120V SHUNT TIP

ACCESSORY IN CB1, WIRING

AND CONNECTION TO MDU.

SHUNT

TRIP

COIL

DISC. 1

NEMA 1

DISC. 2

NEMA 1

DISC. 3

NEMA 1 #8G.

BOND TO

BUILDING EARTH

NOTES:

1. EQUIPMENT SHOWN SHADED IS EXISTING TO REMAIN.

2. EQUIPMENT SHOWN BOLD IS TO BE PROVIDED. REFER TO INFORMATION MATRIX

ON DRAWING E0.0 FOR ADDITIONAL INFORMATION RELATING TO EQUIPMENT

FURNISHED BY THE MRI MANUFACTURER.

PUMP

P-1

PUMP

P-2

NEMA 3R

NON-FUSED

60A, 3P, 480V

NEMA 3R

NON-FUSED 100A,

3P, 480V

(2)- 4-350 KCM, & 1#1 GND., 3" EMT.

? FT.

3- #4

G

N D

1/ 4"

C

FT

3-#2/0 & #2/0 GND.; 1 1/4" C

15? FT.

3- #1

G N

D

3/ 4"

C

FT

3-

#6

G N

D

1/

4" C

F T.

01_TX_T1-1-36E

ROOM 1818

15KVA

480V/208/120V

01_PB_1-1-36E

ROOM 1818

(2)3-350 MCM & 1 GND.

5 FT.

01_AT_ ATS 1-1

ROOM B408

600 AMP

4-POLE

3-#6 & #10 GND.

270 FT.

4-350 MCM & 250 MCM GND.

130 FT.

4-#1/0 & #3 GND.

100 FT.

4-250 MCM & 250 MCM GND.

170 FT.

4-#3 & #3 GND.

70 FT.

4-#1/0 & #1/0 GND.

140 FT.

01_SP_J-BOX 1-1-8E & 1-1-35E

01_SP_J-BOX 1-1-35E, ECB CB-1

208/120V 3Ø, 4W, 100A 100A

MCB 10KAIC

(2)3-350 MCM & 1 GND.

10? FT.

?-#? & #? GND.

25 FT.

SPARE

4-#3/0

? FT.

MRI TRAILER

PLUG

ROOM?

4-#3/0 & #3 G

N D

? FT.

XRAY 1740

ROOM?

4-#6 & #10 G

N D

? FT.

XRAY 1747A??

ROOM?

NTSE-606

ONE-LINE DIAGRAM1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-606

A

Fi le

P at h

Field Investigation and Studies

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E firm POC: Bryan Hanneman

Electrical Condition Assessment - Des Moines VA Medical Center

3600 36th St., Des Moines, IA 50310

636A6-19-302

Project Director

Revisions: Date:

FIELD INVESTIGATION AND STUDIES 10/30/20

--/--/-- BDH AGJ

SHEET E-602

( 208VOLTS )

15HP

2A C

-2

15HP

2H V

-2

10HP

2A C

-1

3 HP3/4HP

2C

3/4HP

2C

S P

A R

E

70 20 30

S P

A R

E

70 20 2020 20

BLDG. NO. 2 ATTIC

600 AMP

S P

A R

E

20 40

(SPD11) M

(A2)

END CABLE TAP BOX

0A

EMERGENCY EQUIPMENT BRANCH

M A

IR

A

IR

C

O M

P

C O

N D

E N

S A

TE

P

U M

P

E X

. F A

N

P -1

S U

P P

LY

A

IR

F

A N

A .H

.U . E

X . F

A N

M

3 HP3 HP 3 HP

2040 40 3040 20 20 20

SHEET E-603

(M2B)

1P -2

1P -2

1P -2

1P -2

OPTIONAL STANDBY BRANCH

(C1) (A1)

M

70 10

3- #6

; 1 "C

M

#6

60 60

M

1P -2

1P -2

SPARE

CRITICAL/LIFE SAFETY BRANCH

(1)

M

M

S H

E E

T E

-6

#1/0 GEC

M

225225

225225

SHEET E-603

(0 1W

-P B

1W

-B -1

7E

#8AWG GEC

60-2P

(0 1_

A T_

A

TS

-1 W

-1 1)

(ROOM B201)

(ROOM B201)

(ROOM B201)

SHEET E-603

SHEET E-603

S H

E E

T E

-6

SPLICE (TYP.)

50AM MMM M

MM MMM M

Nutrition electrical room (thru break room #?)

M

M

FED FROM

02_PB_

2-B-6E(A)

FED FROM

02_PB_

2-B-6E(B)

FED FROM

02_PB_

2-B-6E(A)

FED FROM

02_PB_

2-B-6E(A)

FED FROM

02_PB_

2-B-6E(B)

FED FROM

02_PB_

2-B-6E(B)

FED FROM

02_PB_

2-B-6E(A)

FED FROM

02_PB_

2-B-6E(B)

FED FROM

02_PB_

2-B-6E(B)

FED FROM

02_PB_

2-B-6E(B)

(01W-AT_ATS-1W-1)

PANEL 2-B-6E SPLIT

02_PB_ 2-B-6E(A)

02_PB_ 2-B-6E(B)

ROOM B005

02_PB_

2-1-4E

ROOM 1060

02_PB_

2-1-5E

ROOM 1060

02_PB_

2-B-5E

ROOM B005

02_PB_

2-1-6E

ROOM 1060

02_PB_

2-1-7E

ROOM 1060

02_PB_

2-B-13E

ROOM B021A

02_PB_

2-B-14E

ROOM B021A

02_PB_

2-B-3E

ROOM B043

02_PB_

2-B-2E

ROOM C006

02_PB_

2-2-1E

ROOM 2021

(CORRIDOR)

02_PB_

2-1-1E

ROOM 1060

02_PB_

2-1-2E

ROOM 1060

02_PB_

2-1-3E

ROOM 1060

02_PB_

2-1-9E

ROOM 1060

02_PB_

2-B-11E

ROOM B021A

02_PB_

2-B-12E

ROOM B021A

(01W-PB_ 1W-B-14E)

02_PB_

2-B-15E

ROOM C006

02_MC_2-MCC-1

ROOM B037B

02_MC_2-MCC-2

ATTIC

02_PB_

2-B-1E

ROOM B037B

02_PB_

2-B-7E

ROOM B021A

02_PB_

2-B-8E

ROOM B021A

02_PB_

2-B-9E

ROOM B021A

02_PB_

2-B-10E

ROOM B021A

3- #4

; 1

/4 "C

F

T.

3- #1

0;

/4 "C

F

T.

3- #4

; 1

/4 "C

F

T.

3- #1

0;

/4 "C

F

T.

3- #1

0;

/4 "C

F

T.

3- #1

0;

/4 "C

F

T.

2C

D

IS

H W

A S

H E

R R

O O

M

4-

M

C M

G

N D

1/ 2"

C

FT

4-

M

C M

G

N D

1/ 2"

C

F T.

4- #2

; 1

/2 "C

F

T.

02_TX_10 KVA

TRANSFORMER

ROOM 1060

10KVA, ?IMP

208/240-120V

SINGLE PHASE

20 HP

KITCHEN

SUPPLY

FAN

2- #6

G

N D

; 3 /4

"C

FT

2- #6

G

N D

; 1 "C

FT

4- #4

/0 ; 2

/2

" C (1

G N

D

FT

4-#4/0& #4 GND;

2 1/2"C

2 FT.

4- #4

/0

G N

D ; 2

/2

"C

FT

4- 2/

0;

"C

F T.

4-#4/0 & #4 GND;

2 1/2"C

3 FT.

4-

M

C M

G

N D

; 3

/2 "C

F

T. 4- #4

/0 ; 2

/2

"C

FT

4- #2

; 1

/2 "C

F

T.

4- #2

G

N D

1/ 2"

C

F T.

4- #1

G

N D

F T.

3- #6

; 1 "C

FT

1200A BUS DUCT

HVAC

UNIT 2

AC3

5 HP

FREIGHT

ELEV.

CHILLED

WATER

PUMP

40 HP

TRANSONIC

OUTLET

7.5 HP

KITCHEN

RETURN

AIR FAN

BLDG. 2

AUTOMATIC

DOORS

BLDG. 2

VESTIBULE

OUTLET

BLDG. 2

VESTIBULE

OUTLET

BLDG. 2

OUTLET

4-#6 & #10 GND; 1"C

55 FT.

(ROOM B201 50A BREAKER)

4-#3 & #8 GND; 1"C

30 FT.

2 @

1/3HP

3- #8

; 3 /4

"C

F T.

3- #8

; 3 /4

"C

F T.

3- #8

; 3 /4

"C

F T.

3- #8

; 3 /4

"C

F T.

3- #8

; 3 /4

"C

F T.

30 HP

ELEV.

ROOM 1A

DIETETICS

ELEV.

25HP

4-#4/0 & #6 GND.; 2 1/2"C

6 FT.

4-#4/0 & #6 GND.; 2 1/2"C

4 FT.

4-500 MCM & #2 GND.; 3 1/2"C

6 FT.

3-#4/0; 2"C

8 FT.

61 CHP

M

02_PB_

2-2-2E

ROOM 2050

ATTIC

02_PB_

2-1-8E

ROOM 1080

4- #2

G

N D

FT

4- #3

/0

#6 G

N D

F T.

02_PB_

2-2-3E

ROOM 2030

(CORRIDOR)

(2)4-350 MCM

1050 FT.

02_TX_T2-B-1

ROOM B021A

112.5KVA, 4.6%

480/208-120V

FED FROM

02_PB_

2-B-6E(B)

3- #2

G

N D

1/ 4"

C

FT

4- #2

FT

4-#4/0 & #6 GND.

3 FT.

4- #4

/0

G N

D

F

T.

4-#4/0 & #6 GND.; 2 1/2"C

3 FT.

NTSE-607

ONE-LINE DIAGRAM1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-607

A

Fi le

P at h

Field Investigation and Studies

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E firm POC: Bryan Hanneman

Electrical Condition Assessment - Des Moines VA Medical Center

3600 36th St., Des Moines, IA 50310

636A6-19-302

Project Director

Revisions: Date:

FIELD INVESTIGATION AND STUDIES 10/30/20

--/--/-- BDH AGJ

Building 2

LIFE SAFETY BRANCH

1600A SWBD., BLDG. 4

20 20 20 20

(SMOKING

SHELTER)

(C)

(K2)(K1)

225 100

ENTRY HEATERS

E

150 AMP

N

(LC)

(E41)

150125 60150 60

SHEET E-601 41

1001252015070250

(E3B)

0A

0A

2P

0 225A

15 HP

(B22)

LIFE SAFETY BRANCH

(01W_PB_1W-B-14E)

SHEET E-60314

(EG1)

(M41)

S H

E E

T E

-6

S H

E E

T E

-6

13 24

9 SHEET E-601

S H

E E

T E

-6

SHEET E-609 45

S H

E E

T E

-6

L

480V, 3Ø, 3W

SPD

40A

100A

35A

35A

6A

15A

1 1

200A 40A 60A

S H

E E

T E

-6

3- #8

G

N D

3/

4" C

3- #8

G

N D

3/

4" C

3- #1

G N

D

3/ 4"

C

NF NF 3-

#1

G N

D

3/ 4"

C

S P

A R

E

VFD

12KW 12KW

200A

(N)

15 FT. 15 FT. 15 FT. 15 FT. 15 FT. 15 FT.

35A

S H

E E

T E

-6

100200225

100 200

SPACE SPACE

0A

/2 P

(00_TX_T4-1)

(0 1W

_P B

_1 W

-B -1

7E

(00_TX_T3-1)

#8

GUARD

SHACK

#2

LOWER

BEAVER

M

M MMMMM

M M

M

MMM M

S P

A R

E

S P

A R

E

20 20

MM

SPARE

M

VFD

M

VFD

M

M

01W_PB_

1W-P-5E

ROOM 6000

04_MC_4-MCC-1E

ROOM 1114

04_SB_SWBD 4-1

ROOM 1137

04_PB_4-2-2

ROOM 2138

04_PB_

4-1-8E

ROOM 1114

04_MC_4-MCC-2

ROOM 2138

04_PB_

4-1-3

RM 1167

04_PB_

4-1-4

RM 1167

04_PB_

4-1-9

RM 1137

04_PB_

4-1-7

RM 1120

04_PB_

4-2-1

RM 2140

04_PB_

4-2-3

ROOM 2111

04_PB_

4-2-4

ROOM 2111

04_PB_

4-1-5E

ROOM 1171

04_PB_

4-1-7E

ROOM 1137

04_AT_ATS 4-1

ROOM 1137

(0 1W

-S B

_S W

B D

W

-4 E

04_TX_

XFMR ATS 4-1

ROOM 1137

75 KVA, 6.56%

480/208-120

04_PB_

4-3-1

RM 3101

(0 1W

_P B

_1 W

-B -1

4E

(0 1W

_P B

_1 W

-B -4

E

03_SB_SWBD 3-1

ROOM B954

03_PB_

3-B-5

ROOM B909

03_PB_

3-1-3

ROOM B954

03_PB_

3-B-2

ROOM B939

03_PB_

3-1-6

ROOM B954

03_PB_

3-1-1

ROOM 1941

03_PB_

3-1-2

ROOM 1941

03_PB_

3-B-7

ROOM B939

03_PB_

3-B-10E

ROOM B954

03_PB_

3-B-6E

ROOM B953

03_PB_

3-1-5E

ROOM 1959

03_PB_

3-2-1E

ROOM 2951

03_PB_

3-B-4E

ROOM B909

03_PB_

3-A-1E

ROOM 3000

ATTIC

03_PB_

3-B-1E

ROOM B939

EQUIPMENT BRANCH

03_PB_

3-2-2E

ROOM 2951

03_PB_

3-B-3E

ROOM B939

01W_PB_

1W-B-16E

ROOM B120

(0 1W

_P B

_1 W

-B -8

E

01W_TX_

T1W-B-4

ROOM B120

75 KVA ,4.8%

480/208-120V

03_TX_T3-B-1E

ROOM B954

75 KVA ,4.5%

480/208-120V

03_EB_

3-1-11

ROOM B954

03_AT_

ATS 3-1

ROOM B954

260 AMP

4-POLE

(01W-SB_SWBD 1W-4E)

03_PB_

3-B-8

ROOM B942

03_PB_

3-B-7(A)

ROOM B934

4-RV1

BATH

EXH.

.75 HP

(ROOF)

4-RV2

KITCH.

EXH.

1.5 HP

(ROOF)

4-HV1

SERV.

ROOM 1.5

HP

(GROUND

FLOOR)

4-CFI 3

HP

(MECH.

RM.)

P-1 1 HP

MECH

RM.1171

P-2 1 HP

MECH

RM.1171

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #1

2;

/4 "C

F

T.

AHU SF 25

HP MECH

RM. 2138

AHU RF 15

HP MECH

RM. 2138

3- #2

: 1

/4 "C

F

T.

3- #4

: 1 "C

F

T.

3- #2

G

N D

1/ 4"

C

F T.

3- #4

G

N D

1"

C

F T.

3- #3

/0

G N

D ; 3

"C

F T.

4-350 MCM & #3 GND; 4"C

88 FT.

4- #2

G

N D

; 2 "C

FT

4- #4

/0

G N

D

3" C

FT

3- #2

F

T.

2- #3

/0 ; 1

/4

"C

F T.

3- #1

/0 ; 2

/2

"C

F T.

4- #6

; 1 "C

F

T.

4- #6

; 1 "C

F

T.

3- #1

/0

#6 G

N D

: 2 "C

FT

4-#2 & #6 GND:

1-1/4"C

5 FT.

4-#2 & #6 GND.; 2"C

90 FT.

4-#1 & #6 GND.; 2"C

22 FT.

4- #1

G

N D

1/ 2"

C

F T.

04_MO_ELEVATOR

30 HP

CONTROLLER

FURNISHED W/BASIN

HEATERS04_ MO_P-32

20HP

ROOM 1114

04_ MO_P-33

50HP

ROOM 1114

P-34

15HP

P-35

15HP

EF-1

2HP

AHU-1

5HP

NF

NEMA

4X

NF

NEMA

4X

CT-2

BASIN

HEATERS

NF

NEMA

4X

EQUIPMENT BRANCH

3-#10 &

#10 GND.

EACH

BUSS CONNECT FOR

FUTURE SECTION

3- #8

G

N D

3/

4" C

FT

ATTIC FAN

1 HP

3- #3

/0 ; 2

"C

4- #2

; 1

/4 "C

F

T.

3- #4

; 1

/4 "C

FT

4- #1

/0 ; 2

"C

F

T.

4- #1

2;

/4 "C

FT

4- #1

; 2 "C

FT

3- #2

G

N D

; 1

/2 "C

FT

4-#4/0 & #4 GND.; 2 1/2"C

5 FT.

3- #2

; 2 "C

F

T.

4-

#3 /0

G

N D

1/ 2"

C

FT

SPLICE

BOX

C H

IL

LE

D W

A

TE

R P

U M

P

SURGE

PROTECTIVE

DEVICE

EQUIPMENT

BRANCH

4- #2

G

N D

FT

4- #4

/0

G N

D

1/

2" C

F

T.

4- #4

/0

G N

D

F

T.

4- #1

; 1

/2 "C

FT

03_PB_

3-1-10

ROOM 1926F

(SCHEDULED FOR

DEMOLITION)

3- #3

/0

G N

D

4- #2

G N

D

F

T.

150 150

03_NFD_

T3-B-1E

ROOM B954

4-#2 & #6 GND.

105 FT.

4-#1/0 & #6 GND.

125 FT.

4-#2/0 & #6 GND.

150 FT.

4-

M

C M

G

N D

FT

4- #2

G

N D

F T.

4- #1

/0

G N

D

FT

4- #6

G

N D

FT

3-#2 & #8 GND

5 FT.

4-#1/0 & #4 GND

8 FT.

3- #1

/0 ; 2

"C

F T.

4- #2

G

N D

2"

C

FT

4- #2

G

N D

2"

C

FT

04_FD_

ATS 4-1

ROOM 1137

3- #8

; 3 /4

"C

F T.

E N

L

3- #1

/0

G N

D

FT

M

03_MO_BLDG 3

ELEVATOR

ROOM B934

40 HP

03_EB_BLD 3

ELEVATOR

ROOM B954

03_PB_

3-1-4

ROOM 1959

4- #4

/0

G N

D

F

T.

4-#2 &

#8 GND.

14 FT.

4-#6 &

#10 GND

40 FT.

4-

M

C M

G

N D

2"

C

FT

4-#2 & #6 GND.;

1 1/2"C

8 FT.

3-1-9

(SCHEDULED FOR

DEMOLITION)

3- #2

; 1

/4 "C

F

T.

150 AMP

04_ECB_ELEVATOR F

ROOM 1139

3- #1

G

N D

F T.

4- #1

/0

G N

D

F

T.

3-

#2

FT

3- #1

/0

G N

D

F

T.

4-#1/0 & #6 GND.

18 FT.

4-#1/0 & #4 GND.

6 FT.

3- #2

FT

3-#3/0 & #4 GND.

100 FT.

80 100

3- #8

G

N D

3/

4" C

FT

3- #3

G

N D

1/ 2"

C

F T.

SPACE FOR

ONE SIZE 1

01W_VFD_CT-3

ROOM 6000

01W_NFD_CT-3

(CARRIER CLG FAN)

PENTHOUSE ROOF

100 AMP

01W_MO_CT-3

(CARRIER CLG FAN)

PENTHOUSE ROOF

50 HP

3-#3/0 & #8 GND.

15 FT.

3-#6 & #8 GND.

60 FT.

3- #6

G

N D

FT

V

FD

01W_CC_

VFD-CT-1

PENTHOUSE

01W_NFD_CT-1

PENTHOUSE

60 AMP

3-#8& #6 GND.

15 FT.

3-#6 & #8 GND.

40 FT.

M

01W_MO_CT-1

PENTHOUSE

NTSE-608

ONE-LINE DIAGRAM1

3 & 4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-608

A

Fi le

P at h

Field Investigation and Studies

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E firm POC: Bryan Hanneman

Electrical Condition Assessment - Des Moines VA Medical Center

3600 36th St., Des Moines, IA 50310

636A6-19-302

Project Director

Revisions: Date:

FIELD INVESTIGATION AND STUDIES 10/30/20

--/--/-- BDH AGJ

Buildings 1W, 3 & 4

361C05-125A

S H

E E

T E

-6

(0 1W

_A T_

A

TS

W

-2

(0 1W

_A T_

A

TS

W

-4

S H

E E

T E

-6

S H

E E

T E

-6

S H

E E

T E

-6

(0 1_

A T_

A

TS

-1

(0 1W

_A T_

A

TS

W

-1

(0 4_

A T_

A

TS

-1

S H

E E

T E

-6

(1 2_

S B

_S W

B D

2-

1E

(0 1W

_A T_

A

TS

W

-1 2)

(0 1W

_A T_

A

TS

W

-3

(0 1W

_A T_

A

TS

W

-5

(0 3_

A T_

A

TS

-1

(0 1_

A T_

A

TS

-2

361C05-125A

MH#18

NE

L

L.S. CR. CR.

L.S.

CR.

L.S.

EQ.

L.S. EQ. EQ. E.Q. EQ.

(0 1_

E B

1-

B -1

8E

EQ.

S H

E E

T E

-6

(0 1W

_S B

_S W

B D

W

-3

O.S.

NE

L

S H

E E

T E

-6

(0 1W

_S B

_S W

B D

W

-3

O.S.

GFA

O.S.

NE

L

(0 1_

FD

_1

-B -1

9)

O.S.

S H

E E

T E

-6

(0 1W

_S B

_S W

B D

W

-3

NE

L

S H

E E

T E

-6

(0 1W

_S B

_S W

B D

W

-3

BLDG. 1W

400400

SHEET E-607

(02_PB_2-B-7E)

L.S.

#3/0 GEC#3/0 GEC

SHEET E-608

(04_MC 4-MCC-1E)

VFD

(0 1W

_A T_

A

TS

W

-1 0)

L.S.

#16 #1 #2 #6 #17 #10 #3 #4 #18 #7 #5 #8 #13 #9 #14 #11 #12 #19

S H

E E

T E

-6

(0 1W

_A T_

A

TS

W

-1 1)

O.S.

18 27 49

S H

E E

T E

-6

S H

E E

T E

-6

S H

E E

T E

-6

S H

E E

T E

-6

S H

E E

T E

-6

S H

E E

T E

-6

46 19 30 36 S

H E

E T

E -6

S H

E E

T E

-6

S H

E E

T E

-6

S

H E

E T

E -6

S

H E

E T

E -6

EMERGENCY EQUIPMENT BRANCH

(ELB)

20 80

(DPL)

30/2P 100

200 150

(A)

9 9 35 15

20 20 40 20 12

P

(DPH)

(ELB)

50 125

(06M_TX_T6M-1-11E)

SHEET E-610 63

6 SHEET E-602

(0 0_

TX

_T

5- 1)

S H

E E

T E

-6

M

M M M M M

200 200

(01W_AT_ATS 1W-10

BLDG. 1W, RM. B201)

M

#20

EQ. L.S.

05_PB_

5-B-5E

ROOM 002

05_FD_T5-B-1E

ROOM 002

05_TX_T5-B-1E

ROOM 002

15KVA, 3.3%

480V/208-120V

05_PB_

5-B-1E

ROOM 002 05_PB_5-B-4

ROOM 002

05_TX_T5-B-3

ROOM 002

150KVA, 4.3%

480V/208-120V

05_PB_

5-B-3

ROOM 002

05_PB_

5-B-2

ROOM 002

05_PB_

5-1-3

ROOM 117

05_PB_

5-1-2

ROOM 117

05_PB_

5-1-1

ROOM 117

05_PB_

5-2-1

ROOM 216

05_PB_

5-3-1

ROOM 316

01W_SB_SWBD 1W-4E

ROOM B121

00_TX_TE-2

OUTSIDE

00_TX_TE-1

OUTSIDE

00_GN_GEN-200_GN_GEN-1

01W_PB_

1W-B-17E

ROOM B121

(0 1_

P B

_1 -B

-1 5E

3- #2

G

N D

1/ 4"

C

F T.

3- #2

G

N D

1/ 4"

C

FT

3- #2

G

N D

1/ 4"

C

F T.

3-#3/0 & #4 GND.; 2"C

910 FT.

05_MO_ELEVATOR

50 HP

1000KW @ 0.8PF/1250KVA 3Ø,

4W, GROUNDED NEUTRAL 2500KVA

5.69% IMP.

480Y/13200Y

1000KW @ 0.8PF/1250KVA 3Ø,

4W, GROUNDED NEUTRAL

(4)600MCM; 350 MCM GND.

*MANUFACTURER'S WIRING

10 FT.

(4)600MCM; #4/0 GND.

70 FT.

(4)600MCM; #4/0 GND.

70 FT.

(4)600MCM; 350 MCM GND.

*MANUFACTURER'S WIRING

10 FT. ELECTRICALLY

CONTROLLED

52-G1 1600A

52-G2 1600A

ELECTRICALLY

CONTROLLED

3- 1/

C

1/ 0;

(3 ) 2

"C

FT

(8)4-350MCM

85 FT.

2500KVA

13200Y/480Y

5.74% IMP. SEC.

TAP 2.5%

C.R. - CRITICAL BRANCH

L.S. - LIFE SAFETY BRANCH

EQ. - EQUIPMENT BRANCH

O.S. - OPTIONAL STANDBY

3-

M

C M

; 2

/2 "C

F T.

4- #4

/0

G N

D

1/

2" C

F T.

3-

M

C M

G

N D

; 3

/2 "C

F T.

3-

M

C M

G

N D

4"

C

FT

3- #6

M I

FT

3- #3

; 1

/4 "C

FT

3-

M

C M

G

N D

1/ 2"

C

F

T.

3-

M

C M

G

N D

1/ 2"

C

F

T.

3- #2

; 2 "C

FT

(2 )3

-3

M C

M

G N

D

2) 3"

C

FT

3-

M

C M

; 2

/2 "C

F T.

4- #4

/0

F T.

3-

M

C M

; 2

/2 "C

F T.

3-

M

C M

; 2

/2 "C

F T.

3- #3

/0 ; 2

/2

"C

FT

3- #3

/0 ; 2

/2

"C

F

T.

4- #3

/0

G N

D

2" C

F T.

3-

M

C M

G

N D

3"

C

F

T.

3-

M

C M

G

N D

3"

C

F

T.

3-

M

C M

G

N D

3"

C

FT

(2 )3

-5

M C

M

1/

G

N D

3"

C

F

T.

(2 )3

-5

M C

M

1/

G

N D

1/ 2"

C

F

T.

(2 )4

-3

M C

M

G N

D

3" C

F T.

(2 )4

-3

M C

M

G N

D

3" C

F T.

4-

M

C M

G

N D

4"

C

F

T.

4-

M

C M

G

N D

4"

C

FT

(2 )4

-5

M C

M

2) 4"

C

FT

3- #2

; 1

/4 "C

F T.

(2 )3

-3

M C

M

G N

D

F

T.

3- #2

; 1

/4 "C

F T.

4-

M

C M

G

N D

4"

C

F

T.

(2 )4

-3

M C

M

G N

D

3" C

F T.

(2 )3

-5

M C

M

1/

G

N D

3"

C

F

T.

3000A MAIN

4-500 MCM & #1 GND.; 3 1/2"C.

95 FT.

4-500 MCM & #1 GND.; 3 1/2"C.

135 FT.

3- #2

/0

G N

D

1/

2" C

FT

3- #1

2;

/4 "C

FT

3- #1

2;

/4 "C

F

T.

3- #8

; 1 "C

F

T.

3- #1

2;

/4 "C

F

T.

3- #2

; 1

/2 "C

F

T.

RETURN

AIR FAN

1HP

CHILLED

WATER

PUMP

1HP

SUPPLY

AIR FAN

5HP

2HP AIR

COMP.

2HP

4-#1/0 & #6 GND; 1 1/2"C

85? FT.

4-#2/0 & #6 GND.; 1 1/4"C

75 FT.

4-#4/0 & #0 GND.; 2"C

60 FT.

SPARE

3- #3

/0

G N

D

2" C

F

T.

4- #3

/0

G N

D

2" C

F

T.

3-#2 & #6 GND.; 2"C

250 FT.

05_FD_ELEVATOR

ROOM 002

05_FD_ELEVATOR P-1

ROOM 001B

3- #2

G

N D

F T.

3- #1

G N

D

3/ 4"

C

F T.

3- #6

G

N D

F T.

05_CC_CHILLER

ROOF

4-

M

C M

IN

W

IR

E

W A

Y

G N

D

FT

4-#4/0 & #6 GND

4 FT.

M

05_MO_

CHILLER

01W_AT_

ATS 1W-8

ROOM B121

400A

4-POLE

01W_AT_

ATS 1W-7

ROOM B121

600A

4-POLE

01W_AT_

ATS 1W-6

ROOM B121

800A

4-POLE

01W_AT_

ATS 1W-9

ROOM B121

300A

3-POLE

100% RATED BKR.

(0 1W

_A T_

A

TS

F P

,1

W , 2

B

LD

G

W

F

IR

E P

U M

P A

TS

04_MO_

675 TON

CH…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .