S02 - 36C25221B0001 Att1 SOW 585-19-119.pdf
PDF 106 KB Posted
- Attached to
- Solicitation Project #585-19-119 Upgrade Lighting Controls Federal contract opportunity
- Solicitation number
- 36C25221B0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 - 36C25221B0001 0003.pdf | ||
| S06 - Att1 Upgrade Lighting ICRA.pdf | ||
| S06 - 36C25221B0001 0002.docx | DOCX document | |
| S06 - Att 2 Site Visit Sign-in Sheet 585-19-119.pdf | ||
| S06 - 36C25221B0001 Amend 0001- 585-19-119 f.pdf | ||
| S02 - 36C25221B0001 Att2 SPECS 585-19-119.pdf | ||
| S02 - 36C25221B0001 Att3 DWGS 585-19-119.pdf | ||
| S02 - 36C25221B0001 Att4 Wage Rate dtd 8.7.29020 -585-19-119.pdf | ||
| S02 - 36C25221B0001 585-19-119.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Project Data
Title: Upgrade Lighting Controls
Location: Oscar G. Johnson, VA Medical Center, Iron Mountain, MI
Project No: 585-19-119
COR: Michael Seda
Scope of Work
Contractor shall furnish all labor, materials, equipment and supervision in accordance with the documents, drawings and specifications to complete Upgrade Lighting Controls, Project 585-19- 119 at the Oscar G. Johnson VA Medical Center, Iron Mountain, MI.
The project includes, but not be limited to, replacement of existing interior light fixtures to LED type in building 1, 2, 8, 10, 12, and 19. Dimming controls also to be added within areas of building 1. Existing exterior light fixtures are to be replaced with LED type fixtures at buildings 8 and 11.
Period of Performance
The project is to be completed within 150 calendar days.
File details come from the government source that posted it. Updated .