RR-25-2034-AddendumNo.1_04162026.pdf
PDF 7 MB Posted
- Contract number
- 26-557THA-ENGCO-P-98247
- Issued by
- Illinois
About this file
Contract Summary
Addendum No. 1 to Contract RR-25-2034 is issued by the Illinois State Toll Highway Authority for systemwide structural rehabilitation work across multiple tollway locations in Lake, DuPage, and Cook Counties, Illinois. The addendum, dated April 16, 2026, modifies the original contract requirements and was issued in advance of the bid opening scheduled for May 1, 2026 at 10:30 A.M. local time. The document incorporates revisions to contract documents, schedule of prices, special provisions, and contract drawings, as well as minutes and sign-in sheets from the optional pre-bid meeting held on April 1, 2026.
The contract encompasses structural rehabilitation work including partial depth transition and approach slab repairs, joint removal and replacement, concrete beam repairs, bearing cleaning and painting, structural concrete repair, guardrail removal and replacement, parapet removal and replacement, epoxy crack injection, wall panel stabilization, noise abatement wall repairs, culvert pipe joint repair, asphalt shoulder repairs, bridge deck repairs, and maintenance of traffic. The revised schedule of prices includes numerous construction line items with quantities specified, totaling a contingency work budget of $250,000. Compliance goals include 18 percent Disadvantaged Business Enterprise participation, 2.5 percent Veteran-Owned Small Business participation, and equal employment opportunity targets of 19.6 percent minority and 6.9 percent female workforce. Key project milestones include a Notice-to-Proceed anticipated for July 20, 2026, interim completion dates for various bridge and structure work between October 9, 2026 and November 20, 2026, substantial completion by June 15, 2027, and final contract completion by July 27, 2027.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois State Toll Highway Authority Contract No. RR-25-2034 Addendum 1 Page 1 of 2 4/16/2026
ADDENDUM NO. 1
TO
CONTRACT REQUIREMENTS
FOR CONTRACT RR-25-2034
ILLINOIS STATE TOLL HIGHWAY AUTHORITY
Date: 4/16/2026
For which bids will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy until 10:30:00 A.M. local time, May 1, 2026
NOTICE OF REVISION TO CONTRACT
NOTES:
1. The following revised page to the Contract Requirements is included with this Addendum and must be inserted into the Required Documents, Volume II, by the Bidder: TOC-1R.
2. A complete set of Schedule of Prices is included with this Addendum and must be inserted into the Contract Bid by the Bidder. The Bidder’s attention is called to pages P-13R and P-14R which have been revised and included as part of the Schedule of Prices.
3. The following revised Special Provision pages are included in the Contract with this Addendum: J-2R, J-170R, J- 171R and J-172R.
4. The following revised Contract Drawings are included in this Addendum:
Drawings 1 and 2
5. The following new Contract Drawings are included in this Addendum:
Drawings 160A, 160B, 160C, 160D, 160E, 160F and 160G
6. The minutes and sign-in sheet from the Optional Pre-Bid Meeting held on April 1, 2026 are included in this
Addendum.
Contract No. RR-25-2034 Addendum 1 Page 2 of 2 4/16/2026
CHANGES TO THE CONTRACT REQUIREMENTS
CHANGES TO THE CONTRACT SCHEDULE OF PRICES
Change #1 Required Documents, Volume I, replace page TOC-1 with page TOC-1R. This replacement contains the following revisions (attached):
1.1. Revised Table of Contents
Change #2 Required Documents, Volume I, replace pages P-13 and P-14 with pages P-13R and P-14R. This replacement contains the following revisions (attached):
2.1. Removed various traffic control-related adjustment items (999ADJ47, 999ADJ49, 999ADJ51, 999ADJ53, 999ADJ55, 999ADJ57, 999ADJ59, 999ADJ61, and 999ADJ63) based on revised Extended Maintenance of
Traffic Work and Equipment Rates (Illinois Tollway) special provision.
2.2 Modified the language of the special provision.
CHANGES TO THE CONTRACT SPECIAL PROVISIONS
Change #3 Special Provisions, Volume II, replace page J-2 with page J-2R. This replacement contains the following revisions (attached):
3.1. Revised Index of Drawings.
Change #4 Special Provisions, Volume II, replace pages J-170, 171 and 172 with J-170R, J171R and J-172R. This replacement contains the following revision (attached):
4.1. Replaced Extended Maintenance of Traffic Work and Equipment Rates (Illinois Tollway) special provision with latest version dated March 20, 2026.
CHANGES TO THE CONTRACT DRAWINGS
Change #5 Contract Plan, Drawing 1. Cover Sheet. This drawing contains the following revisions (attached):
5.1. Revised Index of Drawings.
Change #6 Contract Plans, Drawing 2. Index of Drawings and General Notes. This drawing contains the following revisions (attached):
6.1. Revised Index of Drawings.
Change #7 Contract Plans, New Drawings 160A, 160B, 160C, 160D, 160E, 160F, and 160G. IDOT Details. This new drawings contains the following revisions (attached):
7.1. IDOT BLR and District 1 Details added to sheets.
END OF ADDENDUM CHANGES
TOC-1
TABLE OF CONTENTS
PART I: Instructions
Bid Schedule and Information A-1
Pre-Bid Meeting Announcement A-2
Construction Bid Check List CL-1 – CL-3
Instruction and Information to Bidders I-1 thru I-11
PART II: Bid Requirements
Bid P-1 thru P-15
Bid Bond (Insert after P-Pages)
Vendor Disclosure or IPG Active Registered Vendor Disclosure N-1 thru N-2
Bidder Preferences and Affidavit R-1
Bidder List of Individual Contacts R-2
Affidavit R-3
Responsible Bidder Affidavit R-4
Plant and Equipment Questionnaire S-1 thru S-6
Current Contractual Obligations S-7
Disadvantaged Business Enterprise Participation & Utilization Plan DBE-1 thru DBE-16
Equal Employment Opportunity Program EEO-1 thru EEO-8
Veteran Small Business Participation & Utilization Plan VOSB-1 thru VOSB-12
Bid Credit Incentive Programs BCP-1 thru BCP-5
Illinois Tollway Standard Business Terms and Conditions TC-1 thru TC-9
PART III: Contract Requirements
Contract Bond Agreement T-1 thru T-5
Performance Bond U-1, U-2
Payment Bond V-1, V-2
Insurance I-5
R
S.P.
PAY ITEM
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
* 20200100 EARTH EXCAVATION CU YD 8
44000157 HOT-MIX ASPHALT SURFACE REMOVAL, 2" SQ YD 6,954
50102400 CONCRETE REMOVAL CU YD 24.1
* 50300225 CONCRETE STRUCTURES CU YD 1.0
* 50300255 CONCRETE SUPERSTRUCTURE CU YD 3.1
50300260 BRIDGE DECK GROOVING SQ YD 178
50300300 PROTECTIVE COAT SQ YD 12
50500405 FURNISHING AND ERECTING STRUCTURAL STEEL POUND 11,730
GBSP 50606701
CLEANING AND PAINTING STRUCTURAL STEEL,
LOCATION 1
L SUM 1
* 50800205 REINFORCEMENT BARS, EPOXY COATED POUND 4,220
50800515 BAR SPLICERS EACH 8
59000200 EPOXY CRACK INJECTION FOOT 164
60624610 CORRUGATED MEDIAN (DOWELLED) SQ FT 964
63200310 GUARDRAIL REMOVAL FOOT 113
* 66900530 SOIL DISPOSAL ANALYSIS EACH 1
* 70307120
TEMPORARY PAVEMENT MARKING - LINE 4" -
TYPE IV TAPE
FOOT 160,536
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-2034
SCHEDULE OF PRICES
SYSTEMWIDE STRUCTURAL REHABILITATION
Contract RR-25-2034 Addendum 1 P - 5 April 16, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-2034
SCHEDULE OF PRICES
SYSTEMWIDE STRUCTURAL REHABILITATION
* 70307140
TEMPORARY PAVEMENT MARKING - LINE 8" -
TYPE IV TAPE
FOOT 5,409
70600280
IMPACT ATTENUATORS, TEMPORARY (SEVERE
USE,NARROW), TEST LEVEL 3
EACH 6
70600290
IMPACT ATTENUATORS, TEMPORARY (SEVERE
USE,WIDE), TEST LEVEL 3
EACH 1
78000200
THERMOPLASTIC PAVEMENT MARKING - LINE
4"
FOOT 4,061
78000600
THERMOPLASTIC PAVEMENT MARKING - LINE
12"
FOOT 65
BDE 78005130 EPOXY PAVEMENT MARKING - LINE 6" FOOT 22,470
BDE 78005150 EPOXY PAVEMENT MARKING - LINE 12" FOOT 1,177
GBSP X0322194
POLYMER MODIFIED PORTLAND CEMENT
MORTAR
SQ FT 45
* X0322906 WEEP HOLES CORED EACH 47
* X1200201 STRIP SEAL GLAND REPLACEMENT FOOT 147
* X4400110 TEMPORARY PAVEMENT REMOVAL SQ YD 107
D1 X5021512
COFFERDAM (TYPE 1) (IN-STREAM/WETLAND
WORK)
EACH 2
* X5036002 CONCRETE HEADWALL REPAIR EACH 1
D1 X5051204 STRUCTURAL STEEL REMOVAL POUND 11,730
D1 X5051206 STRUCTURAL STEEL REPAIR POUND 6,590
* X5060700 CLEANING AND PAINTING BEARINGS EACH 9
* X5060704 CLEANING AND PAINTING EXPOSED REBAR SQ FT 17
* X5110308 SLOPE WALL CRACK SEALING FOOT 834
Addendum 1 P - 6 April 16, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-2034
SCHEDULE OF PRICES
SYSTEMWIDE STRUCTURAL REHABILITATION
* X5110310 SLOPE WALL REPAIR SQ YD 150
* X5230146 BRIDGE DRAINAGE SYSTEM REPAIR FOOT 9
* X5510008 STORM SEWER REPAIR FOOT 126
* X6060500 CORRUGATED MEDIAN REMOVAL SQ FT 964
* X6333500 TRAFFIC BARRIER TERMINAL REMOVAL EACH 2
D1 X7010216 TRAFFIC CONTROL AND PROTECTION, (SPECIAL) L SUM 1
D1 X7011015
TRAFFIC CONTROL AND PROTECTION
(EXPRESSWAYS)
L SUM 1
* X7200061 TEMPORARY INFORMATION SIGNING SQ FT 32
* X7830050
RAISED REFLECTIVE PAVEMENT MARKER,
REFLECTOR REMOVAL
EACH 104
* X7830052
RAISED REFLECTIVE PAVEMENT MARKER,
REFLECTOR REPLACEMENT
EACH 104
* Z0010400 CLEANING BRIDGE SEATS SQ FT 1,882
* JI251010
EROSION CONTROL BLANKET, BIODEGRADABLE
NETTING
SQ YD 354
* JI406108 ASPHALT TACK COAT (NON-TRACKING) POUND 3,142
* JI406510
WARM-MIX ASPHALT SURFACE COURSE, MIX
"D", N70
TON 779
* JI440022 SHOULDER RUMBLE STRIP REMOVAL SQ YD 3,268
* JI481070 AGGREGATE SHOULDERS SPECIAL, TYPE C TON 3
* JI482104 WARM-MIX ASPHALT SHOULDERS (6 IN.) SQ YD 25
* JI485010 TEMPORARY PAVEMENT, CLASS 1 SQ YD 107
Addendum 1 P - 7 April 16, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-2034
SCHEDULE OF PRICES
SYSTEMWIDE STRUCTURAL REHABILITATION
* JI503002 APPROACH SLAB REPAIR (PARTIAL) SQ YD 6
* JI503009 CONCRETE SUPERSTRUCTURE, SPECIAL CU YD 19.0
* JI633010
REMOVAL AND REPLACEMENT OF GUARD RAIL
POST
EACH 5
* JI633020
REMOVAL AND REPLACEMENT OF GUARD RAIL
BLOCK-OUT
EACH 5
* JI642010 ASPHALT SHOULDER RUMBLE STRIP FOOT 20
* JI642014 ASPHALT SHOULDER RUMBLE STRIP, 16 INCH FOOT 26,991
* JI669016
REGULATED SUBSTANCES MONITORING AND
FIELD SCREENING
CAL DAY 1
* JI701001 DETOUR SIGNING, LOCATION 1 L SUM 1
* JI703996
TEMPORARY PAVEMENT MARKING TAPE
REMOVAL
SQ FT 57,118
* JI704001
TEMPORARY CONCRETE BARRIER, CROSS-BOLT
CONNECTION
FOOT 7,388
* JI780145 EPOXY PAVEMENT MARKING - LINE 10" FOOT 3,147
* JI781010 RAISED PAVEMENT LANE MARKER REFLECTOR EACH 678
** JS120102
TRAILER MOUNTED FULL MATRIX PORTABLE
CHANGEABLE MESSAGE SIGNS
EACH /
MONTH
** JS121101
DRILL AND GROUT DOWEL BARS AND ANCHOR
RODS
EACH 240
** JS121200 LOW PRESSURE EPOXY INJECTION FOOT 341
** JS250314 SEEDING, CLASS 4B ACRE 0.1
** JS280050 SILT FENCE FOOT 125
** JS280070 STABILIZED CONSTRUCTION ENTRANCE SQ YD 503
** JS280072 TRACKOUT CONTROL MAT SQ YD 79
Addendum 1 P - 8 April 16, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-2034
SCHEDULE OF PRICES
SYSTEMWIDE STRUCTURAL REHABILITATION
** JS285055
ARTICULATED CONCRETE BLOCK REVETMENT
SYSTEM, TYPE 1
SQ YD 71
** JS440030 PAVED SHOULDER REMOVAL, VARIABLE DEPTH SQ YD 25
** JS451110 CRACK SEALING POUND 30
** JS630002
GALVANIZED STEEL PLATE BEAM GUARDRAIL,
TYPE A 6 FOOT POSTS
FOOT 113
** JS631120 TRAFFIC BARRIER TERMINAL, TYPE T2 EACH 2
** JS670B00 FIELD OFFICE, TYPE B CAL MO 13
** JS671020 MOBILIZATION, TOLLWAY (MODIFIED) L SUM 1
* JS701010 MAINTENANCE OF TRAFFIC L SUM 1
** JS780JC1
GROOVING FOR RECESSED PAVEMENT
MARKING LINES, 7" GROOVE
FOOT 103,668
** JS780JE1
GROOVING FOR RECESSED PAVEMENT
MARKING LINES, 11" GROOVE
FOOT 3,147
* JS782022 BARRIER WALL REFLECTORS, TYPE C EACH 282
* JT202009 NON-SPECIAL WASTE DISPOSAL, TYPE 1 CU YD 8
* JT280500 SEDIMENT FILTER BAG EACH 1
* JT501729 PROTECTIVE SHIELD SQ YD 565
* JT503010 DECK SLAB REPAIR (PARTIAL) SQ YD 178
* JT503040
STRUCTURAL REPAIR OF CONCRETE (DEPTH
EQUAL TO OR LESS THAN 5 IN.)
SQ FT 733
Addendum 1 P - 9 April 16, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-2034
SCHEDULE OF PRICES
SYSTEMWIDE STRUCTURAL REHABILITATION
* JT503041
STRUCTURAL REPAIR OF CONCRETE (DEPTH
GREATER THAN 5 IN.)
SQ FT 44
* JT503100 FIBER WRAP REPAIR SQ FT 115
* JT503431 FAST APPROACH SLAB REPAIR (PARTIAL) SQ YD 8
* JT524010 APPLY CONCRETE SEALANT SQ FT 12,050
* JT524015 BRIDGE DECK CONCRETE SEALER SQ FT 101,548
* JT525068
MODULAR EXPANSION JOINT STRIP SEAL
REPLACEMENT, 6 IN
FOOT 224
* JT525230
BONDED PREFORMED JOINT SEAL
REPLACEMENT, 3 IN.
FOOT 355
* JT525235
BONDED PREFORMED JOINT SEAL
REPLACEMENT, 4 IN.
FOOT 204
* JT544200 CULVERT TO BE CLEANED (SPECIAL) FOOT 364
* JT546000 TELEVISION INSPECTION OF SEWER FOOT 364
* JT599105
SLOPE WALL GAP FILLER REMOVAL AND
REPLACEMENT
FOOT 158
* JT602831 CLEAN DRAINAGE SYSTEM, LOCATION 1 EACH 1
* JT780310 MULTI-POLYMER PAVEMENT MARKING - LINE 6" FOOT 103,668
* JT780320
MULTI-POLYMER PAVEMENT MARKING - LINE
10"
FOOT 3,147
* JT780325
MULTI-POLYMER PAVEMENT MARKING - LINE
12"
FOOT 1,177
* JT783005
WATERBLAST PAVEMENT MARKING REMOVAL
WITH VACUUM RECOVERY
SQ FT 72,764
* JT783009
RAISED PAVEMENT LANE MARKER, REFLECTOR
REMOVAL
EACH 678
* JT900532 INJECT POLYURETHANE FOAM POUND 347
TOTAL AMOUNT OF CORE WORK
Addendum 1 P - 10 April 16, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-2034
SCHEDULE OF PRICES
SYSTEMWIDE STRUCTURAL REHABILITATION
* JT155001 CONTRACTOR'S QUALITY PROGRAM L SUM 1 $100,000.00 $100,000.00
* JT154008
UNFORESEEN ADDITIONAL MAINTENANCE OF
TRAFFIC
UNIT 50,000 $1.00 $50,000.00
* JT154045
CONTRACT ALLOWANCE FOR COLD
WEATHER PAVEMENT MARKINGS
UNIT 25,000 $1.00 $25,000.00
* JT154067
CONTRACT ALLOWANCE FOR
CONSTRUCTIONWORKS APPRENTICES
UNIT 25,000 $1.00 $25,000.00
* JT154095
CONTRACT ALLOWANCE FOR MAINTAIN
LIGHTING SYSTEMS
UNIT 5,000 $1.00 $5,000.00
* JT154103
ALLOWANCE FOR RAILROAD FLAGGING AND
SERVICES
UNIT 30,000 $1.00 $30,000.00
* JT154118 ALLOWANCE FOR UNFORESEEN CONDITIONS UNIT 15,000 $1.00 $15,000.00
** 999NEG04
NON-COMPLIANCE WITH TOLLWAY
MAINTENANCE OF TRAFFIC PER TOLLWAY
SUPPL. SPEC. 701.08(a)
INC/DAY ($2,500.00)
** 999NEG05
FAILURE TO RESPOND TO RE-ESTABLISH
DEVICES PER TOLLWAY SUPPL. SPEC.
701.08(b)
OCCUR ($2,500.00)
** 999NEG06
FAILURE TO REPAIR IMPACT ATTENUATORS,
TEMPORARY PER TOLLWAY SUPPL. SPEC.
701.08(c)
OCCUR ($2,500.00)
** 999NEG08
FAILURE TO OPEN TRAFFIC LANES TO
TRAFFIC PER TOLLWAY SUPPL. SPEC.
701.08(e)(a)
15 MINUTES ($3,000.00)
** 999NEG09
FAILURE TO OPEN TRAFFIC LANES TO
TRAFFIC PER TOLLWAY SUPPL. SPEC.
701.08(e)(b)
15 MINUTES ($5,000.00)
Addendum 1 P - 11 April 16, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-2034
SCHEDULE OF PRICES
SYSTEMWIDE STRUCTURAL REHABILITATION
** 999NEG20
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 - TRI-
STATE
OCCUR ($10,000.00)
** 999NEG24
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 -
REAGAN MEMORIAL EAST
OCCUR ($9,000.00)
** 999NEG30
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 -
ALL ROADWAYS OFF-PEAK
OCCUR ($2,000.00)
** 999NEG31
DAMAGE TO ELECTRICAL FACILITIES PER
TOLLWAY SUPPL. SPEC. 107.30(b)
INC/DAY ($1,000.00)
** 999NEG32
LIQUIDATED DAMAGES FOR DELAY IN
SUBMITTAL OF PROGRESS SCHEDULE PER
TOLLWAY SUPPL. SPEC. 108.02(e)
DAY ($300.00)
** 999NEG33
NON-COMPLIANCE WITH EROSION AND
SEDIMENT CONTROL PER TOLLWAY SUPPL.
SPEC. 280.02 (2) (1)
INC/DAY ($1,000.00)
** 999NEG34
NON-COMPLIANCE WITH RESPONSIBILITY
FOR CONSTRUCTION HAULING EQUIPMENT
PER TOLLWAY SUPPL. SPEC. 105.15
DAY ($1,000.00)
** 999NEG35
FAILURE TO RESPOND TO REGULATORY
AGENCY REQUESTS, PER TOLLWAY SUPPL.
SPEC. 280.02 (2) (2)
OCCUR ($25,000.00)
** 999NEG36
FAILURE TO COMPLY WITH OCCUPANCY
DATE OR PROVIDE COMPLETE FACILITIES.
FIELD OFFICE OR LAB PER TOLLWAY SUPPL.
SPEC. 670.01 (b)
DAY ($500.00)
** 999NEG44
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.1
CAL DAY ($6,000.00)
** 999NEG45
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.2
CAL DAY ($6,000.00)
** 999NEG46
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.3
CAL DAY ($3,000.00)
** 999NEG47
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.4
CAL DAY ($3,000.00)
** 999NEG48
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.5
CAL DAY ($3,000.00)
** 999NEG49
DAMAGE TO FIBER OPTIC UTILITIES, PER S.P.
115.3
OCCUR ($10,000.00)
** 999NEG48
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.8
CAL DAY ($3,000.00)
Addendum 1 P - 12 April 16, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-2034
SCHEDULE OF PRICES
SYSTEMWIDE STRUCTURAL REHABILITATION
* 999NEG53
NON-COMPLIANCE WITH CONTRACTOR
QUALITY PROGRAM SPECIAL PROVISION
OCCUR ($1,000.00)
* 999NEG54
DAMAGE TO TOLLWAY MULTI-MODE CABLE,
DMS SIGNS,
CAMERAS,TELECOMMUNICATION,CABLE,
ELECTRICAL,WATER and SEWER PER S.P.
115.4
OCCUR ($1,000.00)
** 999NEG60
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.6
CAL DAY ($3,000.00)
** 999NEG61
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.7
CAL DAY ($3,000.00)
** 999NEG62
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.8
CAL DAY ($3,000.00)
* 999ADJ45
CONSTRUCTIONWORKS APPRENTICES WAGE
RATE PAYMENT
HOUR $15.00
* 999ADJ46 ARROW BOARD EACH $13.32
* 999ADJ48 TYPE I OR TYPE II BARRICADE EACH $1.00
* 999ADJ50 TYPE III BARRICADE EACH $2.35
* 999ADJ52 PLASTIC DRUM EACH $1.25
* 999ADJ54 FLASHER LIGHT EACH $0.20
* 999ADJ56 STEADY BURN LIGHT EACH $0.30
Addendum 1 P - 13 April 16, 2026R
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-2034
SCHEDULE OF PRICES
SYSTEMWIDE STRUCTURAL REHABILITATION
* 999ADJ58 HI-INTENSITY LIGHT, SIGN MOUNTED EACH $1.70
* 999ADJ60 CMS, SOLAR POWERED EACH $45.70
* 999ADJ62 SIGNS, WORK ZONE EACH $2.00
* 999ADJ64
TEMPORARY MODULAR GLARE SCREEN (12.5
FT. SECTION)
UNIT $0.60
* 999ADJ65
TEMPORARY CONCRETE BARRIER (12.5 FT.
SECTION)
UNIT $0.83
* 999ADJ66
TEMPORARY CONCRETE BARRIER (10.0 FT.
SECTION)
UNIT $0.50
* 999ADJ67
TEMPORARY CONCRETE BARRIER, CROSS
BOLT CONNECTION (12.5 FT. SECTION)
UNIT $1.47
* 999ADJ68 TEMPORARY SAND MODULE ATTENUATOR EACH $18.33
* 999ADJ69
IMPACT ATTENUATOR, TEMPORARY (SEVERE
USE, NARROW), TEST LEVEL 3
EACH $18.33
* 999ADJ70
IMPACT ATTENUATOR, TEMPORARY (SEVERE
USE, WIDE), TEST LEVEL 3
EACH $18.33
* 999ADJ71
TEMPORARY INFORMATION SIGNING-
GROUND MOUNTED, 24 SQ FT IN AREA OR
LESS
SQ FT $0.25
* 999ADJ72
TEMPORARY INFORMATION SIGNING-
GROUND MOUNTED, GREATER THAN 24 SQ
FT IN AREA
SQ FT $0.25
* 999ADJ73
TEMPORARY INFORMATION SIGNING-
OVERHEAD, 24 SQ FT IN AREA OR LESS
SQ FT $0.25
* 999ADJ74
TEMPORARY INFORMATION SIGNING-
OVERHEAD, GREATER THAN 24 SQ FT IN
AREA
SQ FT $0.25
Addendum 1 P - 14 April 16, 2026R
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-2034
SCHEDULE OF PRICES
SYSTEMWIDE STRUCTURAL REHABILITATION
TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S QUALITY PROGRAM (CQP) $250,000
BID CREDIT
AWARD CRITERIA
S.P. COLUMN LEGEND
INDICATES SPECIAL PROVISION (PROJECT SPECIFIC OR TOLLWAY STANDARD) *
INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS **
INDICATES IDOT SUPPLEMENTAL SPECIFICATIONS AND RECURRING SPECIAL PROVISIONS ***
INDICATES IDOT BDE SPECIAL PROVISION BDE
INDICATES IDOT GBSP SPECIAL PROVISION GBSP
INDICATES DISTRICT 1 SPECIAL PROVISION D1
TOTAL AMOUNT OF CORE WORK + TOTAL AMOUNT OF CONTINGENCY WORK +
CONTRACTOR'S QUALITY PROGRAM = TOTAL AMOUNT OF BASE BID
Addendum 1 P - 15 April 16, 2026
Contract No. RR-25-2034 J- 2R April 16, 2026
Addendum 1
S.P. 102 CONTRACT RR-25-2034 INDEX OF DRAWINGS
DRAWING NO. SHEET NO. DRAWING DESCRIPTION
1 COVER COVER SHEET
2 GEN-01 INDEX OF DRAWINGS AND GENERAL NOTES
3-4 PRG-01 TO PRG-02 SUGGESTED PROGRESS SCHEDULE
5-6 SOQ-01 TO SOQ-02 SUMMARY OF QUANTITIES
7-8 MOT-01 TO MOT-02 MAINTENANCE OF TRAFFIC NOTES
9-19 MOT-03 TO MOT-13 MAINTENANCE OF TRAFFIC TYPICAL
SECTIONS
20-40 MOT-14 TO MOT-34 MAINTENANCE OF TRAFFIC
41-53 PMK-01 TO PMK-13 PAVEMENT MARKING
54-55 DRAIN-1 TO DRAIN-2 CULVERT REPAIR PLANS
56-59 REC-01 TO REC-04 CULVERT RECORD PLANS
60-62 SA-1 TO SA-3 RETAINING WALL B PLANS
63-70 SB-1 TO SB-8 BRIDGE NO. 141/142
71-78 SC-1 TO SC-8 BRIDGE NO. 157
79-85 SD-1 TO SD-7 BRIDGE NO. 273
86-94 SE-1 TO SE-9 BRIDGE NO. 331
95-97 SF-1 TO SF-3 BRIDGE NO. 165
98-117 SG-1 TO SG-20 BRIDGE NO. 447
118-141 SH-1 TO SH-24 NOISE ABATEMENT WALL TN22.30N.EBS
142-150 MOT-02-01 TO
MOT-02-09
BRIDGE NO. 120 MAINTENANCE OF TRAFFIC
151-155 RDY-1 TO RDY-5 BRIDGE NO. 120 ROADWAY PLAN
156-160 SJ-1 TO SJ-5 BRIDGE NO. 120 STRUCTURAL PLANS
160A-160G DETAIL-01 TO DETAIL-07 IDOT DETAILS (BLR AND DISTRICT 1)
ILLINOIS TOLLWAY STANDARD DRAWINGS
STANDARD NO. TITLE
SECTION C -
C1-13 GALVANIZED STEEL PLATE BEAM GUARDRAIL
C6-11 SHOULDER WIDENING FOR TRAFFIC BARRIER
TERMINAL TYPE T1 (SPECIAL) TANGENT
C7-08 TRAFFIC BARRIER TERMINAL, TYPE T2
SECTION D - ROADWAY APPURTENANCES
D4-10 ROADWAY DELINEATORS AND REFLECTORS
D5-11 PERMANENT PAVEMENT MARKINGS MAINLINE
D7-01 SHOULDER RUMBLE STRIP DETAILS
D8-03 RAISED PAVEMENT LANE MARKER
D10-04 TEMPORARY CONCRETE BARRIER WITH CROSS-
BOLT CONNECTION
SECTION E - MAINTENANCE OF TRAFFIC
E1-07 CONSTRUCTION SIGNS
E2-12 LANE CLOSURE DETAILS
Contract No. RR-25-2034 J- 170R April 16, 2026
EXTENDED MAINTENANCE OF TRAFFIC WORK AND EQUIPMENT RATES (Illinois Tollway)
Effective: September 1, 2021 Revised: March 20,2026
Description. This work shall consist of performing work zone traffic control and protection work as specified in the Contract Documents beyond the original Substantial Completion Date. In addition, maintenance of traffic related equipment rates are established that apply to extra work.
Method of Measurement & Basis of Payment.
Payment will be made on a force account basis in accordance with Article 109.04 of the Illinois Tollway Supplement Specifications. Payment rates for devices will be made at the unit Rate Per Day in the below table.
Should the Contractor qualify for such payment, a corresponding adjustment amount will then be made to UNFORESEEN ADDITIONAL MAINTENANCE OF TRAFFIC.
In all cases, payment for devices will be made for a maximum of 180 days beyond the original Substantial Completion Date shown in the approved baseline schedule.
The below rates reflect equipment usage only. Additional costs for realignment, repairs, maintenance, or replacement of these devices shall be reimbursed according to Illinois Tollway Supplemental Specifications Article 109.04, Payment for Extra Work.
Item number Device Description Unit Rate Per Day
999ADJ46 Arrow Board Each $13.32
999ADJ48 Type I or Type II Barricade Each $1.00
999ADJ50 Type III Barricade Each $2.35
999ADJ52 Plastic Drum Each $1.25
999ADJ54 Flasher Light Each $0.20
999ADJ56 Steady Burn Light Each $0.30
999ADJ58 Hi-intensity Light, Sign Mounted Each $1.70
999ADJ60 CMS, Solar Powered Each $45.70
999ADJ62 Signs, Work Zone Each $2.00
999ADJ64
Temporary Modular Glare Screen (12.5 Ft.
Section)
Unit $0.60
999ADJ65 Temporary Concrete Barrier (12.5 Ft. Section) Unit $0.83
999ADJ66 Temporary Concrete Barrier (10.0 Ft. Section)
Unit
$0.50
Contract No. RR-25-2034 J- 171R April 16, 2026
999ADJ67
Temporary Concrete Barrier, Cross Bolt Connection (12.5 Ft. Section)
Unit $1.47
999ADJ68 Temporary Sand Module Attenuator Each $18.33
999ADJ69
Impact Attenuator, Temporary (Severe Use, Narrow), Test Level 3
Each $18.33
999ADJ70
Impact Attenuator, Temporary (Severe Use, Wide), Test Level 3
Each $18.33
999ADJ71
Temporary Information Signing-Ground Mounted, 24 Sq Ft in area or less
Sq Ft $0.25
999ADJ72
Temporary Information Signing-Ground Mounted, Greater than 24 Sq Ft in area
Sq Ft $0.25
999ADJ73
Temporary Information Signing-Overhead, 24 Sq Ft in area or less
Sq Ft $0.25
999ADJ74
Temporary Information Signing-Overhead, Greater than 24 Sq Ft in area
Sq Ft $0.25
Contract No. RR-25-2034 J- 172R April 16, 2026
PAGE INTENTIONALLY LEFT BLANK
NUMBERTITLE
Ro ck
Fo x
R iv e r
R iv e r
R ive r
F o x
ILLINOIS
WISCONSIN
CHICAGO
IN
D
IA
N A
IL
L
IN
O
IS
Lake
Fox
LAKE MICHIGAN
LEE
WINNEBAGO
OGLE
HENSON
LA SALLE
DE KALB
KENDALL
KANE
BOONE
Mc HENRY
COOK
WILL
Du PAGE
LAKE
JURISDICTIONAL MAP
ZION
GURNEE
WAUKEGAN
HIGHLAND PARKHALF DAY
MUNDELEIN
BARRINGTON
CRYSTAL
MARENGO
LAKE
BELVIDERE
HARVARD
HEBRON
RICHMOND
ANTIOCH
Lake
Geneva
Fontana
Walworth
Clinton
BELOIT
ROCKTON
LOVES
PARK
ROCKFORD
Durand
Dakota
Orangeville
BYRON
OREGON
POLO
KIRKLAND
GENOA
HAMPSHIRE
ELGIN
SYCAMORE
DEKALB
MALTA
CRESTON
ROCHELLE
ELBURN
ST. CHARLES
ROSELLE
ARLINGTON
HTS.
O'HARE
EVANSTON
NAPERVILLE
JOLIET
PLAINFIELD
AURORA
SANDWICH
HINCKLEY
SHABBONA
COMPTON
DIXON
Grove
Deer
ORLAND
PARK
PALOS
HTS.
HARVEY
MCHENRY
/1
/2
B W
P L O
T D
A T E
P L O
T T E D B
Y p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \I S T H
A \R
R -2
-4
\2
.0
D
U R T O \1
D e si g n \1
.3
C
A D
D \S
H E E T S \4
T O -G e n C o v e r.
d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
IL
T o ll w a y C o v e r
P L O
T D
R
IV
E R c p w lo c a l\ v i\ h h w y ss
\b w it o rt \d m s3
\p d f-
IL
T o ll w a y .p lt c fg
P E N
T A
B L E p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \S ta n d a rd s\
IL
T o ll w a y C
A D \T a b le s\
P e n \B la c k
W h it e -I L T o ll w a y .T
B L
P L O
T T
IM
E
:5
:3
A
M
PAGE SIZE:PLOT SCALE: 0.1667 ' / in. 17x11 (in.)
2 7 0 0 O G D E N A V E N U E • D O W N E R S G R O V E • I L L I N O I S • 6 0 5 1 5
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
SUBCONSULTANTS
DESIGN SECTION ENGINEER
www.rina-us.org
CHICAGO, IL 60603
SUITE 3450
55 EAST MONROE STREET
PATRICK ENGINEERING INC.
Design Firm License No. 184000409-0014
550 WARRENVILLE RD # 220, LISLE, IL 60532 (630) 702-9855
A S S O C I A T E S
Illinois State Engineering Corporation #035.002718
Collinsville, IL 62234
Suite 206B
T. 618 344 1156 1803 Ramada Boulevard, I-88 RONALD REAGAN, MP 138.5
SN: BN 273 (NB)
NW I-294 RAMP M OVER E-W AND SALT CREEK
SN: BN 165 (NB)
SOUTHWEST HIGHWAY BRIDGE
I-294 TRI-STATE TOLLWAY, MP 16.1
CONTRACT RR-25-2034
STRUCTURAL REHABILITATION
SYSTEMWIDE
I-94 TRI-STATE TOLLWAY, MP 22.3
TN: TN22.30N (EB)
NOISE WALL REPAIR
RR-25-2034
I-294 TRI-STATE TOLLWAY, MP 48.9
SN: BN 331 (CROSSROAD)
WILLOW ROAD BRIDGE
RR-25-2034
RR-25-2034
I-94 TRI-STATE TOLLWAY, MP 1.2
SN: BN 447 (WB)
US ROUTE 41 RAMP
RR-25-2034
RR-25-2034
I-294 TRI-STATE TOLLWAY, MP 14.6
SN: BN 157 (NB)
115TH STREET BRIDGE
RR-25-2034
I-294 TRI-STATE TOLLWAY, MP 14.1
PAVEMENT AND CULVERT REPAIRS
RR-25-2034
I-294 TRI-STATE TOLLWAY, MP 10.7
SN: BN 141 (NB) & BN 142 (SB)
135TH STREET BRIDGE
RR-25-2034
I-294 TRI-STATE TOLLWAY, MP 4.1
WALL TS4.00 NB-R
BARRIER REPAIR
RR-25-2034
RR-25-2034
I-294 NB OVER ASHLAND AVENUE, CN RAILROAD AND WOOD STREET
SN: BN 120 (NB)
I-294 TRI-STATE TOLLWAY, MP 3.7
D
W
G
GENERAL
MAINTENANCE OF TRAFFIC
DRAINAGE PLANS
RETAINING WALL PLANS
BRIDGE PLANS
NOISE WALL PLANS
54-59
60-62
63-117
118-141
7-40
PAVEMENT MARKING PLANS 41-53
1-6
142-160BN 120 PLANS
IDOT DETAILS 160A - 160G
NTS
N
ILLINOIS
ILLINOIS
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
BITUMINOUS PAVING IS TO BE COMPLETED BY BITUMINOUS PRODUCER.3.
COMPENSATION WILL BE PAID FOR THIS WORK.
OPERATIONS SHALL BE SWEPT DAILY OR IMMEDIATELY AS DIRECTED BY THE ENGINEER. NO ADDITIONAL
CONSTRUCTION. ANY DIRT OR DEBRIS TRACKED ONTO PAVEMENT OR ROADWAYS DUE TO CONTRACTOR
CONTRACTOR SHALL PREVENT DIRT AND DEBRIS FROM BEING TRACKED OUTSIDE OF THE LIMITS OF 2.
THE WORK.
TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED AS SOON AS PRACTICAL AFTER COMPLETION OF
AREAS, SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AND TO THE SATISFACTION OF THE ENGINEER.
THE JOB SITE, TEMPORARY VEHICULAR PARKING, TEMPORARY STORAGE, AND TEMPORARY EROSION CONTROL
ALL AREAS THAT HAVE BEEN DISTURBED BY THE CONTRACTOR'S OPERATIONS, INCLUDING TEMPORARY ACCESS TO 1.
RESTORATION NOTES
AREA ON A DAILY BASIS.
REMOVE ALL CONSTRUCTION-RELATED DEBRIS FROM AREAS OUTSIDE THE LIMITS OF THE CONTRACTOR'S WORK 3.
REMAIN FROM CONTRACTOR OPERATIONS.
CONTRACTOR SHALL KEEP WORK AREAS FREE FROM ACCUMULATIONS OF WASTE OR DEBRIS. NO RUBBISH SHALL 2.
WATER, AND NOISE POLLUTION.
THE CONTRACTOR IS REQUIRED TO COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS REGARDING AIR, 1.
POLLUTION CONTROL NOTES
GENERAL NOTES
FEATURE TOLLWAY LOCATION LOCAL ROAD JURISDICTION COUNTY
PROJECT JURISDICTIONS
TB
KM
RM
GEN-01
INDEX OF DRAWINGS
DRAWING NO. SHEET NO. DESCRIPTION
COVER SHEET1 COV-01
2 GEN-01 INDEX OF DRAWINGS AND GENERAL NOTES
SUMMARY OF QUANTITIES
- MAINTENANCE OF TRAFFIC TYPICAL SECTIONS
-3 4 02-PRG-01 SUGGESTED PROGRESS SCHEDULE
- 02-MOT-01
-MOT-03
CULVERT REPAIR PLANS
- RETAINING WALL B PLANS-SA-1
- 8-SB-1 BRIDGE NO. 141-142 PLANS
- 8-SC-1 BRIDGE NO. 157 PLANS
- 7- BRIDGE NO. 273 PLANS
- 9- BRIDGE NO. 331 PLANS
MAINTENANCE OF TRAFFIC NOTES
- -REC-01 CULVERT RECORD PLANS
DATE: ______________________________
I S
ILLNOI
PROFESSIONAL
ENGINEER
OF
LICENSED
062-070776
APPLY TO DRAWINGS:
NO. 062-070776 EXP. DATE: 11/30/2027
TRENTON G BRUNS, P.E.
S N
U
RB G NOT
N
E R
T
OF
LICENSED
062-066696
DATE: ______________________________
L
IC
E N S
ED
ST
RUCTURALEN
G
IN
E E R
STATEOFILLIN
OI
S
081-007649
APPLY TO DRAWINGS:
NO. 081-007649 EXP. DATE: 11/30/2026
LAURA BLOOMBERG, P.E., S.E.
OF
LICENSED
062-073445
APPLY TO DRAWINGS:
NO. 062-066696 EXP. DATE: 11/30/2027
SOPHIA AHMED, P.E.
APPLY TO DRAWINGS:
NO. 062-073445 EXP. DATE: 11/30/2027
MOHAMMAD NEISHAPOURI, P.E.
I R
U O
P A
HSIEN DA
M
M A
H O
M
D E
MHA .F AIH
P
O S
LAURA F. BLOOMBERG
S
D
W
G
S
I
S
T
H
A
GALVANIZED STEEL PLATE BEAM GUARDRAIL C1-13
D4-10
D5-11
D7-01
D8-03
E1-07
E2-12
E3-11
701601-09
WITH NONTRAVERSABLE MEDIAN
URBAN LANE CLOSURE, MULTILANE, 1W OR 2W
701606-10
WITH MOUNTABLE MEDIAN
URBAN SINGLE LANE CLOSURE, MULTILANE, 2W
701611-01
WITH MOUNTABLE MEDIAN
URBAN HALF ROAD CLOSURE, MULTILANE, 2W
701701-10URBAN LANE CLOSURE, MULTILANE INTERSECTION
701801-06SIDEWALK, CORNER OR CROSSWALK CLOSURE
TRAFFIC CONTROL DEVICES
TRAFFIC BARRIER TERMINAL TYPE 1 BLR23-4
ROADS, INTERSECTIONS, AND DRIVEWAYS
TRAFFIC CONTROL AND PROTECTION FOR SIDE
TC-10
ROADWAY DELINEATORS AND REFLECTORS
PERMANENT PAVEMENT MARKINGS MAINLINE
SHOULDER RUMBLE STRIP DETAILS
RAISED PAVEMENT LANE MARKER
CONSTRUCTION SIGNS
LANE CLOSURE DETAILS
SHOULDER CLOSURE DETAILS
DATE: ______________________________
L
IC
E N S
ED
ST
RUCTURALEN
G
IN
E E R
STATEOFILLIN
081-007039
NATHAN D. RICK
APPLY TO DRAWINGS:
NO. 081-007039 EXP. DATE: 11/30/2026
NATHAN D. RICK, P.E., S.E.
- -SG-1 BRIDGE NO. 447 PLANS
- 24- NOISE ABATEMENT WALL TN22.30N.EB PLANS
I-294 OVER 135TH STREET ROBBINS COOK
I-294 OVER 115TH STREET WORTH COOK
I-294 OVER I-88 TOLLWAY DUPAGE
I-294 UNDER WILLOW ROAD IDOT COOK
I-94 OVER US-41 IDOT LAKE
- - MAINTENANCE OF TRAFFIC PLANS
- -DRAIN-01 02
SH-1
CONTRACTOR ACCESS TO WORK AREA E6-09
SD-1
SE-1
K1-14EROSION CONTROL AND LANDSCAPE
BRIDGE (BN 141 & 142)
BRIDGE (BN 157)
BRIDGE (BN 273)
BRIDGE (BN 331)
BRIDGE (BN 447)
- -PMK-01 PAVEMENT MARKING PLANS
- -SF-1 3 BRIDGE NO. 165 PLANS
I-294 IDOT COOKBRIDGE (BN 165) OVER SOUTHWEST HIGHWAY
DATE: ______________________________
APPLY TO DRAWINGS:
NO. 062-066245 EXP. DATE: 11/30/2027
AMBER M. SEIBER, P.E.
OF
LICENSED
062-066245 R E
BI
ES .M R
E
B M
A
DATE: ______________________________
L
IC
E N S
ED
ST
RUCTURALEN
G
IN
E E R
STATEOFILLIN
081-
NO. 081-007039 EXP. DATE: 11/30/2026
APPLY TO DRAWINGS:
LUKAS JANULIS
007565
LUKAS JANULIS, S.E.
SHEETS 7-53 SHEETS 54-59
ARTERIAL ROAD INFORMATION SIGNING TC-22
TC-26
SHEETS 118-141
19 13
MOT-144020
41 53 13
63 70
71 78
79 85
86 94
118 141
3 / 20 / 2026 3 / 20 / 2026 3 / 20 / 2026 3 / 20 / 2026 3 / 20 / 2026
3 / 20 / 2026 3 / 20 / 2026
NOTES
INDEX OF DRAWINGS AND GENERAL
C6-11
TERMINAL TYPE T1 (SPECIAL) TANGENT
SHOULDER WIDENING FOR TRAFFIC BARRIER
TRAFFIC BARRIER TERMINAL, TYPE T2 C7-08
SHEETS 60-97 SHEETS 98-100, 102-117
I
D
O
W
G
S
PAVEMENT MARKERS (SNOW-PLOW RESISTANT)
TYPICAL APPLICATIONS RAISED REFLECTIVE
TC-11
-5 6 02-SOQ-01
7 8
SHEETS 1-6
SHEET 101
TC-13DISTRICT ONE TYPICAL PAVEMENT MARKINGS
DRIVEWAY ENTRANCE SIGNING
701106-02
15' AWAY
OFF-ROAD OPERATIONS, MULTILANE, MORE THAN
701400-12
FREEWAY/EXPRESSWAY
APPROACH TO LANE CLOSURE,
701401-13LANE CLOSURE, FREEWAY/EXPRESSWAY
701411-09
EXIT RAMP, FOR SPEEDS >= 45 MPH
LANE CLOSURE, MULTILANE, AT ENTRANCE OR
701428-01
FREEWAY/EXPRESSWAY
TRAFFIC CONTROL SETUP AND REMOVAL
- -142 160 BRIDGE NO. 120 PLANS
CONNECTION
TEMPORARY CONCRETE BARRIER WITH CROSS-BOLT D10-04
I-294 COOKOVERBRIDGE (BN 120) ASHLAND AVENUE COOK
I-294 COOKOVERBRIDGE (BN 120) CN RAILROAD CN RAILROAD
I-294 COOKOVERBRIDGE (BN 120) PARK AVENUE E HAZEL CREST
I-294 COOKOVERBRIDGE (BN 120) WOOD STREET IDOT
OF
LICENSED
3 / 20 / 2026
APPLY TO DRAWINGS:
NO. 062-059216 EXP. DATE: 11/30/2027
NICHOLAS J. SCHILLING III, P.E.
062-059216
II
I
G
NI
L
LI
HCS .J S
A
L O
H
CI
N
DATE: ______________________________
L
IC
E N S
ED
ST
RUCTURALEN
G
IN
E E R
STATEOFILLIN
APPLY TO DRAWINGS:
006191
3 / 20 / 2026
SARAH L. CZAPLICKI
SARAH L. CZAPLICKI, S.E.
NO. 081-006191 EXP. DATE: 11/30/2026
MOT-02-01 SJ-5
SHEET 142-155
AS DIRECTED BY THE ENGINEER.
SPECIFICALLY INDICATED IN THE PLANS, SHALL BE PERFORMED AT LOCATIONS
12. ITEMS OF WORK LISTED IN THE SUMMARY OF QUANTITIES, WHICH ARE NOT
MATERIALS ACCORDINGLY TO AVOID DELAYS.
CONJUNCTION WITH CONTRACT COMPLETION REQUIREMENTS AND ORDER
11. THE CONTRACTOR SHALL REVIEW THE SUGGESTED PROGRESS SCHEDULE IN
COST TO THE TOLLWAY.
IMMEDIATELY UNDER THE UTILITY OWNER’S DIRECTION AND AT NO ADDITIONAL
CAUSED BY THE CONSTRUCTION OPERATIONS SHALL BE REPAIRED OR REPLACED
SERVICE SHALL BE FULLY PROTECTED BY THE CONTRACTOR, AND ANY DAMAGE
DAYS OF THE REQUEST. ANY EXISTING UTILITIES THAT ARE TO REMAIN IN
THE DAY THE REQUEST IS MADE, AND EXCAVATION MUST COMMENCE WITHIN 14
ARE COMPLETED. JULIE TICKETS ARE VALID FOR 28 CALENDAR DAYS, INCLUDING
CONTRACTOR SHALL NOT BEGIN ANY EXCAVATION UNTIL ALL JULIE PROCEDURES
REQUEST FOR THE FIELD LOCATIONS OF BURIED NON-TOLLWAY UTILITIES. THE
SHALL CALL J.U.L.I.E AT (800) 892-0123 OR 811 OR SUBMIT AN ONLINE
UNDER THIS CONTRACT. BEFORE STARTING ANY EXCAVATION, THE CONTRACTOR
AND NATURE OF ANY EXISTING UTILITIES THAT MAY INTERFERE WITH THE WORK
CONDUCT THE NECESSARY INVESTIGATIONS INTO THE LOCATION, SIZE, DEPTH
GUARANTEED TO BE CORRECT OR ALL INCLUSIVE. THE CONTRACTOR SHALL
REPRESENT DATA RECEIVED FROM VARIOUS SOURCES AND ARE NOT
10. THE LOCATIONS OF EXISTING UTILITIES, AS SHOWN ON THE DRAWINGS,
S.P. 115.
https://www.illinoisvirtualtollway.com/doing-business. SEE SPECIAL PROVISIONS
REQUEST FORM A-36. TO SUBMIT A TOLLWAY LOCATE, LOG ONTO
PROCESS FOR THE TOLLWAY FACILITIES BY COMPLETING AN ONLINE LOCATE
INCLUDED IN THE CONTRACT. THE CONTRACTOR SHALL INITIATE THE LOCATE
WORK SHALL NOT BE PAID FOR SEPARATELY BUT SHALL BE CONSIDERED
THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE TOLLWAY. THIS
PROCEDURES, REPAIR OF THE DAMAGES TO THE CABLES SHALL BE DONE AT
EITHER THROUGH CARELESSNESS OR FAILURE TO FOLLOW THE ABOVE
THEN RELOCATED. IF THE CONTRACTOR CUTS OR DAMAGES ANY CABLES,
LOCATION SHALL FIRST BE EXPOSED BY THE CONTRACTOR BY HAND DIGGING,
CABLES. ANY BURIED CABLE AT OR NEAR A PROPOSED CONSTRUCTION
CABLES. TOLLWAY ELECTRICIANS WILL LOCATE ANY POSSIBLE INTERFERING
NEAR TOLLWAY OWNED ELECTRICAL COMMUNICATIONS OR TRAFFIC CONTROL
TOLLWAY ELECTRICIAN AT LEAST 10 DAYS IN ADVANCE OF ANY CONSTRUCTION
9. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE
(CORS) NETWORK IS AVAILABLE FOR CONTRACTOR USE.
8. THE ILLINOIS TOLLWAY CONTINUOUSLY OPERATING REFERENCE STATION
CURRENT ADJUSTMENT.
COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN DATUM OF 1983 (NAD 83),
7. THE SYSTEM ALIGNMENT IS BASED ON THE ILLINOIS STATE PLANE
THE PLANS.
1988 (NAVD 88, GEOID12A). BENCHMARKS FOR THE PROJECT ARE DESCRIBED IN
6. ALL ELEVATIONS ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM OF
INTERNATIONAL SURVEY FOOT.
CURRENT ADJUSTMENT. ALL COORDINATE VALUES ARE SHOWN IN
COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN DATUM OF 1983 (NAD 83),
5. ALL COORDINATES SHOWN ARE BASED ON THE ILLINOIS STATE PLANE
THIS SHEET MAY BE USED FOR APPROXIMATE MEASUREMENTS.
MAKING MEASUREMENTS ON REDUCED-SIZE PLANS, THE SCALE BARS SHOWN ON
SCALES. REDUCED-SIZE PLANS DO NOT CONFORM TO STANDARD SCALES. WHEN
4. FULL-SIZE PLANS HAVE BEEN PREPARED USING STANDARD ENGINEERING
TO REMAIN OVERNIGHT.
STANDARD SPECIFICATIONS. NO OPENINGS IN THE FENCE SHALL BE ALLOWED
REMOVED BY THE CONTRACTOR IN ACCORDANCE WITH SECTION 664 OF THE
TEMPORARY FENCE SHALL BE INSTALLED IF THE EXISTING FENCE IS TO BE
THE CONTRACTOR IN KIND AT NO ADDITIONAL COST TO THE ILLINOIS TOLLWAY.
THE CONTRACTOR'S OPERATION SHALL BE RECONNECTED AND/OR REPLACED BY
3. EXISTING FENCE THAT HAS TO BE DISCONNECTED AND/OR REMOVED FOR
ADJACENT HIGHWAY APPURTENANCES.
WITH SHIELDS TO PREVENT DAMAGES TO MOTORISTS' VEHICLES AND TO
2. ALL DISTRIBUTORS FOR ASPHALT PAVING OPERATIONS SHALL BE EQUIPPED
COMMONWEALTH EDISON'S TRANSMISSION LINES.
LIMITED TO 15 FEET ABOVE EXISTING GRADE WHILE CROSSING UNDER
1. GENERAL SAFETY PROVISIONS: ALL CONSTRUCTION VEHICLES SHALL BE
SHEETS 156-160
701901-11
-160A 160G DETAIL-01 - 07 IDOT DETAILS (BLR AND DISTRICT 1)
1 ADDENDUM 14-16-2026
DATE: ______________________________
APPLY TO DRAWINGS:
NO. 062-054128 EXP. DATE: 11/30/2027
MICHAEL D. DUMAS, P.E.
OF
LICENSED
062-054128 S A
M
U
D .D LE
A
H
CI
M
160A - 160G
4 / 15 / 2026
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
DRAWING NO.
OF
DESCRIPTIONDATENO.
SHEET NO.DESIGNED BY: DATE:
DATE:
CHECKED BY: DATE:
DRAWN BY:
MILESTONE:
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY CONTRACT NO.
/1
/2
B W
P L O
T D
A T E
P L O
T T E D B
Y p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \I S T H
A \R
R -2
-4
\2
.0
D
U R T O \1
D e si g n \1
.3
C
A D
D \S
H E E T S \4
T O -G e n
N o te s.
d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D e fa u lt
P L O
T D
R
IV
E R c p w lo c a l\ v i\ h h w y ss
\b w it o rt \d m s3
\p d f-
IL
T o ll w a y .p lt c fg
P E N
T A
B L E p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \S ta n d a rd s\
IL
T o ll w a y C
A D \T a b le s\
P e n \B la c k
W h it e -I L T o ll w a y .T
B L
P L O
T T
IM
E
:1
:2
P
M
PAGE SIZE:PLOT SCALE: 0.1667 ' / in. 17x11 (in.)
REVISIONS
RR-25-203412/4/2025
12/4/2025
12/4/2025 2 160
DETAIL-01
IDOT DETAIL1 4/16/26
MD
BW
MD
4/17/26
4/17/26
4/17/26
ADDENDUM 1 - NEW SHEET
DRAWING NO.
CHECKED BY: DATE:
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT NO.
/2
B W
P L O
T D
A T E
P L O
T T E D B
Y p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \I S T H
A \R
R -2
-4
\2
.0
D
U R T O \1
D e si g n \1
.3
C
A D
D \S
H E E T S \4
T O -I
D O
T -D
-0
.d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D e fa u lt
P L O
T D
R
IV
E R c p w lo c a l\ v i\ h h w y ss
\b w it o rt \d m s3
\p d f-
IL
T o ll w a y .p lt c fg
P E N
T A
B L E p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \S ta n d a rd s\
IL
T o ll w a y C
A D \T a b le s\
P e n \B la c k
W h it e -I L T o ll w a y .T
B L
P L O
T T
IM
E
:1
:1
P
M
PAGE SIZE:PLOT SCALE: 10.000 ' / in. 17x11 (in.)
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
Design Firm License No. 184000409-0014 www.rina-us.org
LISLE, IL 60532
SUITE 100
2150 WESTERN COURT
PATRICK ENGINEERING INC.
RR-25-2034
160A 160
DETAIL-02
IDOT DETAIL1
MD 4/17/26
4/17/26BW
MD 4/17/26
ADDENDUM 1 - NEW SHEET4/16/26
DRAWING NO.
/2
B W
P L O
T D
A T E
P L O
T T E D B
Y p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \I S T H
A \R
R -2
-4
\2
.0
D
U R T O \1
D e si g n \1
.3
C
A D
D \S
H E E T S \4
T O -I
D O
T -D
-0
.d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D e fa u lt
P L O
T D
R
IV
E R c p w lo c a l\ v i\ h h w y ss
\b w it o rt \d m s3
\p d f-
IL
T o ll w a y .p lt c fg
P E N
T A
B L E p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \S ta n d a rd s\
IL
T o ll w a y C
A D \T a b le s\
P e n \B la c k
W h it e -I L T o ll w a y .T
B L
P L O
T T
IM
E
:0
:3
P
M
PAGE SIZE:PLOT SCALE: 10.000 ' / in. 17x11 (in.)
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
Design Firm License No. 184000409-0014 www.rina-us.org
LISLE, IL 60532
SUITE 100
2150 WESTERN COURT
PATRICK ENGINEERING INC.
160B 160
DETAIL-03
IDOT DETAIL4/16/261
MD 4/17/26
4/17/26BW
MD 4/17/26
ADDENDUM 1 - NEW SHEET
DRAWING NO.
/2
B W
P L O
T D
A T E
P L O
T T E D B
Y p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \I S T H
A \R
R -2
-4
\2
.0
D
U R T O \1
D e si g n \1
.3
C
A D
D \S
H E E T S \4
T O -I
D O
T -D
-0
.d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D e fa u lt
P L O
T D
R
IV
E R c p w lo c a l\ v i\ h h w y ss
\b w it o rt \d m s3
\p d f-
IL
T o ll w a y .p lt c fg
P E N
T A
B L E p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \S ta n d a rd s\
IL
T o ll w a y C
A D \T a b le s\
P e n \B la c k
W h it e -I L T o ll w a y .T
B L
P L O
T T
IM
E
:2
:1
P
M
PAGE SIZE:PLOT SCALE: 10.000 ' / in. 17x11 (in.)
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
Design Firm License No. 184000409-0014 www.rina-us.org
LISLE, IL 60532
SUITE 100
2150 WESTERN COURT
PATRICK ENGINEERING INC.
160C 160
DETAIL-04
MD 4/17/26
4/17/26BW
MD 4/17/26
ADDENDUM 1 - NEW SHEET
DRAWING NO.
/2
B W
P L O
T D
A T E
P L O
T T E D B
Y p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \I S T H
A \R
R -2
-4
\2
.0
D
U R T O \1
D e si g n \1
.3
C
A D
D \S
H E E T S \4
T O -I
D O
T -D
-0
.d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D e fa u lt
P L O
T D
R
IV
E R c p w lo c a l\ v i\ h h w y ss
\b w it o rt \d m s3
\p d f-
IL
T o ll w a y .p lt c fg
P E N
T A
B L E p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \S ta n d a rd s\
IL
T o ll w a y C
A D \T a b le s\
P e n \B la c k
W h it e -I L T o ll w a y .T
B L
P L O
T T
IM
E
:2
:1
P
M
PAGE SIZE:PLOT SCALE: 10.000 ' / in. 17x11 (in.)
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
Design Firm License No. 184000409-0014 www.rina-us.org
LISLE, IL 60532
SUITE 100
2150 WESTERN COURT
PATRICK ENGINEERING INC.
160D 160
DETAIL-05
MD 4/17/26
4/17/26BW
MD 4/17/26
ADDENDUM 1 - NEW SHEET
DRAWING NO.
/2
B W
P L O
T D
A T E
P L O
T T E D B
Y p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \I S T H
A \R
R -2
-4
\2
.0
D
U R T O \1
D e si g n \1
.3
C
A D
D \S
H E E T S \4
T O -I
D O
T -D
-0
.d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D e fa u lt
P L O
T D
R
IV
E R c p w lo c a l\ v i\ h h w y ss
\b w it o rt \d m s3
\p d f-
IL
T o ll w a y .p lt c fg
P E N
T A
B L E p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \S ta n d a rd s\
IL
T o ll w a y C
A D \T a b le s\
P e n \B la c k
W h it e -I L T o ll w a y .T
B L
P L O
T T
IM
E
:2
:5
P
M
PAGE SIZE:PLOT SCALE: 10.000 ' / in. 17x11 (in.)
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
Design Firm License No. 184000409-0014 www.rina-us.org
LISLE, IL 60532
SUITE 100
2150 WESTERN COURT
PATRICK ENGINEERING INC.
160E 160
DETAIL-06
MD 4/17/26
4/17/26BW
MD 4/17/26
ADDENDUM 1 - NEW SHEET
DRAWING NO.
/2
B W
P L O
T D
A T E
P L O
T T E D B
Y p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \I S T H
A \R
R -2
-4
\2
.0
D
U R T O \1
D e si g n \1
.3
C
A D
D \S
H E E T S \4
T O -I
D O
T -D
-0
.d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D e fa u lt
P L O
T D
R
IV
E R c p w lo c a l\ v i\ h h w y ss
\b w it o rt \d m s3
\p d f-
IL
T o ll w a y .p lt c fg
P E N
T A
B L E p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \S ta n d a rd s\
IL
T o ll w a y C
A D \T a b le s\
P e n \B la c k
W h it e -I L T o ll w a y .T
B L
P L O
T T
IM
E
:2
:2
P
M
PAGE SIZE:PLOT SCALE: 10.000 ' / in. 17x11 (in.)
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
Design Firm License No. 184000409-0014 www.rina-us.org
LISLE, IL 60532
SUITE 100
2150 WESTERN COURT
PATRICK ENGINEERING INC.
160F 160
DETAIL-07
MD 4/17/26
4/17/26BW
MD 4/17/26
ADDENDUM 1 - NEW SHEET
DRAWING NO.
/2
B W
P L O
T D
A T E
P L O
T T E D B
Y p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \I S T H
A \R
R -2
-4
\2
.0
D
U R T O \1
D e si g n \1
.3
C
A D
D \S
H E E T S \4
T O -I
D O
T -D
-0
.d g n
F
IL
E N
A M
E
M O
D E L N
A M
E
D e fa u lt
P L O
T D
R
IV
E R c p w lo c a l\ v i\ h h w y ss
\b w it o rt \d m s3
\p d f-
IL
T o ll w a y .p lt c fg
P E N
T A
B L E p w \p a tr ic k c o -p w .b e n tl e y .c o m :p a tr ic k c o -p w -0
\D o c u m e n ts \S ta n d a rd s\
IL
T o ll w a y C
A D \T a b le s\
P e n \B la c k
W h it e -I L T o ll w a y .T
B L
P L O
T T
IM
E
:3
:5
P
M
PAGE SIZE:PLOT SCALE: 10.000 ' / in. 17x11 (in.)
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
Design Firm License No. 184000409-0014 www.rina-us.org
LISLE, IL 60532
SUITE 100
2150 WESTERN COURT
PATRICK ENGINEERING INC.
160G 160
Addendum 1 1 of 5 4/16/2026
Capital Program
PRE-BID MEETING MINUTES
MEETING PURPOSE: Optional Pre-Bid Meeting - Contract RR-25-2034 Systemwide Structural Rehabilitation
MEETING DATE: April 1, 2026
MEETING TIME: 2:00 P.M.
CHAIRPERSON: Sherita Kelly - Senior Contract Negotiator
LOCATION: Illinois Tollway Microsoft Teams
TO: See Attached Sign-In Sheet
ISSUE DATE: April 16, 2026
1.0 Sherita Kelly called the meeting to order at 2:00 P.M.
2.0 Meeting attendees were introduced.
3.0 A brief project description was provided:
3.1 Contract Title: Systemwide Structural Rehabilitation.
3.2 The improvements to be constructed under this contract shall be performed along the Illinois Tollway at various locations in Lake, DuPage and Cook County, Illinois.
3.3 The scope of work under this contract includes partial depth transition and approach slab repairs, removal and replacement of joints, clean and reseal joints, PPC beam repairs, clean and paint existing bearings, structural repair of concrete, removal and replacement of guardrail, parapet removal and replacement, epoxy crack injection, MSE wall panel stabilization, noise abatement wall repairs, culvert pipe joint repair, asphalt shoulder repairs, bridge deck repairs, and maintenance of traffic and all other appurtenances and miscellaneous work shown on the plans as required by the Standard Specifications and within these special provisions.
4.0 Advertisement Schedule:
4.1 Plan Holder questions should be provided to
4849D.2034_Questions@docs.e-builder.net as identified on Page A-1.
4.2 Final Date for Plan Holder Questions- April 10, 2025 at 2:00 P.M local time.
4.3 Bid Opening Date – May 1, 2026 at 10:30:00 A.M. local time.
4.4 Please note that in accordance with the R pages of the Illinois Tollway Bid Requirements and section 45-105 of the Illinois Procurement Code (30 ILCS 500/45-105), the bidder or contractor must submit at the time of bid the Illinois
Addendum 1 2 of 5 4/16/2026
Capital Program
PRE-BID MEETING MINUTES
Business Bid Preference Affidavit and any other supporting documents demonstrating that the bidder or contractor is an Illinois business at the time of bid in order to be eligible for a 4% bid preference.
5.0 Compliance Goals:
5.1 Disadvantaged Business Enterprise Program (DBE) - 18 %
5.2 Veteran-Owned Small Business Program (VOSB) – 2.5 %
5.3 Workforce
5.3.1 Equal Employment Opportunity (EEO)
• Minority (19.6%)
• Female (6.9%)
6.0 Diversity Programs - Overview of Available Programs:
6.1 Earned Credit Program (ECP) – Encourages contractors to hire and retain low income-eligible individuals in heavy highway construction.
6.2 Technical Assistance Program – Provides customized business development for small, diverse, and veteran firms.
6.3 Partnering for Growth (P4G) - Encourages established contractors and consultants to mentor small, diverse, and veteran businesses.
6.4 ConstructionWorks Program – Provides pre-apprenticeship training and support to prepare diverse individuals for heavy highway construction careers.
7.0 Project Schedule:
7.1 Anticipated Notice-to-Proceed – July 20, 2026
7.2 Interim Completion Date (Bridge 273) – October 30, 2026
7.3 Interim Completion Date (Bridge 331) – November 2, 2026
7.4 Interim Completion Date (Noisewall TN22.30N EB) – October 19, 2026
7.5 Interim Completion Date (Bridge 165) – October 9, 2026
7.6 Interim Completion Date (Bridge 447) – November 19, 2026
7.7 Interim Completion Date (Bridge 120) – November 20, 2026
7.8 Substantial Completion Date – June 15, 2027
7.9 Contract Completion Date - July 27, 2027
8.0 Special Items to Note:
8.1 Construction activities will need to be coordinated with IDOT, Cook County Department of Transportation and Highways, Village of Worth, Village of Robbins, Village of East Hazel Crest, US Army Corps of Engineers, and Canadian National Railway per the specifications.
Addendum 1 3 of 5 4/16/2026
Capital Program
PRE-BID MEETING MINUTES
9.0 Responses to Plan Holder Questions
9.1 Questions received during the question period to be included in an addendum.
9.2 Addendum No 1 will be sent out the week of April 13, 2026 and will include the District One standard drawings.
10.0 Meeting adjourned at approximately 2:15 P.M.
4 of 5 4/16/2026
Name Email Role Organization Williamson, Carrie CWilliamson@getipass.com Organizer Illinois Tollway Kelly, Sherita skelly@getipass.com Organizer Illinois Tollway Coleman, Timothy TJColeman@getipass.com Presenter Illinois Tollway Qureshi, Safuddin squreshi@getipass.com Presenter Illinois Tollway King, Raven RKing@getipass.com Presenter Illinois Tollway Seagrave, Ann ASeagrave@getipass.com Attendee Illinois Tollway Kenneth ENG (External) kenneth.eng@rina.org External Presenter Mondel, Jim JMondel@getipass.com Attendee Illinois Tollway '+13316310562 Attendee Coppola, Morgan MCoppola@getipass.com Attendee Illinois Tollway Prohammer, Valerie VProhammer@getipass.com Attendee Illinois Tollway Drozd, Laura LDrozd@getipass.com Attendee Illinois Tollway Myers, Lindia LMyers@getipass.com Attendee Illinois Tollway Howe, Ruth RAHowe@getipass.com Attendee Illinois Tollway Ramos, Vanessa VRamos@getipass.com Attendee Illinois Tollway '+16303794726 Attendee
Optional Pre-Bid Meeting: Contract #RR-25-2034 Systemwide Structural Rehabilitation
Illinois State Toll Highway Authority Contract RR-25-2034
5 of 5 4/16/2026
File details come from the government source that posted it. Updated .