Runway 26L GS Shelter Foundation Replacement PR.pdf

PDF 88 KB Posted

Attached to
Foundation Shelter Replacement Federal contract opportunity
Solicitation number
6973GH-24-R-00103
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document is a Procurement Request Information (PR) related to a federal contract opportunity to replace the existing Runway 26L glide slope shelter foundation at Gerald Ford International Airport in Grand Rapids, Michigan.

The key details include: the Scope of Work to furnish all necessary materials, labor, equipment, tools, and supervision to replace the existing foundation; a 30-calendar day Performance Time; the requirement to place the Glide Slope, PAPI, and RVR on a Facility Shutdown Schedule; the need to obtain Airport Manager and Air Traffic Office approvals; and the requirement for a post-completion flight check. The contract will be awarded as a Firm Fixed-Price arrangement. The applicable NAICS code is 236220 with a $45.0M business size standard. A site visit is scheduled for June 4, 2024, and responses are due one week prior to the closing date.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROCUREMENT REQUEST INFORMATION

Contract is to be awarded and work to

SCOPE OF WORK: Furnish all necessary materials, labor, equipment, tools, and supervision to replace the existing Runway 26L glide slop shelter foundation at Gerald Ford International Airport, Grand Rapids, Michigan.

CONTRACT SCHEDULE:

begin based on contractor schedule and approval of submittals.

PERFORMANCE TIME: 30 calendar days

SHUTDOWN SCHEDULE: Place the Glide Slope on Facility Shutdown Schedule. Allow 30 days for glide slope shutdown.

The PAPI and RVR also need to be placed on the Facility Shutdown Schedule, since the power is supplied from the glide slope shelter.

CONTROL: N.A.

POWER: N.A.

LEASE OR LICENSE: N.A.

AIRPORT MANAGER'S APPROVAL: Send three sets of the project plans, specifications, and construction safety plan to the Airport Manager for his written approval.

LETTER TO AIRPORT DISTRICT OFFICE: N.A.

LETTER TO AIR TRAFFIC OFFICE: Send one set of the project plans, specifications, and construction safety plan to the

ATO.

FLIGHT CHECK: Flight check required upon projection completion.

MATERIALS: All materials, equipment, and labor required to complete the job are to be Contractor furnished.

INSPECTION: Contracting Officer’s Representative (COR) will not be on a per diem basis.

PRECONSTRUCTION: The Contractor shall attend a preconstruction conference prior to starting work at a location agreed upon between the Contractor and Contracting Officer.

NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION: N.A.

PROCUREMENT REQUEST INFORMATION (continued)

HAZARDOUS MATERIAL: Contractor to inspect for hazardous materials prior to shelter removal/demolition.

Specification outlines procedures if hazardous materials present.

ENVIRONMENTAL DECLARATION: N.A.

ENCLOSURES: 1. Specification 1701026

2. Engineer's Estimate

3. Drawings

GRR-D-GS26L-G001

GRR-D-GS26L-G002

GRR-D-GS26L-C001

GRR-D-GS26L-A001

*GRR-D-GS26L-E001

*GRR-D-GS26L-E002

*GRR-D-GS26L-E003

*GL-D-5608-2-6

4. Photos

* Indicates drawing is for reference only.

JUSTIFICATION: The existing shelter foundation has heaved, causing the shelter to be out of plumb and stressing the electrical wiring and conduits connected to it.