RTI WALL COVERING STATEMENT OF WORK 2026 v2.0.pdf
PDF 167 KB Posted
- Attached to
- Protective Wall Covering Application in RTI Building 1 Training Room State and local contract opportunity
- Solicitation number
- SRC0000036809
- Issued by
- Ohio
About this file
This is a Statement of Work issued by the State of Ohio Adjutant General's Department for protective wall covering application services at RTI Building 1 located at 3990 E. Broad Street, Columbus, Ohio 43218. The project scope requires contractors to furnish and install 400 linear feet of 6 mil vinyl wall covering in an off-white color with a textured pattern (non-smooth) from cove base to 48 inches above on the training room walls. The contractor must provide all labor, materials, and equipment necessary to complete the work in strict accordance with specifications. A mandatory site visit is scheduled for February 18th at 9:00 a.m., with contact information provided for Mr. Thom Thorpe for any questions regarding the site visit. All contractors accessing the installation must possess REAL ID compliant identification or suitable substitute identification.
The contractor is responsible for all aspects of project execution, including site cleanliness and debris removal at the end of each working day, protection of materials and products, and restoration of the work area to safe, normal operating conditions upon completion. Invoicing should be submitted on company letterhead or standard invoice documentation to the State of Ohio, which is tax-exempt. The preferred invoicing method is email submission to ng.oh.oharng.mbx.invoices-dimr@mail.mil, with an alternate mailing address provided for U.S. Mail submissions to the Adjutant General's Department State Finance office. The Statement of Work was issued on January 5, 2026, and contractors are expected to have conducted thorough site examination and acquired all necessary information prior to bid submission.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 07-How_to_submit_a_quote.pdf | ||
| 03-COMPLIANCE_VERIFICATION_DOCUMENTATION.pdf | ||
| 02-UPDATED_Ohio_Standard_Terms_and_Conditions_rev._03.31.2025.pdf | ||
| 06-INSTRUCTIONS_ON_HOW_TO_REGISTER_AS_A_PAYEE_.pdf | ||
| Affirmation_and_Disclosure_Form.docx | DOCX document | |
| 05-Bidder_Certification.pdf | ||
| Independent Contractor-Worker Acknowledgement Form (PEDACKN).pdf | ||
| 04-Instructions_to_Bidders.pdf | ||
| Standard_T_C_3-31-25.pdf | ||
| 08-Environmental_Procedures.pdf_safe__1_.pdf | ||
| 01-Request_for_Quotes.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF OHIO
Adjutant General’s Department
2825 West Dublin Granville Road Columbus, Ohio 43235
January 5, 2026
STATEMENT OF WORK
SW I SCOPE
Furnish materials only to perform work in strict accordance with specifications for the project to paint interior walls at RTI Building 1, 3990 E. Broad St. Columbus, OH 43218.
SW II SITE OF WORK
Work will take place at DSCC building 1 3990 E Broad St, Columbus, Ohio 43218.
SW III WORK TO BE ACCOMPLISHED
1. Contractor shall provide all labor, materials and equipment and perform the following:
Provide and install 400 LF of 6 mil vinyl wall covering (VWC) from cove base to 48" above on the training room walls. Color: Off White; Pattern: textured (anything but smooth); Manf: open
SW IV SITE VISITATION
Site visit is scheduled for February 18th at 09:00a.m. For questions regarding the site visit, please contact Mr. Thom Thorpe, Monday through Friday, between 7:00a.m. and 3:00p.m. by phone at 624-496-1577 or via e- mail at thom.l.thorpe.nfg@army.mil. Please be advised that all contractors must have REAL ID compliant identification, or suitable substitute identification, to access the installation.
SW V PERFORMANCE
1. Submittal of a Bid by a Contractor shall be accepted as prime facie evidence that the contractor has examined the Specifications and the Job Site, and has satisfied themself as to the nature and location of the work and all matters which can in any way affect the work or cost thereof, under the contract. Any failure of the Contractor to acquaint themself with all available information, including physical survey of the proposed work, will not relive him from successfully performing all work to be done for a complete and acceptable job.
2. The above brief outline of principle features of work in no way limits the responsibility of the Contractor to perform all work and furnish all labor and materials, required by the Specifications referred herein. Any omission from the Specification, or misdescriptions thereof, shall not relieve the Contractor from performing all work required, and furnishing the materials required to completely fulfill the intent of the Contract
3. The Contractor shall confine operations at the site of areas permitted by the Project Officer. He shall not unreasonably encumber the site with materials or equipment and shall assume full responsibility for the protection and safekeeping of products that interfere with the operation of the facility and, if necessary, obtain and pay for additional storage areas.
STATE OF OHIO
Adjutant General’s Department
2825 West Dublin Granville Road Columbus, Ohio 43235
January 5, 2026
4. At the completion of each working day, the Contractor shall clean and clear away any excess supplies and debris from the site.
5. Upon completion and before the final acceptance of the work, the Contractor is responsible for the removal of all material rubbish. All property shall be restored to safe, normal operating conditions. The area shall be in a neat, clean, presentable condition satisfactory to the Project Officer.
SW VI INVOICING
1. All invoices should be submitted on vendors company letterhead or standard invoice document to include vendors name, address, remit to address if different from main office, invoice date, invoice number, itemized description of goods delivered, or services performed to include pricing less any tax ( The State of Ohio is tax exempt).
2. All invoices should be submitted using one of the methods listed below.
Preferred method:
Email invoices to: ng.oh.oharng.mbx.invoices-dimr@mail.mil
Alternate method:
U.S. Mail
Adjutant General’s Department State Finance 2825 West Dublin Granville Road Columbus Ohio 43235
END OF SECTION
Untitled
File details come from the government source that posted it. Updated .