S01 12FPC322Q0006 Attachment 2 Plans 5077-404-PerryTWP-Area 4-EWP-DWG-Final-approved 8-9-21.pdf

PDF 16 MB Posted

Attached to
EWP Debris Removal Perry Township, Montgomery County, Ohio.
Solicitation number
12FPC322Q0006
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS © 2021 TomTom t Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS © 2021 TomTom

W L

W

L

W

L

W

L

W /L

W

L

W L

N a t u r a l

R e s o u r c e s

C o n s e r v a t i o n

S e r v i c e

U n i t e d

S t a t e s

D e p a r t m e n t o f

A g r i c u l t u r e

PHONE

NO.

NO

REPLY

OHIO811

MEMBER &

LIMITED

BASIS

PARTICIPANT

UTILITY INFORMATION 1/

UNDERGROUND UTILITIES AT EXCAVATION SITE

ADDRESS

OHIO811 I.D.#

NAME

1/ IF NO UTILITIES ARE IDENTIFIED IN THE AREA, CHECK THIS BOX.

Landowners or operators, sponsoring organizations, and contractors are liable for any damage resulting from disruption of a utility service caused by construction activities. NRCS makes no representation on the existence or non-existence of utilities on this site.

Excavator must notify all utilities at least 48 hours, and not more than 10 days, prior to the planned commencement of excavation.

Call OHIO811 (800-362-2764 or 811) for a listing of OUPS and

OGPUPS members and limited basis participant members.

NOTICE TO LANDOWNER AND EXCAVATOR

Project Location

Site of Work

S

W

O

L

F

C

R

E

E

K

P

I

K

E

BROOKVILLE WASTE WATER

TREATMENT PLANT

B

R

O

O

K

M

O

D

I V

E

W O

O D

F I E

I V

E

DOYLE DRIVE

SCALE IN FEET

300' 0 300'

600'

LOCATION MAP

NOT TO SCALE

LOCATION MAP

Project Location

PROPOSED

INGRESS/EGRESS

Yes

A030102407

VECTREN

1335 E Dayton Yellow Springs Rd., Fairborn OH 45324

1-800-227-1376

G . W el ls

K.

L ew is 7/

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text W/L

AutoCAD SHX Text Stream Centerline

AutoCAD SHX Text Clearing Limits

AutoCAD SHX Text Work Limits

AutoCAD SHX Text Temporary Stream Crossing

AutoCAD SHX Text Cover Sheet

AutoCAD SHX Text Designed

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Drawn

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text Sheet 1 of 3

AutoCAD SHX Text File No.

AutoCAD SHX Text 5-2020

AutoCAD SHX Text 5-2020

AutoCAD SHX Text John Bleill/Jeremy Huggler

AutoCAD SHX Text

OH-1-86-2018

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text John Bleill

AutoCAD SHX Text

SHEET INDEX

AutoCAD SHX Text Sheet No.

AutoCAD SHX Text

TITLE

AutoCAD SHX Text

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

AutoCAD SHX Text

OVERALL PLAN VIEW

AutoCAD SHX Text **SPECIAL NOTE** IF POTENTIAL CULTURAL RESOURCE ITEMS ARE DISCOVERED DURING CONSTRUCTION, IMMEDIATELY STOP WORK AND NOTIFY THE NRCS CULTURAL RESOURCES COORDINATOR- BRYAN LEE 614-255-2487

AutoCAD SHX Text **SPECIAL NOTE** THE CONTRACTOR IS RESPONSIBLE TO USE ALL APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE LIKELIHOOD OF SITE EROSION AND OFFSITE SEDIMENT TRANSPORT. WHEN FINAL SITE STABILIZATION CANNOT BE COMPLETED WITHIN 14 DAYS OF COMMENCEMENT OF CONSTRUCTION, AN OHIO EPA NPDES PERMIT MAY BE REQUIRED (CONTRACTOR IS RESPONSIBLE FOR OBTAINING THIS PERMIT IF REQUIRED).

AutoCAD SHX Text

PERRY TOWNSHIP - EWP PROJECT

AutoCAD SHX Text Perry Township

AutoCAD SHX Text Montgomery County, Ohio

AutoCAD SHX Text

JOB CLASS: V

AutoCAD SHX Text

AutoCAD SHX Text

STAGING AREA AND TEMPORARY CROSSING PLAN VIEW

© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS © 2021 TomTom t Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS © 2021 TomTom

W L

W

L

W

L

W

L

W

L

W

L

W

L

W

L

W/L

W

L

W

L

W

L

N a t u r a l

R e s o u r c e s

C o n s e r v a t i o n

S e r v i c e

U n i t e d

S t a t e s

D e p a r t m e n t o f

A g r i c u l t u r e

SCALE IN FEET

200' 0 200'

400'

PLANVIEW

PROJECT AREA ENDS

2209 FEET DOWNSTREAM OF

BROOKVILLE CITY LIMITS /

PERRY TOWNSHIP LINE

PROJECT AREA BEGINS AT

BROOKVILLE CITY LIMITS/

PERRY TOWNSHIP LINE

AND EXTENDS 2209 FEET

DOWNSTREAM

BROOKVILLE CITY LIMITS

/PERRY TOWNSHIP LINE

APPROXIMATE

CREEK CENTERLINE

REMOVE ALL FALLEN TREES,LOGJAMS,

WOODY DEBRIS AND TRASH

WITHIN THE 100 FOOT CLEARING LIMIT.

SEE CONSTRUCTION SPECIFICATIONS

WOODFIELD DRIVE

DOYLE DRIVE

STAGING AND DISPOSAL AREA

39,225 SQ. FT.

SEE SHEET 3 FOR MORE DETAILS

K E

E N

S

W

F

C

E

K

P

I

K

E

WORK AND CLEARING LIMITS

The EWP project will extend along the channel from the Brookville City Limit /

Perry Township Line to a point 2209' downstream. The clearing limits shall extend 50' out in each direction from the centerline of the channel. The work limits shall extend an additional 20' past the clearing limits and include the ingress/egress and staging areas, unless noted otherwise on the drawings.

SOUTH SIDE OF EXISTING BRIDGE

INGRESS/EGRESS

NOTE: SOUTH WOLF CREEK STREET SWITCHES TO

SOUTH WOLF CREEK PIKE AT THE CITY LIMITS OF

BROOKVILLE.

PROJECT AREA ENDS

TO BE STAKED

PROJECT AREA ENDS

TO BE STAKED

WORK LIMITS

70' FROM CREEK CENTERLINE

WORK LIMITS

70' FROM CREEK CENTERLINE

WORK LIMITS

70' FROM CREEK CENTERLINE

CLEARING LIMITS

50' FROM CREEK CENTERLINE

CLEARING LIMITS

50' FROM CREEK CENTERLINE

TEMPORARY STREAM CROSSING

SEE CONSTRUCTION SPECIFICATIONS

WORK LIMITS

WORK LIMITS

12' WIDTH

THE USE OF THIS BRIDGE IS CONTINGENT SOLELY

ON THE OWNER OF THE BRIDGE GIVING WRITTEN

PERMISSION. SEE CONSTRUCTION SPECIFICATIONS

12' WIDTH

G . W el ls

K.

L ew is 7/

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text W/L

AutoCAD SHX Text Stream Centerline

AutoCAD SHX Text Clearing Limits

AutoCAD SHX Text Work Limits

AutoCAD SHX Text Temporary Stream Crossing

AutoCAD SHX Text Designed

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Drawn

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text Sheet 2 of 3

AutoCAD SHX Text File No.

AutoCAD SHX Text 5-2020

AutoCAD SHX Text John Bleill

AutoCAD SHX Text 5-2020

AutoCAD SHX Text John Bleill/Jeremy Huggler

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

OH-1-86-2018

AutoCAD SHX Text

PERRY TOWNSHIP - EWP PROJECT

AutoCAD SHX Text Perry Township

AutoCAD SHX Text Montgomery County, Ohio

AutoCAD SHX Text Overall Planview

G . W el ls

/ K . L ew is

7/

Sheets and Views
20210108 final perry twp ewp-1-CoverSheet
20210108 final perry twp ewp-2-PlanView
20210716 final perry twp ewp.pdf
Sheets and Views
20210716 final perry twp ewp-1-CoverSheet
20210716 final perry twp ewp-2-PlanView
20210716 final perry twp ewp-3-CloseUp
2021-08-09T08:29:32-0400
GREGORY WELLS
2021-08-09T08:31:03-0400
GREGORY WELLS
2021-08-09T08:42:07-0400
GREGORY WELLS

File details come from the government source that posted it. Updated .