S02 - Attachment 06 - Price Matrix (1 page).xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- J045--Replace Plumbing Systems in Bldg. 64 Federal contract opportunity
- Solicitation number
- 36C24822R0194
About this file
This document contains a price matrix template and details of a federal contract solicitation for plumbing replacement services. The solicitation seeks bids to remove and replace the existing overhead horizontal sanitary mains and branches in the basement level ceiling space of Building 64 at the Lake City Veterans Affairs Medical Center in Lake City, Florida. Work must be performed according to the specifications and construction drawings provided by the designer of record and minimize downtime. An organized site visit for interested bidders will take place on October 18, 2022 at 10:00 AM EST at the specified address. Bidders are to meet at the visitors parking area and the meeting will be held in Conference Room B11-19. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The price matrix template includes fields for labor and material costs by construction division, overhead and profit percentages, and total base offer cost.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24822R0194 0001.docx | DOCX document | |
| S02 - Attachment 08 - Past Performance Questionnaire (3 pages).docx | DOCX document | |
| S02 - Attachment 05 Wage Determination.pdf | ||
| S02 - Attachment 04 - VHA Supplemental Contract Requirements for Combatting COVID-19 (2 pages).docx | DOCX document | |
| S02 - Attachment 02 - Specifications Replace Plumbing (360 pages).pdf | ||
| S02 - Attachment 09 - Past Performance Survey (3 pages).docx | DOCX document | |
| S02 - Attachment 07 - Experience Modification Rate (EMR) (1 page).docx | DOCX document | |
| S02 - Attachment 11 - Subcontractor Past Performance Consent Form (1 page).docx | DOCX document | |
| S02 - Attachment 10 - Letter of Commitment Key Subcontractors (1 page).pdf | ||
| S02 - Attachment 03 - VAAR 852.219-77 LOS Certification (2 pages).docx | DOCX document | |
| S02 - Attachment 01 - Drawings Replace Plumbing (68 pages).pdf | ||
| 36C24822R0194 (Replace Plumbing).docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
Base Offer Cost Breakdown
Project Number:
Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
Edward L Roy: VA assigned Project Title
| Project Location | ||
| Offeror Name | ||
| Offeror Street | ||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .