About this file

This document outlines requirements for a federal construction contract opportunity for the replacement of condenser water piping at a Department of Veterans Affairs medical center. Key details include:

  • The scope of work involves replacing condenser water piping from the chiller plant to cooling towers on the roof of Building 4, including replacement of valves, electrical heat tracing, and installation of a centrifugal separator/cleaner package and support piers for piping located on the roof.

  • The period of performance is 260 days from notice to proceed. The general contractor must submit preliminary schedules, bonds, insurance, and other documentation within ten days of contract award.

  • Work must follow all applicable federal, state and local codes and regulations. Coordination is required for utility interruptions and work in occupied areas.

  • Safety, infection control, and environmental requirements include compliance with OSHA standards, development of an ICRA and ILSM/GEMS plans, hazardous materials reporting, and daily cleanup responsibilities.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--630A4-CSI-426 DESIGN ONCOLOGY LINAC SITE PREP, newest first.
File Type Posted
LINAC DESIGN INFORMATION.pdf PDF
S02 BID SHEET.docx DOCX document
Specifications VOLUME 1.pdf PDF
Specifications VOLUME 2.pdf PDF
Halcyon DDR.pdf PDF
S02 VA ID PACKAGE UPDATED 01-16-2019.pdf PDF
S02 ADDITIONAL INSERTS.pdf PDF
S02 ALL POSTERS.pdf PDF
S02 Participation Goals for Minorities and Females.pdf PDF
36C24221B0032.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE

DEPARTMENT OF VETERANS AFFAIRS

DESIGN ONCOLOGY LINAC SITE PREP

VA NY Harbor Healthcare System, Brooklyn Campus

MC TB

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Fi le

P at h 6/

/2

:3

9:

P M

100% CD's Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

16 FEB 2021Revisions: Date:

630A4-CSI-426

800 POLY PLACE, BROOKLYN, NY 11209-7104

DESIGN ONCOLOGY LINAC SITE PREP

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

VA NY HARBOR HEALTHCARE SYSTEM

BROOKLYN CAMPUSENGINEERING LLP

www.fellp.com

22 MULBERRY ST, SUITE 2A

MIDDLETOWN, NY 10940

T:845.343.1481 F:855.320.8735

21-03-BK

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

SECTION SHEET NUMBER

AutoCAD SHX Text

BUILDING ELEVATION SHEET NUMBER

AutoCAD SHX Text N

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text E

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text W

AutoCAD SHX Text S

AutoCAD SHX Text

DETAIL SHEET NUMBER

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

DETAIL NUMBER SHEET NUMBER

AutoCAD SHX Text

PARTITION TYPE

AutoCAD SHX Text

XX

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

WINDOW TYPE

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

ROOM NAME ROOM NUMBER

AutoCAD SHX Text

AutoCAD SHX Text

KEYED NOTE

AutoCAD SHX Text

DATUM LINE

AutoCAD SHX Text

DOOR NUMBER

AutoCAD SHX Text

AutoCAD SHX Text

TITLE

AutoCAD SHX Text

AutoCAD SHX Text

INTERIOR ELEVATION SHEET NUMBER

AutoCAD SHX Text X

AutoCAD SHX Text

XX

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 0-G001

AutoCAD SHX Text

TITLE SHEET

AutoCAD SHX Text GENERAL: 0-G001 - TITLE SHEET - TITLE SHEET TITLE SHEET 0-G002 - ABBREVIATIONS, CODE NOTES AND FIRE SAFETY/EGRESS - ABBREVIATIONS, CODE NOTES AND FIRE SAFETY/EGRESS ABBREVIATIONS, CODE NOTES AND FIRE SAFETY/EGRESS ABATEMENT: HA100 - GROUND FLOOR ASBESTOS ABATEMENT PLAN - GROUND FLOOR ASBESTOS ABATEMENT PLAN GROUND FLOOR ASBESTOS ABATEMENT PLAN HA101 - ASBESTOS DIAGRAMS AND NOTES - ASBESTOS DIAGRAMS AND NOTES ASBESTOS DIAGRAMS AND NOTES STRUCTURAL: SD-101 - STRUCTURAL EXISTING CONDITIONS PLAN - STRUCTURAL EXISTING CONDITIONS PLAN STRUCTURAL EXISTING CONDITIONS PLAN S-101 - STRUCTURAL NEW WORK PLANS - STRUCTURAL NEW WORK PLANS STRUCTURAL NEW WORK PLANS S-400 - STRUCTURAL NOTES - STRUCTURAL NOTES STRUCTURAL NOTES ARCHITECTURAL: 1-AD101 - GROUND FLOOR DEMOLITION PLAN - GROUND FLOOR DEMOLITION PLAN GROUND FLOOR DEMOLITION PLAN 1-AS101 - GROUND FLOOR PLAN AND PARTITION TYPES - GROUND FLOOR PLAN AND PARTITION TYPES GROUND FLOOR PLAN AND PARTITION TYPES 1-AS102 - GROUND FLOOR REFLECTED CEILING PLAN AND DETAILS - GROUND FLOOR REFLECTED CEILING PLAN AND DETAILS GROUND FLOOR REFLECTED CEILING PLAN AND DETAILS 1-AS300 - DOOR SCHEDULE, FINISH SCHEDULE AND ROOM SECTION - DOOR SCHEDULE, FINISH SCHEDULE AND ROOM SECTION DOOR SCHEDULE, FINISH SCHEDULE AND ROOM SECTION 1-AS301 - MILLWORK DETAILS AND SIGNAGE - MILLWORK DETAILS AND SIGNAGE MILLWORK DETAILS AND SIGNAGE 1-AS600 - EQUIPMENT SCHEDULE AND RIGGING PLAN - EQUIPMENT SCHEDULE AND RIGGING PLAN EQUIPMENT SCHEDULE AND RIGGING PLAN MECHANICAL: MH-001 - MECHANICAL SYMBOLS, ABBREVIATIONS & NOTES - MECHANICAL SYMBOLS, ABBREVIATIONS & NOTES MECHANICAL SYMBOLS, ABBREVIATIONS & NOTES MD-101 - MECHANICAL REFLECTED CEILING & ROOF DEMOLITION PLANS - MECHANICAL REFLECTED CEILING & ROOF DEMOLITION PLANS MECHANICAL REFLECTED CEILING & ROOF DEMOLITION PLANS MH-101 - MECHANICAL REFLECTED CEILING & ROOF PLAN - MECHANICAL REFLECTED CEILING & ROOF PLAN MECHANICAL REFLECTED CEILING & ROOF PLAN MH-701 - MECHANICAL DETAILS - MECHANICAL DETAILS MECHANICAL DETAILS MH-702 - MECHANICAL DETAILS - MECHANICAL DETAILS MECHANICAL DETAILS MH-801 - MECHANICAL SCHEDULES - MECHANICAL SCHEDULES MECHANICAL SCHEDULES PLUMBING: PL-001 - PLUMBING SYMBOLS, ABBREVIATIONS & NOTES - PLUMBING SYMBOLS, ABBREVIATIONS & NOTES PLUMBING SYMBOLS, ABBREVIATIONS & NOTES PL-101 - PLUMBING SANITARY, MEDICAL GAS, & DOMESTIC WATER FLOOR PLANS - PLUMBING SANITARY, MEDICAL GAS, & DOMESTIC WATER FLOOR PLANS PLUMBING SANITARY, MEDICAL GAS, & DOMESTIC WATER FLOOR PLANS FIRE PROTECTION: FX-100 - FIRE PROTECTION SPRINKLER REFLECTED CEILING PLANS AND NOTES - FIRE PROTECTION SPRINKLER REFLECTED CEILING PLANS AND NOTES FIRE PROTECTION SPRINKLER REFLECTED CEILING PLANS AND NOTES ELECTRICAL: ES-001 - ELECTRICAL SYMBOLS, ABBREVIATIONS & NOTES - ELECTRICAL SYMBOLS, ABBREVIATIONS & NOTES ELECTRICAL SYMBOLS, ABBREVIATIONS & NOTES ED-101 - ELECTRICAL POWER DEMOLITION FLOOR & ROOF PLANS - ELECTRICAL POWER DEMOLITION FLOOR & ROOF PLANS ELECTRICAL POWER DEMOLITION FLOOR & ROOF PLANS ES-100 - ELECTRICAL BASEMENT, FIRST & PARTIAL FLOOR PLANS - ELECTRICAL BASEMENT, FIRST & PARTIAL FLOOR PLANS ELECTRICAL BASEMENT, FIRST & PARTIAL FLOOR PLANS ES-101 - ELECTRICAL POWER FLOOR & ROOF PLANS - ELECTRICAL POWER FLOOR & ROOF PLANS ELECTRICAL POWER FLOOR & ROOF PLANS ES-201 - ELECTRICAL LIGHTING PLANS - ELECTRICAL LIGHTING PLANS ELECTRICAL LIGHTING PLANS ES-600 - ELECTRICAL ONE-LINE RISER DIAGRAMS - ELECTRICAL ONE-LINE RISER DIAGRAMS ELECTRICAL ONE-LINE RISER DIAGRAMS ES-701 - ELECTRICAL DETAILS- ELECTRICAL DETAILSELECTRICAL DETAILS

AutoCAD SHX Text

800 POLY PLACE, BROOKLYN, NY

AutoCAD SHX Text PROJECT No. 630A4-CSI-426

AutoCAD SHX Text

SITE MAP

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

SYMBOLS

AutoCAD SHX Text

KEY MAP: BUILDING 1

AutoCAD SHX Text

SCALE: 1/32" = 1'-0"

AutoCAD SHX Text

PROPOSED AREA OF WORK

AutoCAD SHX Text

IMAGE: GOOGLE EARTH

AutoCAD SHX Text

POLY PLACE

AutoCAD SHX Text

7TH AVENUE

AutoCAD SHX Text

14TH AVENUE

AutoCAD SHX Text

VA NY HARBOR HEALTHCARE

AutoCAD SHX Text

BROOKLYN CAMPUS

AutoCAD SHX Text

800 POLY PLACE, BROOKLYN, NY

AutoCAD SHX Text

RADIATION ONCOLOGY SUITE

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

BUILDING 1 : PARTIAL FIRST FLOOR

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

DRAWING LIST

AutoCAD SHX Text

RADIATION ONCOLOGY SUITE

SAFETY/EGRESS - FIRST FL PART PLAN

MC TB

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

Fi le

P at h 6/

/2

:3

9:

P M

100% CD's Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

16 FEB 2021Revisions: Date:

630A4-CSI-426

800 POLY PLACE, BROOKLYN, NY 11209-7104

DESIGN ONCOLOGY LINAC SITE PREP

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

VA NY HARBOR HEALTHCARE SYSTEM

BROOKLYN CAMPUSENGINEERING LLP

www.fellp.com

22 MULBERRY ST, SUITE 2A

MIDDLETOWN, NY 10940

T:845.343.1481 F:855.320.8735

21-03-BK

KEY MAP - BLDG 1, GROUND FLOOR

AutoCAD SHX Text

PATH 1 TRAVEL DISTANCE FROM LINAC ROOM TO EXIT: 158'-6"

AutoCAD SHX Text

PATH 2 TRAVEL DISTANCE FROM LINAC ROOM TO EXIT: 199"-0"

AutoCAD SHX Text NOTE: NO CHANGE TO THE EXISTING RADIOLOGY ONCOLOGY SUITE ESTABLISHED TRAVEL DISTANCES - MEASUREMENTS SHOWN FOR REFERENCE ONLY.

AutoCAD SHX Text A LABEL CLASS A DOOR CLASS A DOOR A/C AIR CONDITION AIR CONDITION A/E ARCHITECT/ENGINEER ARCHITECT/ENGINEER ABV ABOVE ABOVE ACT ACOUSTICAL CEILING TILE ACOUSTICAL CEILING TILE AD AREA DRAIN AREA DRAIN ADH ADHESIVE ADHESIVE ADJ ADJACENT ADJACENT ADMIN ADMINISTRATION ADMINISTRATION AFC ABOVE FINISHED COUNTER ABOVE FINISHED COUNTER AFF ABOVE FINISHED FLOOR ABOVE FINISHED FLOOR AHU AIR HANDLING UNIT AIR HANDLING UNIT ALT ALTERNATE ALTERNATE ALUM ALUMINUM ALUMINUM APPROX APPROXIMATE APPROXIMATE ARCH ARCHITECT ARCHITECT ASB ASBESTOS ASBESTOS ASPH ASPHALT ASPHALT ASSN ASSOCIATION ASSOCIATION AUTO AUTOMATIC AUTOMATIC AUX AUXILIARY AUXILIARY BAT BATTEN BATTEN BD BOARD BOARD BEV BEVEL BEVEL BKG BACKING BACKING BLDG BUILDING BUILDING BOT BOTTOM BOTTOM BTWN BETWEEN BETWEEN C TO C CENTER TO CENTER CENTER TO CENTER CAB CABINET CABINET CONC CONCRETE CONCRETE CIR CIRCLE CIRCLE CL CENTER LINE CENTER LINE CLDG CLADDING CLADDING CLG CEILING CEILING CLG HT CEILING HEIGHT CEILING HEIGHT CLR CLEAR CLEAR CM CENTIMETER CENTIMETER CMU CONCRETE MASONRY UNIT CONCRETE MASONRY UNIT CNTR COUNTER COUNTER COL COLUMN COLUMN CONC FLR CONCRETE FLOOR CONCRETE FLOOR CONSTR CONSTRUCTION CONSTRUCTION CONT CONTINUE CONTINUE COORD COORDINATE COORDINATE CPT CARPET CARPET CSWK CASEWORK CASEWORK CT CERAMIC TILE CERAMIC TILE CTRL CONTROL CONTROL DAT DATUM DATUM DC DIRECT CURRENT DIRECT CURRENT DEG DEGREE DEGREE DEL DELETE DELETE DEMO DEMOLITION DEMOLITION DEPT DEPARTMENT DEPARTMENT DTL DETAIL DETAIL DIFF DIFFERENCE DIFFERENCE DIM DIMENSION DIMENSION DIR DIRECTION DIRECTION DR DOOR, OR DRAIN DOOR, OR DRAIN DR OPNG DOOR OPENING DOOR OPENING E.J. EXPANSION JOINT EXPANSION JOINT EL ELEVATION ELEVATION ELEC ELECTRIC ELECTRIC ELEV ELEVATOR ELEVATOR EMER EMERGENCY EMERGENCY ENGR ENGINEER ENGINEER EQ EQUAL EQUAL EQUIP EQUIPMENT EQUIPMENT EQUIV EQUIVALENT EQUIVALENT ESP ESPECIALLY ESPECIALLY EXIST EXISTING EXISTING FA FIRE ALARM FIRE ALARM FAS FASCIA FASCIA FD FLOOR DRAIN FLOOR DRAIN FE FIRE EXTINGUISHER FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FIRE EXTINGUISHER CABINET FIN FLR FINISH FLOOR FINISH FLOOR FIXT FIXTURE FIXTURE FLR FLOOR FLOOR FP FIRE PROTECTION OR FIREPROOF FIRE PROTECTION OR FIREPROOF FRT FIRE RETARDANT TREATED FIRE RETARDANT TREATED FRZ FREEZER FREEZER FT FEET OR FOOT FEET OR FOOT FURN FURNISH OR FURNITURE FURNISH OR FURNITURE GA GAGE OR GYPSUM ASSOCIATION GAGE OR GYPSUM ASSOCIATION GAL GALLON GALLON GALV GALVANIC OR GALVANIZED GALVANIC OR GALVANIZED GB GRAB BAR GRAB BAR GC GENERAL CONTRACTOR GENERAL CONTRACTOR GEN GENERAL OR GENERATOR GENERAL OR GENERATOR GL GLASS GLASS GLU LAM GLUED LAMINATED WOOD GLUED LAMINATED WOOD GT GROUT GROUT GYP GYPSUM GYPSUM GYP BD GYPSUM BOARD GYPSUM BOARD HB HOSE BIBB HOSE BIBB HC HOLLOW CORE HOLLOW CORE HDWD HARDWOOD HARDWOOD HM HOLLOW METAL HOLLOW METAL HT HEIGHT HEIGHT HVAC HEATING, VENTILATING, HEATING, VENTILATING, AND AIR CONDITIONING ID IDENTIFICATION IDENTIFICATION ILLUM ILLUMINATION ILLUMINATION INCL INCLUDED INCLUDED INFO INFORMATION INFORMATION INSUL INSULATION INSULATION INT INTERIOR INTERIOR JAN JANITOR JANITOR J-BOX JUNCTION BOX JUNCTION BOX LAB LABORATORY LABORATORY LAM LAMINATE LAMINATE LAV LAVATORY LAVATORY LDR LEADER LEADER LED LIGHT EMITTING DIODE LIGHT EMITTING DIODE LT LIGHT LIGHT LVD LOUVERED LOUVERED LVR LOUVER LOUVER LYR LAYER LAYER

AutoCAD SHX Text M METER METER MAINT MAINTENANCE MAINTENANCE MATL MATERIAL MATERIAL MAX MAXIMUM MAXIMUM MECH MECHANICAL MECHANICAL MEMO MEMORANDUM MEMORANDUM MEZZ MEZZANINE MEZZANINE MID MIDDLE MIDDLE MIRR MIRROR MIRROR MISC MISCELLANEOUS MISCELLANEOUS MLDG MOLDING (MOULDING) MOLDING (MOULDING) MLWK MILLWORK MILLWORK MO MASONRY OPENING MASONRY OPENING MTL METAL METAL MULL MULLION MULLION NA NOT APPLICABLE NOT APPLICABLE NAT NATURAL NATURAL NIC NOT IN CONTRACT NOT IN CONTRACT NO NUMBER NUMBER NOM NOMINAL NOMINAL NUM NUMERAL NUMERAL OC ON CENTER ON CENTER OCC OCCUPY OCCUPY OFF OFFICE OFFICE OPNG OPENING OPENING OPP OPPOSITE OPPOSITE OSHA OCCUPATIONAL SAFETY AND OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION OZ OUNCE OUNCE PART PARTIAL PARTIAL PAT PATTERN PATTERN PEN PENETRATE PENETRATE PERF PERFORATED PERFORATED PERP PERPENDICULAR PERPENDICULAR PLAS PLASTER OR PLASTIC PLASTER OR PLASTIC PLBG PLUMBING PLUMBING PLYWD PLYWOOD PLYWOOD PNL PANEL PANEL PRCST PRECAST PRECAST PREFAB PREFABRICATE PREFABRICATE PRELIM PRELIMINARY PRELIMINARY PREP PREPARATION PREPARATION PREV PREVIOUS PREVIOUS PROP PROPERTY PROPERTY PTD PAINTED PAINTED PVC POLYVINYL CHLORIDE (PLASTIC) POLYVINYL CHLORIDE (PLASTIC) QA QUALITY ASSURANCE QUALITY ASSURANCE QC QUALITY CONTROL QUALITY CONTROL QT QUARRY TILE QUARRY TILE QTB QUARRY TILE BASE QUARRY TILE BASE QTR QUARTER QUARTER QTY QUANTITY QUANTITY R RADIUS OR RISER RADIUS OR RISER RAD RADIATOR RADIATOR RB RESILIENT BASE OR RUBBER RESILIENT BASE OR RUBBER BASE RBR RUBBER RUBBER RCP REFLECTED CEILING PLAN REFLECTED CEILING PLAN RCVR RECEIVER RECEIVER RD ROAD OR ROOF DRAIN ROAD OR ROOF DRAIN REC RECESSED RECESSED RECT RECTANGLE RECTANGLE REF REFERENCE OR REFRIGERATOR REFERENCE OR REFRIGERATOR REINF REINFORCE REINFORCE REQ REQUIRE REQUIRE REQD REQUIRED REQUIRED RESIL RESILIENT RESILIENT RET RETURN RETURN REV REVISION REVISION RM ROOM ROOM RND ROUND ROUND RO ROUGH OPENING ROUGH OPENING SALV SALVAGE SALVAGE SBSTR SUBSTRATE SUBSTRATE SCHED SCHEDULE SCHEDULE SCHEM SCHEMATIC SCHEMATIC SECT SECTION SECTION SEP SEPARATE SEPARATE SF SQUARE FOOT (FEET) SQUARE FOOT (FEET) SLNT SEALANT SEALANT SMK SMOKE SMOKE SPEC SPECIFICATION SPECIFICATION SPKLR SPRINKLER SPRINKLER SPLY SUPPLY SUPPLY SQ SQUARE SQUARE SS STAINLESS STEEL STAINLESS STEEL STD STANDARD STANDARD STOR STORAGE STORAGE STR STRINGERS STRINGERS STRUCT STRUCTURAL STRUCTURAL SURF SURFACE SURFACE SUSP SUSPEND SUSPEND SYS SYSTEM SYSTEM T&G TONGUE AND GROOVE TONGUE AND GROOVE TECH TECHNICAL TECHNICAL TEL TELEPHONE TELEPHONE TEMP TEMPERATURE OR TEMPORARY TEMPERATURE OR TEMPORARY THK THICKNESS THICKNESS THRU THROUGH THROUGH TMPD TEMPERED TEMPERED TO TOP OF ___ TOP OF ___ TRANS TRANSOM TRANSOM TRTD TREATED TREATED TYP TYPICAL TYPICAL U HEAT TRANSFER COEFFICIENT HEAT TRANSFER COEFFICIENT UPS UNINTERRUPTIBLE POWER UNINTERRUPTIBLE POWER SUPPLY UTIL UTILITY UTILITY UV ULTRAVIOLET ULTRAVIOLET VAC VACUUM VACUUM VAR VARIES VARIES VCT VINYL COMPOSITION TILE VINYL COMPOSITION TILE VENT VENTILATION VENTILATION VERT VERTICAL VERTICAL VEST VESTIBULE VESTIBULE VIF VERIFY IN FIELD VERIFY IN FIELD VOL VOLUME VOLUME W/ WITH WITH W/O WITHOUT WITHOUT WD WOOD WOOD WSCT WAINSCOT WAINSCOT WT WEIGHT WEIGHT

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text

INFECTION CONTROL RISK ASSESSMENT

AutoCAD SHX Text A. 1. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING / RECONSTRUCTION 1. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING / RECONSTRUCTION THE DEPARTMENT OF VETERANS AFFAIRS HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURE. a. NFPA 101 LIFE SAFETY CODE, 2018 EDITION b. NFPA NATIONAL FIRE CODES (WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900) c. NATIONAL ELECTRIC CODE (NEC) d. INTERNATIONAL PLUMBING CODE (IPC) e. ASME BOILER AND PRESSURE VESSEL CODE f. ASME CODE FOR PRESSURE PIPING g. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13) h. ENERGY POLICY ACT (EPAct) i. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) j. VA MENTAL HEALTH DESIGN GUIDE k. INTERNATIONAL BUILDING CODE (IBC) - ONLY WHEN SPECIFICALLY REFERENCE IN VA DESIGN DOCUMENTS l. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS 2. THE CONSTRUCTION CLASSIFICATION IS TYPE II (222). THE MINIMUM FIRE RATING FOR ALL LOAD-BEARING STRUCTURAL ELEMENTS IS 2HRS. IF DURING CONSTRUCTION, ANY DAMAGE TO EXISTING FIREPROOFING IS OBSERVED OR IF DISCOVERED THAT ANY FIRE PROTECTION IS MISSING, THE CONTRACTOR SHALL REPAIR TO MAINTAIN FULL PROTECTION. 3. RENOVATION TO THE EXISTING LINAC AND CONTROL ROOM AREA OCCUPIES APPROX 1,200 SQ FT OF THE EXISTING RADIATION ONCOLOGY SUITE ON THE FIRST FLOOR OF BUILDING 1.

AutoCAD SHX Text

CODE NOTES

AutoCAD SHX Text

TRAVEL DISTANCE

AutoCAD SHX Text 0-G002

AutoCAD SHX Text

ABBREVIATIONS, CODE NOTES AND FIRE SAFETY/ EGRESS

AutoCAD SHX Text

AutoCAD SHX Text G002

AutoCAD SHX Text 1/16" = 1'-0"

AutoCAD SHX Text

2 HOUR FIRE RESISTANCE RATED FIRE BARRIER

AutoCAD SHX Text NFPA 101 REVIEW B. CHAPTER 21 EXISTING AMBULATORY HEALTH CARE OCCUPANCIES CHAPTER 21 EXISTING AMBULATORY HEALTH CARE OCCUPANCIES 1. (21.1.1.1.1) THE REQUIREMENTS OF THIS CHAPTER SHALL APPLY TO EXISTING BUILDINGS OR PORTIONS THEREOF CURRENTLY OCCUPIED AS AN AMBULATORY HEALTH CARE OCCUPANCIES. 2. (21.1.1.4.4) CONSTRUCTION - SEE 4.6.10: BUILDINGS, OR PORTIONS OF BUILDINGS, SHALL BE PERMITTED TO BE OCCUPIED DURING CONSTRUCTION ONLY WHERE REQUIRED MEANS OF EGRESS AND REQUIRED FIRE PROTECTION FEATURES ARE IN PLACE AND CONTINUOUSLY MAINTAINED FOR THE PORTION OCCUPIED OR WHERE ALTERNATIVE LIFE SAFETY MEASURES ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION ARE IN PLACE. 3. (21.1.7) THE OCCUPANT LOAD SHALL BE DETERMINED ON THE BASIS OF OCCUPANT LOAD FACTORS OF TABLE 7.3.1.2. - NOTE NO CHANGE TO EXISTING OCCUPANCY IN THE RENOVATION OF THE LINAC ROOM.

AutoCAD SHX Text C. MEANS OF EGRESS 1. (21.2.1) ALL MEANS OF EGRESS SHALL COMPLY WITH CHAPTER 7, UNLESS OTHERWISE MODIFIED BY 21.2.2 THROUGH 21.2.11. 2. (21.2.3.2) CLEAR WIDTH FOR ANY CORRIDOR OR PASSAGEWAY REQUIRED FOR EXIT ACCESS SHALL NOT BE LESS THAN 44 INCHES. 3. (21.2.3.4) DOOR IN THE MEANS OF EGRESS FROM DIAGNOSTIC OR TREATMENT AREAS SHALL PROVIDE A CLEAR WIDTH OF NOT LESS THAN 32 INCHES. 4. (21.2.5.2) DEAD-END CORRIDORS SHALL NOT EXCEED 50 FT. 5. (21.2.6.2.2) THE MAXIMUM TRAVEL DISTANCE BETWEEN ANY POINT IN A ROOM AND AN EXIT SHALL (150 FT PER 21.2.6.2.1) BE PERMITTED TO INCREASE BY 50 FEET IN BLDGS PROTECTED THROUGHOUT BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM. D. PROTECTION FROM HAZARDS 1. (21.3.2.1) HAZARDOUS AREAS INCLUDING, BUT NOT LIMITED TO , AREAS USED FOR GENERAL STORAGE, BOILER OR FURNACE ROOMS SHALL BE PROTECTED IN ACCORDANCE WITH SECTION 8.7. 1. (21.3.2.5) AREAS WHERE MEDICAL GAS IS STORED OR ADMINISTERED, AND THE OPERATION, MANAGEMENT, AND MAINTENANCE OF MEDICAL GASES SHALL BE IN ACCORDANCE WITH NFPA 99. E. INTERIOR FINISHES - CHAPTER 20 AND SECTION 10.2 1. (21.3.3.2.1) INTERIOR WALL AND CEILING FINISH MATERIAL COMPLYING WITH SECTION 10.2 SHALL BE CLASS A OR CLASS B IN EXITS AND IN EXIT ACCESS CORRIDORS. 2. (21.3.3.2.2) INTERIOR WALL AND CEILING FINISHES SHALL BE CLASS A, CLASS B OR CLASS C IN ALL AREAS OTHER THAN THOSE SPECIFIED IN 20.3.3.2.1.

AutoCAD SHX Text

CALL NORTH

AutoCAD SHX Text

1 HOUR FIRE RESISTANCE RATED FIRE BARRIER

AutoCAD SHX Text THE PURPOSE OF INFECTION CONTROL PROCEDURES IS TO MINIMIZE THE POTENTIAL FOR THE SPREAD OF INFECTIONS DUE TO DEGRADED AIR QUALITY, ENVIRONMENTAL CONTAMINATION, OR CONTAMINATION OF WATER. IT IS THE POLICY OF THIS MEDICAL CENTER THAT A SYSTEMATIC APPROACH BASED ON ASSESSMENT AND PLANNING WILL EFFECTIVELY MANAGE THE ISSUE OF TRANSMISSION OF INFECTIOUS DISEASES AND THE AGGRAVATION OF ALLERGIES. THE OVERALL APPROACH RELIES ON PRE-CONSTRUCTION ASSESSMENT, MANAGEMENT OF HVAC SYSTEMS, AND AGGRESSIVE USE OF A VARIETY OF BARRIERS. CONTRACTOR IS TO WORK CLOSELY WITH THE VA FACILITY MANAGEMENT SERVICE CENTER, THE INFECTION CONTROL PROGRAM STAFF AND THE SAFETY AND OCCUPATION HEALTH MANAGER TO HAVE IN PLACE A MONITORING A PROGRAM TO ASSURE RIGOROUS IMPLEMENTATION OF THE REQUIRED MEASURES. REFER TO PROJECT SPECIFICATIONS.

AutoCAD SHX Text

INFECTION CONTROL NOTES

AutoCAD SHX Text A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND COORDINATE ALL THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND COORDINATE ALL INFECTION CONTROL REQUIREMENTS WITH THE DEMOLITION AND NEW CONSTRUCTION. THE CONTRACTOR SHALL REPORT ALL DISCOVERIES TO THE OWNER'S REPRESENTATIVE FOR RESOLUTION PRIOR TO BEGINNING. B. CONTRACTOR TO INSTALL BARRIERS AND OTHER MEASURES. CONSTRUCTION BARRIER DOOR(S) MUST CONTRACTOR TO INSTALL BARRIERS AND OTHER MEASURES. CONSTRUCTION BARRIER DOOR(S) MUST BE SELF-CLOSING. PROVIDE DUST CONTROL AND CONTAINMENT STICKY MATS ON ALL ACCESS DOORS INTO CONSTRUCTION AREA. ANTE-ROOM REQUIRED AT CONSTRUCTION ENTRY. PROVIDE MANOMETER MONITORS FOR ALL CONSTRUCTION BARRIERS.

AutoCAD SHX Text C. CONTRACTOR TO DISPOSE OF MATERIALS BEFORE 8:00AM OR AFTER 4:00PM UNLESS ARRANGED WITH CONTRACTOR TO DISPOSE OF MATERIALS BEFORE 8:00AM OR AFTER 4:00PM UNLESS ARRANGED WITH THE VA TO DISPOSE OF DURING NORMAL HOURS. USE ROUTE AGREED UPON BY ICRA TEAM AND COTR FOR TRANSPORT OF TRANSPORT CONTAINERS THROUGH THE FACILITY. CONTRACTORS CAN ONLY DEVIATE TO NORMAL HOURS WITH THE APPROVAL OF THE INFECTION CONTROL NURSE AND COR DUE TO PARTICULAR CIRCUMSTANCES THAT MAY OBSTRUCT PROGRESS. A CLEAR PLAN WILL HAVE TO BE SUBMITTED AND PRECAUTIONARY INFECTION CONTROL MEASURES IMPLEMENTED. D. CONTRACTOR TO COVER CARTS AND WEAR BOOTIES WHEN DISPOSING MATERIALS. CONTRACTOR TO COVER CARTS AND WEAR BOOTIES WHEN DISPOSING MATERIALS. E. CONTRACTOR TO CHANGE MATS MULTIPLE TIMES A DAY AS NEEDED AND MOP FLOORS BEHIND THEM CONTRACTOR TO CHANGE MATS MULTIPLE TIMES A DAY AS NEEDED AND MOP FLOORS BEHIND THEM MULTIPLE TIMES A DAY. F. CONTRACTOR TO MAINTAIN CONTINUOUS NEGATIVE AIR PRESSURE WITHIN THE WORK SITE UTILIZING CONTRACTOR TO MAINTAIN CONTINUOUS NEGATIVE AIR PRESSURE WITHIN THE WORK SITE UTILIZING WINDOW EXHAUST FANS STRATEGICALLY LOCATED OR PROVIDE NEGATIVE PRESSURE AIR HEPA UNITS AND EXHAUST TO EXTERIOR OF THE BUILDING. CONTRACTOR TO INCLUDE MONITORING MANOMETER AT ANTEROOM SO THE NEGATIVE PRESSURE CAN BE INSPECTED.

AutoCAD SHX Text

NOT FOR CONSTRUCTION

AutoCAD SHX Text

NO SCALE

N

ASBESTOS ABATEMENT PLAN KEY MAP - BLDG 1, GROUND FLOOR

Drawing 01 of 02

16 FEB 2021 TGE EDS

Egan Environmental Consulting, Inc.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% CD's Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

16 FEB 2021Revisions: Date:

630A4-CSI-426

800 POLY PLACE, BROOKLYN, NY 11209-7104

DESIGN ONCOLOGY LINAC SITE PREP

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

VA NY HARBOR HEALTHCARE SYSTEM

BROOKLYN CAMPUS

21-03-BK

AutoCAD SHX Text

LINEAR ACCEL

AutoCAD SHX Text G110

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text G113

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text G109

AutoCAD SHX Text

TOILET

AutoCAD SHX Text G112

AutoCAD SHX Text

TOILET

AutoCAD SHX Text G112A

AutoCAD SHX Text

RAD ONCOLOGIST

AutoCAD SHX Text G114

AutoCAD SHX Text

CHIEF ONCOLOGIST

AutoCAD SHX Text G115

AutoCAD SHX Text

RAD ONCOLOGIST

AutoCAD SHX Text G116

AutoCAD SHX Text

CONF

AutoCAD SHX Text G117A

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text G117

AutoCAD SHX Text

CORR

AutoCAD SHX Text G110A

AutoCAD SHX Text

LINAC

AutoCAD SHX Text G111

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text G104

AutoCAD SHX Text

TOILET

AutoCAD SHX Text G137

AutoCAD SHX Text

WAITING

AutoCAD SHX Text G136

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text G136A

AutoCAD SHX Text

TEL CLOSET

AutoCAD SHX Text G201

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text G202

AutoCAD SHX Text

RADIATION ONCOLOGY

AutoCAD SHX Text

WAITING

AutoCAD SHX Text G204

AutoCAD SHX Text

MECH

AutoCAD SHX Text G214

AutoCAD SHX Text

TOILET

AutoCAD SHX Text G231

AutoCAD SHX Text

ELEC

AutoCAD SHX Text G232

AutoCAD SHX Text

FEMALE

AutoCAD SHX Text

WAITING

AutoCAD SHX Text G230

AutoCAD SHX Text

CORRIDOR SE3

AutoCAD SHX Text G200C

AutoCAD SHX Text

CAT

AutoCAD SHX Text G103

AutoCAD SHX Text

CHAPEL

AutoCAD SHX Text

JAN

AutoCAD SHX Text LEAD (Pb) LINED WALL TO BE DEMOLISHED IN ACCORDANCE WITH 29 CFR 1926.62.

AutoCAD SHX Text

AutoCAD SHX Text

WORKER DECON. UNIT

AutoCAD SHX Text

WASTE DECON. UNIT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G101

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text 1 HOUR FIRE RESISTANT RATED SMOKE BARRIER 1 HOUR FIRE RESISTANT RATED FIRE BARRIER 2 HOUR FIRE RESISTANT RATED FIRE BARRIER

AutoCAD SHX Text Asbestos-Containing Materials Quantity Table

AutoCAD SHX Text Location

AutoCAD SHX Text Material

AutoCAD SHX Text Quantity

AutoCAD SHX Text Ground Floor - Room G104

AutoCAD SHX Text

PIPE INSULATION

AutoCAD SHX Text

30 L.F. 4-8" 10 FITTINGS

AutoCAD SHX Text Ground Floor - Room G104

AutoCAD SHX Text

CONTAMINATED CEILING TILE

AutoCAD SHX Text

150 SQ. FT.

AutoCAD SHX Text Ground Floor - Room G101

AutoCAD SHX Text

FLOOR TILE & MASTIC

AutoCAD SHX Text

320 SQ. FT.

AutoCAD SHX Text Ground Floor - Room G101

AutoCAD SHX Text

PIPE INSULATION

AutoCAD SHX Text

30 L.F. 4-8" 10 FITTINGS

AutoCAD SHX Text Ground Floor - Room G101

AutoCAD SHX Text

CONTAMINATED CEILING TILE

AutoCAD SHX Text

320 SQ. FT.

AutoCAD SHX Text ASBESTOS ABATEMENT LEGEND: PIPE INSULATION TO BE REMOVED. FLOOR TILE & MASTIC TO BE REMOVED. CONTAMINATED CEILING TILE TO BE REMOVED. PATH OF WASTE OUTSIDE OF BUILDING. HEPA - FILTERED NEGATIVE AIR MACHINE

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HA100

AutoCAD SHX Text

GROUND FLOOR ASBESTOS ABATEMENT PLAN

AutoCAD SHX Text

AutoCAD SHX Text

HA-100

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

GROUND FLOOR PARTIAL PLAN

AutoCAD SHX Text

NOT FOR CONSTRUCTION

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text N

ASBESTOS ABATEMENT CONSULTANT: 14 HIGH STREET MAHWAH, NEW JERSEY 07430 Tel: (914) 320-7924 Email: tom_egan2@yahoo.com

ASBESTOS ABATEMENT NOTES:

1. ALL ASBESTOS REMOVAL AREAS INDICATED ON THE DRAWINGS AND

SPECIFICATION IS FOR INFORMATIONAL ASSISTANCE TO THE CONTRACTOR. ALL

WORK AREAS HAVING ASBESTOS-CONTAINING MATERIALS MUST BE FIELD

MEASURED AND VERIFIED FOR ACTUAL LOCATIONS, SIZE AND QUANTITIES.

ADDITIONAL PIPING OR EQUIPMENT WHICH MAY HAVE ASBESTOS CONTAINING

INSULATION MAY BE PRESENT. THE CONTRACTOR MUST REMOVE ALL ASBESTOS

CONTAINING MATERIALS FROM ALL SPECIFIED AREAS WHETHER OR NOT SHOWN

OR ACCURATELY INDICATED. THESE SPECIFICATIONS SHALL BE USED AS A GUIDE,

AND DO NOT LIMIT THE CONTACTOR'S RESPONSIBILITY TO SEEK AND REMOVE ALL

ASBESTOS CONTAINING MATERIAL AS SPECIFIED.

2. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT

PROCEDURES. CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS

FROM THE SITE WITH A MINIMUM DISTURBANCE AND PROVIDE REGULAR

MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA,

TRANSPORTATION ROUTES, ETC. THROUGHOUT THE BUILDINGS.

3. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT OR OTHER COMPONENTS OF

THIS BUILDING WHICH ARE DAMAGED OR IN ANY WAY DISRUPTED AS A RESULT OF

THE EXECUTION OF THIS CONTRACT SHALL BE REPLACED OR RESTORED TO

ORIGINAL CONDITION.

4. CONTRACTOR SHALL PROVIDE AS MANY SHIFTS OF LABORERS AS NECESSARY TO

COMPLETE THE PROJECT IN THE AMOUNT OF TIME SPECIFIED IN THE CONTRACT

DOCUMENTS AT NO EXTRA COST.

5. ALL ASBESTOS REMOVAL SHALL BE PREFORMED IN ACCORDANCE WITH ALL

APPLICABLE FEDERAL, STATE AND LOCAL LAWS, GUIDELINES, REGULATIONS,

ORDERS AND DIRECTIVES, INCLUDING WITHOUT LIMITATIONS THOSE OF THE

RESPONSIBLE NEW YORK STATE AGENCIES; U.S. ENVIRONMENTAL PROTECTION

AGENCY (EPA), THE U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION (OSHA), NATIONAL INSTITUTE OF OCCUPATIONAL

SAFETY AND HEALTH (NIOSH), AND THE U.S. DEPARTMENT OF VETERANS AFFAIRS.

6. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD

PROCEDURES FOR ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND

SAFEGUARDS FOR ASBESTOS EXPOSURE TO THE WORKERS, EMPLOYEES,

GENERAL PUBLIC AND THE ENVIRONMENT.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ANY LIGHT FIXURES,

SUSPENDED CEILINGS, WALLS, DUCTWORK, OR ANY OBSTRUCTIONS NECESSARY

FOR THE SUCCESSFUL COMPLETION OF THE PROJECT. CONTRACTOR SHALL

CAREFULLY REMOVE, DECONTAMINATE AND REINSTALL ALL REMOVED FIXTURES,

SUPPORTING GRIDS OR ANY OTHER BUILDING STRUCTURE REMOVED BY THE

CONTRACTOR TO ACCESS ASBESTOS CONTAINING MATERIAL.

8. AIR FILTRATION DEVICE (AFD) UNITS SHALL BE EQUIPPED WITH SMOKE/HEAT

SENSOR SYSTEMS THAT WILL SHUT DOWN THE UNIT WITHIN 30 SECONDS AFTER

FIRE OR SMOKE DETECTION. AFD SENSOR UNITS MUST COMPLY WITH AMERICAN

NATIONAL STANDARDS NFPA LIFE SAFTEY CODE 101.

9. ASBESTOS REMOVAL DRAWINGS WERE PREPARED FROM EXISTING DRAWINGS

SUPPLIED BY THE OWNER AND ARE PROVIDED FOR INFORMATION ONLY. THE

CONSULTANT MAKES NO CLAIMS AS TO THEIR ACCURACY OR FOR QUANTITIES

DERIVED THROUGH THEIR USE.

10. CONTRACTOR SHALL PROVIDE ALL SCAFFOLDING, LADDERS, PLYWOOD, ETC., AS

REQUIRED AND/OR AS NECESSARY TO COMPLETE ALL WORK REQUIRED BY THE

CONTRACT DOCUMENTS.

11. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS AND POSTED

INSTRUCTIONS THAT ARE NECESSARY TO PROTECT, INFORM AND WARN PEOPLE

OF THE HAZARD FROM ASBESTOS EXPOSURE.

12. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR THE

WORKERS, A COPY OF THE LATEST APPLICABLE REGULATIONS FORM OSHA, EPA,

NIOSH AND NYS DOL.

13. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING,

ELECTRICAL PANELS, EQUIPMENT, ETC. WITHIN THE WORK AREAS.

14. THE VAMC AND THE ASBESTOS ABATEMENT CONTRACTOR SHALL MUTUALLY

AGREE UPON THE LOCATION OF THE DECONTAMINATION UNITS FOR EACH PHASE

DURING THE PRECONSTRUCTION MEETING UNLESS SHOWN ON THE

DRAWINGS.

15. SUBMIT SHOP DRAWINGS SHOWING LOCATION AND NUMBER OF

HEPA FILTERED NEGATIVE AIR MACHINES, AIRLOCKS AND

DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS

SHOWING NUMBER OF AIR CHANGES FOR EACH CONTAINMENT

AREA.

16. ALL ASBESTOS REMOVALS SHALL BE PERFORMED WITHIN A

HEPA-FILTERED NEGATIVE AIR PRESSURE ENCLOSURE. PIPE

INSULATION WORK SHALL BE PERFORMED USING THE

TENT/GLOVEBAG METHOD.

17. Specific areas on the 1st floor of Building 1 will require asbestos abatement to allow for the LINAC replacement project.

Asbestos-containing materials (ACM's) must be removed to allow for the renovation. ACM's include but are not limited to pipe insulation, floor tile and mastic.

18. Scheduling of work shall be coordinated with the V.A. to avoid interruptions to the normal activities of the V.A. Asbestos Abatement will be performed over a weekend. Work will begin at 5pm on a Friday and be completed by 6am Monday including clearance air testing and breakdown.

19. The contractor shall prepare the work areas for asbestos removal using a HEPA-filtered negative air pressure containment in accordance with this specification and applicable codes, rules and regulations. Ceiling tiles must be removed from the work area following erection of the HEPA-filtered negative air pressure containment.

20. The contractor shall erect isolation barriers that separate the work areas from the remainder of the building. The barriers shall be constructed of a fire retardant sheathing material of at least 5/8" thickness on the work side of the studs. The isolation barrier shall be plasticized with two (2) layers of 6-mil fire retardant plastic sheeting. The isolation barriers shall be caulked at the sheathing seams and where the sheathing meets the floor, walls and ceiling. The isolation barrier shall be constructed using fire retardant 2"x4" framing, 16 inches center-to-center, and caulked at all seams.

21. All utilities and piping shall be locked out and tagged before the contractor is to begin abatement activities.

22. All asbestos-containing materials within the contract limits must be removed and disposed of as asbestos-contaminated waste unless specifically excluded in these specifications or on the drawings.

23. The black iron supporting the drop ceilings is to remain intact throughout asbestos abatement activities.

24. All work area decontamination units (personal and waste) shall be fully framed and sheathed with fire retardant wood because they will be located in areas of public access.

25. All utilities, mechanical systems and piping shall be locked out and tagged before the contractor is to begin abatement activities.

26. All asbestos-containing materials within the contract limits must be removed and disposed of as asbestos-contaminated waste unless specifically excluded in these specifications or on the drawings.

27. The black iron supporting the drop ceilings is to remain intact throughout asbestos abatement activities.

28. All work area decontamination units (personal and waste) shall be fully framed and sheathed with fire retardant wood because they will be located in areas of public access.

Drawing 02 of 02

HA101

Egan Environmental Consulting, Inc.

KEY MAP - BLDG 1, GROUND FLOOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% CD's Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

16 FEB 2021Revisions: Date:

630A4-CSI-426

800 POLY PLACE, BROOKLYN, NY 11209-7104

DESIGN ONCOLOGY LINAC SITE PREP

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

VA NY HARBOR HEALTHCARE SYSTEM

BROOKLYN CAMPUS

21-03-BK

TGE EDS

ASBESTOS DIAGRAMS AND NOTES

AutoCAD SHX Text

10' MIN

AutoCAD SHX Text

EQUIPMENT ROOM

AutoCAD SHX Text

12' MIN

AutoCAD SHX Text

CLEAN ROOM

AutoCAD SHX Text

4'MIN

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

8" MAX

AutoCAD SHX Text

CURTAINED DOORWAY

AutoCAD SHX Text

(3 LAYERS OF 6 MIL

AutoCAD SHX Text

POLY SHEETING WITH

AutoCAD SHX Text

WEIGHTED FLAPS)

AutoCAD SHX Text

(TYP @ AT ENTRANCE

AutoCAD SHX Text

AND EXIT)

AutoCAD SHX Text

2"X4" STUDS

AutoCAD SHX Text

2"X4" STUDS

AutoCAD SHX Text @ 48 O.C

AutoCAD SHX Text

4' MIN

AutoCAD SHX Text

AIRLOCK OF 36" MIN

AutoCAD SHX Text

WITH CURTAINED DOORWAY

AutoCAD SHX Text

CLEAN ROOM

AutoCAD SHX Text

WORK AREA

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text @ 48 O.C

AutoCAD SHX Text

2"X4" STUDS

AutoCAD SHX Text

CONSTRUCTION OF A TEMPORARY SOLID BARRIER

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

10. Puts on any additional

AutoCAD SHX Text clothing -deck shoes, hard hat

AutoCAD SHX Text

11. Collects necessary tools

AutoCAD SHX Text proceeds to work area

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

1. Enters clean room

AutoCAD SHX Text

2. removes street clothing, places in locker

AutoCAD SHX Text

3. Puts on nylon swim suit (optional)

AutoCAD SHX Text

4. Puts on clean overalls

AutoCAD SHX Text

5. If separate disposable foot covering are

AutoCAD SHX Text used, these are put on

AutoCAD SHX Text

6. Applies tape around ankles, wrists, etc.

AutoCAD SHX Text

7. Inspects respirator, puts it on, checks fit

AutoCAD SHX Text

8. Puts on hood over respirator headstraps

AutoCAD SHX Text

9. proceeds to equipment room

AutoCAD SHX Text

21. Dries off, dresses in clean

AutoCAD SHX Text coveralls or street clothing

AutoCAD SHX Text

22. Cleans and dries respirator, AutoCAD SHX Text replaces filter (if applicable)

AutoCAD SHX Text

WORKER

AutoCAD SHX Text filters (without removing)

AutoCAD SHX Text with soap and water

AutoCAD SHX Text

19. Washes swim suit

AutoCAD SHX Text

20. Thoroughly washes body

AutoCAD SHX Text and hair

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

13. Removes all clothing

AutoCAD SHX Text except respirator

AutoCAD SHX Text

14. places disposable

AutoCAD SHX Text protective clothing

AutoCAD SHX Text in a bag or bin

AutoCAD SHX Text

15. Stores any other

AutoCAD SHX Text contaminated articles

AutoCAD SHX Text

16. Proceeds to shower

AutoCAD SHX Text

NOTE: INSIDE WORK AREA WORKERS SHALL EXIT TO OUTSIDE THOUGH

AutoCAD SHX Text

DECONTAMINATION FACILITIES ONLY. ALL WORKERS TO WEAR

AutoCAD SHX Text

WORKER

AutoCAD SHX Text

12. Brushes off

AutoCAD SHX Text contamination

AutoCAD SHX Text

WORK AREA

AutoCAD SHX Text

AIRLOCK

AutoCAD SHX Text

EQUIPMENT ROOM

AutoCAD SHX Text

AIRLOCK

AutoCAD SHX Text

AIRLOCK

AutoCAD SHX Text

CLEAN ROOM

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

ALL ASBESTOS CONTAINING MATERIALS SHALL BE

AutoCAD SHX Text

PACKED IN APPROVED CONTAINERS PRIOR TO

AutoCAD SHX Text

MOVING TO BAG STORAGE

AutoCAD SHX Text

BAGGING CHAMBER

AutoCAD SHX Text

EQUIPMENT/ WASTE

AutoCAD SHX Text

WASH ROOM

AutoCAD SHX Text

SHOWER ROOM

AutoCAD SHX Text

CLEAN ROOM

AutoCAD SHX Text

WORK AREA

AutoCAD SHX Text

CLEAN AREA

AutoCAD SHX Text

AIRLOCK

AutoCAD SHX Text

AIRLOCK

AutoCAD SHX Text

AIRLOCK

AutoCAD SHX Text

AIRLOCK

AutoCAD SHX Text

WORK AREA

AutoCAD SHX Text

AIR LOCK

AutoCAD SHX Text

SHOWER/WASH ROOM

AutoCAD SHX Text

CLEAN ROOM

AutoCAD SHX Text

AIR LOCK

AutoCAD SHX Text

CLEAN AREA

AutoCAD SHX Text

CEILING/DECKING

AutoCAD SHX Text

CAULKING

AutoCAD SHX Text

2 LAYERS OF 6 MIL

AutoCAD SHX Text

WALLS AND FLOOR

AutoCAD SHX Text

WORK AREA

AutoCAD SHX Text

CLEAN SIDE

AutoCAD SHX Text

EXISTING WALL

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

3/8" PLYWOOD SHEET

AutoCAD SHX Text

ON WORK AREA

AutoCAD SHX Text

CEILING DECKING

AutoCAD SHX Text 2"x4" @ 16" O.C(TYP.)

AutoCAD SHX Text

CONTINUOUS CAULKING

AutoCAD SHX Text

@ EDGES & SEAMS OF

AutoCAD SHX Text

PLYWOOD SHEETS

AutoCAD SHX Text

SECTION A-A

AutoCAD SHX Text

EXISTING WALL

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

USE OF GLOVE BAG ENCLOSURE FOR PIPE INSULATION ABATEMENT

AutoCAD SHX Text Staple and tape securely to insure that

AutoCAD SHX Text containment bag will not break as a result

AutoCAD SHX Text of vacuum and/or weight of debris within.

AutoCAD SHX Text Tape seal tightly around

AutoCAD SHX Text the pipe at both sides

AutoCAD SHX Text

WETTING

AutoCAD SHX Text

AGENT

AutoCAD SHX Text

SIDE

AutoCAD SHX Text

PORT

AutoCAD SHX Text

GLOVE

AutoCAD SHX Text

ARMS

AutoCAD SHX Text

TOOL

AutoCAD SHX Text

BAG

AutoCAD SHX Text Hepa vacuum (secure & seal nozzle

AutoCAD SHX Text w/tape after inserting into side

AutoCAD SHX Text port of containment bag)

AutoCAD SHX Text

CEILING

AutoCAD SHX Text

CENTER AFD EXHAUST TUBE.

AutoCAD SHX Text

FIRE RETARDENT PLYWOOD

AutoCAD SHX Text

BLASTGATE MANIFOLD AND ATTACH

AutoCAD SHX Text

FLEXIBLE AFD

AutoCAD SHX Text

EXHAUST DUCT

AutoCAD SHX Text

AFD

AutoCAD SHX Text

UNIT

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

TO ADDITIONAL

AutoCAD SHX Text

AFD UNIT

AutoCAD SHX Text

DUCT TAPE

AutoCAD SHX Text

DUCT TAPE

AutoCAD SHX Text

APPLY TWO LAYERS

AutoCAD SHX Text

OF SIX MIL PLASTIC

AutoCAD SHX Text

EXISTING WALL

AutoCAD SHX Text

EXISTING WALL

AutoCAD SHX Text

CLEAN AREA

AutoCAD SHX Text

CAUTION SIGN SHALL BE PLACED

AutoCAD SHX Text

ON THE CLEAN SIDE OF THE DOOR

AutoCAD SHX Text

CAUTION LABELING SHALL IN

AutoCAD SHX Text

ACCORDANCE WITH EPA FEDERAL

AutoCAD SHX Text

REGULATIONS

AutoCAD SHX Text

APPLY TWO SHEETS

AutoCAD SHX Text

OF SIX MILL POLY

AutoCAD SHX Text

AS REQUIRED

AutoCAD SHX Text

EXISTING DOOR

AutoCAD SHX Text

BUCK

AutoCAD SHX Text

APPLY AND SECURE

AutoCAD SHX Text

SHEETS OF POLY

AutoCAD SHX Text

WITH DUCT TAPE

AutoCAD SHX Text

EXISTING DOOR TO

AutoCAD SHX Text

BE CLOSED AND SEALED

AutoCAD SHX Text

AN EMERGENCY EXIT SIGN IS TO

AutoCAD SHX Text

BE PLACED ON THE CONTAMINATED

AutoCAD SHX Text

SIDE AT ALL SPECIFIED LOCATIONS

AutoCAD SHX Text

EXISTING DOOR

AutoCAD SHX Text

THE PERIMETER OF THE DOOR IS TO

AutoCAD SHX Text

BE SEALED WITH DUCT TAPE ON THE

AutoCAD SHX Text

CONTAMINATED SIDE PRIOR TO APPLYING

AutoCAD SHX Text

THE TWO LAYERS OF POLY

AutoCAD SHX Text

APPLY AND SECURE SHEETS

AutoCAD SHX Text

OF POLY WITH DUCT TAPE

AutoCAD SHX Text

AS REQUIRED

AutoCAD SHX Text

EXISTING WALL

AutoCAD SHX Text

APPLY TWO SHEETS

AutoCAD SHX Text

OF SIX MIL POLY

AutoCAD SHX Text

EMERGENCY CRITICAL BARRIER AT DOOR

AutoCAD SHX Text

CONTAMINATED SIDE

AutoCAD SHX Text

CONSTRUCTION OF PERSONNEL DECONTAMINATION SYSTEM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

POLY SHEETING ON

AutoCAD SHX Text

PARALLEL PERSONNEL AND WASTE DECON. ENCLOSURE SYSTEMS

AutoCAD SHX Text

PERSONNEL DECONTAMINATION SYSTEM

AutoCAD SHX Text

WINDOW AIR FILTRATION DEVICE EXHAUST

AutoCAD SHX Text

RESPIRATORS AND FULLY PROTECTIVE CLOTHING INSIDE THE

AutoCAD SHX Text

WORK AREA (INCLUDING HEAD AND FOOT WEAR)

AutoCAD SHX Text

17. Washes respirator and soaks

AutoCAD SHX Text

18. Removes respirator, washes

AutoCAD SHX Text

WASTE DECONTAMINATION ENCLOSURE SYSTEM

AutoCAD SHX Text

USING ADJUSTABLE CLAMP AND

AutoCAD SHX Text

DUCT TAPE. SEAL AIRTIGHT.

AutoCAD SHX Text

HOSE BEAD

AutoCAD SHX Text

BLASTGATE MANIFOLD AND AJUSTABLE CLAMP FOR WINDOW

AutoCAD SHX Text

ADJUSTABLE CLAMP WITH INTERNAL GASKET

AutoCAD SHX Text

12" I.D. GALVANIZED METAL

AutoCAD SHX Text

GALVANIZED METAL

AutoCAD SHX Text

GALVANIZED METAL

AutoCAD SHX Text

GALVANIZED METAL

AutoCAD SHX Text ASBESTOS ABATEMENT CONSULTANT: 14 HIGH STREET MAHWAH, NEW JERSEY 07430 Tel: (914) 320-7924 Email: tom_egan2@yahoo.com

AutoCAD SHX Text

NO SCALE

EXISTING ROOF SHEILDING SUPPORT PLAN - TO REMAIN

FE PROJECT

NO: 20-175

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CD's Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

05 FEB 2021Revisions: Date:

630A4-CSI-426

800 POLY PLACE, BROOKLYN, NY 11209-7104

DESIGN ONCOLOGY LINAC SITE PREP

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

VA NY HARBOR HEALTHCARE SYSTEM

BROOKLYN CAMPUSENGINEERING LLP

www.fellp.com

22 MULBERRY ST, SUITE 2A

MIDDLETOWN, NY 10940

T:845.343.1481 F:855.320.8735

EXISTING PARTIAL GROUND FLOOR PLAN

SECTION VIEW

SECTION VIEW

SECTION VIEW

SECTION VIEW

EXISTING EXTERIOR EQUIPMENT SLAB

SECTION E-E

FE PROJECT

NO: 20-175

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CD's Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

05 FEB 2021Revisions: Date:

630A4-CSI-426

800 POLY PLACE, BROOKLYN, NY 11209-7104

DESIGN ONCOLOGY LINAC SITE PREP

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

VA NY HARBOR HEALTHCARE SYSTEM

BROOKLYN CAMPUSENGINEERING LLP

www.fellp.com

22 MULBERRY ST, SUITE 2A

MIDDLETOWN, NY 10940

T:845.343.1481 F:855.320.8735

PART GROUND FLOOR PLAN

SECTION VIEW

SECTION VIEW

DOWEL INSTALLATION DETAIL

3A

TREATMENT ROOM FLOOR & PIT NOTES:

FLOOR LOADING NOTES:

STAND AND COUCH FLOOR LOADS

STAND AND COUCH FLOOR LOADS PLAN

1A

TREATMENT ROOM FLOOR PIT CABLE ACCESS

SERVICE REQUIREMENTS

NOTE:

NOTE:

STAND AND COUCH FLOOR LOADS SECTION

1B

SECTION VIEW

CODES AND STANDARDS

1. BUILDING HAS BEEN DESIGNED TO, AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH

THE FOLLOWING BUILDING CODES AND STANDARDS:

1.1. BUILDING CODE OF NEW YORK

2. UNLESS EXPLICITLY MODIFIED IN THE CONTRACT DRAWINGS AND SPECIFICATIONS, THE

CONTRACTOR SHALL COMPLY WITH THE FOLLOWING STANDARDS:

2.1. ASCE/SEI 7-10, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER

STRUCTURES.

2.2. ACI 301-10, SPECIFICATIONS FOR STRUCTURAL CONCRETE.

2.3. ACI 318-14, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE.

2.4. ACI 530-13 / ASCE 5-13 / TMS 402-2013, BUILDING CODE REQUIREMENTS FOR

MASONRY STRUCTURES.

2.5. ANSI/AISC 341-10, SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS.

2.6. ANSI/AISC 360-10, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS.

2.7. AWS D1.4/D1.4M-2011, STRUCTURAL WELDING CODE - STEEL.

2.8. SJI 44TH EDITION CATALOG OF STANDARD SPECIFICATIONS AND LOAD TABLES

FOR STEEL JOISTS AND JOIST GIRDER.

2.9. SDI - NO. MOC2, SDI MANUAL OF CONSTRUCTION WITH STEEL DECK, 2006.

2.10. AISI S100-12, NORTH AMERICAN SPECIFICATION FOR DESIGN OF COLD- FORMED

STEEL STRUCTURE MEMBERS.

DESIGN STRESSES

CONCRETE (STRENGTH DESIGN) MINIMUM COMPRESSIVE STRENGTH IN 28 DAYS:

FOOTINGS F'C=4,000PSI

INTERIOR SLABS ON GRADE, GRADE BEAMS, WALLS, INTERIOR

STRUCTURAL FRAME, AND CONCRETE ON METAL DECK F'C=4,000PSI

CONCRETE SUBJECT TO FREEZING AND THAWING F'C=4,000PSI

LEAN CONCRETE, FOR USE WITH OVER-EXCAVATIONS F'C=1,500PSI

REINFORCING BARS (ASTM A615 OR ASTM A706, GRADE 60) FY=60,000PSI

WELDED WIRE REINFORCEMENT (ASTM A185) FS=30,000PSI

STRUCTURAL STEEL W AND S SHAPES

(ASTM A992 OR ASTM A572/50) FY=50,000PSI

STRUCTURAL STEEL OTHER SHAPES (ASTM A36) FY=36,000PSI

ANCHOR RODS (F1554, GRADE 36) UNLESS OTHERWISE NOTED FY=36,000PSI

HOLLOW STRUCTURAL SECTIONS (ASTM A500, GRADE B)

RECTANGULAR FY=46,000PSI

ROUND FY=42,000PSI

MASONRY F'M=1,500PSI

LOAD-BEARING CMU (ASTM C55 OR C90)

BRICK (ASTM C216 GRADE SW)

MORTAR TYPE M OR S

GROUT (ASTM C476) 3,000 PSI

SOIL BEARING PRESSURE FOR FOUNDATIONS 4,000 PSF

DEMOLITION

1. THE CONTRACTOR IS TO PROVIDE ALL LABOR & MATERIAL FOR THE DEMOLITION AND REMOVAL

WORK.

2. NOTIFY ALL LOCAL AGENCIES HAVING JURISDICTION.

3. LOCATE ALL UNDERGROUND UTILITIES PRIOR TO DEMOLITION.

4. DEMOLITION PROCEDURES, SHORING REQUIREMENTS, SEQUENCE TECHNIQUES, ETC., EITHER

GIVEN IN OR IMPLIED BY THESE DRAWINGS, ARE SUGGESTIONS ONLY. CONTRACTOR SHALL RETAIN, AT HIS OWN EXPENSE, A PROFESSIONAL ENGINEER LICENSED IN THE JURISDICTION WHERE THE

PROJECT IS LOCATED TO DETERMINE ALL CONSTRUCTION PHASE REQUIREMENTS. CONTRACTOR

SHALL SUBMIT DRAWINGS , SIGNED AND SEALED BY HIS ENGINEER, TO THE OWNER AND

ENGINEER FOR CONCEPT REVIEW AND RECORD PURPOSES. CONTRACTOR SHALL BE SOLELY

RESPONSIBLE FOR THE PROTECTION, STABILITY, ETC., OF EXISTING AND NEW STRUCTURES DURING

EXECUTION OF THE WORK.

5. BEFORE UNDERTAKING ANY DEMOLITION WORK, ASCERTAIN THE EXISTING CONDITIONS OF THE

PROPERTIES AND STRUCTURE IN CLOSE PROXIMITY.

6.CONTRACTOR SHALL PERFORM ALL WORK IN SUCH A MANNER AS TO PROTECT EXISTING AND

ADJACENT STRUCTURES AND BE RESPONSIBLE TO PROPERLY REPAIR ANY DAMAGE THAT

OCCURS AS A RESULT OF HIS WORK. CONTRACTOR SHALL REPAIR ALL DAMAGES TO

STREETS, SIDEWALK, UTILITY LINES, OR ANY OTHER PUBLIC OR PRIVATE PROPERTIES RESULTING

FROM THE EXECUTION OF THE WORK AT NO COST TO THE OWNER OR ENGINEER.

7. CEASE OPERATIONS AND NOTIFY OWNER AND ENGINEER IMMEDIATELY IF SAFETY OR INTEGRITY

OF STRUCTURE APPEAR TO BE ENDANGERED. PROPERLY BRACE AND SUPPORT STRUCTURE

BEFORE RESUMING OPERATIONS.

8. NOTIFY OWNER AND ENGINEER IMMEDIATELY IF ANY PORTION OF EXISTING STRUCTURE WHICH IS

NOT TO BE DEMOLISHED IS DAMAGED. CONTRACTOR SHALL PAY FOR ALL REPAIR COSTS, INCLUDING

DESIGN AND INSPECTION EXPENSES.

9. DO NOT CUT OR ALTER ANY STRUCTURAL MEMBERS WITHOUT WRITTEN AUTHORIZATION OF THE

ENGINEER UNLESS INDICATED ON THE STRUCTURAL DRAWINGS.

10. DO NOT ALLOW RESULTING DEBRIS TO ACCUMULATE. DISPOSE OF THE MATERIAL IN A LEGAL

MANNER.

CONCRETE CONSTRUCTION

1. ALL CONCRETE CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST BUILDING CODES

REQUIREMENTS FOR REINFORCED CONCRETE ACI 318 AND ACI DETAIL MANUAL, EXCEPT THAT

CONSTRUCTION AND REMOVAL OF FORMS AND RESHORING SHALL BE INSPECTED BY THE

CONTRACTOR'S ENGINEER.

2. REINFORCING STEEL SHALL HAVE THE FOLLOWING MINIMUM COVERAGE. PLACE BARS AS NEAR TO

THE CONCRETE SUFACE AS THE MINIMUM PERMITTED WHEREVER POSSIBLE, UNLESS NOTED

OTHERWISE:

2.1. CONCRETE POURED AGAINST EARTH 3"

2.2. FORMED CONCRETE IN CONTACT WITH EARTH 2"

2.3. EXTERIOR FACE OF WALLS 2"

2.4. ALL OTHER WALL FACES AND SLABS 3/4"

2.5. BEAMS AND COLUMNS 1 1/2" (2" FOR EXTERIOR)

3. WELDED WIRE REINFORCEMENT FOR SLABS ON GROUND SHALL HAVE A MINIMUM COVERAGE OF 1"

AND MAXIMUM TOP COVERAGE OF 1 1/2", UNLESS OTHERWISE NOTED. REINFORCEMENT SHALL BE

POSITIVELY SUPPORTED AND MAINTAINED IN THIS POSITION DURING PLACEMENT OF CONCRETE.

4. FURNISH BAR SUPPORTS WHERE NECESSARY DURING CONSTRUCTION.

5. PROVIDE PLASTIC-COATED (NOT PLASTIC-TIPPED) OR STAINLESS STEEL CHAIRS IN ALL CONCRETE

EXPOSED TO VIEW IN COMPLETED STRUCTURE.

6. PROVIDE PIPE SLEEVES AND INSERTS IN CONCRETE WORK WHERE REQUIRED. SEE

ARCHITECTURAL AND MECHANICAL DRAWINGS.

7. UNLESS NOTED OTHERWISE, PROVIDE THE FOLLOWING MINIMUM REINFORCING:

7.1. SLAB ON GROUND, SLAB ON DECK, AND TOPPINGS (2" MINIMUM): 6 X 6-W1.4 X W1.4

WELDED WIRE REINFORCEMENT IN FLAT SHEETS.

8. CONSTRUCTION JOINTS SHALL BE POSITIONED SO AS NOT TO CHANGE THE STRUCTURAL DESIGN

REQUIREMENTS. FRAMED FLOORS AND ROOFS SHALL HAVE CONSTRUCTION JOINTS SO THAT THE

RATIO OF LENGTH TO WIDTH OF A SINGLE POUR SHALL NOT EXCEED 2. THE LOCATION AND SIZE OF

ALL CONSTRUCTION JOINTS SHALL BE APPROVED BY THE ENGINEER. SUBMIT PROPOSED POUR

LAYOUT FOR ENGINEER'S REVIEW AND APPROVAL TWO WEEKS PRIOR TO PLACING CONCRETE.

9. WELDING REBARS SHALL COMPLY WITH ASTM A706 (FY=60 KSI) AND WELDING SHALL CONFORM TO

AWS D1.4. WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS.

10. PROVIDE HORIZONTAL KEYWAYS IN CONSTRUCTION JOINTS IN SUPPORTED SLABS AND WALL

FOOTINGS; MINIMUM 1 1/2" DEPTH WITH HEIGHT EQUAL TO ONE-THIRD OF MEMBER DEPTH, UNLESS

OTHERWISE SHOWN OR NOTED.

11. ALL EXPOSED CORNERS OF COLUMNS, WALLS, AND STEEL MEMBERS ENCASED IN CONCRETE ARE

TO BE CHAMFERED 45°. MINIMUM CHAMFER TO BE 1/2".

12. SLAB THICKNESS INDICATED OVER STEEL FORM DECK INCLUDES FORM DEPTH. PROVIDE FORM

DECK CONTINUOUS OVER AT LEAST THREE SUPPORTS AND WELD TO EACH SUPPORT AT MINIMUM 12"

INTERVALS. USE DECKING THAT WILL SAFELY SUPPORT ALL CONSTRUCTION LOADS, INCLUDING WET

WEIGHT OF CONCRETE. LIMIT DEFLECTION OF DECKING TO 1/240 OF SPAN WHEN LOADED WITH WET

WEIGHT OF CONCRETE AND CONSTRUCTION LOADS

13. BEND ALL HORIZONTAL WALL AND FOOTING BARS 1'-0" AROUND CORNERS OR PROVIDE CORNER

BARS WITH 2'-0" LAP.

14. KEY AND DOWEL ALL AREAWAYS AND OTHER PROJECTING ELEMENTS TO SUPPORTING WALLS

WITH #4 @ 12" ON CENTER EXTENDING 1'-0" INTO SUPPORTING WALLS UNLESS NOTED

15. PROVIDE FOUNDATION DOWELS FOR ALL WALLS, PIERS, AND COLUMNS SAME SIZE AND SPACING

AS VERTICAL STEEL.

16. ALL BARS INTERRUPTED BY STRUCTURAL STEEL SHALL EXTEND TO WITHIN 1" OF STRUCTURAL

STEEL FLANGE OR WEB AND HAVE A 90° HOOK UNLESS OTHERWISE SHOWN.

17. DRAWINGS SHOW TYPICAL REINFORCING CONDITIONS. CONTRACTOR SHALL PREPARE DETAILED

PLACEMENT DRAWINGS OF ALL CONDITIONS SHOWING QUANTITY, SPACING, SIZES, CLEARANCES, LAPS, INTERSECTIONS, AND COVERAGE REQUIRED BY THE STRUCTURAL DETAILS, APPLICABLE CODE, AND TRADE STANDARDS. CONTRACTOR SHALL NOTIFY REINFORCING INSPECTOR OF ANY

ADJUSTMENTS FROM TYPICAL CONDITIONS WHICH ARE PROPOSED IN PLACEMENT DRAWINGS TO

FACILITATE FIELD PLACEMENT OR REINFORCING STEEL AND CONCRETE.

18. BAR BENDS ARE TO BE MADE COLD. BARS SHALL NOT BE BENT AFTER ANY PORTION OF THE BAR

IS ENCASED IN CONCRETE.

19. SPLICES (GRADE 60 DEFORMED BARS):

19.1. LAP ALL COMPRESSION SPLICES 30 BAR DIAMETERS OF THE LARGER BAR.

19.2. LAP ALL TENSION SPLICES IN ACCORDANCE WITH THE FOLLOWING TABLES. PROVIDE

CLASS B TENSION LAP SPLICES UNLESS OTHERWISE NOTES.

19.3. INCREASE TENSION OR COMPRESSION SPLICE LENGTHS BY THE FOLLOWING FACTORS.

INCREASES ARE CUMULATIVE:

19.3.1. EPOXY-COATED TOP BARS 1.3

19.3.2. EPOXY-COATED OTHER BARS 1.5

19.3.3. LIGHTWEIGHT CONCRETE 1.3

19.4. TOP BARS ARE DEFINED AS HORIZONTAL BARS WITH MORE THAN 12" OF FRESH

CONCRETE BELOW.

19.5. MECHANICAL SPLICES SHALL DEVELOP 125% OF THEIR YIELD STRENGTH OF THE BAR AND

ARE REQUIRED FOR TENSION TIE MEMBERS. MECHANICAL SPLICES IN ADJACENT BARS

SHALL BE STAGGERED AT LEAST 30".

CLASS B TENSION LAP SPLICE

BAR F'C=3000PSI F'C=4000PSI F'C=5000PSI

SIZE TOP OTHER TOP OTHER TOP OTHER

#3 28" 22" 24" 19" 22" 17"

#4 37" 29" 33" 25" 29" 23"

#5 47" 36" 41" 31" 36" 28"

#6 56" 43" 49" 37" 43" 34"

#7 81" 63" 71" 54" 63" 49"

#8 93" 72" 81" 62" 72" 56"

#9 105" 81" 91" 70" 81" 63"

#10 118" 91" 102" 79" 92" 70"

CLASS A DEVELOPMENT…