Heavy Duty Rolling Service Doors Replacement – Bonneville Lock and Dam
Solicitation number
W9127N26QA139
Issued by

About this file

This is a Purchase Description for a rolling service doors replacement project at Bonneville Lock and Dam, managed by the Portland District of the U.S. Army Corps of Engineers (USACE).

The procurement requires furnishing and installing three heavy-duty rolling service doors with electric operators across three locations: the Paint Shop (15'4"W x 12'0"H), Garage Service Bay #1 (12'0"W x 12'6"H), and Warehouse (12'0"W x 10'6"H). The contract includes six Contract Line Item Numbers (CLINs) covering the doors themselves and onsite field installation services with removal and disposal of existing doors. All doors must meet identical specifications including F265 steel construction, 22-gauge material, 20 PSF windload rating, RHX heavy-duty operators rated at 1/2 HP with 208/230/460V three-phase 60Hz power, wireless monitored edges, wireless entrapment systems, and Code Dodger receivers operating at 315MHz. The contractor must provide all personnel, equipment, tools, materials, and vehicles necessary for delivery and installation.

Delivery must occur within 8 weeks of contract award to Bonneville Lock and Dam in Cascade Locks, Oregon, during normal business hours (Monday-Thursday, 6:30 a.m. to 5:00 p.m. PST). The contractor must submit PDF submittals including rolling service door drawings and electric motor operator specifications prior to arrival. Installation requires a minimum of five successful prior installations on door openings larger than 12'x12', with the government providing 10 business days' advance notice. All items are covered by the manufacturer's standard one-year warranty. The contractor must comply with USACE Safety and Health Requirements Manual EM 385-1-1, submit an Accident Prevention Plan and Activity Hazard Analysis seven days prior to work, and ensure all personnel possess valid Government-issued photo identification and E-Verify compliance. Roger Montavon serves as the delivery point of contact at (541) 374-3616 or (541) 419-7052. Invoices must be submitted electronically to CEFC-G2INVOICES@USACE.ARMY.MIL with a copy to roger.a.montavon@usace.army.mil.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PURCHASE DESCRIPTION

Rolling Service Doors Replacement Bonneville Lock and Dam

Contract: TBD

1. GENERAL BACKGROUND

Portland District, U.S. Army Corps of Engineers (COE), Bonneville Lock and Dam project requires the purchase of three (3) heavy-duty rolling service doors and electric operators, including onsite installation services. These will replace the existing, malfunctioning rolling service doors for the Paint Shop, Warehouse, and Garage Service Bay #1, which have reached the end of their service life.

2. SCOPE OF WORK

The Contractor shall provide all personnel, equipment, tools, materials, vehicles, and supervision necessary to furnish, deliver, and install the replacement rolling service doors. The Contractor shall also remove and haul away the existing doors.

CLIN Description Quantity

0001 Heavy Duty Rolling Service Door, 15' 4"W x 12' 0"H Opening, with Electric Operator for Paint Shop

1 each

0002 Onsite Field Installation Services to replace Paint Shop Rolling Service Door; includes removal and hauling away of existing door

1 job

0003 Heavy Duty Rolling Service Door, 12' 0"W x 12' 6"H Opening, with Electric Operator for Garage Service Bay #1

1 each

0004 Onsite Field Installation Services to replace Garage Service Bay #1 Rolling Service Door;

includes removal and hauling away of existing door

1 job

0005 Heavy Duty Rolling Service Door, 12' 0"W x 10' 6"H Opening, with Electric Operator for Warehouse

1 each

0006 Onsite Field Installation Services to replace Warehouse Rolling Service Door; includes removal and hauling away of existing door

1 job

3. SALIENT CHARACTERISTICS (EQUIPMENT SPECIFICATIONS)

The newly manufactured Heavy Duty Rolling Service Doors and Electric Operators shall meet the following specifications:

A. Paint Shop Door

• Dimensions: 15’ 4” W x 12’ 0” H Opening (measured from exterior of building)

• Mounting: R: Steel, Face Mount E Guide; L: Steel, Face Mount E Guide;

Lintel - Steel, Header - Steel

• Curtain: Windload - 20 PSF, F265, Steel, Primed Gray, 22-gauge, Interior Mtd Above Lintel, Var. Freq. Windlock

• Operation: Motor Supplied by Manufacturer, Bench Mount, Right Hand

• Operator: RHX - Heavy Duty, 1/2 HP, 208/230/460V 3Phase 60Hz, Hoist, Wireless Monitored Edge, Brake, Primary - Wireless Entrapment, Receiver, Built-In, Std, (5) Code Dodger, 315MHz, 1-BTN

• Bottom Bar: Extruded 'T', Aluminum, Mill Finish, Electric 2-Wire Wireless Miller Edge

• Guide & Hood: Steel, Powder Coat-Black, Brush-1 Side, Bellmouth Entry.

Round Hood, Steel, Gray, Primed, Exterior Weather Baffle. Bracket: Steel, Powder Coat-Black.

B. Garage Service Bay #1 Door

• Dimensions: 12’ 0” W x 12’ 6” H Opening (measured from exterior of building)

• Mounting: R: Steel, Face Mount E Guide; L: Steel, Face Mount E Guide;

Lintel - Steel, Header - Steel

• Curtain: Windload - 20 PSF, F265, Steel, Primed Gray, 22-gauge, Interior Mtd Above Lintel, Var. Freq. Windlock

• Operation: Motor Supplied by Manufacturer, Bench Mount, Right Hand

• Operator: RHX - Heavy Duty, 1/2 HP, 208/230/460V 3Phase 60Hz, Hoist, Wireless Monitored Edge, Brake, Primary - Wireless Entrapment, Receiver, Built-In, Std, (5) Code Dodger, 315MHz, 1-BTN

• Bottom Bar: Extruded 'T', Aluminum, Mill Finish, Electric 2-Wire Wireless Miller Edge

• Guide & Hood: Steel, Powder Coat-Black, Brush-1 Side, Bellmouth Entry.

Round Hood, Steel, Gray, Primed, Exterior Weather Baffle. Bracket: Steel, Powder Coat-Black.

C. Warehouse Door

• Dimensions: 12’ 0” W x 10’ 6” H Opening (measured from exterior of building)

• Mounting: R: Steel, Face Mount E Guide; L: Steel, Face Mount E Guide;

Lintel - Steel, Header - Steel

• Curtain: Windload - 20 PSF, F265, Steel, Primed Gray, 22-gauge, Interior Mtd Above Lintel, Var. Freq. Windlock

• Operation: Motor Supplied by Manufacturer, Bench Mount, Right Hand

• Operator: RHX - Heavy Duty, 1/2 HP, 208/230/460V 3Phase 60Hz, Hoist, Wireless Monitored Edge, Brake, Primary - Wireless Entrapment, Receiver, Built-In, Std, (5) Code Dodger, 315MHz, 1-BTN

• Bottom Bar: Extruded 'T', Aluminum, Mill Finish, Electric 2-Wire Wireless Miller Edge

• Guide & Hood: Steel, Powder Coat-Black, Brush-1 Side, Bellmouth Entry.

Round Hood, Steel, Gray, Primed, Exterior Weather Baffle. Bracket: Steel, Powder Coat-Black.

4. SUBMITTALS

Prior to arrival onsite and installation, the Contractor must submit:

1. Rolling Service Door Drawings: PDF format including material, dimensions, specifications, vendor name/phone, and reference drawing numbers.

2. Electric Motor Operator Specifications: PDF format including material, dimensions, specifications, and vendor name.

5. DELIVERY AND INSTALLATION

• Delivery Schedule: All items must be delivered no later than 8 weeks after contract award.

• Delivery Address: US Army Corps of Engineers, Bonneville Lock and Dam, Interstate 84 Exit 40, NE Bonneville Way, Cascade Locks, OR 97014.

• Working Hours: Deliveries and installation must occur during normal business hours: Monday-Thursday, 6:30 a.m. to 5:00 p.m. PST, excluding federal holidays.

• Installation Notice: The Government will notify the Contractor at least 10 business days in advance to schedule the onsite installation.

• Installer Requirements: The installer must have a minimum of five (5) successful installations on door openings larger than 12’ x 12’.

6. WARRANTY

All items shall be covered by the manufacturer’s standard warranty on all parts, labor, and workmanship from factory defects. The warranty period shall be a minimum of one (1) year.

7. SAFETY & SECURITY REQUIREMENTS

• Safety Manual: The Contractor will comply with all pertinent provisions of the USACE Safety and Health Requirements Manual EM 385-1-1. An Accident Prevention Plan and Activity Hazard Analysis (AHA) must be submitted 7 days prior to onsite work.

• Access Verification: All persons must provide a valid Government-issued photo ID (REAL ID compliant). The Contractor must use the E-Verify Program to meet employment eligibility requirements.

• Contractor Identification: All employees shall wear name tags and identifying uniforms. Vehicles used on the project must display suitable company identification and a Government-furnished Project parking tag.

8. INVOICE INFORMATION & POINTS OF CONTACT

• Invoicing: Submit electronic PDF invoices to the USACE Finance Center at:

CEFC-G2INVOICES@USACE.ARMY.MIL and copy roger.a.montavon@usace.army.mil.

• Delivery POC: Roger Montavon | Phone: (541) 374-3616 or (541) 419-7052 | Email: roger.a.montavon@usace.army.mil https://www.publications.usace.army.mil/portals/76/publications/engineermanuals/em_385-1-1.pdf https://www.e-verify.gov/ mailto:CEFC-G2INVOICES@USACE.ARMY.MIL mailto:roger.a.montavon@usace.army.mil mailto:roger.a.montavon@usace.army.mil

PURCHASE DESCRIPTION
1. GENERAL BACKGROUND
2. SCOPE OF WORK
3. SALIENT CHARACTERISTICS (EQUIPMENT SPECIFICATIONS)
4. SUBMITTALS
5. DELIVERY AND INSTALLATION
6. WARRANTY
7. SAFETY & SECURITY REQUIREMENTS
8. INVOICE INFORMATION & POINTS OF CONTACT