S02 - Attach 6 Experience Information Sheet.docx

DOCX document 22 KB Posted

Attached to
Replace Electrical Panel Board in OR Federal contract opportunity
Solicitation number
36C24823R0073
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This document contains an experience information sheet template and details of a federal solicitation to replace electrical panel boards in operating rooms at a Veterans Affairs medical center. The experience information sheet template requests information on three past projects including contractor details, contract numbers and dates, work performed as prime or subcontractor, percentage of work performed, description of scope and responsibilities, performance details, pricing information, and termination details if applicable. The federal solicitation is to replace existing panel boards with isolated power systems and provide redundant power sources in ten operating rooms at the Miami VA Medical Center by the specified response and price proposal deadlines of January 17, 2023 and February 3, 2023 respectively. The work must maintain operating room functionality during construction according to the provided design documents. A site visit is scheduled for January 10, 2023 to review the scope.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Electrical Panel Board in OR, newest first.
File Type Posted
Amendment 0001 - 36C24823R0073.docx DOCX document
S02 - Attach 11 Set of Drawings 4 of 4.pdf PDF
S02 - Attach 13 Narrative Set 2 of 3.pdf PDF
S02 - Attach 5 Past Performance Form.pdf PDF
S02 - Attach 9 Set of Drawings 2 of 4.pdf PDF
S02 - SOLICITATION 36C24823R0073.pdf PDF
S02 - Attach 7 Price Matrix.xlsx XLSX spreadsheet
S02 - Attach 14 Narrative Set 3 of 3.pdf PDF
S02 - Attach 1 Site Plan.pdf PDF
S02 - Attach 12 Narrative Set 1 of 3.pdf PDF
S02 - Attach 2 _ Wage Dtermination FL20220125 _9_29_22.pdf PDF
S02 - Attach 8 Set of Drawings 1 of 4.pdf PDF
S02 - Attach 10 Set of Drawings 3 of 4.pdf PDF
S02 - Attach 15 Floor Plan.pdf PDF
S02 - Attach 3 Limitations of Subcontracting .pdf PDF
S02 - Attach 4 - EMR.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXPERIENCE INFORMATION SHEET

36C24822R0003 Attachment 6

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 1 Must have a total of THREE (3) projects, more than 3 will not be evaluated; less than 3 may result in a lower rating.

a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)

c. Project Title/Name and Location

d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)

e. Percent (%) of project work performed by your company

f. if you work as subcontractor, who was the prime?

(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 2

h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project: Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 3

i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution

j. Describe unforeseen conditions and how each were resolved

k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date:

original completion date, if not completed, projected completion date (mm/dd/yyyy)

l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?

Actual Completion Date:

If not completed, Why?

m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.

n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.

Original Contract Price: Final Contract Price:

Explain Differences: