Runway 26L GS Shelter Foundation Replacement J.pdf

PDF 933 KB Posted

Attached to
Foundation Shelter Replacement Federal contract opportunity
Solicitation number
2400895
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document is a market survey notice from the Federal Aviation Administration soliciting capability statements for the replacement of a runway glide slope shelter foundation at Gerald Ford International Airport in Grand Rapids, Michigan. The FAA requires capability statements no longer than six pages by March 14, 2024 identifying experience providing similar services, past performance details including contract sizes and durations, and points of contact. Certification letters should also be included for interested SDVOSB or 8(a) businesses. The FAA will use responses to determine the procurement method and whether to conduct a full and open competition or set aside the work for small, veteran-owned, or socially and economically disadvantaged small businesses. The NAICS code is 236220 for $45 million and the PSC is Z2BA. No incumbent is listed.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART III - SECTION J

LIST OF ATTACHMENTS

ATTACHMENT

NO. TITLE/DESCRIPTION PAGE

1 U.S. DEPARTMENT OF LABOR GENERAL 1 THRU

WAGE DECISION NO. IL

DATED:

2 STATEMENT OF COMPLIANCE WITH UNNUMBERED

INSURANCE REQUIREMENTS

3 HOLD HARMLESS STATEMENT UNNUMBERED

4 FAA SPECIFICATION NO. 1701026 1 THRU

FOR REPLACEMENT OF RUNWAY 26L

GLIDE SLOPE SHELTER FOUNDATION

GRAND RAPIDS, MICHIGAN

Drawing No. Title Rev. Date

5 GRR-D-GS26L Cover Sheet and 0 12-30-21 G001 Drawing Index

GRR-D-GS26L Construction Safety 0 12-30-21 G002 Plan

GRR-D-GS26L Site Plan 0 12-30-21

C001

GRR-D-GS26L 10’ x 12’ Shelter 0 12-30-21 A001 Installation Details

GRR-D-GS26L Replace Shelter 0 12-30-21 C001 Foundation - Site Plan

GLSD –D-LTNGPROT Lightning Protection 11-20-15 E001 and Grounding

*GRR-D-GS26L 10’ x 12’ Equipment 0 4-22-10 E001 Shelter Interior Floor Plan

*GRR-D-GS26L 10’ x 12’ Equipment 0 4-22-10 E002 Shelter Interior Elevations

*GRR-D-GS26L 10’ x 12’ Equipment 0 4-22-10 E003 Shelter Equipment Rack & Demarc

*GL-D-5608-2-6 Mark 1E 0 11-20-78 Glide Slope Shelter

Foundation and Installation Details

*GL-D-5608-2-8 PAPI Site Plan A 06-13-05 Runway 26L

*Indicates drawing is for reference only

6 Photos

File details come from the government source that posted it. Updated .