Summary

This is a bid document and contract specifications package for the Four Rivers Sanitation Authority (FRSA) in Rockford, Illinois for Creek Crossing Protection - Spring Creek Capital Project No. 2686. The project involves the encasement of exposed existing sanitary sewer crossing Spring Creek with work including armoring of the encased sanitary sewer with grouted riprap, potential tree removal, restoration of an existing access drive, and related appurtenances. The scope of work encompasses 13 line items including aggregate ditch checks (41 tons), aggregate surface course (251 square yards), concrete encasement for sanitary sewers (83 feet), erosion control blanket (2,114 square yards), filter fabric (915 square yards), perimeter erosion barrier (459 feet), riprap slurry (786 square yards), seeding and fertilizing (2,114 square yards), stabilized construction entrance (88 square yards), stone riprap for stream crossing (862 square yards), clearing (1 lump sum), construction layout (1 lump sum), and tree removal contingency (36 units). An optional pre-bid meeting was scheduled for August 6, 2026 at 10:00 a.m. at FRSA's offices in Rockford. The project completion deadline is October 31, 2026, with liquidated damages assessed at $300 per calendar day for delays.

Bidders must submit proposals on prescribed forms with a bid bond equal to 10 percent of the total bid price, along with Fair Employment Practices and Responsible Bidder affidavits. All bids are due at the Four Rivers Sanitation Authority office located at 3501 Kishwaukee Street, Rockford, Illinois 61109, with awards made to the lowest responsive, responsible bidder. Contractors must maintain comprehensive insurance coverage including $1,000,000 general liability, $1,000,000 automobile liability, workers' compensation as required by statute, builder's risk at 100 percent of completed work value, and $2,000,000 umbrella coverage for contracts valued at $500,000 or more. All contractors must comply with Illinois prevailing wage requirements, submit certified payroll reports through the State's Certified Transcript of Payroll Portal, maintain a permanent business office within 40 miles of FRSA, and document at least three prior sanitary sewer system contracts of equal or greater value within the past five years. The contract requires performance and labor and material payment bonds equal to 100 percent of the contract price, with a three-year maintenance guarantee for trench settlement and two years for all other work.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Doc. No. 27-411

Four Rivers Sanitation Authority

Rockford, Illinois

Bidding Requirements and Contract Forms for

Creek Crossing Protection – Spring Creek Capital Project No. 2686

Not t o be use d fo r b id din g purp ose s

Rockford, Illinois

Bidding Requirements and Contract Forms and

General Provisions and Technical Specifications for Sanitary Sewer Construction for

Board of Trustees

Richard T. Pollack . . . . . . . . . . . . . . . . . . President Benjamin W. Bernsten . . . . . . . . . . . . . . . . . . Vice President Richard W. Mowris . . . . . . . . . . . . . . . . . . Clerk/Treasurer Brad Long . . . . . . . . . . . . . . . . . . Trustee Ed Grondzki . . . . . . . . . . . . . . . . . . Trustee

Official Christopher T. Baer, PE . . . . . . . . . . . . . . . . . . Executive Director Matthew L. Campbell, PE . . . . . . . . . . . . . . . . . . Director of Engineering Not t o be use d fo r b id din g purp

Table of Contents

I. Bidding Requirements

Article 1 Notice to Bidders

Article 2 Instructions to Bidders 1 General 2 Legal Requirements 3 General Instructions

Article 3 Detailed Specifications

1 General 2 Notification, Access, and Special Considerations 3 Permit Requirements 4 Aggregate Ditch Checks 5 Aggregate Surface Course 6 Concrete Encasement for Sanitary Sewers 7 Construction Layout 8 Dewatering 9 Erosion Control Blanket 10 Filter Fabric 11 Perimeter Erosion Barrier 12 Riprap Slurry 13 Seeding and Fertilizing 14 Stabilized Construction Entrance 15 Stone Riprap for Sanitary Sewer Stream Crossing 16 Tree Removal and Clearing

II. Contract Forms

Proposal Fair Employment Practices Affidavit of Compliance Affidavit of Compliance: Responsible Bidder Ordinance Bid Bond Agreement Labor & Material Payment Bond Performance Bond

III. General Provisions and Technical Specifications for Sanitary Sewer

Construction (separate document incorporated by reference) N ot t o be use d fo r b id din g purp

Section I

Bidding Requirements o be use d fo r b id din g purp d fo r b id din g purp

Bid Doc. No. 27-411 Instruction to Bidders / Page 1 of 9

Article 2 — Instructions to Bidders

1 General

1.1 Scope and Intent

This section of the Contract Documents provides detailed information and requirements for preparing bids to prospective bidders, bidders' responsibility, the preparation and the submission of bids, basis for awarding the Contract and other general information concerned with bidding and executing the Contract.

1.2 Contradictions

If in the case of apparent contradictions between or among the Contract Documents, the Contract Documents shall be consulted in the following order: Addenda, Agreement, Supplementary Drawings, Instructions to Bidders, Detailed Specifications, Plans, Four Rivers Sanitation Authority (FRSA) General Provisions and Technical Specifications for Sanitary Sewer Construction. The language in the first such document in which language regarding the conflict, error or discrepancy occurs shall control.

1.3 Optional Pre-Bid Meeting

An optional Pre-Bid Meeting for this project will be held on Thursday, August 6, 2026, at 10:00 a.m.

in the FRSA Board Room at 3501 Kishwaukee Street, Rockford, Illinois. All Contractors intending to bid on this project are encouraged to attend the pre-bid meeting.

2 Legal Requirements

2.1 Illinois Regulations

A. Public Act 100-1177 (820 ILCS 130/) entitled the “Prevailing Wage Act” requires the Bidder to comply with prevailing wages in accordance with the Illinois Department of Labor Standards. The State of Illinois requires contractors and subcontractors on FRSA projects to submit certified payroll reports via the State’s Certified Transcript of Payroll Portal currently found at: https://labor.illinois.gov/laws-rules/conmed/certifiedtranscriptofpayroll.html. The Bidder is responsible for verifying current information at the State’s website.

B. Public Act 83–1030 (30 ILCS 565/) entitled the "Steel Products Procurement Act" requires that steel products used or supplied in performance of this Contract or subcontract must be manufactured or produced in the United States with three exceptions.

The provisions of this Section shall not apply:

1. Where the Contract involves an expenditure of less than $500.

2. Where the executive head of the public agency certifies in writing that

a) the specified products are not manufactured or produced in the United States in sufficient quantities to meet the agency's requirements, or

b) obtaining the specified products, manufactured or produced in the United States would increase the cost of the Contract by more than 10%.

3. When its application is not in the public interest.

Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Instructions to Bidders / Page 2 of 9

C. Public Act 96-929 (30 ILCS 570/) entitled the “Employment of Illinois Workers on Public Works Act” provides that Illinois residents be employed on Illinois public works projects, provided there has been a period of excessive unemployment (5%) in the State of Illinois as defined in the Act; and, further, that Illinois workers are available and capable of performing the particular type work involved.

D. Public Act 101-221 (820 ILCS 96/) entitled the “Workplace Transparency Act” requires that any party to a contract adopt and promulgate written sexual harassment policies that include, as a minimum, the following information:

1. the illegality of sexual harassment

2. the definition of sexual harassment under Illinois State law

3. a description of sexual harassment, utilizing examples

4. my (our) organization's internal complaint process including penalties

5. the legal recourse, investigative and complaint process available through the Illinois

Department of Human Rights and the Illinois Human Rights Commission

6. directions on how to contact the Department and the Commission

7. protection against retaliation as provided by Section 6-101 of the Illinois Human Rights

Act Upon request, this information must be provided to the Illinois Department of Human Rights and the FRSA.

E. With regard to nondiscrimination in employment, the Contractor for this project will be required to comply with the Illinois Fair Employment Practices Commission's Rules and Regulations.

F. The Contractor for this project must comply with the Occupational Safety and Health Act.

G. The Contractor for this project must comply with the Federal Drug-Free Workplace Act.

H. Public Act 96-1416 requires the Certification of Clean Construction and Demolition Debris

(CCDD) and uncontaminated soil prior to disposal at a CCDD fill site. The Contractor for this project must comply with Public Act 96-1416 and be responsible for the certifications and any fees associated with the disposal at a CCDD fill site.

1. In the event that contaminated soil is uncovered on the project, the Contractor must notify

FRSA immediately. Any extra costs resulting from the presence of contaminated soil must be evaluated in accordance with FRSA General Provisions & Technical Specs for Sanitary Sewer Construction; General Conditions: Article 5 – Time Provisions and Article 8 – Changes.

2.2 Americans with Disabilities Act

The Contractor for this project will comply with all applicable requirements of the Americans with Disabilities Act of 1990 (ADA). The Contractor will hold harmless and indemnify Four Rivers Sanitation Authority (FRSA) and their representatives from all:

A. suits, claims, or actions B. costs, either for defense (including but not limited to reasonable attorney's fees and expert witness fees) or for settlement

Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Instructions to Bidders / Page 3 of 9

C. damages of any kind (including but not limited to actual, punitive, and compensatory damages) relating in any way to or arising out of the ADA, to which said firm is exposed or which it incurs in the execution of the Contract.

3 General Instructions

3.1 Bidder's Responsibility

Bidders are cautioned not to submit proposals until having carefully examined the entire site of the proposed work and adjacent premises and the various means of approach and access to the site, and having made all necessary investigations to inform themselves thoroughly as to the facilities for delivering, placing and handling the materials at the site, and having informed themselves thoroughly as to all difficulties involved in the completion of all the work under this Contract in accordance with its requirements.

Bidders must examine the Plans, Specifications and other Contract Documents and shall exercise their own judgment as to the nature and amount of the whole of the work to be done and for the bid prices must assume all risk of variance, by whomsoever made, in any computation or statement of amount or quantities necessary to complete fully the work in strict compliance with the Contract Documents.

The Bidder must satisfy himself by making borings or test pits, or by such methods as he may prefer, as to the character and location of the materials to be encountered or work to be performed. No pleas of ignorance of conditions that exist or that may hereafter exist, or of conditions or difficulties that may be encountered in the execution of the work under this Contract, as a result of failure to make the necessary examinations and investigations, will be accepted as an excuse for any failure or omission on the part of the Contractor to fulfill, in every detail, all of the requirements of the Contract Documents, or will be accepted as a basis for any claims whatsoever for extra compensation or for an extension of time.

The Contractor is responsible for verifying the location of all existing utilities in the project areas.

The Bidder, therefore, shall satisfy himself by such means as he may deem proper as to the location of all structures that may be encountered in construction of the work.

3.2 Addenda and Interpretations

No interpretation of the meaning of the Plans, Specifications, or other Contract Documents will be made to any bidder orally. Every request for such interpretation must be in writing addressed to Four Rivers Sanitation Authority, 3501 Kishwaukee Street, Rockford, Illinois. To be given consideration, such request must be received at least five (5) days prior to the date fixed for the opening of bids.

Any and all such interpretations and any supplemental instructions will be in the form of written addenda which, if issued, will be sent by email, fax, or certified mail with acknowledgement of receipt requested, to all prospective bidders, at the respective addresses furnished for such purposes, not later than three (3) days prior to the date fixed for the opening of bids. Failure of any bidder to receive any such addenda or interpretation shall not relieve said bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents.

3.3 Laws and Regulations

The prospective bidder is warned that he must comply with all laws of the United States Government, State of Illinois, all ordinances and regulations of FRSA in the performance of the work under this

Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Instructions to Bidders / Page 4 of 9

Contract. The Bidder's attention is specifically called to that provision of the General Conditions regarding the rate of wage to be paid on the work.

3.4 Quantities Estimated Only

Bidders are warned that the estimate of quantities of the various items of work and materials, as set forth in the Proposal form, is approximate only and is given solely to be used as a uniform basis for the comparison of bids. The quantities actually required to complete the Contract work may be less or more than so estimated, and if awarded a contract for the work specified, the Contractor further agrees that he will not make any claim for damages or for loss of profits or for an extension of time because of a difference between the quantities of the various classes of work assumed for comparison of bids and quantities of work actually performed.

3.5 Form, Preparation, and Presentation of Proposals

For particulars as to the quantity and quality of the supplies, materials and equipment to be furnished, and the nature and extent of the work or labor to be done, prospective bidders are referred to the Contract Documents, which may be examined or obtained at the office of FRSA.

Each bid will be submitted upon the prescribed Proposal form. All blank spaces for bid prices must be filled in, in ink, with the unit or total sum or both for which the Proposal is made. If the Proposal contains any omissions, erasures, alterations, additions or items not called for in the itemized Proposal, or contains irregularities of any kind, such may constitute sufficient cause for rejection of bid. In case of any discrepancy in the unit price or amount bid for any item in the Proposal, the unit price as expressed in figures will govern. In no case is the agreement form to be filled out or signed by the bidder.

Bidders may opt to contact FRSA’s Engineering Department at 815.387.7660 to obtain an electronic Proposal form. If used, this form must be attached to the hard copy Proposal form and appropriately signed and executed with the bid.

The bid must be verified and be presented on the prescribed form in a sealed envelope on or before the time and at the place stated in the Advertisement for Bids, endorsed with the name of the person, firm or corporation presenting it, the date of presentation, and the title of the work for which the bid is made. If forwarded by mail, the sealed envelope containing the Proposal and marked as directed above, must be enclosed in another envelope addressed to Clerk of the Four Rivers Sanitation Authority, 3501 Kishwaukee Street, Rockford, Illinois, 61109 and be sent preferably by certified mail.

FRSA will not accept facsimile generated bids.

3.6 Bid Security

Each Proposal must be accompanied by the FRSA Bid Bond form with an acceptable Bid Security attached, in the amount specified in Article One, Notice to Bidders. This sum is a guarantee that, if the Proposal is accepted, a contract will be entered into and its performance properly secured. The FRSA’s Bid Bond Form included in the bid packet must be used. No other Bid Bond form may be substituted.

Within ten (10) days after the award of the bid, the deposits of all but the three lowest bidders will be returned. The deposits of the remaining two unsuccessful bidders will be returned within three (3) days after the execution of the Contract, or, if no such Contract has been executed, within sixty (60) days after the date of opening bids. The deposit of the successful bidder will be returned only after he has duly executed the Contract and furnished the required bond and insurance.

Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Instructions to Bidders / Page 5 of 9

3.7 Affidavit of Compliance

Each proposal must be accompanied by fully executed original copies of the Fair Employment Practices Affidavit of Compliance and the Affidavit of Compliance: Responsible Bidder Ordinance, both of which are enclosed with the Proposal packet. Failure to submit executed original copies of both affidavits with the Proposal may constitute sufficient cause for rejection of the bid.

3.8 Statement of Qualifications

Each Proposal must be accompanied by a Statement of Qualifications certifying that the bidder is registered to do business in the State of Illinois, has a permanent business office within forty (40) miles of the FRSA office at 3501 Kishwaukee Street in Rockford, IL, and provides documentation that the bidder possesses the appropriate financial, material, equipment, facility and personnel resources and expertise necessary to meet all contractual obligations. The bidder shall document no less than three (3) contracts for sanitary sewer system work within the past five (5) years having equal or greater value to the bid being submitted. FRSA reserves the right to request additional information, as needed, to evaluate bids prior to making an award.

3.9 Comparison of Proposals

Bids on item contracts will be compared on the basis of a total computed price arrived at by taking the sum of the estimated quantities of each item, multiplied by the corresponding unit prices and including any lump sum bids on individual items, in accordance with the estimate of quantities set forth in the Proposal form. Bids on lump sum contracts will be considered upon the basis of the lowest sum bid.

3.10 Acceptance of Bids and Basis of Award

The contract will be award, if at all, to the lowest responsive, responsible bidder. No bidder may withdraw his bid after the scheduled closing time for receipt of bids, for at least sixty (60) days. Four Rivers Sanitation Authority also reserves the right to reject any of all bids.

The bidder whose proposal is accepted will be notified of the Notice of Award issued by FRSA Executive Director. Within ten (10) days of issuance of a Notice of Award by the FRSA Executive Director, the successful bidder shall enter into a written contract for the performance of the Proposal work and shall furnish the required bonds and insurance certificates upon being served such Notice, personally, by mailing, or via email.

If the bidder does not comply with the Notice of Award, FRSA will issue a Deficiency Notice. If the bidder to whom the contract is awarded refuses or neglects to execute it or fails to furnish the required bond and insurance within five (5) days after receipt by him of Deficiency Notice, the amount of his deposit shall be forfeited and shall be retained by FRSA as liquidated damage and not as a penalty. It being now agreed that said sum is a fair estimate of the amount of damages that FRSA will sustain in case said bidder fails to enter into a contract and furnish the required bond and insurance. No plea of mistake in the bid shall be available to the bidder for the recovery of his deposit or as a defense to any action based upon the neglect or refusal to execute a contract.

3.10.1 Evaluation of Responsiveness

The responsiveness of bidders will be judged on the basis of the completeness of the bid submitted.

To be responsive, a Bid must be submitted on the forms provided as part of the Bid Documents and comply with all the requirements of the Instruction to Bidders.

d fo r b id din g purp

Bid Doc. No. 27-411 Instructions to Bidders / Page 6 of 9

3.10.2 Evaluation of Responsibility

To be judged as responsible, the bidder shall:

A. Have adequate financial resources for performance, the necessary experience, organization, technical qualifications, and facilities, or a firm commitment to obtain such by subcontracts;

B. Be able to comply with the required completion schedule for the project;

C. Have a satisfactory record of integrity, judgment, and performance, including, in particular, any prior performance on contracts from FRSA;

D. Have an adequate financial management system and audit procedures, that provide efficient and effective accountability and control of all property, funds, and assets;

E. Conform to the civil rights, equal employment opportunity and labor law requirements of the Bid

Documents.

F. Compliance with apprenticeship training participation as required in Four Rivers Sanitation

Authority Ordinance No. 25 26 M 18 G. Have satisfactorily completed no less than three (3) sanitary sewer system repair contracts within the past five (5) years of equal or greater value to the bid being submitted.

3.11 The Rejection of Bids

FRSA reserves the right to reject any bid if the evidence submitted in the statement of the bidder's qualifications, or if investigation of such bidder fails to satisfy FRSA that such bidder is properly qualified to carry out the obligations and to complete the work contemplated therein. Any or all proposals will be rejected if there is reason to believe that collusion exists among the bidders.

Conditional bids will not be accepted. FRSA reserves the right to reject any and all bids and to accept the bid which they deem most favorable to the interest of FRSA after all Proposals have been examined and canvassed.

3.12 Insurance and Bonding

Contractor shall provide all necessary insurance and bonds required to complete the project. No more than ten (10) calendar days subsequent to FRSA’s issuance of an award letter, the Contractor shall provide documentation to prove that he has obtained all required insurance and bonds. FRSA shall be the sole judge as to the acceptability of any such proof.

Contractor shall provide and maintain all insurance and bonds as required by FRSA.

3.12.1 General

The Contractor shall ensure that:

A. All insurance policies shall be specific to the project.

B. The insurance certificate shall state: This certifies that the insurance coverage meets or exceeds that required for Creek Crossing Protection – Spring Creek, Capital Project No.

2686.

C. FRSA shall be named as Additional Insured in all policies; this shall include the Owners’ Contractors’ Protective Policy option.

D. All completed operations coverages and bonds shall remain in force for a period of two (2) years following acceptance of the Project and completed operations shall stay in force for two (2) years following completion of the Project.

Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Instructions to Bidders / Page 7 of 9

3.12.2 Insurance

The Contractor shall, for the duration of the Contract and for two (2) years following project acceptance, maintain the following:

A. General Liability: $1,000,000 combined single limit per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project or the general aggregate limit shall be twice the required occurrence limit. The Contractor shall provide "XCU" coverage.

B. Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage including coverages for owned, hired or non-–owned vehicles, as applicable.

C. Workers' Compensation and Employers Liability: Workers' Compensation limits as required by statute and Employers Liability limits of $500,000 per accident and $500,000 per disease.

D. Builder’s Risk (Course of Construction): Contractor shall purchase and maintain builder’s risk insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to one hundred percent (100%) of the completed value of the Work with no coinsurance penalty provisions.

Coverage shall be adjusted for any amendments to the Contract that affect the completed value of the Work. Builder’s risk insurance shall be maintained until written confirmation of Owner’s procurement of property insurance coverage. The insurance company providing the builder’s risk coverage shall grant permission for FRSA to partially occupy or use the premises under construction prior to Substantial Completion without removing or affecting the coverage.

The builder’s risk insurance shall also cover materials to be incorporated into the Work which are stored off-site, in-transit or at the place of manufacture.

E. Umbrella: $2,000,000 per occurrence/aggregate for contracts valued at $500,000 or over, or $1,000,000 for contracts below $500,000. $10,000 is maximum allowable self-retained limit.

F. Errors and Omissions: If the Contractor performs professional services, he shall maintain errors and omissions insurance with a limit no lower than $1,000,000 for the duration of the contract.

The policies shall contain, or be endorsed to contain, the following provisions in the General Liability and Automobile Liability Coverage’s:

1. Unless otherwise provided in paragraph “c” of this section, FRSA, its officers, officials, employees and volunteers shall be covered as additional insureds as respects liability arising out of activities performed by or on insured’s general supervision of the Contractor, products and completed operations of the Contractor, premises owned, occupied or used by the Contractor, or automobiles owned, leased, hired or borrowed by the Contractor. The coverage shall contain no special limitations on the scope of protection afforded to FRSA, its officers, officials, employees, volunteers, or agents.

2. Unless otherwise provided in paragraph “c” of this section, the Contractor’s insurance coverage shall be primary insurance as respects FRSA, its officers, officials, employees, volunteers, and agents. Any insurance or self-insurance maintained by FRSA, its officers, officials, employees, volunteers, or agents shall be excess of the Contractor’s insurance and shall not contribute with it.

3. As an acceptable alternative to provisions “a” and “b” of this section, the Contractor may provide owner's and contractor's protective liability insurance with coverage limits, named insureds, and in conformity with all applicable specifications of this section.

Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Instructions to Bidders / Page 8 of 9

4. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to FRSA, its officers, officials, employees, volunteers, or agents.

5. The Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.

6. All Coverages — Each insurance policy required by this clause shall not be suspended, voided, canceled by either party, reduced in coverage, or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to FRSA.

3.12.3 Best's Ratings

FRSA shall be the sole judge of whether or not said insurer's ratios are satisfactory. FRSA 's decision shall be final and FRSA 's bidding procedures contain no appeal provision.

A. Alphabetical Rating: For purposes of this Request for Bids, "insurer" shall mean any surety, insurance carrier, or other organization which proposes to provide an insurance policy or bond for the Contractor. No insurer or surety rated lower than "A-, Excellent” in the current Best's Key Rating Guide shall be acceptable to FRSA.

B. Financial Size Rating: Provided an insurer's alphabetical rating is satisfactory, FRSA will examine said insurer's financial size rating.

1. If Best classifies the insurer XII or larger, said insurer shall be acceptable to FRSA.

2. If Best classifies the insurer as smaller than XII, but larger than VI, said insurer shall be submitted to FRSA’s Director of Management Services and/or FRSA’s insurance consultant for review.

Financial Size ratings less than VII are not acceptable and will disqualify the Contractor.

3.12.4 Performance Bond and Labor & Materials Payment Bond Form The Contractor shall provide a Performance Bond and Labor & Materials Payment Bond form acceptable to FRSA. The performance bond shall be for either 100% of the contract price or for the Contractor’s unit price times the estimated number of units, as applicable.

This Request for Bids contains a Performance Bond and a Labor & Material Bond form for the Contractor’s use.

If the Contractor fails to provide acceptable bonds within the specified time, he shall be in default.

3.12.5 Correction of Contractor’s Insurance or Bond Deficiencies If FRSA determines that the Contractor’s insurance or bond documentation does not conform to these specifications, FRSA shall inform said Contractor of the non-conformity. If said Contractor fails to provide conforming insurance or bond documentation within five (5) calendar days of FRSA’s deficiency notice, he shall be in default.

3.12.6 Indemnification Clause

Contractor shall protect, indemnify, hold and save harmless and defend FRSA, its officers, officials, employees, volunteers, and agents against any and all claims, costs, causes, actions and expenses, including but not limited to attorney's fees incurred by reason of a lawsuit or claim for compensation arising in favor of any person, including the employees, officers, independent contractors, or subcontractors of the Contractor or FRSA, on account of personal injuries or death, or damages to property occurring, growing out of, incident to, or resulting directly or indirectly from the performance by the Contractor or subcontractor, whether such loss, damage, injury or liability is

Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Instructions to Bidders / Page 9 of 9 contributed to by the negligence of FRSA or by premises themselves or any equipment thereon whether latent or patent, or from other causes whatsoever, except that the successful bidder shall have no liability for damages or the costs incident thereto caused by the sole negligence of FRSA.

The indemnification shall not be limited by a limitation on amount or type of damages payable by or for the Contractor or its subcontractor under any employee benefits act including, but not limited, to the Workers Compensation Act.

No inspection by FRSA, its employees, or agents shall be deemed a waiver by FRSA of full compliance with the requirements of the Contract. This indemnification shall not be limited by the required minimum insurance coverages in the Contract.

3.13 Tax Exemption

FRSA is exempt, by law, from paying bidder Federal Excise Tax and Illinois Retailers' Occupational Tax. Therefore, the bidder shall exclude those taxes from his bid. FRSA’s tax exemption number is E9992-3696-06. The bidder shall include all other applicable taxes in his bid price.

d fo r b id din g purp

Article 3 – Detailed Specifications

1 General This article contains detailed specifications related to Proposal items. The work to be done under each item is discussed along with units for payment and measurement for payment. However, the descriptions given do not necessarily outline all the work to be done under any item. All work shall conform to current editions of the following: Standard Specifications for Water and Sewer Main Construction in Illinois, Four Rivers Sanitation Authority General Provisions and Technical Specifications for Sanitary Sewer Construction, and the Illinois Department of Transportation’s (IDOT’s) Standard Specifications for Road and Bridge Construction (IDOT Standard Specifications).

Throughout these specifications, the term “Owner” and “FRSA” shall be synonymous.

In case of apparent contradictions between Article 3 - Detailed Specifications, IDOT Standard Specifications, and General Provisions and Technical Specifications for Sanitary Sewer Construction, Article 3 - Detailed Specifications shall govern.

Utility locations shown on the plans are based on records of varying reliability and are not guaranteed. The orientation and location (horizontal and vertical) of all existing underground utilities, such as gas mains, water mains, electric lines, field tiles, irrigation pipes, etc., shall be ascertained by the Contractor. The Contractor shall assume full responsibility all utility locations.

The general locations of the proposed work are governed by existing field conditions. Minor variations in alignment may be made to facilitate construction operations with prior FRSA approval.

Any construction not supervised by a Four Rivers Sanitation Authority (FRSA) Inspector will not be accepted.

No work shall be permitted on Sundays or FRSA Holidays without prior approval by the FRSA Director of Engineering. A 24-hour notice for work performed on Saturdays shall be provided to a FRSA Inspector.

The following holidays will be observed by FRSA during the anticipated construction duration:

• Monday, September 7, 2026 – Labor Day

• Monday, October 12, 2026 – Indigenous Peoples/Columbus Day The FRSA will not supervise, direct, control, have authority over or be responsible for the Contractor’s means, methods, techniques, sequences, procedures of construction, safety precautions and programs incident thereto, or for any failure by the Contractor to comply with all applicable laws and regulations in performance of the specified work. The FRSA shall not be responsible for the Contractor’s failure to perform or furnish the work in accordance with the Contract documents.

d fo r b id din g purp

Bid Doc. No. 27-411 Detailed Specifications / Page 2 of 14

2 Notification, Access, and Special Considerations

2.1 Notification

The Contractor shall notify all utility companies prior to beginning any work. All underground utilities shall be located by the utility owner and special care shall be taken when excavating near underground utilities to avoid damage. Contractor shall call JULIE at (800) 892-0123 for utility locations in the project area, seventy-two (72) hours, minimum, prior to construction.

The Contractor shall notify FRSA and all affected property owners forty-eight (48) hours, minimum, prior to beginning any work. More advanced notification shall be provided if required by permits.

Affected property owners include:

• LIFE815 Church (815) 540-4824

• Spring Creek United Church of Christ (815) 877-2576

2.2 Access

The Contractor shall be responsible for the temporary maintenance of all roadways and drives for the duration of this project and shall maintain access to residences and businesses at all times during construction (i.e., drives, roadways, ramps, etc., must remain open or temporary access must be provided). All materials, equipment, labor, etc., necessary to ensure access is maintained shall be incidental to the Contract.

It shall be the Contractor's responsibility to secure any temporary or permanent access, storage or construction easements beyond those provided from property owner(s) if deemed necessary to perform the work as shown on the plans or defined in the specifications.

2.3 Special Considerations

The existing access to the GTE Mobilnet tower will serve as the construction entrance for the project. Throughout construction, access to the tower shall be maintained at all times. Upon completion of all major construction activities, any unsuitable material within the existing access shall be removed, and the entrance shall be restored with a 2-inch aggregate surface course as shown on the plans.

2.4 Required Submittals

None.

2.5 Basis of Payment

No payment will be made for costs associated with notification, access, and special considerations.

3 Permit Requirements

3.1 General

The total disturbed area for this project is estimated to be 0.69 acres therefore no National Pollutant Discharge Elimination System (NPDES) permit is required.

FRSA has requested correspondence from the U.S. Army Corps of Engineers verifying the project has coverage under Illinois Regional Permit 16.

Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Detailed Specifications / Page 3 of 14

3.2 Required Submittals

1. None.

3.3 Basis of Payment

No payment will be made for costs associated with permitting.

4 Aggregate Ditch Checks

4.1 General

This work shall conform to FRSA requirements, details, and provisions, and Section 280 of the IDOT Standard Specifications for Road and Bridge Construction, current edition. This work shall include all equipment, materials, labor, transportation, and workmanship to install aggregate ditch checks for erosion control as shown on the plans.

This work shall be in accordance with the following standards or details:

IDOT Highway Standard 280001 This work shall consist of the construction of ditch checks to prevent siltation, erosion, or scour of ditches and drainageways, and shall be installed according to Article 280.04 (a) and 280.05 of the IDOT Standard Specifications for Road and Bridge Construction, current edition.

The course aggregate, filter fabric, and accumulated silt or debris shall be removed and disposed of immediately prior to completion of seeding and temporary stabilization. The riprap shall be removed from the site.

Filter fabric shall be measured for payment as a separate item.

4.2 Materials

1. Coarse aggregate shall be in accordance with Article 1004.04 of the IDOT Standard

Specifications for Road and Bridge Construction, current edition.

2. Stone riprap shall be in accordance with Section 281 and Section 1005 of the IDOT Standard

Specifications for Road and Bridge Construction, current edition.

4.3 Required Submittals

The Contractor shall submit the following items for review and approval:

1. Material gradation certificates for coarse aggregate.

4.4 Method of Measurement

This work will be measured for payment according to Article 280.07 (b) of the IDOT Standard Specifications for Road and Bridge Construction, current edition.

4.5 Basis of Payment

This work shall be paid for at the Contract unit price per tons (TON) for Aggregate Ditch Checks.

Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Detailed Specifications / Page 4 of 14

5 Aggregate Surface Course

5.1 Description:

This work shall conform to FRSA requirements, details, and provisions, and Section 402 of the IDOT Standard Specifications for Road and Bridge Construction, current edition. This work shall include all equipment, materials, labor, transportation, and workmanship to install compacted aggregate surface course as shown on the plans.

This work shall consist of blading off any unsuitable materials on the existing aggregate access, removing and disposing of unsuitable materials, shaping the existing aggregate access, and the furnishing, placing, and final grading of the aggregate surface course.

Aggregate surface course shall be installed to the lines, grades, and depths shown on the plans.

Contractor shall compact the surface course and provide an adequate number of compaction tests as determined by the FRSA. Compaction tests must be performed as work progresses. All compaction tests must meet 95% of standard Proctor density and be performed by an approved independent geotechnical company.

5.2 Materials:

1. Coarse aggregates shall be 2 inches of IDOT gradation CA 2 in accordance with Article

1004.04 of the IDOT Standard Specifications for Road and Bridge Construction, current edition. Crushed concrete materials approved by IDOT and in accordance with Article 1004.04 may be used.

5.3 Required Submittals:

The Contractor shall submit the following items for review and approval:

1. Material gradation certificates for coarse aggregate.

5.4 Basis of Payment:

This work shall be paid for at the Contract unit price per square yard (SQ YD) for Aggregate Surface Course, Type B, 2”.

6 Concrete Encasement for Sanitary Sewers

6.1 General

This work shall conform to FRSA requirements, details, and provisions. This work shall include all equipment, materials, labor, transportation, and workmanship to construct concrete encasements for sanitary sewers as shown on the plans.

This work shall be in accordance with the following standards or details:

FRSA Standard Detail Sheet FRSA Standard Details ‘Concrete Encasement For Sanitary Sewers Detail’

This work shall consist of constructing a concrete encasement of sanitary sewers where shown on the plans. This work shall include all labor, equipment, materials, temporary construction access, dewatering, bypass pumping, bracing, shoring, creek diversion, concrete forming, excavation, Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Detailed Specifications / Page 5 of 14 trench backfill, etc. to complete the concrete encasements as shown on the plans or as directed by the FRSA.

The sanitary sewer pipe shall be exposed to allow for the construction of concrete encasements and forming. The outside of the sanitary sewer pipe shall be cleaned prior to placement of concrete.

The sanitary sewer pipe shall be braced and tied to eliminate horizontal or vertical movement from the original position during concrete placement. At a minimum, the pipe shall be tied at every pipe joint to eliminate floating of the pipe. The Contractor shall check the pipe elevation at every joint to ensure that floating is not occurring. The Contractor shall stage the encasement operation so that only a reasonable length of pipe is exposed and encased at one time, for the purposes of maintaining horizontal and vertical position. If sanitary sewer pipe begins to float or is not maintained in its original position during encasement operations, the operation shall immediately cease, and the Contractor shall re-evaluate the method of maintaining horizontal and vertical position before commencing encasement operations. Any deviation from horizontal or vertical position due to concrete encasement shall be corrected by the Contractor at no additional cost to the FRSA.

The proposed encasement shall be either earthen or wood formed. Earthen forming will not be permitted unless the soils are cohesive enough to support a vertical face and to prevent soil/concrete migration, as determined by the Engineer. The use of earthen or bank poured concrete shall be approved by the Engineer. Wood or manufactured forms shall be provided for the full length and width of each continuous unit formed. The forms shall be braced or tied to provide the structural capacity required to produce finished concrete to the lines and grades shown on the plans.

Prior to reinforcement bar placement, forms shall be coated with form oil. When the concrete surfaces are not exposed to view, wood forms may be saturated with water immediately prior to the placement of concrete in lieu of form oil.

Forms shall remain in place for a minimum of 24 hours or as directed by the Engineer. The method of form removal shall not result in damage to the concrete. If forms are removed prior to the completion of the required curing period, curing shall be resumed with an approved curing method for the remainder of the curing period.

No concrete shall be placed on ice, snow, or frozen foundation material. The method and manner of placing concrete shall be such as to avoid the segregation or separation of the aggregates or the displacement of reinforcement. The external surface of all concrete shall be thoroughly worked during the operations of placing in such a manner as to work the mortar against the forms to produce a smooth finish free of honeycomb and with a minimum of water and air pockets. Open troughs and chutes shall be extended as nearly as practical to the point of deposit. Dropping the concrete a distance of more than 5 feet will not be permitted. The concrete shall be consolidated by internal vibration. The Contractor shall provide and use a sufficient number of vibrators to ensure that consolidation can be started immediately after the concrete has been deposited in the forms. Concrete shall not be exposed to the action of water before setting, or be deposited in water, except with the approval of the Engineer.

Reinforcement bars of #4 size shall be placed at the bottom two corners of the encasement, for the full length of the encasement. Reinforcement shall have a 2” cover from the concrete surfaces.

Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Detailed Specifications / Page 6 of 14

Concrete encasement width shall be 8 inches (all sides) for 12 inch or less diameter sanitary sewer and shall be 12 inches (all sides) for sanitary sewer having a diameter of greater than 12 inches.

6.2 Materials

1. Concrete shall be IDOT Class DS according to Section 1020 of the IDOT Standard Specifications for Road and Bridge Construction, current edition.

2. Reinforcement shall be #4 size and shall conform to Section 508 and Section 1006.10 of the IDOT Standard Specifications for Road and Bridge Construction, current edition.

6.3 Required Submittals

The Contractor shall submit the following items for review and approval:

1. PCC mix designs.

6.4 Method of Measurement

This work will be measured for payment in place in Feet, along the horizontal alignment of the center of the encased pipe.

6.5 Basis of Payment

This work shall be paid for at the Contract unit price per foot (FOOT) for Concrete Encasement for Sanitary Sewers, 20”.

7 Construction Layout

7.1 General

This work shall be in accordance with Check Sheet #9 Construction Layout Stakes, revised January 1, 2022 of the IDOT Supplemental Specifications and Recurring Special Provisions, adopted January 1, 2026, as included in this Contract, except as modified herein, and shall consist of the Contractor providing all layout for the construction of this project to the lines and grades as shown on the plans. Reference points for the sanitary sewer centerline and benchmarks are shown on the plans.

The Contractor shall set sufficient stakes as are necessary for the Engineer to determine that the work is in conformance with the lines and grades shown on the plans. The Engineer may request construction layout stakes in addition to the Contractor’s layout at any time.

7.2 Required Submittals

None.

7.3 Basis of Payment

This work shall be paid for at the Contract unit price per lump sum (L SUM) for Construction Layout.

N ot t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Detailed Specifications / Page 7 of 14

8 Dewatering

8.1 General

Contractor shall use all means at his disposal to maintain dry trenches to the satisfaction of FRSA.

If dewatering is required, well point permits must be obtained from the Winnebago County Health Department (WCHD). Well point installation, maintenance, operation and removal shall be per WCHD requirements. The WCHD shall be notified prior to well placement and removal.

Groundwater will not be allowed to be pumped on existing ground surfaces or pavements where it may cause a traffic nuisance, or into existing sanitary sewers; it shall be discharged at points acceptable to FRSA, with all erosion control requirements and specifications taken into consideration.

Any permits required to perform dewatering work on this project shall be secured by the Contractor; it shall be the Contractor’s responsibility to provide any bonds, insurance, guarantees, etc., as required by said permits. Abandonment of dewatering facilities shall be performed in accordance with pertinent State and County requirements. If generators are required on a twenty-four (24) hour basis, the noise level shall be restricted to a level of 90 decibels or less. Approval to operate generators on a twenty-four (24) hour basis shall be obtained from the City of Rockford prior to implementation.

If trench dewatering becomes necessary, the Contractor shall exercise caution to avoid any detrimental impact to area wells. The Contractor shall be responsible for maintaining adequate water service to all residents and shall be solely liable for any wells that become dry as a result of construction.

8.2 Required Submittals

The Contractor shall submit the following items for review and approval:

1. Copy of permits, as applicable.

8.3 Basis of Payment

No payment shall be made for the work included in this provision. The cost of this work shall be included in the various pay items of this contract.

9 Erosion Control Blanket

9.1 General

This work shall conform to FRSA requirements, details, and provisions, and Section 251 of the IDOT Standard Specifications for Road and Bridge Construction, current edition. This work shall include all equipment, materials, labor, transportation, and workmanship to install erosion control blanket as shown on the plans.

This work shall be in accordance with the following standards or details:

Illinois Urban Manual IUM-530 Any additional erosion control blanket than what is shown on the plans and that is required due to the Contractor’s actions or negligence shall be provided at no additional cost to the FRSA. The

Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Detailed Specifications / Page 8 of 14

Contractor shall remove and dispose of all erosion control blanket within 30 days of final site stabilization and approval by the FRSA.

9.2 Materials

1. Erosion control blanket and all appurtenances shall be in accordance with Article 1081.10 of the IDOT Standard Specifications for Road and Bridge Construction, current edition.

9.3 Required Submittals

The Contractor shall submit the following items for review and approval:

1. Material certifications for erosion control blanket.

9.4 Method of Measurement

This work will be measured in place in Square Yards.

9.5 Basis of Payment

This work shall be paid for at the Contract unit price per square yard (SQ YD) for Erosion Control Blanket.

10 Filter Fabric

10.1 General

This work shall conform to FRSA requirements, details, and provisions, and Section 282 of the IDOT Standard Specifications for Road and Bridge Construction, current edition. This work shall include all equipment, materials, labor, transportation, and workmanship to install filter fabric as shown on the plans.

This work shall be in accordance with the following standards or details:

FRSA Standard Details ‘Sanitary Sewer Protection – Major Creek Crossing Detail’ This work shall consist of preparing subgrade and installing filter fabric as shown on the plans or as directed by the Engineer.

The subgrade and filter fabric placement shall be per Section 282 of the IDOT Standard Specifications for Road and Bridge Construction, current edition and to the satisfaction of the Engineer. Fabric shall be covered in a timely fashion with stone riprap. Filter fabric shall be wrapped into the rip rap section where shown in the plans and details.

10.2 Materials

1. Filter fabric shall be according to Sections 282 and 1080 of the IDOT Standard Specifications for Road and Bridge Construction, current edition.

10.3 Required Submittals

The Contractor shall submit the following items for review and approval:

1. Material certificates for filter fabric.

10.4 Basis of Payment

This work shall be paid for at the Contract unit price per square yard (SQ YD) for Filter Fabric.

Not t o be use d fo r b id din g purp

Bid Doc. No. 27-411 Detailed Specifications / Page 9 of 14

11 Perimeter Erosion Barrier

11.1 General

This work shall conform to FRSA requirements, details, and provisions, and Section 280 of the IDOT Standard Specifications for Road and Bridge Construction, current edition. This work shall include all equipment, materials, labor, transportation, and workmanship to install perimeter erosion barrier as shown on the plans.

This work shall be in accordance with the following standards or details:

IDOT Highway…