This document is a Time and Materials Commercial Pricing schedule for SERVPRO, a restoration and cleaning services provider, effective for 2024. The pricing document appears to be specifically tailored for the State of Ohio, providing a comprehensive rate schedule for labor, consumables, and equipment across various restoration and emergency services categories.

The document details hourly rates for multiple labor classifications ranging from General Labor at $42 per hour to Senior Project Managers at $135 per hour, with additional specialized roles like Restoration Technicians, CDL Drivers, and Health & Safety Officers. The pricing schedule includes three primary sections: Schedule A (Labor Rates), Schedule B (Consumables), and Schedule C (Equipment Rental), which cover everything from cleaning agents and safety equipment to generators and specialized restoration machinery. The rates are designed to be flexible, with provisions for overtime, holiday work, and different project scales, and include detailed descriptions of each labor role's responsibilities. Quick pay discounts are available for full payment within 30 days, and the document notes that other SERVPRO franchisees may be utilized to provide services under the same terms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sr. Project Manager $135.00 Per Hour

Schedule A: Labor

Category: Rate: Unit:

Project Coordinator $145.00 Per Hour

Per Hour

Per Hour

Per Hour

Per Hour

Per Hour

Restoration Technician

Technical Specialist

Assistant Project Manager

Remediation Supervisor $87.00

Project Manager $115.00

Health & Safety Officer $93.00

$85.00

$85.00

Restoration Supervisor Per Hour$77.00

Per Hour

Per Hour

Per Hour

Remediation Technician $69.00

Content Inventory Supervisor $70.00 Per Hour

$68.00

$62.00

CDL Driver

Skilled Labor

Project Clerical Administrator

Resource Coordinator/Supply Supervisor $65.00 Per Hour

$75.00

$78.00

Per Hour

Per Hour

Per Hour

Per Hour

Per HourGeneral Labor

Management Fee * (See Page 11)

$65.00

$57.00

$42.00

$105.00 Per Hour

Per Hour

Category: Rate: Unit:

Per Hour

$4.00

Consultant/Estimator ** (See Page 11)

Welder

Plumber

HVAC Mechanical

Electrician

Roofer

Carpenter/Framer

Per Hour

Per Hour

Per Hour

Per Hour

$87.00

Reconstruction Sr. Project Manager $135.00 Per Hour

$105.00

$128.00

$115.00

$120.00

$125.00

$110.00

$90.00

Per Hour

Painter

Brick Mason

Insulator

Reconstruction Foreman

Tile/Flooring Installer

Drywaller/Finisher

Equipment Operator

$60.00 Per Hour

$78.00

Per Hour

Per Hour

Per Hour

Per Hour$79.00

2024 Page 1 of 13 Initial:______

Rate: Unit: Concentrate:

Ready to

Use:

$3.76 Gallon ●

$56.95 Gallon ●

$85.41 Gallon ●

$89.89 Gallon ●

$78.49 250 ct ●

$139.71 Gallon ●

$13.91 Gallon ●

$2.18 Gallon ●

$40.52 Gallon ●

$5.95 Gallon ●

$84.62 Gallon ●

$115.40 Gallon ●

$7.97 Gallon ●

$53.21 Gallon ●

$22.75 Aerosol/Can ●

$73.18 Gallon ●

$66.89 Gallon ●

$95.20 Gallon ●

$208.05 Kit ●

$381.02 5 Gallon Pail ●

$60.48 9 lb. pail ●

$198.47 35lb pail ●

$79.95 Gallon ●

$10.04 Gallon ●

$99.55 Gallon ●

$18.26 Aerosol/Can ●

$8.95 Aerosol/Can ●

$24.25 Gallon ●

$91.32 Gallon ●

$4.25 Gallon ●

$41.84 Gallon ●

$139.71 Gallon ●

$3.89 Gallon ●

$54.67 Gallon ●

$3.39 Gallon ●

$83.70 Gallon ●

$70.64 Gallon ●

$53.34 Gallon ●

$82.49 Gallon ●

$5.34 Gallon ●

$73.60 Gallon ●

Schedule B: Consumables

Cleaning/Disinfectant

Consumables Description:

All Surface Green Clean

Extreme Laundry Detergent

All Surface Green Clean

Benefect Decon 30

Benefect Disinfectant

Benefect Disinfectant Wipes

Bright-N-Neutral Cleaner

BioBlast

BioBlast

Citrus Deodorizer, Water-Based

Bright-N-Neutral Cleaner

Carpet and Upholstery Green Clean

Carpet and Upholstery Green Clean

CitraSolvent

Citrus Deodorizer, Water-Based

Coil Cleaner

Glass Cleaner, Multi-Purpose

Glass Cleaner, Ready-To-Use

Concrobium ® Disinfectant

Defoamer

Duct Sealer

EnviroShield™ Odor and Stain Blocker

Extreme Laundry Detergent

EASYDECON DF200

Glass Cleaner, Super Concentrate

Heavy Duty Degreaser

Fire Star

Fire Star

Flame Stop

Furniture Polish

Heavy Duty Degreaser

Husky 815 HCD Disinfectant

Industrial Cleaner

Industrial Cleaner

Pre-Spray & Traffic Lane Cleaner

Liquid Emulsifier

Powdered Emulsifier

Pre-Spray & Traffic Lane Cleaner

Lemon Fresh Deodorizer

Lemon Fresh Deodorizer

Lemon Oil Polish

2024 Page 2 of 13 Initial:______

Rate: Unit: Concentrate:

Ready to

Use:

$35.56 Quart ●

$28.68 Gallon ●

$2.40 Gallon ●

$55.93 Gallon ●

$3.86 Gallon ●

$75.91 Gallon ●

$4.83 Gallon ●

$68.89 Gallon ●

$3.21 Gallon ●

$80.68 Gallon ●

$151.63 Gallon ●

$4.84 Gallon ●

$110.07 Gallon ●

$6.89 Gallon ●

$76.08 Gallon ●

$16.21 Aerosol/Can ●

$45.60 Gallon ●

$2.90 Gallon ●

$38.05 Gallon ●

$2.52 Gallon ●

$67.25 Gallon ●

$4.23 Gallon ●

$58.67 Gallon ●

$3.63 Gallon ●

$74.15 Gallon ●

$63.38 Gallon ●

$1.21 Gallon ●

$63.60 Gallon ●

$4.25 Gallon ●

$54.19 Gallon ●

$56.85 Gallon ●

$25.16 Gallon ●

$65.08 Gallon ●

$4.54 Gallon ●

Schedule B: Consumables

Consumables Description:

Cleaning/Disinfectant (continued)

Vanquish (Cannot be used in California)

Ultrasonic Cleaning Agent

Shampoo Super Concentrate

Rusticide

SERVPRO Green

SERVPRO Green

SERVPRO Orange

Shampoo Super Concentrate

SERVPRO Orange Plus

SERVPRO Orange

SERVPRO Orange Plus

ServprOXIDE

Wintergreen Deodorizer

Wall and All Plus

Wall Rinse

Window Green Clean

Wintergreen Deodorizer

Wall and All Surface Cleaner

Wall and All Plus

Sporicidin

Stainless Steel Cleaner

Stone and Porcelain Cleaner

Smoke Deodorizer

Solvent Additive

Smoke Deodorizer

Solvent Additive

Tile & Grout Cleaner

Ultra Content CleanER

Stone and Porcelain Cleaner

Tile & Grout Cleaner

Vanquish (Cannot be used in California)

Ultra Content CleanER

Ultrasonic Cleaning Agent

Upholstery/Drapery Solvent, Heatable

2024 Page 3 of 13 Initial:______

Rate:

168,62

$281.72

$59.94

$139.98

$309.21

$411.84

$611.39

$6.91

$7.55

$6.16

$5.49

$83.92

$5.40

$47.93

$153.45

$0.61

$98.75

$68.95

$86.71

$284.93

$22.65

$11.95

$308.69

$10.95

$17.25

$398.90

$8.25

$176.49

$213.09

$44.53

$18.16

$39.25

$4.95

$28.61

$44.87

$21.71

$44.07

$32.64

Contents

Filters

Wrap - Bubble /Anti Static Roll

Wrap - Stretch Roll

Tacky Mats 37" x 26" PAD/30 Each

Tarp (per square ft) Each

Packing Paper (26" x 24" - 140 ct - recycled) Box/50lb

Box - Medium Each

Box - Small Each

Moving Blankets - One time use only Each

Box - Large Each

Box - Legal Size (1.2 cubic feet) Each

Foam / Wood Blocks Box

Schedule B: Consumables

Plastic Sheeting 6 mil - Fire Retardant Black 20' x 100' - Roll Each

Plastic Sheeting Hangers - Blue Case

Containment

Eco Board Floor Protection 38" x 100' Each

Plastic Sheeting 4 mil - 20' x 100' - Roll Each

Plastic Sheeting 6 mil - 20' x 100' - Aniti Static Roll Each

Floor Protection 15" x 1,100' - Roll Each

Plastic Sheeting .31 mil - 12' x 400' - Roll Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Vacuum Cleaner Bags

Filter - Activated Carbon 2000 cfm

Filter - Activated Carbon 500 cfm

Filter - Air Scrubber 500 cfm - HEPA

Filter - Air Scrubber 500 cfm - Secondary

Filter - Air Scrubber 500 cfm - Prefilter

Filter - Back Pak Vacuum Kit

Filter - Air Scrubber 1000 cfm - HEPA

Filter - Air Scrubber 1000 cfm - Prefilter

Filter - Air Scrubber 1000 cfm - Secondary

Filter - Air Scrubber 2000 cfm - Secondary per 12 pack

Filter - Desiccant Dehumidifier - 5000 cfm

Filter - Refrigerant Dehumidifier - 754

Filter - Upright Vacuum

Filter - Air Scrubber 2000 cfm - Prefilter

Filter - Air Scrubber 2000 cfm - HEPA

Vacuum Cleaner Bags - Back Pack HEPA

Vacuum Cleaner Bags - Canister HEPA

Unit:Consumables Description:

Each

Each

Each

Box

Pak/10

Pak/10

Pak/6

Each

Each

Each

Filter - Wet/Dry Vacuum, non-HEPA

Filter Material, Poly Rolled Medium

2024 Page 4 of 13 Initial:______

$95.66

$7.67

$13.25

$53.95

$14.79

$63.90

$143.86

$819.16

$23.35

$119.48

$227.77

$54.25

$62.75

$36.56

$25.83

$41.24

$55.44

$2.80

$115.08

$46.95

$30.54

$33.00

$6.25

$29.50

$27.50

$24.20

$6.00

$5.00

$23.98

$18.25

$29.70

$13.19

$25.17

$15.78

$9.75

Safety

Tapes/Adhesives

Rayon Mop Head Each

Shoe Covers 150/Case

Zip Ties 36" - Industrial Pak/10

Box 20

Wall Zippers (2 pack) Each

Zip Ties 14" - Industrial Pak/20

Zip Ties 48" - Industrial Pak/10

Trash Bags - Contractor 3 mil

Schedule B: Consumables

Consumables Description: Unit:

Dozen

Cotton Mop Head Each

Dozen

Cleaning Towel (Microfiber)

Box 50

Trash Bags - Environmental 6 mil

Miscellaneous/General

Carpet Protection Film 2' x 200' Each

Cleaning Rags Per lb.

Lay Flat (Roll - 500' x 33")

Sponge Dry Clean 48/Case

Each

Cleaning Towel

Dusting Cloth - Masslin treated 50/Bag

Lay Flat (Roll - 250' x 14") Each

Box/100

20/box

Respirator - Full or Half Mask

Each

Dozen

Each

Gloves - Cotton

Gloves - Leather Safety/Work

Gloves - Nitrile/Latex

Hearing Protection

Respirator Cartridges - Ammonia

Respirator Cartridges - Organic

Respirator - N 95

Safety Goggles (Chemical Splash)

Each

Each

Each

Each

Safety Glasses

Tyvek (Bio-Shield Coveralls)

Each

Per Suit/Exchange

Safety Vest/Hard Hat Combo Each

Aerosol/Can

Roll

Roll

Spray Adhesives

Tape - Caution 3" x 1000' HDX

Tape - Duct - 2" x 60 yrds.

Roll

Roll

Roll

Tape - HVAC 2" x 50 yrds.

Tape - Painter (Blue) 2" x 60yrds.

Tape - Poly/Box - 2" x 109 yrds.

2024 Page 5 of 13 Initial:______

$42.00 $44.00 $30.00

$165.00 $128.00 $90.00

$125.00 $60.00

$140.00 $475.00 $180.00

$357.50 $46.75

$357.50 $225.00 $27.50

$175.00 $150.00 $522.50 $220.00 $412.50 $26.25

$115.00 $55.00 $70.00

$50.00 $150.00 $125.00 $475.00 $690.00

$1,225.00 $1,625.00 $2,775.00 $4,450.00 $2,860.00 $325.00 $145.00 $302.50

$1,495.00 $2,275.00

$27.50 $825.00

$1,155.00 $1,375.00

Temporary Heat: 200k-300k BTU Temporary Heat: 300k-450k BTU

Desiccant - 15,000 cfm

DX Unit - 1 Ton DX Unit - 20/30 Ton

DX Unit - 60 / 70 Ton Flex Duct

5000 cfm Desiccant Package Unit (**)

Temporary Heat: 150k-200k BTU

Desiccant Door Kit - Total/one time charge Dry Force Injectidry (Wall Cavity)

Each/Day Each/Day

Each/Day

Each/Day Each/Day Each/Day

Each/Day Per Opening

Each/Day

Each/Day Media Blasting Machine

Each/Day

Each/Day Each/Day

Desiccant - 5,000 - 6,000 cfm Each/Day Desiccant - 3,500 cfm Each/Day

Desiccant - 10,000 / 12,000cfm Each/Day

Desiccant - 2,000/2250 cfm

Each/Day Camera - Infrared/Thermal Imaging

LGR Dehumidifier - Commercial (100 and over PPD)

Portable Fuel Cells

Each/Day Each/Day

Pump - Trash (2" to 4") Pump - Sump (Gas)

Desiccant -to 1000 cfm

Each/Day

Each/Day Each/Day

Each/Day Each/Day Each/Day Each/Day

Each/Day

Schedule C: Equipment

Air Scrubber - 1000 cfm Each/Day

Air Mover - Carpet Each/Day Air Scrubber - 2000 cfm Each/Day

Air Compressor - Portable

Each/Day Air Scrubber - 500 cfm

Each/Day Air Mover - Axial Each/Day

Equipment Description: Unit:

Air Mover/Compressor

Blast/Power Wash Units

Portable Extractor

Cleaning/Vacuum Extraction

Each/Day Each/Day Each/Day Each/Day

Insulation Vacuum Orbital Floor Machine

Portable Carpet Machine

Electrostatic Sprayer Each/Day Fogger/Macromist

Pressure Washer - Hot Each/Day

Fogger/Thermal Each/Day

Vapor Shark

Each/Day

Each/Day

Drying Equipment

Each/Day

LGR Dehumidifier - Commercial (100 and under PPD)

Rover Extraction Unit Ultrasonic Cleaning Machine

Vacuum - Upright Vacuum Cleaner Vacuum - Back Pack, or Canister HEPA

Vacuum - Wet/Dry

Truck Mount Carpet/Extraction Machine

Each/Day

2024 Page 6 of 13 Initial:______

$616.00

$300.00

$125.00

$235.00

$142.00

$38.50

$30.25

$17.55

$82.50

$410.00

$599.50

$797.50

$915.00

$1,100.00

$1,300.00

$1,550.00

$2,700.00

$5,670.00

$175.00

$148.00

$80.00

$300.00

$25.00

$125.00

$25.00

$16.00

$25.00

$168.00

$48.50

$25.00

$12.00

$42.50

$50.00

$100.00

$175.00

$130.00

$550.00

$300.00

$375.00

$140.00

Trailers/Vehicles

Generator - 50kW Each/Day

Vehicle - Trailer/ Flatbed Each/Day

Golf Cart/Gator Each/Day

Vehicle - Onsite Recovery Trailer (53') Each/Day

Vehicle - Semi-Tractor Each/Day

Vehicle - Cargo/Passenger Van Each/Day

Vehicle - Mobile Command Center Each/Day

Vehicle - Auto/Pick-up Each/Day

Vehicle - Box Truck Each/Day

HVAC

Video Inspection Each/Day

Odor Control

Safety/Site Services

Power

Lighting - 50' String Lights Each/Day

Generator - 20kW Each/Day

Generator - 36kW Each/Day

Cable Ramps

Schedule C: Equipment

Equipment Description: Unit:

Cable - 50 ft. Each/Day

Airless Sprayer Each/Day

Ozone Generator - Activated Oxygen Each/Day

Hydroxyl Each/Day

Each/Day

Each/Day

HVAC Cleaning Package (**)

Cable - 100 ft.

Each/Day

Generator - Portable Each/Day

Generator - 100kW Each/Day

Generator - 150kW Each/Day

Generator - 300kW Each/Day

Generator - 200kW Each/Day

Each/Day

Each/Day

Generator - 500kW

Generator - 1,000kW

Each/Day

Generator Cable - 5 Band

Personal Fall Protection (With Lanyard) Each/Day

Scaffolding, Bakers (Per Section) Each/Day

Lock-Out/Tag-Out Kit Each/Day

Lighting - Tower Mobile Each/Day

Lighting - Wobbles Each/Day

Lighting - Demo Lights Each/Day

Power Distribution, 100-200 Amp Each/Day

Spider Box (With Cable) Each/Day

Floor Scraper - Electric Each/Day

Lighting - 100' String Lights Each/Day

Demo Carts Each/Day

DocuSketch™ or Matterport™ Imaging Cameras Each/Day

2024 Page 7 of 13 Initial:______

Two Way or Portable

Radios, Communication

Devices

Utility Knives

Wheelbarrows

Rope 50" (Nylon, Hemp)

Unger Poles

Moisture Meters

Chain Saws

Hammers

Roto ZipsChairs

Hand Sanitizer

Cell Phones

Generator Aux.

Adapter

Repair Kit - Hose, Airless, Electric Chains/Locks

GFI Scraper

Hog Rings

Ice Chests

Power Hand Tools

Putty Knife

Brooms

Scrapers

SandersChalk/Chalk Line

Saws (All types)Demo Tools

Screw Drivers

Drills/Drill Bit Set

Step Ladders (All sizes)

Buckets (All types)

Funnels

Pump Sprayers (All types)Bulbs (Replacements)

Dolly/Hand Truck

Inventory Tags

Electric Heaters < 15kw

Barrel Pumps

Gang Boxes

Extension Cords

Laundry cost for reuse of rags will be paid at cost plus 10%.

Blades (Replacements)

Fire Extinguishers

Mop Buckets, Handles and Wringers Bolt Cutters

First Aid Kits

Flash Lights

O2 Meters

Brushes (All types)

Fuel Cans

Pallet Jacks (All types)

Schedule C: Equipment

Small Tools (See page 9)

Shovels

Trash Barrel

Staple Guns

Tool Kit (Mechanical)

Tables

Tape Gun

Thermo Hygrometer

Tool Box

Spray Bottles/Triggers

Squeegees

Mobile Office Equipment

(Laptops, Monitors, Printers, Scanners, Tablets, etc.)

Smocks, Vests and T-

Shirts

Adjustable

Wrenches/Pliers

Bar - Flat Pry

2024 Page 8 of 13 Initial:______

Labor Conditions:

Safety officers – shall be charged as needed for the project and upon notification to client.

Standard Rates – the rates on Page 1 are “standard rates” and apply during a standard 8-hour work day, Monday through Friday between the hours of 7am and 5pm. Donning and doffing PPE and any necessary personnel decontamination will be charged actual time.

Overtime Rates – will be billed for all labor classifications at the rate of 1.5 times the standard rate per hour after normal business hours- 7am - 5pm Mon-Fri or on the same project in excess of 40 hours per week , and on weekends, as required by applicable law. Hours worked by personnel on the following holidays will be charged at

2 times the standard rate: New Year’s Day, Easter, Memorial Day, Independence Day, Labor Day, Thanksgiving

Day, the day after Thanksgiving, Christmas Eve and Christmas Day. If a state or local authority imposes more stringent overtime requirements, including holidays, those will apply. Other than performing Emergency Services, overtime must have client approval.

Stand-by – When delays caused by the agency occurs that delays SERVPRO from beginning or continuing work, the rates herein per hour will be charged for personnel and equipment, with a maximum of 6 hours per day for personnel, and all labor associated fees will apply.

Prevailing, Union, State and Government Wages – In such events that labor is required by code to be paid prevailing wage, labor will be paid according to the Ohio Code and section 3.9 of the contract.

Labor Classifications and Rates – listed on Page 1 apply to personnel engaged to provide services. Whether regular full-time employees of SERVPRO franchisees, temporary labor engaged directly by SERVPRO franchises or personnel secured through a labor service or vendor source.

2024 Page 9 of 13 Initial:______

Remediation Supervisor – Has developed expertise through project experience and supervises the General

Laborers (GL) to maintain quality production but does not participate in the physical completion of tasks, other than training and coaching the General Laborers performing the work.

Technical Specialist – handles specific specialty restoration services or tasks, such as thermal imaging or 3D geospatial scans of a structure and is a technical advisor in specialty restoration services.

Assistant Project Manager – executes the production plan (based on work orders and the direction of the Project

Manager) by coordinating Restoration Supervisors (RS) and labor while assuring safety compliance and quality of production. Job Responsibility Examples: Job site inspection with PM; morning meeting with Restoration

Supervisors; issue Daily Work Orders; morning line-up; on-going quality inspections; end-of-shift meeting with

Restoration Supervisors; collect daily paperwork and review for accuracy; review end-of-shift paperwork with PM.

Restoration Services Labor Descriptions:

Project Coordinator – coordinates activities and assignments of designated projects to ensure that goals and objectives specified for the projects are accomplished. Job Responsibility Examples: Ensure Corporate Reporting

(CLLD); Review Project Burn Reports; Review status of jobs in progress; inspect all projects in progress; assist with project scope and estimate as necessary; meet with Adjuster/Consultant/Insured to review progress and provide dispute resolution and job site inspections and all appropriate permits are in place, if applicable.

Sr. Project Manager – for extremely large projects requiring multiple Project Managers, a Senior Project Manager draws communication responsibilities with the materially interested parties away from the PMs, so they can better focus on task completion and documentation of their assigned project. Job Responsibility Examples: Job site inspection; prepare daily work orders; morning meeting with PM's; oversee morning line-up; meeting with

Project Clerical Administrator to review previous days paperwork and ensure insurance company receives proper documentation; meeting with Insured/Adjuster/Consultant to review progress; troubleshoot issues as necessary;

complete daily checklist and job diary; review end of shift paperwork with APM for accuracy; daily meeting with

PC; and ensures daily reporting to all stakeholders.

Project Manager – directs all operations of a designated project and provides the primary single point of contact for all materially interested parties. The PM is accountable for the project's execution and completion. Job

Responsibility Examples: Jobsite inspection; prepare Daily Work Orders; morning meeting with APM, HSO & RC;

oversee morning line-up; meet with Project Clerical Administrator to review previous day's paperwork and ensure insurance company receives proper documentation; meet with Insured/Adjuster/Consultant to review progress;

troubleshoot issues as necessary; complete Daily Checklist and Job Diary; review end-of-shift paperwork with

APM for accuracy; daily meeting with PC and ensures daily reporting to all stakeholders.

Health & Safety Officer – identifies, evaluates, and implements policy and procedures that affect health and safety aspects for all personnel on the jobsite. Job Responsibility Examples: Morning meeting with PM; morning

Safety Meeting at line-up; continuous site inspections for safety infractions; ensure all safety boards are in place and satisfy all SERVPRO standards; incident reports as necessary; OSHA inspections as necessary; job site safety training, as necessary.

2024 Page 10 of 13 Initial:______

Content Inventory Supervisor – is responsible for tracking and documenting all aspects of the contents handling and processing on a project. This supervisor will manage teams within the structure/project and audit documentation and reports and provide them on a daily basis for the project file.

Restoration Services Labor Descriptions:

CDL Driver – is responsible for transportation involving vehicles that require CDL license.

Restoration Technician – performs skilled restoration tasks.

Skilled Labor – has developed expertise through project experience such as boarding up structures, the building temporary walls, erecting containment, and making precision cuts to building materials. This may also include the operation of specialty equipment (i.e. power tools, forklifts, and specialty restoration equipment) and work performed at high risk or height and providing specialized content packing and handling.

Remediation Technician – performs skilled production tasks and has training to work in specialized environments which may require additional PPE, safety gear. and communication techniques.

Restoration Supervisor – Has developed expertise through project experience and supervises all labor classifications to ensure quality production but does not participate in the physical completion of tasks, other than training and coaching the those performing the work.

Project Clerical Administrator – collects, compiles and validates all documentation and financial information for the project. Job Responsibility Examples: attending the morning meeting with PM to review previous day’s paperwork; data entry for all paperwork into Time and Materials Management (T&M) Software; reconcile invoices to tickets.

General Labor – perform labor tasks and are capable of using basic hand tools.

Resource Coordinator/Supply Supervisor – identifies, negotiates and secures needed resources including labor, equipment, and subcontractors. Job Responsibility Examples: Morning meeting with PM; purchase subcontractor services as requested by PM; issue purchase orders as requested by PM; oversee subcontractor services; general site services oversight; evening meeting to review daily paperwork with PM.

Management Fee – is charged for supervising and training labor provided by the customers employee pool. At times we are asked or required to utilize the customers employees to utilize certain task and this fee is a per employee supervisor fee.

Project Consultant/Estimator – may be billed at the request or the invitation of a customer/client to provide consulting services, including detailed estimates on third party projects.

2024 Page 11 of 13 Initial:______

Consumables Conditions:

**Desiccant Package Unit – 5k Desiccant, 150kW Generator, Fuel Cell, Trailer, Distro Panel, Flex Duct/1 set, Power

Cables/1 set.

Equipment Conditions:

Daily Rate – is charged for each calendar day equipment is utilized on a project, whether partial or full day.

Quick Pay Discount – full payment made within 30 days of invoice applies as follows: Page 6 only.

● Weekly rate of the first 5 consecutive days of the same week (no charge for last 2 days), and

● Monthly rate of 3 consecutive weeks (21 Days) of a monthly period (no charge for the fourth/last week).

**HVAC Cleaning Package – Negative Air Machine, Compressor, Portable Cleaner, and WIP Kit.

Generators –Service Provider makes no guarantee on timelines for generator availability during a catastrophic event or other circumstances beyond our control.

2024 Page 12 of 13 Initial:______

Invoices – Invoicing will be completed according to the terms and conditions set forth in the contract.

Bonding – may be applicable upon mutual agreement and will be invoiced at 5% of project.

Other Servpro franchisees – Client acknowledges and agrees that other Servpro franchisees may be utilized to provide necessary services; provided, however, the undersigned Provider shall be responsible for their performance and shall make payment once received from Client.

Scope – Upon arrival on site, Provider will assess the loss and begin Emergency Services, which are those needed, recommended and approved to stabilize the environment/property and help prevent additional damage. Service Provider will use best efforts to communicate a preliminary scope within 72 to 96 hours after on-site arrival, subject to supplements, revisions and change orders as circumstances and later discoveries indicate.

General Conditions:

Permits – the rates herein do not include permit costs and fees, which will be billed with 10% overhead and

10% profit added.

Provider is an independently owned and operated SERVPRO franchise.

City, State and Zip:

d/b/a SERVPRO® of:

Date:

Client's Signature: Provider's Signature:

Project Address:

Client Printed Name: Franchise Legal Name:

2024 Page 13 of 13

File details come from the government source that posted it. Updated .