This document package includes a statement of work and federal contract opportunity notice for a linear accelerator site preparation project. Key details include:
-
The statement of work is for replacing condenser water piping from the chiller plant to cooling towers on the roof of Building 4 at the VA Brooklyn Medical Center. Work includes replacing valves, installing electrical heat tracing and a centrifugal separator/cleaner package, as well as support piers for piping located on the roof.
-
The pre-solicitation federal contract opportunity is for design and site preparation work associated with project number 630A4-CSI-426 at the Brooklyn VA Medical Center. The scope involves design of a linear accelerator vault and associated shielding. Documents provided include shielding calculations and drawings.
-
The period of performance for the statement of work is 260 days from notice to proceed. Off-hours and weekend work may be required.
-
Safety, environmental, and infection control requirements are outlined for work at the VA medical center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specifications VOLUME 1.pdf | ||
| Specifications VOLUME 2.pdf | ||
| Halcyon DDR.pdf | ||
| S02 VA ID PACKAGE UPDATED 01-16-2019.pdf | ||
| S02 ADDITIONAL INSERTS.pdf | ||
| S02 BID SHEET.docx | DOCX document | |
| S01 DRAWINGS.pdf | ||
| S02 ALL POSTERS.pdf | ||
| S02 Participation Goals for Minorities and Females.pdf | ||
| 36C24221B0032.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN ONCOLOGY LINAC SITE PREP 100% CD SUBMITTAL - BOD NARRATIVE
PROJECT NO. 630A4-CSI-426 16 FEBRUARY 2021
THINKFORM DESIGN ARCHITECT LLC LINAC DESIGN INFORMATION A4.0 - 1
A4.0 LINAC Design Information
1. Preliminary Drawing for Varian Halcyon
2. Halcyon / Ethos Shielding Details
THINKFORM DESIGN ARCHITECT LLC LINAC DESIGN INFORMATION A4.0 - 2
A4.1 Preliminary Drawing for Varian Halcyon
REL I M I NARY---
PRELIMINARY DRAWING FOR
VETERANS ADMINSTARTION
MEDICAL CENTER
BROOKLYN, NY
December 14, 2017 var1an
THINKFORM DESIGN ARCHITECT LLC LINAC DESIGN INFORMATION A4.0 - 3
A4.2 Halcyon / Ethos Shielding Details
SD-AL-SHIELDING-D MAY 2020
PPG - SUPPORT INFORMATION
Halcyon/Ethos Shielding
Language of Origin The origin of this publication is of English-language, the English version should always be considered the master.
Conventions Dimensions and Tolerances Units are shown as SI units first in the format – Metric [Imperial] - cm [inches], unless otherwise noted. Tolerances are given where critical, otherwise general tolerances from ISO 4463-1: 1989 should be used. All dimensions are from finished surfaces.
All listed component weights are within a ±5% tolerance, not including system cabling or coolant.
Digital Drawing Files AutoCAD DWG files may be available for layouts within this document, contact your Varian Regional Planner for more information.
Varian Medical Systems https://www.varian.com
Regional Planning Groups Americas:
Email: planning.ams@varian.com Asia Pacific, Australia and China:
Email: planning.apac@varian.com Europe, Middle East, India and Africa:
Email: planning.emea@varian.com
Limitation of Liability The information in this document is provided in good faith to promote best practice. It is the responsibility of the end user to ensure that any content used is fit for the purpose intended. Information in this document is subject to change without notice and does not represent a commitment on the part of Varian. Varian is not liable for errors contained in this document or for incidental or consequential damages in connection with the furnishing or use of this material. This document contains proprietary information protected by copyright. No part of this document may be reproduced, translated, or transmitted without the express written permission of Varian Medical Systems, Inc.
Trademarks Halcyon®, TrueBeam® and VitalBeam™ are trademarks or registered trademarks of Varian Medical Systems, Inc. these and/or other Varian Medical Systems Inc.’s products referenced herein are either trademarks or registered trademarks of Varian Medical Systems in the U.S. and/or other countries. The names of other companies and products mentioned herein may be the trademarks of their respective owners. Any rights not expressly granted herein are reserved.
© 2020 Varian Medical Systems, Inc.
All rights reserved.
https://www.varian.com/ mailto:planning.ams@varian.com mailto:planning.apac@varian.com
2 of 5 SD-AL-SHIELDING-D
TREATMENT ROOM SHEILDING REQUIREMENTS
WARNING
Varian Medical Systems shall have no approval or other responsibility for any matter affecting or related to the adequacy of the radiation protection walls and barriers or related safety devices. All radiation shielding designs must meet codes and regulations of all Authorities Having Jurisdiction (AHJ) and must be approved by the Customer’s or Facility’s Physicist of Record and shall be the sole responsibility of the Customer/Facility. The hours of operation, patient workload, accelerator energy, and the shielding materials should all be taken into consideration when calculating shielding requirements. Severe injury or death can result from improper radiation shielding.
WARNING
A qualified physicist needs to be available to complete a preliminary radiation survey per Varian Rad safety instruction L9330 (includes links to L9330A form for AMS & to L9205 & L9206 for APAC & EMEA). The survey needs to take place at initial beam on, approximately 5 days after the accelerator is rigged in and installation started. Failure to perform this survey or unsatisfactory results will stop the installation. The radiation survey form will be provided by the Varian Project Manager and/or the Varian Installation Team.
The Halcyon and Ethos systems only produce a 6 MV FFF beam. Due to the transmission factor of the integrated beam-block being equivalent to the head leakage value, a primary shielding wall is not required for the room. Therefore, secondary shielding walls will typically satisfy radiation shielding requirements.
Refer to the following documents for additional information:
• Halcyon and Ethos Radiotherapy System IEC Accompanying Documents Type Tests and Procedures
• Ethos Product Spec Sheet RAD10674
• Halcyon Product Spec Sheet RAD10506
For documentation contact your Varian Sales District Manager or Varian Regional Planner documents, or go to www.MyVarian.com.
Magnetic Field Shielding Considerations
• Consideration should be taken when locating linear accelerator equipment in the proximity of Magnetic Resonance Imaging (MRI) units or other magnetic field generating equipment.
• The Halcyon Accelerator and associated video monitors should be located outside of the 100 μT (1 Gauss) magnetic field.
http://www.myvarian.com/
3 of 5 SD-AL-SHIELDING-D
Radiation Shielding Details
• Treatment room shielding is required for the protection of therapists and others while the Halcyon/Ethos accelerator has the beam on. Accelerator shielding is provided by either poured-in-place concrete, lead/steel plates, or a combination.
• The amount and type of shielding on treatment room entrance doors have varying requirements based on the presence and length of the maze, and the energy of the Accelerator. The exact composition of the door shielding must be designed and approved by the Physicist of Record.
Typically, shielded doors must be “exempted” where fire code labeling is required.
• Most treatment rooms are entered through a maze. This hallway is designed to reduce radiation levels at the entrance door. The length of the maze and the occupancy outside the entrance door affects the amount of shielding required in the door. “No-maze” doors are available from several shielding manufacturers. The use of these doors must be reviewed by the Physicist of Record early in the design process.
• To reduce radiation exposure outside room, air handling ducts should enter/exit the room through penetration(s) above the maze door. The ducts should be placed as high as possible in order to minimize radiation exposure to occupied space. The ducts should be designed to minimize the area of penetration through the wall. In most cases, duct shielding will not be required. Clear space should be left around the duct (outside the treatment room) for shielding retrofit, in case the post installation radiation survey indicates a requirement. Penetration, including ducts, directly into the treatment room should be avoided. For no-maze treatment rooms, duct design and shielding must be addressed by the Physicist of Record.
• Provide adequate radiation shielding (usually lead or steel with a 25 mm [1"] margin) behind all junction and pull boxes recessed in concrete walls. Verify thickness and location with the Physicist of Record. Steel or lead shielding at Accelerator rooms may be embedded in or mounted on the inside surface of concrete walls and ceiling. Additional structural reinforcement may be required.
• Except where specifically noted, radiation leakage in non-controlled areas shall not exceed 20 µSv/week (2 mrem/week), assuming 100% occupancy beyond the shielding barriers (per NCRP Report 91 “Recommendations of Limits for Exposure to Ionizing Radiation”).
• Supplement No. 11 (1972) and Supplement No. 17 (1983) of the “British Journal of Radiology” describes two different conventions for referencing the quality of an x-ray radiotherapy beam. The convention presented in Supplement No. 11 has been adopted for this sheet.
• The Physicist of Record for the project should become involved with the treatment room design as early as possible. Regarding facility shielding, the Physicist of Record is responsible for designing the treatment room radiation shield barriers and confirming they meet applicable regulatory requirements.
The facility design is based on regulatory requirements of the regulatory body tasked with oversight of Radiation Producing Devices in the Region, and recommendations of the National Council of Radiation Protection and Measurement (NCRP).
4 of 5 SD-AL-SHIELDING-D
Integrated Beam-Block Details
• Composition of Beam-Block – 172mm of 3% Antimony Lead inside a 10mm steel case
Figure 1-1 Beam-Block Plan View
5 of 5 SD-AL-SHIELDING-D
Figure 1-2 Beam-Block Front View
THINKFORM DESIGN ARCHITECT LLC LINAC SHIELDING REPORT A5.0 - 1
A5.0 LINAC Shielding Report
Astarita Associates, Inc.
MEDICAL PHYSICS CONSULTANTS
414 Route 11, 1 S mithtown. NY 11 787
Phone (631) 265-2950
Fax (631) 265-2962
12/7/2020
THINKFORM Design Architects, LLC
38 E Broad Street
Hopewell, NJ 08525 tim@thinkformarchitects.com
Att. Tim Bleck
RE: Shielding Calculations for:
Halcyon Vault
Brooklyn VA Medical Center
800 Poly Place
Brooklyn, NY 11209
Dear Mr. Bleck:
Enclosed are shielding calculations for the Varian Halcyon 6MV Linear Accelerator located at the above referenced facility. The following pages describe the shielding design in detail using the principles found in NCRP Report No. 151, Shielding Techniques for Radiation Oncology
Facilities, by Patton H. McGinley, the Varian site planning guide, and supplied diagrams.
Page 2 of this report describes the assumptions used for the calculations. These are based upon information provided including structural drawings, estimated workloads, and unit specifications.
Please ensure all assumptions are reviewed by the medical physics/clinical staff for accuracy and notify our office immediately should any changes occur.
Page 3 of this report describes the shielding plan in detail. Please reference the "Install" column for shielding required as well as any noted comments. Wall shielding should be installed to the shielded ceiling above. The shielding needed is based upon noted material densities. Should the building material change, please contact our office immediately to ensure shielding adequacy.
A summary of our analysis is as follows:
1. Add 3" of lead (Pb.) to the maze endcap from floor to vault ceiling as shown on diagram.
2. Add 3" of lead (Pb.) to wall 6 from floor to vault ceiling as shown on diagram.
3. Ensure the existing 4" Pb. installed on the remaining maze wall is not removed.
4. Ensure the vault door has a minimum of 1/4" Pb. shielding installed.
Please do not hesitate to contact our office should you need additional information.
mailto:tim@thinkformarchitects.com
I I
December 7, 2020
Halcyon Vault shielding calculations for: Brooklyn VA Medical Center
Unit: Varian Halcyon 6MV
Assumptions
Head Leakage (of W@1m)
Xray
0.0005
Neutron mSv/G 1m
0.000% of 6.00 MVworkload
Workload (W)
Energy
(MV)
Dose cGv/ot Workload (ots/dav) (days/wk)
IMRT
IMRT
Factor
Primary cGv/wk
Leakage cGv/wk
Weekly 6 400 30 5 100% 8 60,000 240
Maximum Exposure in any 1 hour
Primary
Leakage
NCRP Occupancy Factors
Fully occupied areas: 1
Exam/treatment rooms 0.5
Corridors, patient rooms, lounges, staff rest room 0.2
Corridor doors 0.125
Public toilets, storage rooms, waiting rooms, patient holding 0.05
Outdoor areas w/ transient acc., attics, stairs, elevators, ianitor closets 0.025
Radiation Protection Criteria Used
(MV)
Dose cGy/pt
Workload pts/hr
IMRT
IMRT
Factor
Max in any 1 hr
N/A N/A N/A N/A N/A O cGy
6 2400 1 100% 8 10 cGy
Area Limit
Restricted 10mR/wk
Unrestricted 2mR/wk
2mR in anv 1 hr
Wall # Area Ditti D/ml u P,l .S:cGylwk P.L.S:
T R/NR Enerav P/US/N N:cSv/wk N; mRe in an 1hr
::J I max mR Des ired mR/wk
Total
TV L 's
Current TVL's Needed
TV L 's Needed Lead
Reauired Existing to install 11.35o/cm3
Needed Inst all (In.)
Concrete Lead
300lbs/ft3 11.35a/cm3 Comments
3 Corridor 13 3.96 1.00 0.200
NR
6 L 3.06 3057.21 2.0 3.18 4.18 -1.00 -1.8 -5.4
Include 3"Pb on the maze wall e11d c a p
D oor (thro u gh 18 5.49 1.00 0.125
Above 18 0.025
Above (old 12 3.66 1.00 0.025
NR 0
Above (old 12 3.66 1.00 0.025
NR 0
Above (old
#13)
7.32
7.32
1.00
1.00
1.000
NR 6
L
L
4.48 4484.96 2.0
179.40
3.35
1.95
3.40
3.40
-0.05
-1.45
-0.1
-2.6
-0.3
-7.8
Leakaae Enerav IMVI
Brooklyn VA Medical Center: Varian Halcyon 6MV Linear Accelerator
TVL' s (inches)
Concrete 147Ibs/ft3l
Concrete 300Ibs/ft3I
Lead 11.35g/cm3l
Steel 8.05g/cm3l
Wa·ll- C-a- lcu-lations
1 Entrv Area 17 5.18 1.00 0.200 R 6 L 1.79 1787.78 5.0 2.55 3.09 -0.54 -1.0 -2.9 0
2 Ramo 14 4.27 1.00 0.200 R 6 L 2.64 2636.06 5.0 2.72 3.00 -0.28 -0.5 -1.5 0
2a Control 21 6.40 1.00 1.000 R 6 L 5.86 5857.91 6.0 2.99 3.00 -0.01 0.0 -0.1 0 Located beyond ramp
13 3.96 1.00 1 6 L 611.44 2.49 4.18 -1.69 -3.1 -9.2
4 Physics Room 12 3.66 1.00 1.000
NR 6 L 17.94 17939.85
2.0 3.95 3.95 0.00 0.0 0.0 0 12 3.66 1.00 1 6 L 717.59 2.55 3.95 -1.40 -2.5 -7.5
Corridor 22 6.71 1.00 0.200
NR
L
1.07
1067.50
2.0
2.73
4.70
-1.97
-3.6
-10.7
22 6.71 1 6 L 213.50 2.03 4.70 -2.67 -4.8 -14.4
6 Corridor 22 6.71 1.00 0.200
NR 6 L 1.07 1067.50
2.0 2.73 1.80 0.93 1.7 5.0 3" 22 6.71 1.00 1 6 L 213.50 2.03 1.80 0.23 0.4 1.2 maze) 18 5.49 1.00 1 NR
L 318.93 2.20 4.30 -2.10 -3.8 -11.3 /see below)
8 (previous 5.49 1.00 NR 6 L 0.20 199.33 2.0 2.00 6.90 -4.90 -8.8 -26.5 0 nrimaN\ 18 5.49 1 6 L 318.93 2.20 6.90 -4.70 -8.5 -25.4
#12) 12 3.66 1.00 1 6 L 717.59 2.55 2.64 -0.09 -0.2 N/A
#13) 12 3.66 1.00 1 6 L 717.59 2.55 3.30 -0.75 -1.3 -4.0
Door Calculations
We c Gy/wk w, cSv /wk
WP
cGy/wk
T
Maze Wall
" concrete
TVL
lso-Door
D(m)
D;so,.wall d, (m)sc-leak
D '!ic-d oo r d2(m)s c-leak
Neutron
TVD (m)
D i&0-<ieiu 1mau d1 ( m) neutron
D d o wnmaze d2(m)neurton
Pt. Scatter fa ctor (a)
IMRTField
F (cm w-. An,a"""'-
A1(m
0.5MV
Pt. Scatter a
Leakage a total mR/wk
Pb scatter
TVL (in)
Inst all
Inches Pb
6 188 0 60000 0.125 47.3 11 5.500 3.3 5.4 NIA NIA N/A 0.00139 225 22.50 0.022 0.010 18.52 0.31 1/4 10 0 0 0 0 0 11 1.000 1 1 1 1 1 0.00135 225 8.36 0.022 0010 0.31
D• distance T- occupancy factor
U - use factor R • restricted area
NR -unrestricted L . leakage S - 30° scatter off primary TVL - tenth value layer
P - primary beam N - neutron W - workload (P,L,S,N)
0 0 0 6
3.2
1.8
5.4
6 L 1.00 996.66 5.0 2.30 4.30 -2.00 -3.6 -10.8 1/4"Pb
6 L 0.45 448.50 2.0 2.35 2.64 -0.29 -0.5 -1.6
6 L 0.45 448.50 2.0 2.35 3.30 -0.95 -1.7 -5.1
II :::::::i? ILJI
3 " Pb to be installed on wall and maze endcap
Keep existing 4" Pb on remaining maze wall
Ensure 1/4" Pb