S000000382 Technical Advisory Committee~2.pdf
PDF 288 KB Posted
- Attached to
- Technical Advisory Committee
- Solicitation number
- S000000382
- Issued by
- Arkansas
About this file
This is a Request for Proposal (RFP) issued by the Arkansas Department of Transformation and Shared Services Office of State Procurement on behalf of the Arkansas Department of Education for a Technical Advisory Committee. The RFP seeks a contractor to provide technical expertise and guidance related to public school student assessment and accountability issues. Proposals are due January 21, 2025 at 10:00 AM Central Time through the ARBuy eProcurement system. The anticipated contract start date is May 1, 2025 for an initial three-year term, with up to four additional one-year renewal options for a maximum potential contract term of seven years. The contractor will be required to organize three face-to-face meetings in Little Rock and up to four 2-3 hour virtual conference calls annually.
The contractor must demonstrate membership in at least three major national education organizations for a minimum of five years and have at least 10 years of experience managing state/consortium level Technical Advisory Committees, including 4 years supporting Arkansas specifically. Key deliverables include supporting research studies on the ATLAS K3 screener for literacy, preparing white papers (approximately two per year), and providing expertise on federal accountability requirements and assessment systems. The evaluation will be based on technical criteria (700 points) and cost (300 points). The technical scoring includes Experience (30%), Solution (20%), Risk (20%), and Interview (30%). Pricing must include all travel costs, meeting space, AV equipment, and participant meals for approximately 15 DESE staff/guests, 5 TAC members and the project manager.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract and Grant Disclosure~79.pdf | ||
| S000000382 Official Solicitation Price Sheet~1.xlsx | XLSX spreadsheet | |
| S000000382 Technical Proposal Packet.docx | DOCX document | |
| Services Contract SRV-1 Sample~7.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF ARKANSAS
DEPARTMENT OF TRANSFORMATION AND SHARED SERVICES
OFFICE OF STATE PROCUREMENT
501 Woodlane St., Ste. 220
Little Rock, Arkansas 72201-1023
REQUEST FOR PROPOSAL
SOLICITATION DOCUMENT
SOLICITATION INFORMATION
Solicitation Number: S000000382 Solicitation Issued: December 19, 2024
Description: Technical Advisory Committee
Department: Arkansas Department of Education
SUBMISSION DEADLINE AND DELIVERY OF RESPONSE DOCUMENTS
Proposal Opening Date: January 21, 2025 Proposal Opening Time: 10:00 AM, Central Time
Proposal submissions for this Request for Proposal must be submitted through ARBuy, the State’s eProcurement system. It can be accessed at arbuy.arkansas.gov. Proposals received after the submission deadline may be rejected as untimely.
LIVE PROPOSAL OPENING INFORMATION
Teams Meeting Link: Join the meeting now
Meeting ID: 297 043 748 873
Passcode: Gb7JA2Q8
Call in (audio only): 501.244.3310 or find a local number
TSS OFFICE OF STATE PROCUREMENT CONTACT INFORMATION
TSS OSP Procurement Specialist:
Joshua Williams Procurement Specialist’s Direct Phone Number:
501-371-5701
Email Address: Joshua.williams@arkansas.gov TSS OSP’s Main Number: 501-324-9316
TSS OSP Website: transform.ar.gov/procurement/ https://arbuy.arkansas.gov/ https://teams.microsoft.com/l/meetup-join/19%3ameeting_NzExYWRhMTYtZjc5OC00NmIxLTk4NDEtZmExZmRhNDUzM2Yy%40thread.v2/0?context=%7b%22Tid%22%3a%225ec1d8f0-cb62-4000-b327-8e63b0547048%22%2c%22Oid%22%3a%2255e922e0-af81-440a-bcc5-85ef0c48b10c%22%7d https://dialin.teams.microsoft.com/6b6513dc-a034-48d2-8d06-7e711c4ecc0b?id=719036839 https://www.transform.ar.gov/procurement/
Rev 10/2024
SECTION 1 – GENERAL INFORMATION AND INSTRUCTIONS
1.1 INTRODUCTION
This Request for Proposal (RFP) is issued by the TSS Office of State Procurement (TSS OSP) for the Arkansas Department of Education (“ADE” or “Department”) to obtain pricing and a contract(s) for a Technical Advisory Committee.
Contract(s) will be awarded to the Prospective Contractor determined to have submitted the proposal that is the most advantageous to the State. Direct all questions, comments, or concerns regarding this solicitation to the TSS OSP, not the Department.
1.2 OBJECTIVE AND GOALS
The Department seeks to obtain proposals from vendors with experience in the facilitation and management of a Technical Advisory Committee (TAC) focused on providing guidance related to public school student assessment and accountability issues.
The goals for this project include:
1. Providing technical expertise: Leveraging the specialized knowledge of committee members to evaluate technical proposals, assess risks, and recommend optimal solutions based on current industry standards and practices.
2. Ensuring alignment with strategic goals: Aligning technical decisions with broader organizational objectives and strategic plans by offering insights on how technical advancements can contribute to achieving business goals.
3. Quality assurance and oversight: Reviewing technical aspects of projects to ensure quality standards are met, compliance with regulations is maintained, and potential technical issues are mitigated.
4. Supporting decision-making: Providing credible and objective advice to decision-makers regarding technical choices.
1.3 BACKGROUND AND CURRENT ENVIRONMENT
The Department of Education with the Division of Elementary and Secondary Education (DESE) has a newly established kindergarten through 10th grade (K-10) assessment system and is in the process of revamping the state and federal accountability systems.
The required state assessments include the following:
1. Arkansas Teaching Learning and Assessment System (ATLAS) exams in K-10:
a. English Language Arts (ELA), grades K-10.
b. Math, grades K-8.
c. Algebra 1, Biology, and Geometry End of Course.
d. Science, grades 3-8.
2. ACT in grade 11
3. Dynamic Learning Maps (DLM) as the alternative assessment for ELA, math, and science
4. English Language Proficiency Assessment for the 21st Century (ELPA21) and Alt ELPA for assessing English Language Proficiency.
The accountability system includes both federal and state accountability with a letter grade required in state legislation for all K-12 schools. The work of the technical advisory committee will influence decisions pertaining to the assessment and accountability systems.
1.4 TYPE OF CONTRACT
A. As a result of this RFP, TSS OSP intends to award a contract to a single Contractor.
B. The anticipated starting date for any resulting contract is May 1, 2025, except that the actual contract start date may be adjusted unilaterally by the State for up to three (3) calendar months. By submitting a signed proposal in response to the RFP, the Prospective Contractor represents and warrants that it will honor its proposal as being held open as irrevocable for this period.
C. The initial term of a resulting contract will be for three (3) years. Upon mutual agreement by the Contractor and Department, the contract may be renewed by TSS OSP for up to four (4) additional one-year terms or portions thereof, not to exceed a total aggregate contract term of seven (7) consecutive years.
1.5 DEFINITION OF TERMS
A. Unless otherwise defined herein, all terms defined in Arkansas Procurement Law have the same meaning herein.
B. “Prospective Contractor” means a responsible offeror who submits a proposal in response to this Solicitation.
C. The terms “Request for Proposal,” “RFP,” and “Solicitation” are used synonymously in this document.
D. “Requirement” means a term, condition, provision, deliverable, Specification, or a combination thereof, that is obligated under the Solicitation, resulting contract, or both.
E. “Responsive Proposal” means a proposal submitted in response to this Solicitation that conforms in all material respects to this RFP.
F. “Shall” and “must” mean the imperative and are used to identify Requirements.
G. “Specification” means any technical or purchase description or other description of the physical or functional characteristics, or of the nature, of a commodity or service. “Specification” may include a description of any Requirement for inspecting, testing, or preparing a commodity or service for delivery.
H. “State” means the State of Arkansas. When the term “State” is used herein to reference any obligation of the State under a contract that results from this Solicitation, that obligation is limited to the Department using such a contract.
1.6 SOLICITATION SCHEDULE
For informational purposes, TSS OSP is providing a Solicitation Schedule; however, dates listed and noted with an asterisk (*) are anticipated dates only and are subject to change at the discretion of the State. All times are listed in Central Time.
TABLE A: TENTATIVE SOLICITATION SCHEDULE
ACTIVITY DATE
RFP Release to Prospective Contractors December 19, 2024
Deadline for Prospective Contractor Questions December 31, 2024
Answers to Questions Posted to ARBuy* January 3, 2025
Proposal Due Date January 21, 2025 @ 10 am
Initial Proposal Evaluation* January 27, 2025
Interviews* February 3-6, 2025
Final Proposal Evaluation* February 6, 2025
Discussions Kick Off Meeting* February 10, 2025
Finalize Discussions* February 20, 2025
Post Anticipation to Award* February 24, 2025
Award Contract* May 1, 2025
1.7 CLARIFICATION OF SOLICITATION
A. Submit questions requesting clarification of information contained in this Solicitation via the
Solicitation posting in ARBuy by the date and time listed in Table A.
1. For each question submitted, Prospective Contractor should reference the specific Solicitation item number to which the question refers, as applicable.
2. Prospective Contractors’ written questions will be consolidated and responded to by the State as deemed appropriate. The State’s consolidated written response is anticipated to be posted to the Solicitation posting in ARBuy by the close of business on the date provided in Table A. If Prospective Contractor questions are unclear or non-substantive in nature, the State may request clarification of a question(s) or decline to answer.
B. The Prospective Contractor should notify the TSS OSP Procurement Specialist of any Requirements that precludes the Prospective Contractor from submitting a Responsive Proposal.
C. Prospective Contractors may contact the TSS OSP Procurement Specialist with non-substantive questions at any time prior to the proposal opening.
D. An oral statement by TSS OSP will not be part of any contract resulting from this Solicitation and may not reasonably be relied on by any Prospective Contractor as an aid to interpretation unless it is reduced to writing and expressly adopted by TSS OSP.
E. Only an addendum written and authorized by the State will modify the Solicitation.
1.8 RESPONSE DOCUMENTS
A. All proposal responses must be submitted through ARBuy, the State’s eProcurement system. The system can be accessed at arbuy.arkansas.gov.
1. Prospective Contractors must be registered in ARBuy to submit proposals responses.
B. Technical Proposal Packet
1. Prospective Contractors shall utilize the Technical Proposal Packet to submit their responses.
2. The following items are proposal Submission Requirements and must be submitted as part of a Prospective Contractor’s proposal response.
a. Signed Proposal Signature Page; signature may be ink or digital.
b. Technical Proposal response to the Information for Evaluation section included in the Technical Proposal Packet, which must be in the English language.
c. Completed Official Solicitation Price Sheet attached to the Solicitation in ARBuy.
i. Pricing must be proposed in U.S. dollars and cents.
ii. Quantities stated are estimates only and are not guaranteed. Prospective Contractor must submit unit price on the estimated quantity and unit of measure specified.
• The State may order more or less than the estimated quantity on term contracts, and the Contractor shall sell to the Department quantities ordered at no more than the submitted price.
iii. If pricing documents do not allow for accurate pricing, Prospective Contractor should notify the OSP Procurement Specialist at least seventy-two (72) hours before the proposal opening time.
iv. Prices must be firm offers and shall not be subject to escalation.
v. Discount from list pricing is not acceptable unless requested elsewhere in the Solicitation.
https://arbuy.arkansas.gov/
vi. State or local sales taxes should not be included in the price. Trade discounts should be deducted from the unit price and the net price should be shown in the pricing response.
d. Recommended Options Form
i. The Recommended Options form included in the Technical Proposal Packet allows Prospective Contractors to identify any recommended options or optional service ideas that may benefit the State that were not included in the Requirements and the proposed solution.
e. Copy of Prospective Contractor’s Equal Opportunity Policy
i. Pursuant to Arkansas Code Annotated § 19-11-104, OSP requires a Prospective Contractor bidding on a state contract to submit a copy of the Prospective Contractor’s Equal Opportunity (EO) Policy.
ii. Prospective Contractors not required by law to have an EO Policy must submit a written statement to that effect.
f. Proposed Subcontractors Form (see SRV-1, section 14)
3. The following items, which must be submitted prior to a contract award to the Prospective Contractor, may also be included with the Prospective Contractor’s proposal:
a. EO 98-04: Contract and Grant Disclosure Form (see SRV-1, section 11)
b. Voluntary Product Accessibility Template (VPAT), if applicable
4. Prospective Contractors should not include any other documents or ancillary information, such as a cover letter or promotional/marketing information.
C. Redacted copy of the Technical Proposal Packet
1. One (1) redacted (marked Redacted) copy of the Prospective Contractor’s proposal response (see Proprietary Information), if applicable.
D. Prospective Contractors should not alter language in Solicitation document(s) or Official Solicitation Price Sheet provided by the State.
E. Prospective Contractor’s proposals cannot be altered or amended after the proposal opening except as permitted by law or rule.
F. Prospective Contractors may submit multiple proposals.
https://transform.ar.gov/wp-content/uploads/Services-Contract-SRV-1-Fillable-Form-110824-1.pdf https://www.section508.gov/sell/vpat/
SECTION 2 – REQUIREMENTS
2.1 PROSPECTIVE CONTRACTOR MINIMUM QUALIFICATIONS
A. The Prospective Contractor shall be a current member in a minimum of three (3) of the following national groups:
1. Council of Chief State School Officers (CCSSO) which is a nonpartisan, nationwide, nonprofit organization of public officials who head departments of elementary and secondary education in the states, the District of Columbia, the Department of Defense Education Activity, the Bureau of Indian Education and the five U.S. extra-state jurisdictions.
2. The National Council on Measurement in Education (NCME) which is a professional organization for individuals involved in assessment, evaluation, testing, and other aspects of educational measurement.
3. The American Educational Research Association (AERA) which is a national research society that strives to advance knowledge about education, to encourage scholarly inquiry related to education, and to promote the use of research to improve education and serve the public good.
4. The Society for Research on Educational Effectiveness (SREE) which is dedicated to advancing research relevant to practice, from early childhood through post-secondary education. The Society strives to generate knowledge and facilitate applications in new contexts and across fields.
B. The Prospective Contractor must have been a member of a minimum of three (3) of these groups for a total of at least five (5) years.
C. The Prospective Contractor shall have at least ten (10) years of experience in managing and leading a state or consortium level TAC.
D. The Prospective Contractor shall have at least four (4) years of experience in supporting Arkansas with TAC related activities.
2.2 GENERAL REQUIREMENTS
A. The Prospective Contractor shall have knowledge of current federal requirements for accountability and assessment with experience advising other states or entities on their Every Student Succeeds Act (ESSA) plan and assessment systems.
B. The Prospective Contractor shall have knowledge of the development of coherent balanced assessment systems and the ability to advise the State of Arkansas
C. The Prospective Contractor shall have knowledge of the Arkansas assessment and accountability program including the current approved ESSA plan and assessment requirements.
D. The Contractor shall support DESE with coordination and execution of a research study to support the validity of its newly operationalized ATLAS K3 screener for literacy. Activities required to complete the study may be subcontracted and must be completed in consultation with national experts in dyslexia and early literacy development. The study will be designed in conjunction with the TAC and reviewed by the TAC prior to completion.
E. The Contractor shall prepare white papers or original research to help support the work of DESE and the TAC. The specific paper topics and necessary research shall be determined by DESE and the contractor, with an expectation of approximately two papers per year. Bids should include cost for two papers per year.
F. The Contractor shall coordinate and lead Arkansas’ TAC.
G. The Contractor shall provide digital sharing space for documents.
2.3 MEETING ORGANIZATION AND PLANNING
A. All proposals must include stipends for meetings both face-to-face and virtual.
B. Pricing must include cost for three (3) face-to-face meetings to be held in Little Rock and budget for up to four (4) 2–3-hour conference call meetings with the TAC focused on specific issues or proposals
1. The Contractor shall provide the virtual meeting platform used during these meetings.
2. Proposals should include a full day pay for TAC members in preparation and participation in the call
C. Proposals must include all travel costs for TAC members to and from each face-to-face meeting, including lodging and other travel related costs. Where possible the vendor shall negotiate a state rate for room rentals and will utilize established per diem rates for reimbursement.
D. Proposals must include all cost associated with meetings including rental of meeting space and AV equipment, meals for participants during the meeting and all travel expense for TAC members and
PM.
1. Prospective Contractor should estimate cost of meeting based on the following number of participants: Fifteen (15) DESE staff/guests, five (5) TAC members and the PM.
2. Prospective Contractor shall agree with DESE upon meeting location prior to booking.
E. Cost shall include estimates of all activities listed above; actual costs will be billed to DESE after each meeting but shall not exceed the budgeted cost.
2.4 PROJECT MANAGER
A. The Contractor shall have a project manager (PM) assigned to work directly with DESE and TAC members.
B. The PM shall have a doctorate degree in measurement and/or related educational disciplines.
C. The PM shall have experience sitting on a TAC and/or running a TAC.
D. The PM shall have access to expertise within their company.
E. The PM shall work with DESE to establish meeting dates and coordinate the availability of TAC members.
F. The PM shall set agendas.
G. The PM shall host in person planning meetings with DESE at least six (6) weeks prior to TAC meeting dates. The TAC meeting will be held in Little Rock and scheduled with at least four (4) weeks’ notice.
H. The PM shall advise DESE on appropriate agenda items and how to prioritize these items during the meeting to maximize the use of time during TAC meetings.
I. The PM shall lead all TAC meetings and keep members on track, lead meeting discussions and be prepared to facilitate conversations.
J. The PM shall review submitted documents prior to meetings.
K. The PM shall provide all documents submitted by DESE to TAC members digitally at least one (1) week prior to meeting.
L. The PM shall take notes during the meeting and facilitate each TAC meeting along with the Arkansas leadership to structure the discussion as meaningfully as possible and to synthesize the various points so Arkansas leadership can easily understand the practical and policy implications of the discussions.
M. The PM shall share meeting notes to DESE and all TAC members within an agreed timeline following each TAC meeting.
N. The PM shall interact with internal work, advisory committees, legislative groups, or contractors as needed by the DESE.
2.5 PERFORMANCE STANDARDS
A. State law requires that qualifying contracts for services include Performance Standards for measuring the overall quality of services that a Contractor shall provide.
B. The State may be open to negotiations of Performance Standards prior to contract award, prior to the commencement of services, or at times throughout the contract duration.
C. Performance Standards shall not be amended unless they are agreed to in writing and signed by the parties.
D. Failure to meet the minimum Performance Standards as specified will result in the assessment of damages.
E. In the event a Performance Standard is not met, the Contractor will have the opportunity to defend or respond to the insufficiency. The State has the right to waive damages if it determines there were extenuating factors beyond the control of the Contractor that hindered the performance of services. In these instances, the State has final determination of the performance acceptability.
F. Should any compensation be owed to the Department due to the assessment of damages, Contractor shall follow the direction of the Department regarding the required compensation process.
SECTION 3 – SELECTION
3.1 SELECTION PROCESS
A. TSS OSP will review each Technical Proposal Packet to verify Submission Requirements have been met. Technical Proposal Packets that do not meet Submission Requirements will be rejected and will not be evaluated.
1. The State may conduct cost checks based on the cost submitted by each Prospective Contractor on the completed pricing response.
a. Prospective Contractors submitting Responsive Proposals with a proposed cost that falls twenty-five percent (25%) or more from the average submitted cost may be asked to justify their submitted cost.
b. Should TSS OSP request clarification and/or additional information regarding cost, Prospective Contractors shall provide clarification and/or additional information as specified by the request.
B. A Department-appointed Evaluation Committee will evaluate and score Responsive Proposals.
Evaluation will be based on Prospective Contractor’s response to the Information for Evaluation section included in the Technical Proposal Packet and the pricing submitted by the Prospective Contractor.
1. Cost information will be provided to the members of the Evaluation Committee (Evaluators) to allow them to determine which proposal(s) is the most advantageous to the State.
2. Evaluators will individually review and evaluate proposals and complete an Individual Score Worksheet for each proposal. Individual scoring for each Evaluation Criteria will be based on the scoring description in Table B: Scoring Table.
TABLE B: SCORING TABLE
SCORE DESCRIPTION
The response provides metrics clearly establishing that the Prospective Contractor is reliable and capable of fully performing the required services.
The response provides metrics suggesting that the Prospective Contractor’s level of performance may be acceptable, but it does not clearly establish that the Prospective Contractor is reliable and capable of fully performing the required services.
The response provides metrics clearly establishing that the Prospective Contractor is unreliable and incapable of fully performing the required services.
3. After initial individual evaluations are complete, the Evaluators will meet to discuss their individual scores. At the initial consensus meeting, each Evaluator will be afforded an opportunity to discuss his or her score for each evaluation criteria.
4. After Evaluators have had an opportunity to discuss their individual scores with the committee, the Evaluators will be given the opportunity to change their initial individual scores, if they feel that is appropriate.
5. The final individual scores of the Evaluators will be recorded on the Consensus Scoresheets and averaged to determine the group or consensus score and rank for each proposal.
6. Other agencies, consultants, and experts may also examine documents at the discretion of the Department.
C. Prospective Contractors submitting Responsive Proposals will be contacted by TSS OSP to schedule an interview.
1. Prospective Contractors shall attend the interview as scheduled by TSS OSP.
2. Evaluators will complete an Individual Score Worksheet for each interview. Evaluation will be based on Prospective Contractor’s responses to questions presented during the interview.
Individual scoring for each interview will be based on the Scoring Descriptions in 3.1.B.2.
3. During a final consensus meeting, after all interviews are complete, Evaluators will have the opportunity to discuss the interviews and change their individual interview scores on the Consensus Scoresheet, if they feel that is appropriate.
a. The final individual scores of the Evaluators will be recorded on the Consensus Scoresheets and averaged to determine the group or consensus score and rank for each proposal.
4. Should the State receive only one (1) Responsive Proposal, the State may forgo the interview portion of the evaluation if the proposal has received the Maximum Weighted Score Possible for the Experience, Solution, and Risk subsections.
a. In this scenario, the proposal would automatically receive the maximum weighted score possible for the interview subsection.
D. Should the State request clarification and/or additional information Prospective Contractors’ responses, Prospective Contractors shall provide clarification and/or additional information as specified by the State.
E. TSS OSP will submit responses and pricing received from the interviewed Perspective Contractors, along with the Evaluation Committee’s recommendation to the Department for review and approval to move into Discussions.
3.2 TECHNICAL PROPOSAL SCORE
A. The Information for Evaluation section has been divided into subsections.
1. Each subsection has been assigned a maximum point value of ten (10) points. The total point value for each subsection is reflected in the table below as the Maximum Raw Points Possible.
2. The Department has assigned Weighted Percentages to each subsection according to its significance.
INFORMATION FOR EVALUATION
SUBSECTIONS
MAXIMUM
RAW
POINTS
POSSIBLE
SUBSECTION’S
WEIGHTED
PERCENTAGE
* MAXIMUM
WEIGHTED
SCORE
POSSIBLE
Experience 10 30% 210
Solution 10 20% 140
Risk 10 20% 140
Interview 10 30% 210
Total Technical Score 40 100% 700
*Subsection’s Percentage Weight x Total Technical Maximum Weighted Score = Maximum Weighted Score Possible for the subsection.
B. The proposal’s weighted score for each subsection will be determined using the following formula:
(A/B)*C =D
A = Actual Raw Points received for subsection in evaluation
B = Maximum Raw Points possible for subsection
C = Maximum Weighted Score possible for subsection
D = Weighted Score received for subsection
C. The proposal’s weighted scores for subsections will be added to determine the Total Technical Score for the proposal.
3.3 COST SCORE
A. When scores are applied to pricing, the maximum amount of cost points will be given to the proposal with the lowest seven (7) year grand total as shown in Table One (1) on the completed Official Solicitation Price Sheet. (See Grand Total Score for maximum points possible for cost score.)
B. The amount of cost points given to the remaining proposals will be allocated by using the following formula:
(A/B)*C =D
A = Lowest estimated cost
B = Second (third, fourth, etc.) lowest estimated cost
C = Maximum Points for lowest estimated cost
D = Total price points received
3.4 GRAND TOTAL SCORE
The Technical Score and Cost Score will be added together to determine the Grand Total Score for the proposal. The State may move forward to Discussions with the Prospective Contractor determined reasonably susceptible of being selected for award.
MAXIMUM
POINTS
POSSIBLE
Technical Proposal 700
Cost 300
Maximum Possible Grand Total Score 1,000
3.5 EXPLANATION OF THE SUBSECTIONS OF THE TECHNICAL PROPOSAL
A. Experience
1. The Experience subsection included in the Technical Proposal Packet allows Prospective Contractors to differentiate themselves based on their experience, technical capability, and understanding of the State’s specific needs.
2. Prospective Contractors should identify expertise in the form of a claim and provide relevant experience to support each claim.
3. Prospective Contractors should use verifiable metrics (number of accounts, size of accounts, years of experience, customer satisfaction ratings) to support each claim.
B. Solution
1. The Solution subsection included in the Technical Proposal Packet allows Prospective Contractors to differentiate themselves based on their proposed solution and/or approach to solve the State’s specific needs.
2. Prospective Contractors should provide a high-level overview of the Prospective Contractor’s proposed solution and/or approach to services using the Requirements outlined in the RFP.
3. Proposed solutions should be non-technical and include the Prospective Contractor’s recommendations for meeting the objectives and Requirements of the RFP.
4. Additional service options and recommendations above and beyond those included in proposed solution should be included in the Recommended Options Form.
C. Risk
1. The Risk subsection included in the Technical Proposal Packet allows Prospective Contractors to identify and prioritize major risks that they reasonably foresee could potentially prevent or impair the Prospective Contractor’s delivery of the solution as offered in the proposal or to otherwise fail to meet the State’s desired outcome, specifications, and performance standards, and how they will mitigate, manage, and/or minimize each risk listed.
a. Prospective Contractors should include sources, causes, or actions that are both within and beyond the control of the Prospective Contractors that they reasonably foresee may cause cost increases, delays, amendments, or dissatisfaction to the State.
b. Risks should be described in simple, clear, and non-technical terms.
c. Prospective Contractor should explain how the Prospective Contractor will mitigate, manage, and/or minimize each risk listed.
i. The Documented Performance cell should include details such as how many times any identified risk was previously mitigated and the impact on the Prospective Contractor’s performance in terms of time, cost, and client satisfaction.
D. Interview
1. The Interview will allow Prospective Contractors to further demonstrate their experience in providing the services outlined in the RFP.
a. Each Prospective Contractor meeting the Submission Requirements will be contacted by TSS OSP to schedule an interview. Prospective Contractors shall attend the interview as scheduled by TSS OSP.
b. Prospective Contractors shall identify one (1) Project Lead at the time of interview confirmation who shall attend the interview as part of the evaluation process.
c. The Evaluation Committee will interview the Prospective Contractor’s identified Project Lead using a pre-determined set of interview questions. Follow up questions may be asked based on responses given by the Project Lead.
3.6 DISCUSSIONS
A. The State will move forward into Discussions with the responsible Prospective Contractor(s) whose proposal(s) have been determined to be reasonably susceptible to being selected for award.
B. Discussions may be conducted with the highest-ranking Prospective Contractor based on the Grand Total Score for each proposal or with multiple Prospective Contractors reasonably susceptible of being awarded a contract.
C. Should the State choose to engage in Discussions with the highest-ranking Prospective Contractor, the Prospective Contractor invited to participate in Discussions shall provide all documents required during Discussions.
1. Should the Department determine, through the Discussions process, that the Prospective Contractor’s solution, approach, timelines, deliverables, expectations of the State, or a combination thereof make the Prospective Contractor no longer reasonably susceptible of being awarded a contract, the Department may abandon Discussions with that Prospective Contractor through a written justification to TSS OSP, and may proceed to additional rounds of Discussions with the next highest-ranking Prospective Contractor.
D. Should the State choose to engage in Discussions with multiple Prospective Contractors contemporaneously, each Prospective Contractor invited to participate in Discussions shall provide all documents required during Discussions.
1. Should a Prospective Contractor not provide the required documents within timeframes requested by TSS OSP or choose not to engage in the Discussions process, the Prospective
Contractor’s proposal will be considered withdrawn and will not be subject to further consideration in the Solicitation process.
E. If Discussions necessitate material revisions of proposals, each responsible Prospective Contractor reasonably susceptible of being awarded a contract will be provided an opportunity to revise its proposal for the purpose of submitting a best and final offer.
F. During the Discussions Kick Off Meeting, the Prospective Contractor shall provide the following documents to the State:
1. A detailed scope of work clearly identifying the Prospective Contractor’s understanding, implementation, and performance of services required in this RFP, including all activities required by the Contractor and all activities expected by the State/Participating Entities
2. A Risk Management Plan intended to mitigate any risks, including but not necessarily limited to, the risks identified in the Risk Plan submitted in the Prospective Contractor’s Technical Proposal Packet
3. A proposed financial summary, including:
a. The completed pricing response and Recommended Options Form submitted in the Prospective Contractor’s Technical Proposal Packet
b. A proposed payment schedule
4. Proposed project management and reporting templates
G. During the Discussions Kick Off Meeting, the Prospective Contractor shall address questions and/or concerns the State may have to the satisfaction of the State.
H. During Discussions, the Prospective Contractor shall revise the discussions documents until agreement is made and the State has provided final approval.
1. The Prospective Contractor shall attend follow up Discussions meeting as determined necessary by the State. Reasonable effort will be made to accommodate scheduling conflicts.
I. During Discussions, the Prospective Contractor shall present a final draft of the Discussions documents to the State, including, at minimum:
1. A summary of all plans and scope of work developed during the discussions process and mutually agreed upon by the State and the Prospective Contractor
2. A detailed scope of work clearly identifying the Prospective Contractor’s implementation and performance of services required in this RFP, including all provisions negotiated and agreed upon by the State and the Prospective Contractor since the Discussions Kick Off Meeting
3. Description of deliverables in terms of simplified metrics
4. The Risk Management Plan
5. Project management and reporting templates
6. Financial summary, including:
a. The completed pricing response submitted in the Prospective Contractor’s Technical Proposal Packet
b. A list of agreed upon and accepted recommended options (with impact to price)
c. A payment schedule
d. Contact information for the Prospective Contractor’s key personnel
J. During Discussions, the Prospective Contractor shall present the final drafts of the items and shall summarize the coordination and planning completed during the discussion process.
K. Once approved by the State, final drafted documents will become part of the resulting contract.
L. The Prospective Contractor may determine which key personnel will attend the Discussions meetings.
3.7 ANTICIPATION TO AWARD
A. Once an anticipated Contractor has been determined, the anticipated award will be posted to the
Solicitation posting in ARBuy by the date and time listed in Table A.
1. It is the responsibility of Prospective Contractors to check the ARBuy website for the posting of an anticipated award.
B. Anticipated awards will generally be posted for a period of fourteen (14) days prior to the issuance of a contract. These notices are anticipated awards only and are subject to protest.
C. A contract resulting from this Solicitation is subject to State review and approval processes prior to award, which may include Legislative review.
3.8 PROSPECTIVE CONTRACTOR ACCEPTANCE OF EVALUATION TECHNIQUE
The submission of a Technical Proposal Packet signifies the Prospective Contractor’s understanding and agreement that some subjective value judgments will be made during the evaluation and scoring of the technical proposals.
SECTION 4 – SOLICITATON TERMS AND CONDITIONS
4.1 ACCEPTANCE OF REQUIREMENTS
A. A Prospective Contractor's past performance with the State may be used to determine if the
Prospective Contractor is responsible (OSP Rule R8:19-11-229).
1. Proposals submitted by Prospective Contractors determined to be non-responsible will be rejected.
B. A single Prospective Contractor must be identified as the prime contractor.
1. The prime Contractor shall be responsible for the resulting contract and jointly and severally liable with any of its subcontractors, affiliates, or agents to the State for the performance thereof.
C. By submission of a proposal, the Prospective Contractor represents and warrants:
1. That the prices in the proposal have been arrived at independently, without any collusion with another competing Prospective Contractor.
a. Collusion violates Arkansas Procurement Law and can lead to suspension, debarment, and can be referred to the Attorney General’s officer for investigation and appropriate legal action (Arkansas Code Annotated § 19-11-240 and 19-11-245).
2. That the Prospective Contractor has not retained a person to solicit or secure the resulting contract upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, except for retention of bona fide employees or bona fide established commercial selling agencies maintained by the Prospective Contractor for the purpose of securing business.
D. Prospective Contractor should not discuss the Solicitation or proposal response, issue statements or comments, or provide interviews to public media during the Solicitation and award process.
E. Qualifications and services must meet or exceed the required Specifications as set forth in the Solicitation.
F. The State will not pay costs incurred in the preparation of a proposal.
4.2 GENERAL TERMS AND CONDITIONS
A. The Contractor must be registered as a vendor to receive payment and may register online by visiting https://www.ark.org/vendor/index.html and clicking the Start Here button.
B. All payments to the Contractor under a resulting contract shall be made exclusively through ACH (Automated Clearing House) direct deposit.
1. The Contractor shall provide the necessary banking information, including account number, routing number, and any other details required to facilitate ACH direct deposits.
2. The Contractor shall be responsible for ensuring that the provided banking information is accurate and up to date. Any delays or errors in payment caused by incorrect or outdated information provided by the Contractor shall not be the responsibility of the Department.
3. The Department will process payments according to the agreed payment schedule, and all payments made via ACH direct deposit shall be considered as duly received upon successful transmission to the Contractor’s designated bank account.
C. Pursuant to Arkansas State Procurement Law, the Contractor shall certify that, unless they offer to provide the goods or services for at least twenty percent (20%) less than the lowest certifying Prospective Contractor:
1. They are not engaged in and shall not, during the aggregate term of the resulting contract, engage in a boycott of Israel (Arkansas Code Annotated § 25-1-503), https://www.ark.org/vendor/index.html
2. They are not engaged in and shall not, during the aggregate term of the resulting contract, engage in a boycott of an Energy, Fossil Fuel, Firearms, or Ammunition Industry (Arkansas Code Annotated § 25-1-1102).
D. Pursuant to Arkansas Procurement Law, the Contractor shall certify that the Contractor does not knowingly employ or contract with illegal immigrants and that the Contractor shall not knowingly employ or contract with illegal immigrants during the aggregate term of any contract with the State or any of its departments, institutions, or political subdivisions (Arkansas Code Annotated § 19-11-105).
E. Specifications, drawings, technical information, dies, cuts, negatives, positives, data, other such item furnished by the State to the Contractor, or a combination thereof hereunder or in contemplation hereof or developed by the Contractor for use hereunder shall:
1. Remain property of the State.
2. Be kept confidential as permitted or required by law.
3. Be used only as expressly authorized.
4. Be returned at the Contractor's expense to the F.O.B. destination point provided by the State, as requested by the State.
a. The Contractor shall properly identify items being returned.
F. The Contractor shall invoice the State as required by the Department and should not invoice the State in advance of delivery and acceptance of any goods or services (Arkansas Code Annotated § 19-4-1206).
1. The Contractor should invoice the agency by an itemized list of charges. The Department’s purchase order number and/or the contract number should be referenced on each invoice.
2. Payment will be made in accordance with applicable State of Arkansas accounting procedures upon acceptance of goods and services by the Department.
3. Payment will be made only after the Contractor has successfully satisfied the Department as to the reliability and effectiveness of the goods or services purchased as a whole.
G. The Contractor should be able to accept the State’s authorized VISA Procurement Card (p-card) as a method of payment. Price changes or additional fee(s) must not be levied against the State when accepting the p-card as a form of payment.
H. The Prospective Contractor shall certify that they are not a company owned in whole or with a majority ownership by the government of the People's Republic of China (a “Scrutinized Company”) and that they do not and shall not during the aggregate term of the resulting contract employ a Scrutinized Company as a contractor (Arkansas Code Annotated § 25-1-1203).
I. This RFP incorporates all terms of the Services Contract (SRV-1) Fillable Form (found here).
1. The contract template is attached to the Solicitation in ARBuy as a sample for your information only.
2. A Prospective Contractor’s proposal may be rejected if a Prospective Contractor takes exception to any terms, conditions, or Requirements in this RFP.
J. The Prospective Contractor agrees and shall adhere to all terms, conditions, and Requirements if selected as the Contractor.
1. Items may only be modified if the legal requirement is satisfied and approved by the State during Discussions.
4.3 MINORITY AND WOMEN-OWNED BUSINESS
A. A minority-owned business is defined by Arkansas Code Annotated § 15-4-303 as a business owned by a lawful permanent resident of this State who is:
• African American
• American Indian
• Asian American
• Hispanic American
• Pacific Islander American
• A Service-Disabled Veteran as designated by the United States Department of Veteran Affairs
B. A women-owned business is defined by Act 1080 of the 91st General Assembly Regular Session
2017 as a business that is at least fifty-one percent (51%) owned by one (1) or more women who are lawful permanent residents of this State.
C. The Arkansas Economic Development Commission conducts a certification process for minority-owned and women-owned businesses. If certified, the Prospective Contractor’s Certification Number should be included on the Proposal Signature Page.
4.4 PROPRIETARY INFORMATION
A. The release of public records is governed by the Arkansas Freedom of Information Act (Arkansas
Code Annotated § 25-19-101 et. seq.).
B. Submission documents pertaining to the Solicitation become the property of the State and are subject to the Arkansas Freedom of Information Act (FOIA).
C. In accordance with FOIA, and to promote maximum competition in the State competitive sealed proposals, the State may maintain the confidentiality of certain types of information described in FOIA. Such information may include trade secrets and other information exempted from public disclosure pursuant to FOIA.
D. Consistent with and to the extent permitted under FOIA, any Prospective Contractor may designate appropriate portions of a proposal as confidential by submitting a redacted copy of the proposal. By so redacting any information contained in the proposal, the Prospective Contractor warrants that, after having received such necessary or proper review by counsel or other knowledgeable advisors, it has formed a good faith opinion that the portions redacted are not considered public records under
FOIA.
E. If a Prospective Contractor deems part of the information contained in a response not to be a public record, the Prospective Contractor should submit one (1) complete copy of the submission documents from which any proprietary or confidential information has been redacted in their proposal response. Except for the redacted information, the redacted copy must be identical to the original copy, reflecting the same pagination as the original and showing the space from which information was redacted.
F. The Prospective Contractor is responsible for identifying all proprietary information and for ensuring the electronic copy is protected against restoration of redacted data.
G. The redacted copy will be open to public inspection under the FOIA without further notice to the Prospective Contractor. If the State deems redacted information to be subject to a public record request under FOIA, the State will endeavor to notify the Prospective Contractor prior to release of the redacted record.
H. The State has no liability to a Prospective Contractor with respect to the disclosure of Prospective Contractor’s confidential or proprietary information ordered by a court of competent jurisdiction pursuant to FOIA or other applicable law.
File details come from the government source that posted it. Updated .