This market survey announcement solicits statements of interest and capabilities from vendors for the replacement of a runway glide slope shelter foundation at Gerald Ford International Airport in Grand Rapids, Michigan. The Federal Aviation Administration requires the replacement as part of its ongoing operations and maintenance at the airport. Respondents should provide a capabilities statement no more than six pages in length describing their experience and past performance on similar projects. They should also include points of contact for any questions. If applicable, vendors should attach certifications for their status as a Service Disabled Veteran Owned Small Business or participation in the SBA 8(a) Program. Responses are due by March 14, 2024. The FAA will review all information received to determine the nature and extent of future competition for this requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Runway 26L GS Shelter Foundation Replacement J.pdf | ||
| 2022-AGL-1-NR Case Data - Quick View.pdf | ||
| SOW - Shelter Foundation Replacement Spec.pdf | ||
| Form_3900-17_Runway 26L GS Shelter Foundation Replacement-Signed.pdf | ||
| Runway 26L GS Shelter Foundation Replacement C.pdf | ||
| Runway 26L GS Shelter Foundation Replacement PR.pdf | ||
| Project Transmittal EOSH Doc-GRR GS-Foundation Replacement.pdf | ||
| CSA EOSH Checklist-GRR GS- Foundation Replacement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
1.
PASSING A NUMBER 200 SEIVE.
A CLEAN MIXTURE OF SAND AND GRAVEL AS DEFINED BY ASCE 32, WITH LESS THAN 6% BY WEIGHT REMOVE SOIL IN EXCAVATED AREA AND REPLACE WITH A NON-FROST SUSCEPTIBLE SOIL CONSISTING OF
CONTRACTOR SHALL SEAL ALL PENETRATIONS THROUGH BUILDING WALSS WITH SILICONE SEALER.
PROVIDED BY THE TOWER'S AIR TERMINAL.
DOWN CONDUCTORS ARE NOT REQUIRED FOR THIS SHELTER DUE TO LIGHTING PROTECTION
SEE DWG. GLSD-D-LTNGPROT-E001 FOR SHELTER GROUNDING DETAILS. AIR TERMINALS AND
AND BACKFILL REQUIREMENTS. EXCAVATION SHALL BE SHORED OR SHAPED PER OSHA REQUIREMENTS.
SEE SPECIFICATION FOR CONCRETE FORMWORK, REINFORCEMENT PLACEMENT, CURING, EXCAVATION, SAFELY HANDLING 10,000 LBS.
REQUIRED TO OFFLOAD THIS SHELTER. LIFTING EQUIPMENT SHALL BE CAPABLE OF
IT ON NEW FOUNDATION. TWO 12' MIN. LENGTH SPREADER BARS AND FOUR 4" X 25' LONG STRAPS WILL BE CONTRACTOR SHALL PROVIDE CRANE AND FLATBED TRAILER TO REMOVE EXISTING SHELTER AND PLACE
2.
3.
4.
5.
ENGINEERING SERVICES
OPERATIONS
GS
FOUNDATION AND INSTALLATION DETAILS
10' X 12' FIBERGLASS SHELTER
RUNWAY 26L
MIGERALD R. FORD INTERNATIONAL AIRPORTGRAND RAPIDS
HR
ENGINEER, OPS ENGINEERING MANAGER, OPS ENGINEERING
12/23/2021 1701026
GRR-D-GS26L-A001
g rr -d -g s l-a .d n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
C O
N S
T R
U
IO
12'-5"
11'- 0" 8"
6"
6"
"6
11" 11" 4'-0"
TYP.
10'-0"
8'-8" 8"
SEE NOTE 3
-1%
EXTERIOR LIGHT
VIA METER PEDESTAL
TRANSFORMER
2" GRS CONDUIT FROM
INCOMING POWER IN
& CONTROL EQPT
PAPI POWER
CABLES IN 2" GRS CONDUIT
PAPI CONTROL
AND WHITE COLORS). SEE NOTE 1.
IN ALTERNATING AVIATION ORANGE
W/FIBERGLASS SHELL PAINTED
SHELTER (WOOD FRAME
PRE-FABRICATED EQUIPMENT
INSTALL
VENT HOOD
HVAC UNIT
FRAME
STEEL I-BEAM
ALL AROUND
1/2" RADIUS
SEE NOTE 2.
CONCRETE FOUNDATION.
CONSTRUCT REINFORCED
RF CABLE ENTRY
IN 2" GRS CONDUIT
RVR POWER CABLES
EXPANSION COUPLING (TYP)
IN 2" GRS CONDUIT
RVR CONTROL CABLES
ENTRANCE SWITCH
PENETRATION INTO SERVICE
SEALED THREADED WALL
ANTENNA HEATERS
OBSTRUCTION LIGHT AND
POWER CABLE ENTRY FOR
EXHAUST FAN
SEE NOTE 3.
30" BELOW GRADE.
GROUNDING CONDUCTOR,
COPPER PERIMETER
4/0 AWG BARE
FURNISH AND INSTALL
WELD (TYP)
EXOTHERMIC
ELECTRODE CONDUCTOR (SEE NOTE 3)
FOR SERVICE ENTRANCE GROUNDING
1" PVC CONDUIT W/EXPANSION COUPLING
(TYPICAL EACH CORNER)
STEEL GROUNDING ROD
3/4" X 10' COPPERCLAD
PAD-MOUNTED TRANSFORMER
2" GRS CONDUIT TO
W/HOOD
EXHAUST FAN
SHELTER SITE PLAN
CRUSHED ROCK PLOT PER
(TYPICAL EACH CORNER)
STEEL GROUNDING ROD
3/4" X 10' COPPERCLAD
WEATHERSHIELD
MOTORIZED DAMPER
HVAC UNIT
STEPS WITH 4' LANDING
CONCRETE
4' WIDE PRECAST
ELEVATION
FINISHED FLOOR
DETAIL "1"
6" TYP.
SEE NOTE 1.
HOLE FOR LIFTING EYE.
WILL NOT BE ALLOWED.
SHALL BE LEVEL. SHIMS
BACKFILLING. TOP OF SLAB
REMOVE FORMS PRIOR TO
USING WALL FORMS.
CONCRETE FOUNDATION
CONSTRUCT REINFORCED
#4
VAPOR BARRIER
COMPACTED CRUSHED ROCK
CONDUCTOR PER NOTE 5
EXOTHERMICALLY WELDED TO
LONG WITH #4/0 CONDUCTOR
3/4" PVC CONDUIT, 2'-6"
STEEL ANCHOR BOLT
GALVANIZED
3/4" X 18" X 4"
STEEL BEAM (BO)
SHELTER
WITH SHELTER)
(SIX SHIPPED
ANCHOR PLATE
INSTALL 1/2"
WWR
STEEL ANCHOR BOLT
3/4" X 18" X 4" GALVANIZED
-d -g s l-a
/1
/2
:3
:5
A
M P lo tt e d b y
V
-C
E
G -E
D
B
F
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
(INSTALL) = INSTALL ITEM SHIPPED LOOSE IN SHELTER.
SHIPMENT OF THE SHELTER.
OR FAA INSTALLATION PERSONNEL PRIOR TO
(BO) = INSTALLED BY SHELTER MANUFACTURER
KEY
NOTES
IS
6 MIL VAPOR BARRIER
6X6 - W2.9XW2.9
PER SPECIFICATIONS
COMPACTED CRUSHED ROCK
TYP.
FRONT ELEVATION
REAR ELEVATION
SHELTER ANCHORING DETAILS
#4@12 (TYP.)
5-#4(TYP.)
2-#4(TYP.)
L
DETAIL
RIGHT SIDE ELEVATION
LEFT SIDE ELEVATION
grr-d-gs26l-a001
2022-02-22T07:23:34-0600
CHRISTOPHER C KEIL
2022-02-18T10:44:38-0600
HERBERT KENT ROMAN
14'-0" 33'-0"
5'-0"
13'-0"
6'-0" 8'-0"
6" 6" 6"
PAINT WITH SAFTEY YELLOW
SURFACE PREP AND
FILLED WITH CONCRETE.
6" DIA. SCH 40 GALV PIPE
AT TOP
AND FORM 1" HIGH CROWN
FILL PIPE WITH CONCRETE
SITE PLAN
REPLACE SHELTER FOUNDATION
12/30/2021 1701026
GRR-D-GS26L-C001
-d -g s l-c
PVC
1050' TO RUNWAY END 4
W
Y
IN
RVR POWER CABLES
RVR CONTROL CABLES
IL
PAPI POWER AND
CONTROL CABLES
GRR-GL-D-5608-8
GLIDE SLOPE PLOT LAYOUT
SCALE: 1" = 10' - 0"
W
Y
IN
1063' TO RUNWAY 26L
THRESHOLD
ASPHALT PAVED ACCESS ROAD
SHEET 1
SEE DRAWING GL-D-5608-2-1B,
1-25 PR #19 CONTROL CABLE
1-12 PR #19 CONTROL CABLE AND
PVC COND UNDER ROADWAY
GLIDE SLOPE SHELTER AREA .
TO THE RUNWAY 35
SHELTER'S DEMARC BOX
RUNWAY 26L GLIDE SLOPE
1-#6 GUARD WIRE FROM
1-12 PR #19 CONTROL CABLE &
XFMR BY CP CO
PAD-MOUNTED
25 KVA
2 NEW BOLLARDS PER DETAIL 1
BOLLARD AND PROVIDE
REMOVE EXISTING
PROVIDE NEW IN LOCATION SHOWN.
REMOVE EXISTING PEDESTAL AND
INSTALLED PER GRR-D-GS26L-A001.
AFTER NEW FOUNDATION IS
SHELTER. REMOVE AND REPLACE
EXISTING GLIDE SLOPE
CABLES FROM SHELTER TO RVR
U.S.E. AND1-#6 BARE CU
CABLE AND 2-1/C #4, 600V,
ABANDONED 6 PR #19 CONTROL
TO 25 KVA TRANSFORMER
INCOMING SERVICE BY UTILITY
SHEET 2
SEE DRAWING GL-D-5608-2-1B,
TO LOCALIZER AREA.
1-25 PR #19 CONTROL CABLE
DRAWING GL-D-5608-2-4
ANTENNA MAST PER
ANTENNA FOUNDATION AND
PVC CONDUIT
ABANDONED 1" CONDUIT
2/C-#12 (OBSTRUCTION)
3/C-#12 (HEATER)
PVC
ABANDONED
3' WIDE AGGREGATE WALKWAY
RVR PROJECTOR AND DETECTOR
1-6 PR #19 CONTROL CABLE BETWEEN
2-1/C #8, 600V U.S.E., 1 #6 BARE CU, AND
-d -g s l-c lo tt e
SHELTER FOUNDATION
TO REPLACE THE GLIDE SLOPE
ARE INCLUDED IN THE SCOPE OF WORK
ONLY ITEMS ENCLOSED BY CLOUDS
DETAIL 1
SCALE: 1/2" = 1'- 0"
grr-d-gs26l-c001
2022-02-22T07:23:48-0600
CHRISTOPHER C KEIL
2022-02-18T10:45:46-0600
HERBERT KENT ROMAN
COVER SHEET & DRAWING INDEX
GRR-D-GS26L-G001
-d -g s l-g
-d -g s l-g
:0 lo tt e
T OF TRANSPO
T A
IC
OF
STATES
IT
TM
EN
AVIA
I
LAR
TRAT
SI
NI
GRAND RAPIDS, MI
GERALD FORD INTERNTIONAL AIRPORT
RUNWAY 26L GLIDE SLOPE
VICINITY MAP
DRAWING DESCRIPTION
GRR-D-GS26L-C001
GRR-D-GS26L-A001
CONSTRUCTION SAFETY PLAN
10' X 12' SHELTER INSTALLATION DETAILS
COVER SHEET AND DRAWING INDEX
SITE PLAN
* INDICATES DRAWING FOR FOUNDATION REFERENCE ONLY
GRR-D-GS26L-G001
GRR-D-GS26L-G002
GL-D-5608-2-6 MARK 1E GLIDE SLOPE SHELTER*
GRR-D-GS26L-E001 10' X 12' SHELTER INSTALLATION DETAILS
GRR-D-GS26L-E002 10' X 12' SHELTER INSTALLATION DETAILS
GRR-D-GS26L-E003 10' X 12' SHELTER INSTALLATION DETAILS*
GLSD-D -LTNGPROT-E001 LIGHTNING PROTECTION AND GROUNDING
GL-D-5608-2-8 PAPI SITE PLAN*
grr-d-gs26l-g001
2022-02-22T07:22:55-0600
CHRISTOPHER C KEIL
2022-02-18T10:41:59-0600
HERBERT KENT ROMAN
CONSTRUCTION SAFETY PLAN
GRR-D-GS26L-G002
-d -g s l-g
PROHIBITED.
CLEARLY INDICATE THE BOUNDARIES BEYOND WHICH CONSTRUCTION ACTIVITY IS
APPLICABLE, THE CONTRACTOR IS RESPONSBILE FOR PROVIDING SNOW FENCE TO
REGARDLESS WHICH OF THE ABOVE TWO CONSTRUCTION CONDITIONS IS
SA IS REDUCED FROM 1000 FT. TO ONLY 500 FT.
APPROACHING FROM THE OPPOSITE END OF THE RUNWAY, THE LENGTH OF THE
PROVIDED THE AIR TRAFFIC MANAGER APPROVES OF AIR TRAFFIC
ALL OF THE WORK AND IDEAL.
BOUNDARY OF THE RSA. THIS MAY BE ALL THAT'S NECESSARY TO PERFORM
WORK CAN OCCUR INSIDE THE GLIDE SLOPE AREA, BUT ONLY UP TO THE
RSA, THE FOLLOWING LIMITATIONS ARE APPLICABLE:
ARE MITIGATED. BECAUSE THE GLIDE SLOPE CRITICAL AREA ENCOMPASSES THE
WILL REQUIRE THE GLIDE SLOPE TO BE SHUTDOWN, AND THESE RESTRICTIONS
THESE AREAS UNDER THAT CONDITION. HOWEVER, THE WORK FOR THIS PROJECT
SAFETY AREA (RSA) DURING NORMAL OPERATIONS. WORK IS NOT ALLOWED IN
THIS DRAWING DEPICTS THE GLIDE SLOPE CRITICAL AREA AND THE RUNWAY
LONG 85°30'32.45"W
LONG 85°30'31.17"W
LAT 42°52'45.23"N
LONG 85°30'31.08"W
LAT 42°52'44.76"N
STAGING AREA
PROJECT LOCATION
LONG 85°30'32.51"W
LAT 42°52'45.07"N
LONG 85°30'32.43"W
LAT 42°52'44.61"N
CONSTRUCTION VEHICLE ROUTE
SECURITY GATE
ENTER THROUGH
-d -g s l-g
:4
:2 lo tt e
6.
7.
8.
9.
10.
DRAWINGS OR AS DESIGNATED BY THE COR.
THE CONTRACTOR SHALL STORE ALL EQUIPMENT, VEHICLES, AND MATERIALS ONLY IN THOSE STAGING AREAS SHOWN ON THE
THE CONTRACTOR STAGING AREA SHALL BE LOCATED AS SHOWN.
7.
8.
9.
10.
WORK.
AT ALL TIMES MAINTAIN ADEQUATE PROTECTION TO SAFEGUARD AIRCRAFT, THE PUBLIC AND ALL PERSONS ENGAGED IN THE
PRECAUTIONS REQUIRED SHALL BE DEEMED TO LIMIT OBLIGATIONS ASSUMED BY THE CONTRACTOR. THE CONTRACTOR SHALL
ACTIVITY MAY CAUSE DISRUPTION TO AIRPORT OPERATIONS. NO REQUIREMENTS OF THIS CONTRACT WITH RESPECT TO
THE OPERATION OF THE AIR TRAFFIC CONTROL FUNCTION OF THE AIRPORT, AND THEIR FAILURE DUE TO CONSTRUCTION
SITE GRADING, AND VEHICULAR TRAFFIC OVER EARTH AREAS THAT OCCUR ANYWHERE NEAR FAA FACILITIES ARE CRITICAL TO
CONTRACTOR OPERATIONS SUCH AS TRENCHING, JACKING OF PIPE OR CASINGS, EXCAVATION FOR PAVEMENT OR STRUCTURES, IMMEDIATELY RESTORED TO ITS ORIGINAL CONDITION BY THE CONTRACTOR AT HIS OWN EXPENSE.
CONSTRUCTION VEHICLES BE KEPT CLEAR OF DEBRIS AT ALL TIMES. ANY AREA DAMAGED DURING CONSTRUCTION SHALL BE
THE CONTRACTOR SHALL MAKE SURE ALL TAXIWAYS, RUNWAYS, ROADS, AND APRONS THAT ARE USED OR CROSSED BY
KEEP THE AIRPORT IN OPERATION.
LIMITED AND/OR REFUSED FOR LIMITED PERIODS OF TIME. THE CONTRACTOR MUST COOPERATE WITH AIRPORT AUTHORITIES TO
ESCORT. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT ACCESS TO CERTAIN CONTRACT AREAS MAY BE
THE CONTRACTOR CANNOT CROSS ANY ACTIVE RUNWAY OR TAXIWAY TO DELIVER MATERIAL OR WORKMEN WITHOUT A BADGED
PROGRESS OF THE WORK.
WILL BE ALLOWED DUE TO THE PHASING OF THE WORK OR DUE TO NORMAL WEATHER CONDITIONS WHICH MAY IMPEDE THE
NO ADDITIONAL COMPENSATION OR EXTENSION OF TIME OF COMPLETION FOR THE PROJECT, OR ANY PHASE OF THE PROJECT, ENTRANCE TO THE VARIOUS WORK SITES.
RESPONSIBLE FOR THE CONSTRUCTION, REPAIR, AND/OR MAINTENANCE OF ALL HAUL ROADS TO AND FROM THE DESIGNATED
DESIGNATED. NO PERSONAL VEHICLES WILL BE PERMITTED WITHIN THE AIR OPERATIONS AREA. THE CONTRACTOR SHALL BE
PERSONNEL NECESSARY TO DO THE WORK SHALL ENTER AND LEAVE THE CONTRACT SITE VIA THE GATES AND ROUTES
THE CONTRACTOR SHALL PLAN HIS CONSTRUCTION OPERATION SO THAT MATERIAL, EQUIPMENT, SUPPLIES, AND WORKING
AND MATERIALS.
WHEN SO ORDERED BY THE COR, THE CONTRACTOR SHALL REMOVE FROM THE SITE OF THE WORK ALL EQUIPMENT, MACHINERY, WITH AIRPORT OPERATIONS AND ATCT.
PERMITTED TO PARK VEHICLES/EQUIPMENT OR STORE MATERIALS OUTSIDE THE STAGING AREA SHOWN WITHOUT COORDINATION
FIELD WILL NOT BE SUBJECTED TO HAZARDS DUE TO THE CONSTRUCTION OPERATION. IN NO CASE WILL THE CONTRACTOR BE
CONSTRUCTION WORK AND SHALL UTILIZE HIS MACHINERY AND EQUIPMENT SUCH THAT AIRCRAFT AND VEHICLES USING THE
SITE TO THE MUTUAL BENEFIT OF ALL IN COMPLETING THEIR RESPECTIVE WORK. THE CONTRACTOR SHALL HANDLE
THE CONTRACTOR SHALL COOPERATE IN EVERY WAY WITH ANY OTHER CONTRACTOR DOING WORK ON OR ABOUT THE CONTRACT
PRIOR TO DESIRED ACCESS TIME.
ASSISTANCE THROUGH THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) TO ACCESS TO THE FAA FACILITY 48 HOURS
ACCESS TO FAA FACILITIES SHALL BE COORDINATED WITH THE LOCAL FAA SSC OFFICE. CONTRACTOR SHALL REQUEST FAA
OPERATION OF THE AIRPORT.
HEREIN SPECIFIED SO AS TO OFFER THE LEAST OBSTRUCTION AND/OR IMPEDIMENT TO AIRPORT TRAFFIC AND THE GENERAL
COORDINATION OF THE WORK IS AN ESSENTIAL FEATURE OF THIS CONTRACT AND WILL REQUIRE THE COMPLETION OF ALL WORK
THE AIRPORT WILL BE IN OPERATION WHILE CONSTRUCTION UNDER THIS CONTRACT IS TAKING PLACE. TIMING AND
A.O.A.
FAMILIARIZE CONSTRUCTION PERSONNEL WITH ANY CHANGE IN THE REQUIREMENTS FOR ENTERING AND OPERATING WITHIN THE
THIS FORM TO THE BADGING OFFICE WHEN APPLYING FOR BADGES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
VEHICLE OPERATIONS GUIDE (INCLUDED IN CONTRACT BID DOCUMENTS), AND SIGN THE CERTIFICATION STATEMENT. PRESENT
BEGINNING WORK WITHIN THE RESTRICTED AREA. CONTRACTOR SHALL REVIEW FAA ORDER 5200.7A, FAA AIRPORT GROUND
OBTAIN ALL VEHICLE PASSES, PERSONNEL SECURITY BADGES, AND SATISFY ALL SECURITY REQUIREMENTS PRIOR TO
ALL CONSTRUCTION WILL OCCUR WITHIN THE AIRCRAFT OPERATIONS AREA (A.O.A.). THE CONTRACTOR WILL BE REQUIRED TO
PRESENT, AND THE CONTRACTOR'S PLAN TO PROTECT AND AVOID THESE UTILITIES.
WHERE THE EXISTING UTILITIES WITHIN THE CURRENT WORK ZONE ARE LOCATED, THE TYPE, SIZE AND NUMBER OF UTILITIES
A TOOLBOX SAFETY MEETING SHALL BE HELD EACH DAY AT START OF WORK. EVERY MEETING MUST INCLUDE A DISCUSSION OF
ARTIFICIAL LIGHT PROVIDED IS SUFFICIENT.
THE COR WILL HAVE THE FINAL DETERMINATION ON WHETHER OR NOT ARTIFICIAL LIGHTING IS NEEDED, AND IF THE
PRECAUTIONS TO ENSURE THAT MORE THAN SUFFICIENT LIGHT IS AVAILABLE WHEN EXCAVATING NEAR EXISTING UTILITIES.
ILLUMINATE WORK AREAS DURING NIGHT WORK, OR DURING LOW- LIGHT HOURS. THE CONTRACTOR SHALL TAKE EXTRA
IF NIGHT WORK IS REQUIRED, THE CONTRACTOR SHALL PROVIDE AN ADEQUATE NUMBER OF LIGHT PLANTS TO PROPERLY
IDENTIFYING DEPTHS OF EXISTING UTILITIES, THE CONTRACTOR SHALL EXCAVATE BY HAND- DIGGING.
THE CONTRACTOR SHALL REQUEST FAA UTILITY LINES BE LOCATED AT LEAST 48 HOURS PRIOR TO DIGGING. WHEN
INSTALL PROTECTIVE ORANGE SNOW FENCE TO FURTHER DEMARCATE PROTECTED UTILITIES.
RESERVES THE RIGHT TO REQUEST THE PLACEMENT OF ADDITIONAL PAINT TO CLEARLY IDENTIFY THE UTILITY FOR WORKERS.
THE CONTRACTOR SHALL MARK EXPOSED UTILITY LINES WITH AN ADEQUATE AMOUNT OF FLUORESCENT PAINT. THE COR
THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF AIRPORT OPERATIONS.
ALL AIRFIELD LIGHTING DAMAGED BY CONSTRUCTION OPERATIONS SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT
UTILITY.
PRIVATE UTILITY CABLES, PIPELINES, OR SEWERS UNTIL THE COR HAS REVIEWED THE PROCEDURES FOR PROTECTION OF THE
THE CONTRACTOR SHALL NOT START ANY WORK WHICH MAY AFFECT EXISTING CITY, FAA, AT&T, CECO, GAS, OR OTHER
CONSTRUCTED UNTIL THE LOCATION IS APPROVED BY THE COR.
THE CONTRACTOR SHALL LAY OUT THE LOCATION OF ALL NEW ITEMS FOR REVIEW BY THE COR. NO ITEM SHALL BE
SATISFACTION OF THE COR. NO EXTRA PAYMENT WILL BE MADE FOR ANY SUCH INTERFERENCE OR OBSTRUCTION.
RELOCATION OF SUCH STRUCTURES. IF DAMAGED, THE CONTRACTOR SHALL MAKE REPAIRS OR PAY FOR REPAIRS TO THE
SUPPORTED AND PROTECTED. THE CONTRACTOR SHALL MAKE ARRANGEMENTS WITH THE CONTRACTING OFFICER FOR THE
OR COMPLETE. ALL STRUCTURES ABOVE OR BELOW GROUND THAT ARE ENCOUNTERED DURING CONSTRUCTION MUST BE PROPERLY
PLANS STRICTLY AS AN AID TO THE CONTRACTOR, BUT SHALL NOT BE CONSTRUED AS BEING ABSOLUTELY ACCURATE, CORRECT, AND DIMENSIONS OF EXISTING FACILITIES AND OBSTRUCTIONS ARE BASED UPON AVAILABLE RECORDS, AND ARE SHOWN ON THE
TO CONSTRUCTION. EXISTING UTILITIES SHALL BE MAINTAINED IN SERVICE AT ALL TIMES. THE LOCATION, MATERIAL, UTILITIES ARE NOT GUARANTEED TO BE ALL INCLUSIVE OR CORRECT. THE CONTRACTOR SHALL VERIFY THE FEATURES PRIOR
EXISTING CONDITIONS ARE TAKEN FROM THE BEST AVAILABLE SURVEY. INFORMATION SHOWN CONCERNING FEATURES AND
EXTENSIONS DUE TO SUCH STOPPAGE OF WORK.
UNTIL SERVICE IS RESTORED. THE CONTRACTOR WILL NOT BE ALLOWED TO MAKE CLAIMS FOR EXTRA COSTS OR TIME
UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER IN WRITING. THE CONTRACTOR SHALL HALT ALL OPERATIONS
THE PERIOD OF TIME THAT THE CABLES OR UTILITIES ARE OUT OF SERVICE, ALL CONTRACT WORK MUST BE SUSPENDED, IMMEDIATELY REPAIRED BY THE CONTRACTOR, UNDER THE OWNER'S DIRECTION, AND AT THE CONTRACTOR'S EXPENSE. DURING
ANY CABLE OR OTHER EXISTING UTILITY LINE THAT IS DAMAGED DURING THE PERFORMANCE OF THIS CONTRACT SHALL BE
UTILITY.
THE CONTRACTOR SHALL NOTIFY THE COR, IN WRITING, 48 HOURS PRIOR TO NEEDING THE UTILITY OWNER TO LOCATE THE
OWNERS OF ALL UTILITIES PRIOR TO THE START OF THE WORK SO THAT THEY MAY LOCATE AND STAKE THEIR UTILITIES.
COMMUNICATIONS CABLES, WATER AND FUEL LINES, AND SEWER AND DRAINAGE LINES. THE CONTRACTOR SHALL CONTACT THE
WORK. THESE UTILITIES INCLUDE, BUT ARE NOT LIMITED TO CITY, FAA, TELCO, GAS, POWER, CONTROL AND
ALL EXISTING UTILITIES SERVING THE AIRPORT MUST REMAIN IN CONTINUOUS OPERATION DURING THE EXECUTION OF THE
WITH ALL FAA PART 139 TRAINING REQUIREMENTS AND REGULATIONS.
150/5370-2F AND AUGMENTED BY THESE PLANS AND SPECIFICATIONS, WILL APPLY TO THE WORK. CONTRACTOR SHALL COMPLY
THE CONTRACTOR IS ADVISED THAT CERTAIN RULES AND RESTRICTIONS, AS CONTAINED IN FAA ADVISORY CIRCULAR
MAXIMUM EQUIPMENT HEIGHT WILL BE 25'.
LIMITS OF ACTIVE CRITICAL AREAS NEAR THE WORK AREA SHALL BE DELINEATED WITH ORANGE SNOW FENCE.
FLIGHT CREWS.
ALL LIGHTING WILL BE SHIELDED BY THE CONTRACTOR SO THAT IT DOES NOT AFFECT THE AIR TRAFFIC CONTROL TOWER OR
PERSONNEL.
ELEVATED LIGHTED CROSSES WILL BE PLACED AND MAINTAINED AS NEEDED ON CLOSED RUNWAYS BY AIRPORT OPERATIONS
ROOF FOR USE AT ALL TIMES.
POSITION. IN ADDITION, EACH VEHICLE AND PIECE OF EQUIPMENT SHALL HAVE A ROTATING YELLOW BEACON MOUNTED ON THE
BELONGING TO THE CONTRACTOR SHALL HAVE A WARNING FLAG ATTACHED TO IT IN A VERTICAL AND CLEARLY VISIBLE
DISPLAY A FLAG WHICH SHALL BE MAINTAINED VERTICAL AT ALL TIMES. EACH VEHICLE OR OTHER PIECE OF EQUIPMENT
AND EQUIPMENT ITEM IN ALL WORK AREAS, REGARDLESS OF WHETHER OR NOT NEAR RUNWAYS, TAXIWAYS OR APRONS, SHALL
VEHICLES AND EQUIPMENT USE, AND ONE FOOT SQUARE FOR PERSONAL USE. EACH SEPARATE GROUP OR INDIVIDUAL VEHICLE
THE CONTRACTOR SHALL FURNISH AIRCRAFT WARNING FLAGS, COLORED ORANGE AND WHITE, THREE FOOT SQUARE, FOR
RUNWAY SAFE
TY AREA
GLIDE SLOPE CRITICAL AREA
GLIDE SLOPE CRITICAL AREA
WORK IN LOCALIZER CRITICAL AREA AND RUNWAY SAFETY AREA
SAFETY PLAN
AIRPORT OPERATIONS
STAGING AREA
UTILITIES
grr-d-gs26l-g002
2022-02-22T07:23:17-0600
CHRISTOPHER C KEIL
2022-02-18T10:43:15-0600
HERBERT KENT ROMAN