RIR_QAP_W03326.docx

DOCX document 22 KB Posted

Attached to
To procure 33 different hydraulic motor pipe parts.
Solicitation number
N6660420Q0702
Issued by

View the file

Other files

File Type Posted
VIR_W03326.docx DOCX document
N6660420Q0702.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J:\LIBRARY\FORMS

FORM REV. 06/08/2009

TAHE FACILITY

NETC, BLDG. 6

NEWPORT, RI 02841

TAHE FACILITY QUALITY PROVISIONS

RECEIPT INSPECTION REPORT

PART NUMBER / DRAWING NUMBER

See W03326

REV

PART NOMENCLATURE

542/9070 – Various Piping

SOURCE:

S/N:

CONTRACT:

N66604-

PURCHASE ORDER:
PURCHASE REQUEST:
WORK ORDER:

W03326

OUTSIDE SERVICES SOW:
TRAVELER:

QTY RECEIVED

SAMPLE SIZE**

AQL

CHARACTERISTIC MEASURED / VERIFIED

FINDINGS

ACCEPT REJECT

DISPOSITION-REMARKS

THE FOLLOWING QUALITY DOCUMENTATION / INFORMATION / INSTRUCTIONS MUST BE PROVIDED / ADHERED TO:

QTY: See W03326 and attached documentation

Certificate of Compliance that items were manufactured in accordance with all applicable instructions and specifications

Required

(A001)

Mercury Free Statement: Mercury or mercury compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract.

Required

(A002)

Domestically Sourced Material: All raw material must be sourced domestically.

Required

Material Identification must be in accordance with attached drawings/documentation. If not specified, then identification must appear on external surfaces of items or packages. (Military Specifications will be provided upon request)

Required

Certificate of Analysis of Raw Material stating that it meets the specifications identified

Not Required

Inspection is required by the vendor

Required – Document all measured part dimensions and compare to required dimensions per drawing.

Process Certification that items were manufactured in accordance with special processes identified i.e., Welding, Post Weld Anneal, Painting

Not Required

Special packaging requirements

Required – Package to protect part features during shipping and handling.

Test data to be provided

Not Required

First Article Inspection required

Not Required

SPECIAL INSTRUCTIONS/REMARKS/ENCLOSURES

7443674_53711_FN_A_D17-048, 7443674_53711_PL_A_D17-048, DEP0182_F, DEP0184, DEP0185, DEP0186, DEP0195_E_DCR19-011, DEP0261_D, DEP0263_A, DEP0267_B

VIR_W03326, RIR_QAP_W03326

**SAMPLING PERFORMED IN ACCORDANCE WITH ANSI/ASQZ1.4 GENERAL INSPECTION LEVEL II

TOTAL ACCEPTED

TOTAL REJECTED

INSPECTOR

DATE

REV. 06/08/2009

File details come from the government source that posted it. Updated .