Rowe Road Bid Questions.pdf

PDF 257 KB Posted

Attached to
Natural Gas Main Replacement - Rowe Road
Solicitation number
PE-74750-NONST-2025-000000020
Issued by
Ware County, Georgia

About this file

This document contains bid questions and answers for the City of Monroe's Rowe Road Gas Main Replacement project. The project involves installing approximately 8,500 feet of natural gas main on Rowe Road, using roll/coil pipe rather than stick pipe. The new main will be installed on the west side of the road, the same side as the existing main. No pre-bid meeting is scheduled, and while lane closures will be needed for parts of the job, no lane closure permits will be issued.

The technical specifications indicate that tracer wire (but no ditch tape) will be required for open-trenched sections, EF branch saddles can be used for reg station tie-overs, and creek crossings must be deep enough to prevent fracking. The City of Monroe will handle service relights and provide service cards to the low bidder. All materials will be stored at and picked up from the city yard, where removed equipment must also be hauled. No steel welding is required, but SRCS qualification and OQ records are required for all fusers working onsite.

View the file

Other files

File Type Posted
Corrected Rowe Road Gas Bid.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rowe Road Gas Main Bid Questions

1. Can you please provide what the row is on Rowe Road? To be determined before work begins.

2. What Kind of Pipe will be provided for installation? (Roll Pipe or Stick Pipe) Roll pipe

3. Will the new main stay on the same side of Rowe Road? Yes

4. Is there a pre-bid meeting? No

5. Are there any more drawings available other than the overview map included in the bid package?

No

6. Can a map of the existing facilities within the scope of the project be supplied? No, they are not our utilities.

7. It appears that the new main is intended to be run on the east side of Rowe rd. for the whole job, is this correct? No, the new main will go on the west side. Same side the old main is on.

8. Who will handle relights for the services that will be tied over? City of Monroe

9. Is there a list of services affected by the project and materials/sizes of the services? Yes, we will give service cards to the low bidder.

10. What is the minimum depth expected under the creek crossings? Deep enough not to frack out in the creek.

11. Is the 4x4 tie-in anticipated to be under the pavement? No.

12. Will the project be permitted for lane closures? A lane closure will be needed for parts of the job.

No.

13. Will coiled pipe be utilized or stick pipe? Coil pipe

14. Will ditch tape be required for this project where it is open-trenched? No, just tracer wire.

15. Can EF Branch saddles be used or are inline tee’s going to be required at reg station tie-overs?

Branch saddles is fine.

16. Where will the materials be stored or picked up from? Here at the city yard.

17. Where will the removed equipment need to be hauled to? (Reg stations and farm taps)? City yard.

18. How do they qualify welders? No steel to weld.

19. How do they qualify fusers? SRCS. OQ records are required for everyone working onsite.