Text version

General Decision Number: PA120002 03/16/2012 PA2

Superseded General Decision Number: PA20100002

State: Pennsylvania

Construction Type: Building

Counties: Armstrong, Cameron, Clarion, Clearfield, Clinton, Crawford, Elk, Forest, Indiana, Jefferson, McKean, Potter, Venango and Warren Counties in Pennsylvania.

BUILDING ERECTION AND FOUNDATION EXCAVATION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories), EXCLUDING

SEWAGE AND WATER TREATMENT PLANT PROJECTS

Modification Number Publication Date

0 01/06/2012

1 02/10/2012

2 03/16/2012

BOIL0013-002 01/01/2011

POTTER AND CLINTON COUNTIES

Rates Fringes

BOILERMAKER......................$ 37.35 30.02

* BOIL0154-002 06/01/2011

ARMSTRONG, CAMERON, CLARION, CLEARFIELD, ELK, FOREST,

JEFFERSON, INDIANA, McKEAN, VENANGO, AND WARREN COUNTIES

BOILERMAKER......................$ 38.10 23.06

BOIL0744-002 07/01/2008

CRAWFORD COUNTY

BOILERMAKER......................$ 35.34 18.48

BRPA0005-048 05/01/2011

CLINTON COUNTY

Bricklayer.....................$ 30.05 13.15

TILE SETTER......................$ 27.37 12.66

BRPA0009-005 06/01/2011

CLARION (Except Brady, Madison, Perry,Tobe, Porter, Redbank

Twps), CLEARFIELD, FOREST, JEFFERSON, AND VENANGO COUNTIES

BRICKLAYER.......................$ 27.65 14.52

CAULKER..........................$ 26.87 13.95

TILE SETTER......................$ 28.39 14.44

BRPA0009-007 06/01/2011

CLARION (except Brady, Madison, Perry, Tobe, Porter, Redbank

Twps.), FOREST, AND VENANGO COUNTIES

Cement Mason/Plasterer...........$ 27.65 14.52

BRPA0009-016 06/01/2011

CAMERON, ELK, McKEAN, POTTER, AND WARREN COUNTIES

Bricklayer, Cement Mason, Plasterer........................$ 25.35 14.64

CAULKER..........................$ 26.87 13.95

TILE SETTER......................$ 28.39 14.44

BRPA0009-037 06/01/2011

TILE SETTER......................$ 28.39 14.44

BRPA0009-038 06/01/2011

ARMSTRONG, CLARION COUNTY (Brady, Madison, Perry, Tobe, Porter, and Redbank Townships), AND INDIANA COUNTIES

BRICKLAYER.......................$ 29.46 15.69

TILE SETTER......................$ 28.39 14.44

BRPA0009-042 05/01/2011

CRAWFORD County

BRICKLAYER.......................$ 25.62 15.11

CARP0142-002 06/01/2011

ARMSTRONG COUNTY

CARPENTER........................$ 28.77 11.74

CARP0900-001 06/01/2011

CAMERON, CLARION, CLEARFIELD, CLINTON, CRAWFORD, ELK, FOREST,

INDIANA, JEFFERSON, AND POTTER COUNTIES

Carpenter & Soft Floor Layer.....$ 25.85 10.11

CARP1014-002 06/01/2011

MCKEAN, VENANGO, AND WARREN COUNTIES

Carpenter & Soft Floor Layer.....$ 24.85 9.95

CARP1759-005 06/01/2011

FLOOR LAYER: Carpet.............$ 28.77 11.76

ELEC0005-003 12/23/2011

ARMSTRONG, CAMERON, CLARION, CLEARFIELD, ELK, INDIANA,

JEFFERSON, AND MCKEAN COUNTIES

ELECTRICIAN......................$ 35.76 20.75

ELEC0005-008 12/23/2011

VENANGO COUNTY

ELECTRICIAN......................$ 35.76 20.75

ELEC0056-001 06/01/2011

FOREST AND WARREN COUNTIES

ELECTRICIAN......................$ 27.00 19.37

ELEC0712-001 12/27/2010

ELECTRICIAN......................$ 27.50 3%+18.68

ELEC0812-001 06/01/2011

ELECTRICIAN......................$ 27.54 16.67

ELEC0812-005 06/01/2011

POTTER COUNTY

ELECTRICIAN......................$ 28.55 16.70

* ENGI0066-004 07/01/2011

CAMERON, CLARION, CLEARFIELD, CLINTON, CRAWFORD, ELK, FOREST,

JEFFERSON, McKEAN, POTTER, VERANGO, WARREN

Power equipment operators:

Breakman, Deckhand..........$ 22.65 13.91

CLASS 1.....................$ 26.875 13.91

CLASS 2.....................$ 24.20 13.91

Helicopter, Oiler, Mechanic Helper/Fireman, Oiler on Tr.Cr. 50-ton up to but not including 100-ton.........................$ 22.90 13.91

Oiler on Tr.Cr. 100-ton and over....................$ 23.65 13.91

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

CLASS I

Asphalt Paver, Asphalt Roller, Asphalt Plant Operator, Athey

Loader, Auger (Truck or Tractor Mounted), Auto Grader

(C.M.I. and similar), Backhoe (180' and 360' swing), Back-Filling Machine, Batch Plant, Bulldozer, Cable Layer, Cableway, Caisson Drill, Central Mix Plant, Compactor with

Blade, Concrete Pump (all types), Over-Head Crane, Crane

(Crawler or Truck Mounted)*, Tower Crane (Stationary or

Climbing Type), Rough Terrain Crane**, Wagon Crane, Crushing and/or Screening Plant, Derrick Traveler, Derrick

(all types)(when assistance is needed it will be an oiler or apprentice), Derrick Boats, Dragline, Drill (Davey or similar), Dredge, Drill (Well and Core)(Truck or Skid

Mounted), Elevator, Excavating Equipment (all other), Fork

Lift (Lull or similar), Franki Pile Machine (or similar), Guard Post Driver, Gradall (all types), Grader, Elevating

Grader, Equipment Greaser, Helicopter, Helicopter Hoist

Operators, Front End Loader, Hoist, Hydraulic Boom Truck, Jumbo Operator, Kocal, Koehring Scooper, Locomotive, Metro

Chip Harvester (or similar), Mix Mobile, Mixer - Paver, Mucking Machine, Multiple Bowl Machines, Pile Driver (Sonic or similar), Scrapers, Shovels (powered), Slip Form Paver

(C.M.I. and similar), Spreader (Concrete, Asphalt, or

Stone), Tire Repairman (when assigned to a jobsite), Tower

Mobile, Tractors (all types), Trencher, Tug Boat, Vermeer

Saw, Welder (repairman), Whirley

* Cranes with Boom or Mast length (including jib) 100 ft or over shall be paid an additional $.50 per hour for each

50-foot increment of additional boom and/or jib length)

** Rough Terrain Cranes with Boom or Mast length (including jib) 101 ft or over shall be paid an Additional $.50 per hour for each 50-foot increment of additional boom and/or jib length)

Note: An additional $1.25 per hour (not counting boom pay) shall be paid for any crane (excluding overhead cranes) rated 100 ton or over.

CLASS II

Ballast Regulator, Boat (material or personnel)(powered), Boiler, Boring Machine, Compressor (combined with Air

Tugger, Air Pump, Gunite Machine, or Sand Blaster), Concrete Belt Placer, Concrete Saw, Conveyor, Carry Crane, Crushing/Screening Plants, Curb Builder (self-propelled), Forklifts (ridden or self-propelled), Form Line Machine, Generator (over 5KW), Grout Pump, Heaters, Hoist (monorail, roof, one drum-regardless of power used), Huck Machine (or similar), Hydraulic Jack (single or multiple)(power driven), Ladavator, Mortar Mixer, Mulching Machine, Pavement Breaker (self-propelled or ridden), Pin Puller

(powered), Pipe Cleaning Machine, Pipe Dream, Power Broom

(except push type), Pulverizer, Pumps (regardless of power used), Roller/Compactor (Dirt), Refrigeration Plant, Ross

Carrier (or similar), Seeding Machine, Skid Steer Loader

(or similar), Slab Lifting Machine (hydraulic), Soil

Stabilizer (pump type), Spray Cure Machine (power driven), Side Delivery Shoulder Spreader (attachment), Steam Jenny

(or similar), Stone Crusher, Stone Spreader

(self-propelled), Siphon (steam or air), Tie Tamper

(multiple heads), Tractor (when used for landscaping, snaking, or hauling), Truck (Winch)(when hoisting and placing), Tube Finisher (C.M.I. and similar), Tugger, Water

Blaster, Welding Machine, Well Point System

General Note: Hazardous Material Sites Level C & D receive

$1.00 per hour premium for all classifications and Levels A

& B receive $2.50 premium for all classifications

* ENGI0066-008 06/01/2011

ARMSTRONG AND INDIANA COUNTIES

CLASS 1.....................$ 31.05 15.75

CLASS 2.....................$ 27.36 15.75

CLASS 3.....................$ 25.64 15.75

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

CLASS I

Asphalt Paver, Asphalt Roller, Asphalt Plant Operator, Athey

Loader, Auger (Truck or Tractor Mounted), Auto Grader

(C.M.I. and similar), Backhoe (180' and 360' swing), Back-Filling Machine, Batch Plant, Bulldozer, Cable Layer, Cableway, Caisson Drill, Central Mix Plant, Compactor with

Blade, Concrete Pump (all types), Over-Head Crane, Crane

(Crawler or Truck Mounted)*, Tower Crane (Stationary or

Climbing Type), Rough Terrain Crane**, Wagon Crane, Crushing and/or Screening Plant, Derrick Traveler, Derrick

(all types)(when assistance is needed it will be an oiler or apprentice), Derrick Boats, Dragline, Drill (Davey or similar), Dredge, Drill (Well and Core)(Truck or Skid

Mounted), Elevator, Excavating Equipment (all other), Fork

Lift (Lull or similar), Franki Pile Machine (or similar), Guard Post Driver, Gradall (all types), Grader, Elevating

Grader, Equipment Greaser, Helicopter, Helicopter Hoist

Operators, Front End Loader, Hoist, Hydraulic Boom Truck, Jumbo Operator, Kocal, Koehring Scooper, Locomotive, Metro

Chip Harvester (or similar), Mix Mobile, Mixer - Paver, Mucking Machine, Multiple Bowl Machines, Pile Driver (Sonic or similar), Scrapers, Shovels (powered), Slip Form Paver

(C.M.I. and similar), Spreader (Concrete, Asphalt, or

Stone), Tire Repairman (when assigned to a jobsite), Tower

Mobile, Tractors (all types), Trencher, Tug Boat, Vermeer

Saw, Welder (repairman), Whirley

* Cranes with Boom or Mast length (including jib) 100 ft or over shall be paid an additional $.50 per hour for each

50-foot increment of additional boom and/or jib length)

** Rough Terrain Cranes with Boom or Mast length (including jib) 101 ft or over shall be paid an Additional $.50 per hour for each 50-foot increment of additional boom and/or jib length)

Note: An additional $1.25 per hour (not counting boom pay) shall be paid for any crane (excluding overhead cranes) rated 100 ton or over.

CLASS II

Ballast Regulator, Boat (material or personnel)(powered), Boiler, Boring Machine, Compressor (combined with Air

Tugger, Air Pump, Gunite Machine, or Sand Blaster), Concrete Belt Placer, Concrete Saw, Conveyor, Carry Crane, Crushing/Screening Plants, Curb Builder (self-propelled), Forklifts (ridden or self-propelled), Form Line Machine, Generator (over 5KW), Grout Pump, Heaters, Hoist (monorail, roof, one drum-regardless of power used), Huck Machine (or similar), Hydraulic Jack (single or multiple)(power driven), Ladavator, Mortar Mixer, Mulching Machine, Pavement Breaker (self-propelled or ridden), Pin Puller

(powered), Pipe Cleaning Machine, Pipe Dream, Power Broom

(except push type), Pulverizer, Pumps (regardless of power used), Roller/Compactor (Dirt), Refrigeration Plant, Ross

Carrier (or similar), Seeding Machine, Skid Steer Loader

(or similar), Slab Lifting Machine (hydraulic), Soil

Stabilizer (pump type), Spray Cure Machine (power driven), Side Delivery Shoulder Spreader (attachment), Steam Jenny

(or similar), Stone Crusher, Stone Spreader

(self-propelled), Siphon (steam or air), Tie Tamper

(multiple heads), Tractor (when used for landscaping, snaking, or hauling), Truck (Winch)(when hoisting and placing), Tube Finisher (C.M.I. and similar), Tugger, Water

Blaster, Welding Machine, Well Point System

CLASS III

Brakeman, Deck Hand, Helicopter Signalman, Oiler*, Elevator

(Alterations & Remodeling Commercial Buildings),

* Oilers on Truck Cranes: less than 50 ton shall receive $.10 over the Class III base rate; 50 ton up to 100 ton rated capacity shall be paid an additional $.25 per hour over the

Class III base rate; 100 ton and over shall be paid an additional $1.00 per hour over the Class III base rate.

General Note: Hazardous Material Sites Level C & D receive

$1.00 per hour premium for all classifications and Levels A

& B receive $2.50 premium for all classifications

ENGI0066-019 07/01/2011

(ARMSTRONG AND INDIANA AND

LAWRENCE COUNTIES)

SCRAPER.....................$ 31.045 15.75

(CAMERON, CLARION,

CLEARFIELD, CLINTON,

CRAWFORD, ELK, JEFFERSON,

MCKEAN, POTTER, VANANGO AND

WARREN COUNTIES)

SCRAPER.....................$ 24.565 12.07

IRON0003-003 06/01/2011

ARMSTRONG, CLARION, INDIANA, CRAWFORD, FOREST AND WARREN

COUNTIES

Ironworkers:.....................$ 30.38 24.20

Pre-Engineered Metal

Building....................$ 29.43 7.42

Structural, Reinforcing & Ornamental

IRON0003-009 06/01/2011

BLAIR, CAMERON, CENTRE, CLEARFIELD, CLINTON, ELK, JEFFERSON,

MCKEAN AND POTTER COUNTIES

Ironworkers:.....................$ 30.38 24.20

IRON0207-003 06/01/2010

Ironworkers:

Structural, Reinforcing &

Ornamental..................$ 26.81 17.65

Structural, Reinforcing & Ornamental

LABO0323-001 01/01/2011

Laborers:

GROUP 1.....................$ 21.17 10.45

GROUP 2.....................$ 21.32 10.45

GROUP 3.....................$ 21.45 10.45

GROUP 4.....................$ 21.92 10.45

LABORERS CLASSIFICATIONS

GROUP 1 - COMMMON LABORER: Building laborer, west brick buggy or similar (non self-propelled), stripper and mover of forms as follows: Cement finisher, footers, forms not to be re-used, forms that are a matter of record; window cleaner, toolroom man, water proofing (any mode or method).

GROUP 2 - SKILLED LABORER: Powered wheelbarrows, buggies, mason tender, pipe layer, bottom man (10 below grade), mortar mixer, mason plasterer, concrete, other, hod carrier

- mason,plasterer (any method), scaffold builder, concrete buster, jackhammer (air tool, electric, other), other mechanical or power tools, concrete saw, carryable pumps and operating, all operators of compacting equipment, grout machine feeder and pump operator, all material conveyors

(regardless of power used, including starting and stopping), bell and bottom man on furnaces and stacks, burner (demolition), groundman, jackhammer man, drill man, high (climber) blaster, wagon drill operator. .

GROUP 3 - Asbestos removal or abatement laborer

GROUP 4 - Toxic or hazardous waste handling laborer

LABO0419-002 07/01/2011

CLEARFIELD AND CLINTON COUNTIES

GROUP 1.....................$ 18.27 10.15

GROUP 2.....................$ 18.42 10.15

GROUP 3.....................$ 18.52 10.15

GROUP 4.....................$ 17.61 10.15

GROUP 1 - Unskilled laborer

GROUP 2 - Plasterer tender & Mason Tender

GROUP 3 - Asbestos removal and toxic waste removal laborer

GROUP 4 - Flagman

LABO0952-002 06/01/2009

ARMSTRONG, CLARION, INDIANA, AND JEFFERSON COUNTIES

GROUP 1.....................$ 20.92 9.09

GROUP 2.....................$ 21.07 9.09

GROUP 3.....................$ 21.20 9.09

GROUP 4.....................$ 21.67 9.09

GROUP 5.....................$ 19.75 9.09

GROUP 1 - COMMON LABORER Building laborer; Brick removal for alterations; Carryable pumps; West brick buggy or similar;

Walk behind forklift or similar (non self-propelled);

Stripper and mover of forms;Tool room man; all material conveyors(regardless of power used, including starting and stopping);Pouring of mortar or aggregate into blocks of voids

GROUP 2 - SKILLED LABORER Air track; West brick buggy or similar (self propelled); Power wheelbarrows and buggies;

walk behind forklift or similar (self-propelled); Drill runner; (including Drill Mounted on Truck, Track or similar); Blasterer's All operators of compacting equipment; pipe layer; Burner; Jackhammerman - concrete buster; vibator operator; clay spade and/orsimilar; gunnute nozzleman; blaster; copncrete saw operator; hod carrier;

scaffold builder; air track operator; bell and bottom man on furnace and stacks; grout machine feeder and pump operator; gunnite machine opoerator or similar; gunnite machine potman or similar; mortar mixer; mortar mixer machine (regardless of power used including starting and stopping); wagon drill operator; laser cleaner; lancer

GROUP 3 - Asbestos removal or abatement laborer

GROUP 4 - Toxic or Hazardous waste handling laborer

GROUP 5 - Flag Person

LABO0952-003 06/01/2010

CAMERON, ELK, FOREST, McKEAN, POTTER AND WARREN COUNTIES

GROUP 1.....................$ 18.30 10.04

GROUP 2.....................$ 18.55 10.04

GROUP 3.....................$ 19.10 10.04

GROUP 1 - Common laborer, carpenter tender, flagman, spotter equipment, scaffold builder for masons, window cleaner, form stripper and mover, scaffold and runways, building materials handlers (loading and unloading) concrete pitman, puddler, mason tender

GROUP 2 - Mechanical tampers (power) powered wheelbarrows and buggies and worklifts, sweepers and similar, mortar mixer, bell bottom man on furnances and stacks, jackhammer man, concrete buster, sheeters and shorers, vibrator operators, power tamper operators y-gun, burnercutting torch and carrable pumps, chain saw operator, pipe layers, all material conveyors and elevators, signal man, west brick buggies or similar, scaffold builder for plasterers' regardless of height, hod carriers, plasterer tender, form cleaning machine operator, plasterer applicating and/or pump machine operator, paving creaker, asphalt raker, lancer, berfix cutting tool, gunnite potman blacksmith, tool dresser (cable tools)

GROUP 3 - Blasters, wagon drill operator(air trac) drill runner, nozzle man, grout machine operator, walk behind power roller and temper, welder, driller (cable tools) multiplate pipe aligning and securing

LABO0964-001 06/01/2010

Group 1.....................$ 19.46 10.77

Group 2.....................$ 19.61 10.77

Group 3.....................$ 19.74 10.77

Group 4.....................$ 20.21 10.77

GROUP 1 - Common Laborers

GROUP 2 - Material buggy handlers, all power tool operators, pipe layers, drill runner, asbestos and toxic waste removal laborer

GROUP 3 - Mason tender, mortar mixer, hod carrier, scaffold builder, mechanical tamper, powered wheelbarrows

GROUP 4 - Toxic and hazardous waste handling and removal

PAIN0021-007 05/01/2010

Painters:

Brush and Roller............$ 23.30 13.00

Brush & Roller

PAIN0057-006 06/01/2011

ARMSTRONG, CLARION, CLEARFIELD, ELK, INDIANA, JEFFERSON AND

VENANGO COUNTIES

Brush & Roller..............$ 25.72 14.09

PAIN0057-007 06/01/2010

CAMERON, CRAWFORD, FOREST, POTTER AND WARREN (excluding

Freehold and Columbus townships) COUNTIES

Brush and Roller............$ 21.85 12.70

Brush & Roller

PAIN0057-018 06/01/2011

DRYWALL FINISHER/TAPER

(ARMSTRONG AND INDIANA

COUNTIES)........................$ 25.00 14.75

DRYWALL FINISHER/TAPER

(CAMERON, CLARION,

CLEARFIELD, ELK, FOREST,

JEFFERSON, AND VENANGO

COUNTIES)........................$ 24.50 13.92

DRYWALL FINISHER/TAPER

(CRAWFORD, McKEAN, POTTER, AND WARREN COUNTIES).............$ 22.00 12.27

PAIN0057-025 05/01/2011

McKean and Warren Counties (Including Columbus and Freehold

Townships)

PAINTER

Brush and Roller............$ 20.28 13.25

PLAS0024-001 06/01/1998

ELK, MCKEAN, POTTER AND WARREN COUNTIES:

PLASTERER........................$ 18.85 5.83

PLAS0031-002 06/01/2010

PLASTERER........................$ 26.13 12.15

PLAS0031-007 06/01/2010

ARMSTRONG, CLEARFIELD,AND JEFFERSON COUNTIES

PLASTERER........................$ 26.13 12.15

PLAS0031-008 06/01/2010

CLINTON AND INDIANA COUNTIES

PLASTERER........................$ 20.97 9.94

PLAS0526-003 06/07/2011

ARMSTRONG, INDIANA, CLEARFIELD, AND JEFFERSON COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 27.14 12.82

PLAS0526-005 07/01/2011

CEMENT MASON/CONCRETE FINISHER...$ 24.60 11.69

PLUM0027-003 06/01/2011

PLUMBER..........................$ 35.85 17.57

PLUM0047-006 05/01/2011

CLARION, CRAWFORD, FOREST, McKEAN, VENANGO, AND WARREN COUNTIES

Plumbers and Pipefitters.........$ 34.16 17.37

PLUM0354-002 06/01/2011

CAMERON, CLEARFIELD, ELK, INDIANA, AND JEFFERSON COUNTIES

Plumbers and Pipefitters.........$ 31.81 19.18

PLUM0449-002 06/01/2011

PIPEFITTER.......................$ 36.68 18.14

PLUM0520-010 05/01/2011

CLINTON AND POTTER COUNTIES

Plumbers and Pipefitters.........$ 31.92 20.39

* ROOF0030-006 06/01/2011

ROOFER...........................$ 24.25 15.21

* ROOF0037-002 06/01/2011

ARMSTRONG, CAMERON, CLARION, CLEARFIELD, ELK, FOREST, INDIANA,

AND JEFFERSON COUNTIES

ROOFER...........................$ 27.65 12.32

* ROOF0210-002 06/01/2010

CRAWFORD, McKEAN, POTTER, VENANGO, AND WARREN COUNTIES

ROOFER...........................$ 23.65 11.99

SUPA2000-001 06/22/2000

Bulldozers..................$ 19.23 8.46

Excavators..................$ 12.00

Forklift....................$ 17.72 8.46

Loader......................$ 18.91 8.46

Mechanics...................$ 14.08 5.62

Pavers......................$ 19.06 8.39

Rollers.....................$ 14.88 8.46

Sheet metal worker...............$ 20.10 6.10

TRUCK DRIVER.....................$ 9.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be

July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION