RFQ SRWF Installation 25-Q-3001.pdf

PDF 906 KB Posted

Attached to
RFQ-Request for Quotations for SRWF Installation Services 25-Q-3001
Solicitation number
19TU15-25-Q-3001
Issued by

About this file

This is a solicitation document from the U.S. Embassy in Ankara, Turkey (19TU15-25-Q-3001) for the installation of Shatter Resistant Window Film (SRWF) services for embassy offices and U.S. Government-owned/managed properties.

The solicitation is for an indefinite-delivery indefinite-quantity (IDIQ) contract with firm-fixed-price task orders. The scope includes installation of 8 mil (200 micron) clear SRWF, removal of old/damaged SRWF, and preparation of surfaces. Key requirements include approximately 1,000 square meters of SRWF installation and 500 square meters of removal services for both base and option years. The contractor must provide a 7-year warranty. The period of performance is 365 calendar days after the Notice to Proceed. A site visit is scheduled for December 11, 2024 at 10:00 AM, with quotations due by December 20, 2024 at 4:00 PM. The film must meet specific standards including EN 12600 Pendulum Impact Resistance, EN 13501 fire behavior, and EN 356 burglary resistance classifications, with minimum 85% visible light transmission and 99% UV blocking capabilities.

View the file

Other files

File Type Posted
Cover Letter SRWF 25-Q-3001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SENSITIVE BUT UNCLASSIFIED

U.S. EMBASSY in ANKARA, TÜRKİYE

SOLICITATION DOCUMENT

SOLICITATION for EMBASSY

SRWF INSTALLATION IDIQ

Solicitation No.: PR12689651, 19TU15-25-Q-3001

General Services Office: Acquisitions

1480 Sokak, No: 1, Çukurambar, Ankara, Türkiye

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 2/69

SOLICITATION FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

PR12689651

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

5. SOLICITATION NUMBER

19TU15-25-Q-3001

6. SOLICITATION ISSUE DATE

11/29/2024

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME Contracting Officer

Procurement Specialist

b. TELEPHONE NUMBER (No collect calls)

(312) 294-0000

8. OFFER DUE DATE/ LOCAL TIME

1600 hours on 12/20/2024

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE:____ % FOR:

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS

General Services Office U.S. Embassy

Çukurambar Mah. 14780 Sok, No:1, Çankaya, Ankara

HUBZONE SMALL

BUSINESS

(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM NAICS:

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

EDWOSB

8 (A) SIZE STANDARD:

11. DELIVERY FOR FOB DESTINAT-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS 13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO

CODE 16. ADMINISTERED BY

CODE

U.S. Embassy Ankara

Çukurambar Mah. 14780 Sok, No:1, Çankaya, Ankara

U.S. Embassy Ankara RSO

Çukurambar Mah. 14780 Sok, No:1, Cankaya, Ankara

17a. CONTRACTOR/

OFFERER

TELEPHONE NO.

CODE FACILITY

18a. PAYMENT WILL BE MADE BY

U.S. Embassy Ankara / FMC Çukurambar Mah. 14780 Sok, No:1, Cankaya, Ankara

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

SRWF and Installation

Removal of old/or damaged SRWF

(Please refer to Section 1- Prices)

(refer to pricing section)

Sqm

Sqm

USD

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET

FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT

TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. _________________ OFFER DATED ____________.

YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR

CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print)

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER (Type or print)

31c. DATE SIGNED

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 3/69

TABLE OF CONTENTS

Section 1 - The Schedule

• SF 1449 cover sheet

• Continuation To SF-1449, RFQ Number 19TU15-24-Q-3000, Prices, Block 23

• Continuation To SF-1449, RFQ Number 19TU15-24-Q-3000, Schedule Of Supplies/Services, Block

20 Description/Specifications/Work Statement

• Attachment 1 to Description/Specifications/Performance Work Statement,

• Attachment 2 to Government Furnished Property

Section 2 - Contract Clauses

• Contract Clauses

• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

Section 3 - Solicitation Provisions

• Solicitation Provisions

• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in Part 12

Section 4 - Evaluation Factors

• Evaluation Factors

• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part 12

Section 5 - Representations and Certifications

• Offeror Representations and Certifications

• Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not

Prescribed in Part 12

Attachment 1 – NDAA Compliance

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 4/69

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1449, RFQ NUMBER 19TU15-24-Q-3000

PRICES, BLOCK 23

1. PRICES

a. The contractor shall provide materials and installation services for shatter resistant window film for the offices and real property owned or managed by the U.S. Government for the U.S. Embassy in Ankara.

b. The Government will order all work by issuing task orders.

c. This is an indefinite-delivery indefinite-quantity type contract under which may be placed firm-fixed price task orders.

1.1 VALUE ADDED TAX

VALUE ADDED TAX. Value Added Tax (VAT) is not applicable to this contract and shall not be included in the CLIN rates or Invoices because the U.S. Embassy has a tax exemption certificate from the host government.

THIS SPACE IS LEFT EMPTY ON PURPOSE

1.2. BASE YEAR: The firm fixed price for the Base Year of the contract is:

Item

Number Supplies and Services

Approximate

Quantity (Sqm)

Unite Price

(USD)

Total Price

(USD)

Shatter Resistant Window Film and its installation

2 Removal of old or/damaged SRWF 500

Base Year Total Price

1.3. FISRT OPTION YEAR: The firm fixed price for the First Option Year of the contract is:

Item

Number Supplies and Services

Approximate

Quantity (Sqm)

Unite Price

(USD)

Total Price

(USD)

Shatter Resistant Window Film and its installation

2 Removal of old or damaged SRWF 500

1st Option Year Total Price

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 5/69

1.6 Grand Total of Base and All Option Years

Base Year Total

Option Year 1 Total

TOTAL - BASE AND 1ST OPTION YEARS

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 6/69

CONTINUATION TO SF-1449,

RFQ NUMBER 19TU15-24-Q-3008

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

2. STATEMENT OF WORK

1. Overview

Installation services for shatter resistant window film to include the following:

(a) Survey current condition and advise COR of any anticipated problems that would occur in installation of shatter resistant window film

(b) If required remove old film and prepare window

(c) Contractor needs to clean the windows before application is applied, to avoid bubbling and peeling,

(d) Thickness of SRWF will be 8 mil 200 micron,

(e) Install shatter resistant window film,

(f) The SRWF applied should be clear,

(g) Contractor should install SRWF as close as possible to the edge of windows,

(h) No SRWF to be removed from existing window unless there is damaged due to normal wear and tear,

(i) The work area shall be kept clean and cleaned up after completion of SRWF installation,

(j) ) The SRWF to be installed will be tested and classified per the following:

EN 12600 Pendulum Impact Resistance, EN 13501 Behavior on exposure to fire in buildings, EN 356 Burglary resistance and GSA international safety standards.

Visible Light Transmission on 6 mm clear glass: min.85%

UV Blocking: min. 99%

(k) When work is completed in each residence, spreadsheet including SRWF measurement and cost should be submitted to RSO for review and approval. The approved spreadsheet should be attached to each invoice before submitting to the

FMC (Accounting section).

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 7/69

2. Measurement

The Contractor shall measure the total area of window surfaces that are to receive application of shatter resistant window film (SRWF). Measurement may be performed by on-site surveying or through the use of record drawings.

3. Installation

3.1 Examination and Preparation

(a) The Contractor shall inspect existing surfaces of glazing sheets where application of film is required. The Contractor shall report to the COR and Contracting Officer:

(1) Any defective existing conditions that would impair successful installation and performance of applied film, such as loose installation of glass in frame.

(2) Recommended procedure for overcoming the defects.

(b) The Contractor shall await response from COR before proceeding with application of film on such defective units of glazing. When approved to proceed, the

Contractor shall:

(1) Remove (temporarily) existing shades, blinds, and draperies from window units

(2) Remove (temporarily) existing interior window grilles, if any.

(3) Remove existing shatter resistant window film, if any.

(4) Clean the glass of paint, foreign compounds, smears, and spattered surfaces where the shatter-resistant window film is to be applied. After the initial cleaning, the Contractor shall further clean the surface to receive the film following the film manufacturer's instructions.

3.2 Application

After surface preparation, the Contractor shall apply the SRWF with the manufacturer's recommendations and instructions. The Contractor shall apply SRWF to the interior (room) side of the glass for both single and double glazed sheets, unless otherwise required by the

Contracting Officer. Multiple applications of film to achieve specified performance are not allowed. The Contractor shall not apply the SRWF if there:

(a) Are visible dust particles in the air,

(b) Is frost on the glazing, or

(c) Is any room condition such as temperature and humidity that does not meet the manufacturer's instructions.

The Contractor shall follow the manufacturer's instructions on film application and room conditions to allow for proper curing of the adhesive.

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 8/69

The Contractor shall apply a scratch resistant hard coat over the film to extend the life of the film following the manufacturer’s instructions, if any. In the absence of manufacturer’s instructions, the Contractor shall consult with the Contracting Officer.

3.2.1. Application To New Glass Before Glazing - The Contractor shall apply SRWF to extend edge to edge of the glass sheet. The Contractor shall set the film-reinforced glass into the frame with glazing compounds or gaskets. When contact between the glazing compounds and/or gaskets and the SRWF occurs, the Contractor shall ensure compatibility. The Contractor is responsible for delivery of the SRWF to the appropriate location for application. The

Contractor shall coordinate SRWF application and curing with the glass supplier and window or door manufacturer before to glazing installation.

3.2.2. Application To Existing Glass Without Dismantlement - The Contractor shall apply

SRWF to extend to within 1.6 mm (1/16 inch) with a maximum of 5-mm (3/16 inch) of the edge of the visible glass area.

3.2.3. Splicing - Splices or seams in shatter-resistant window film are permitted only when a sheet of glass has a dimension exceeding 1.475 meters (58 inches) in both directions. All seams shall have a minimum overlap of 6-mm (1/4 inch).

3.3. Cleaning - The Contractor shall follow the manufacturer’s instructions for cleaning of the shatter-resistant windows.

4. Field Inspection/Quality Control

(a) The applied SRWF shall be clean and free of peeling, splitting, scratches, creases, wrinkles, discoloration, edge damage, foreign particles, or other optical defects or distortions.

(b) The film application shall be free of air bubbles after 30 days.

(c) SRWF shall not show signs of waviness and distortion at the time the work is accepted.

(d) The unaided eye (except for corrective prescription glasses) shall make this determination, when the film is viewed from a distance of 3 meters (10 feet) from the interior room side at angles up to 45 degrees when looking at a clear or uniformly overcast sky.

(e) The Contractor shall remove unacceptable shatter-resistant window film applications following the manufacturer's instructions and apply new film.

(f) The Contractor shall provide a certificate ascertaining that the installed SRWF is 8 mil, 200 micron, meets the classifications cited under 1.j and the brand name and lot number of the role.

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 9/69

5. Reinstallation

The Contractor shall reinstall any shades, blinds, draperies, and other window dressing elements that were temporarily removed to facilitate SRWF application. The Contractor shall reinstall any interior window grilles that were temporarily removed.

6. Warranty

The Contractor warrants items and services provided, following FAR 52.212-4, Contract

Terms and Conditions-Commercial Items.

The Contractor shall obtain and furnish to the Government all information required to make any subcontractor's, manufacturer’s or supplier's guarantee or warranty legally binding and effective.

The Contractor shall submit both the information and the guarantee or warranty to the

Government in sufficient time to permit the Government to meet any time limit in the guarantee or warranty, but not later than completion and acceptance of all work under this contract.

This 7 year warranty for the installation of the SRWF will require the Contractor at its own expense to replace the SRWF if cracking, crazing, peeling, or inadequate adhesion occurs.

7. Period Of Performance

After contract award and submission of acceptable insurance certificates, the Contracting

Officer shall issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of _10 days from date of contract award unless the Contractor agrees to an earlier date) on which performance shall start.

All work under this contract, including clean up and reinstallation of window dressings, shall not exceed 365 calendar days after the start date shown in the Notice to Proceed.

8. Contractor's Submission of Construction Schedules

(a) The time for submission of the schedules referenced in 52.236-15, "Schedules for

Construction Contracts", paragraph (a), is modified to reflect the due date for submission as "10 days after receipt of an executed contract."

(b) These schedules shall include the time shop drawings, product data, samples and other submittals required by the contract will be submitted for approval.

(c) The Contractor shall revise the schedules

(1) To account for the actual progress of the work,

(2) To reflect approved adjustments in the performance schedule, and

(3) As required by the Contracting Officer to achieve coordination with work by the Government and any separate contractors used by the Government. The

Contractor shall submit a schedule that sequences work to minimize disruption at the job site.

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 10/69

(d) All deliverables shall be in the English language, unless otherwise provided, and any system of dimensions (such as English or metric) shown shall be consistent with that used in the contract. The Government in approving the deliverables if the Contractor fails to act timely in submitting its deliverables shall allow no extension of time for a delay. The Contractor shall identify each deliverable as required by the contract.

9. Acceptance Of Schedule

When the Government has accepted any time schedule, it shall be binding upon the Contractor.

The completion date is fixed and may be extended only by a written contract modification signed by the Contracting Officer. Acceptance or approval of any schedule or revision by the

Government shall not:

(a) Extend the completion date or obligate the Government to do so,

(b) Constitute acceptance or approval of any delay, nor

(c) Excuse or relieve the Contractor of its obligation to maintain the progress of the work and achieve final completion by the established completion date.

10. Work Hours

The Contractor shall perform all work during 08:30 a.m. – 05:00 p.m., Monday through

Friday except for the holidays identified below. The Contracting Officer may approve other hours. The Contractor shall give 24 hours advance notice to the Contracting Officer who may consider any deviation from the hours identified above. Changes, initiated by the Contractor, in work hours will not be cause for a price increase.

10.1 The Department of State observes the following days* as holidays:

New Year's Day

Martin Luther King's Birthday

Washington’s Birthday

Memorial Day

Independence Day

Labor Day

Columbus Day

Veterans Day

Thanksgiving Day

Christmas Day

10.2 When any such day falls on a Saturday, the preceding Friday is observed; when any such day falls on a Sunday, the following Monday is observed. Observance of such days by

Government personnel shall not be cause for additional period of performance or entitlement to compensation except as set forth in the contract. If the Contractor's personnel work on a holiday, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost.

11. Personnel Requirements

11.1 Removal of Personnel

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 11/69

11.1.1 The Contractor shall:

(a) Maintain discipline at the site and at all times;

(b) Take all reasonable precautions to prevent any unlawful, riotous or disorderly conduct by or amongst those employed at the site; and

(c) Take all reasonable precautions for the preservation of peace and protection of persons and property in the neighborhood of the project against unlawful, riotous, or disorderly conduct.

11.1.2 The Contracting Officer may require, in writing that the Contractor remove from the work any employee that the Contracting Officer determines:

(a) Incompetent,

(b) Careless,

(c) Insubordinate

(d) Otherwise objectionable, or

(e) Whose continued employment on the project is deemed by the Contracting

Officer to be contrary to the Government's interests.

11.2 Construction Personnel Security

After award of the contract, the Contractor has ten (10) days to submit to the Contracting

Officer a list of workers and supervisors assigned to this project for the Government to conduct security checks. It is anticipated that security checks will take 6 – 8 weeks to perform. For each individual the list shall include:

(a) Full Name

(b) Place and Date of Birth

(c) Current Address

(d) Identification Number

Failure to provide any of the above information may be considered grounds for rejection and/or re-submittal of the application. Once the Government has completed the security screening and approved the applicants a badge will be provided to the individual for access to the site. The Government may revoke this badge at any time due to the falsification of data, or misconduct on site.

11.3 Language Proficiency

The manager assigned by the Contractor to superintend the work on-site, as required by FAR

52.236-6, "Superintendence by the Contractor," shall be fluent in written and spoken English.

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 12/69

12. Utilities

The Government cannot ensure that utilities will be available at all properties at all times. The

Contractor shall have an alternate source of power (such as a generator) available if needed to ensure that film shall be applied in conformance with manufacturer's specifications. The

Contractor shall not adjust the heating or air conditioning controls in properties with utilities turned on to maintain temperature. Contractor shall have its own source of water available for clean up if the water has been turned off in the property for winterization of the plumbing system.

13. Materials and Equipment

The Contractor shall provide all necessary supplies and equipment, including brushes, rollers, buckets, mixers, space heaters, drop cloths, scrapers, if necessary to perform the work.

3. INSURANCE

3.1 The Contractor is required to provide whatever insurance is legally necessary under Section I, 52.228-5, "Insurance - Work on a Government Installation.” The Contractor shall, at its own expense, provide and maintain during the entire performance period the following insurance amounts:

3.2 General Liability (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury)

1.Bodily Injury stated in U.S. Dollars:

Per Occurrence $ 5,000

Cumulative $ 20,000

2.Property Damage stated in U.S. Dollars:

Per Occurrence $5,000

Cumulative $ 50,000

3.3 The types and amounts of insurance are the minimums required. The Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.

3.4 For those Contractor employees assigned to this contract who are either United States citizens or direct hire in the United States or its possessions, the Contractor shall provide workers’ compensation insurance in accordance with FAR 52.228-3.

3.5 The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to:

• any property of the Contractor,

• its officers,

• agents,

• servants,

• employees, or

• any other person

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 13/69 arising from an incident to the Contractor's performance of this contract. The Contractor shall hold harmless and indemnify the Government from any and all claims arising, except in the instance of gross negligence on the part of the Government.

3.6 The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.

3.7 Government as Additional Insured. The general liability policy required of the Contractor shall name "the United States of America, acting by and through the Department of State", as an additional insured with respect to operations performed under this contract.

3.8 Time for Submission of Evidence of Insurance. The Contractor shall provide evidence of the insurance required under this contract within ten (10) calendar days after contract award. The

Government may rescind or terminate the contract if the Contractor fails to timely submit insurance certificates identified above.

4. LAWS AND REGULATIONS

4.1 Compliance Required - The Contractor shall, without additional expense to the

Government, be responsible for complying with all host country laws, codes, ordinances, and regulations applicable to the performance of the work, and with the lawful orders of any governmental authority having jurisdiction. Host country authorities may not enter the construction site without the permission of the Contracting Officer. Unless directed by the

Contracting Officer, the contractor shall comply with the more stringent of:

(a) The requirements of such laws, regulations, and orders; or

(b) The contract.

If a conflict among the contract and such laws, regulations and orders, the Contractor shall promptly advise the Contracting Officer of the conflict and recommend a proposed course of action for resolution by the Contracting Officer.

5. SAFETY

Accident Prevention

(a) General. The Contractor shall provide and maintain work environments and procedures that will:

(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities;

(2) Avoid interruptions of Government operations and delays in project completion dates; and

(3) Control costs in the performance of this contract. For these purposes, the contractor shall:

(i) Provide appropriate safety barricades, signs and signal lights;

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 14/69

(ii) Comply with the standards issued by any local government authority having jurisdiction over occupational health and safety issues; and

(iii)Take any additional measures the Contracting Officer determines to be reasonably necessary for this purpose.

(b) Records. The Contractor shall maintain an accurate record of exposure data on all accidents incident to work performed under this contract resulting in:

(1) Death,

(2) Traumatic injury,

(3) Occupational disease, or

(4) Damage to or theft or loss of property, materials, supplies, or equipment.

The Contractor shall report this data as directed by the Contracting Officer.

(c) Subcontracts. The Contractor shall be responsible for its subcontractors' compliance with this clause.

(d) Written Program. Before starting the work, the Contractor shall:

(1) Submit a written proposal for implementing this clause; and

(2) Meet with the Contracting Officer to discuss and develop a mutual understanding of the overall safety program.

(e) The Contracting Officer shall notify the Contractor of any non-compliance with these requirements and the corrective actions required. The Contractor shall immediately take corrective action after receiving the notice. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order suspending all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule for any suspension of work issued under this clause.

6. DELIVERABLES

The following items shall be delivered under this contract:

Section/Description Qty Delivery Date Deliver To

1. Warranties/Guaranties 1 As required or by completion date Contracting Officer

2. Construction Schedule 1 10 days after Award Contracting Officer’s Rep

2.2 Labor Dispute Notice 1 As required Contracting Officer’s Rep

2.3 List of Personnel 1 10 days after Award Contracting Officer’s Rep

3.3 Insurance 1 10 days after Award Contracting Officer’s Rep

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 15/69

3. Safety Plan 1 10 days after Award Contracting Officer’s Rep

7. QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The

QASP provides a method for the Contracting Officer's Representative (COR) to monitor

Contractor performance, advise the Contractor of unsatisfactory performance, and notify the

Contracting Officer of continued unsatisfactory performance. The Contractor, not the

Government, is responsible for management and quality control to meet the terms of the contract. The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective Scope of Work Para Performance Threshold

Services.

Performs all Shatter Resistant

Window Film installation services to USG Apartments and Offices as set forth in the scope of work.

1 through 19

All required services are performed and no more than one

(1) customer complaint is received per month.

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 16/69

SECTION 2 - CONTRACT CLAUSES

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (DEC 2022)

IS INCORPORATED BY REFERENCE. (SEE SF-1449,BLOCK 27A)

52.212- 5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE

ORDERS-COMMERCIAL ITEMS (AUG 2020)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN

2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015

(Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by

Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) ( 31 U.S.C.

3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78

( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUNE 2020), with Alternate I (OCT

1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN

2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment

Act of 2009.)

_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (NOV 202) (Pub. L.

109-282) ( 31 U.S.C. 6101 note).

__ (5) [Reserved].

https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i52_203-19 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#id189A70O0P1N https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#unique_1216363765 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1062680 https://www.acquisition.gov/far/part-52#FAR_52_232_40 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/10/3801 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1048661 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1048698 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1063319 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1063504 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1063607 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1064087 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 17/69

__ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub.

L. 111-117, section 743 of Div. C).

_X_ (8) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of

Division R of Pub. L. 117-328).

_X_ (9) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101 note).

__ (10) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT

2018) (41 U.S.C. 2313).

__ (11) [Reserved].

__ (12) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) (15 U.S.C. 657a)

__ (13) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (14) [Reserved]

__ (15)

(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) of 52.219-6 (15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-6

__ (16)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-7.

__ (17) 52.219-8, Utilization of Small Business Concerns (SEP 2023) (15 U.S.C. 637(d)(2) and (3)).

__ (18)

(i) 52.219-9, Small Business Subcontracting Plan (SEP 2023) (15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (NOV 2016) of 52.219-9.

__ (iii) Alternate II (NOV 2016) of 52.219-9.

__ (iv)Alternate III (JUN 2020) of 52.219-9.

__ (v)Alternate IV (SEP 2023) of 52.219-9

__ (19)

(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r))

(ii) Alternate I (MAR 2020) of 52.219-13.

__ (20) 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 637(a)(14)).

https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1064214 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1064243 https://www.acquisition.gov/far/part-52#FAR_52_204_27 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1062590 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1062651 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057314 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057352 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057393 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057393 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057393 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057419 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057419 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i52_219-8 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i52_219-9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i52_219-9 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i52_219-9 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i52_219-9 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i52_219-9 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057715 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057715 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057730 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 18/69

__ (21) 52.219-16, Liquidated Damages-Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i))

__ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT

2022) (15 U.S.C. 657f).

__ (23)

(i) 52.219-28, Post Award Small Business Program Rerepresentation (MAY 2020) (15 U.S.C. 632(a)(2)).

(ii) Alternate I (MAR 2020) of 52.219-28.

__ (24) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-

Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).

__ (25) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns

Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).

__ (26) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

__ (27) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15U.S.C. 637(a)(17)).

__ (28) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).

_X_ (29) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (DEC2022) (E.O.13126).

__ (30) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

__ (31)

(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O.11246).

__ (ii) Alternate I (FEB 1999) of 52.222-26.

__ (32)

(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

__ (ii) Alternate I (JUL 2014) of 52.222-35.

__ (33)

(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

__ (ii) Alternate I (JUL 2014) of 52.222-36.

__ (34) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

__ (35) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.

13496).

_X_ (36)

(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).

__ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057758 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057823 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057874 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057874 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057902 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1057947 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec644.htm https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec637.htm https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1055332 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1055664 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1055713 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1055793 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1055793 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1056230 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1056230 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1056250 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1056250 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1056265 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1056304 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1056535 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1056535

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 19/69

__ (37) 52.222-54, Employment Eligibility Verification (MAY 2022). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.

__ (38)

__(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008)

( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (39) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun

2016) (E.O. 13693).

__ (40) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air

Conditioners (JUN 2016) (E.O. 13693).

__ (41)

(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (OCT 2015) of 52.223-13.

__ (42)

(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Jun2014) of 52.223-14.

__ (43) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).

__ (44)

(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and

13514).

__ (ii) Alternate I (JUN 2014) of 52.223-16.

_X_ (45) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.

13513)

__ (46) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

__ (47) 52.223-21, Foams (Jun2016) (E.O. 13693).

__ (48)

(i) 52.224-3 Privacy Training (JAN 2017) (5 U.S.C. 552 a).

__ (ii) Alternate I (JAN 2017) of 52.224-3.

__ (49)

(i) 52.225-1, Buy American-Supplies (May 2014) (41 U.S.C. chapter 83).

__ (50) https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1056753 https://acquisition.gov/content/part-22-application-labor-laws-government-acquisitions#i1095479 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053138 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053138 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053180 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053196 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053207 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053207 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053232 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053232 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053246 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053274 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053274 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053316 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i52_223_20 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#id1668D08086F https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i52_224_3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i52_224_3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053372

Solicitation for SRWF Installation 19TU15-25-Q-3001 P. 20/69

(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (DEC

2022) (41 U.S.C.chapter83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-

43.

__ (i) Alternate I (RESERVED)

__ (ii) Alternate I (DEC 2022) of 52.225-3.

__ (iii) Alternate II (JAN 2021) of 52.225-3.

__ (iv) Alternate III (MAY 2014) of 52.225-3.

__ (51) 52.225-5, Trade Agreements (DEC 2022) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

_X_ (52) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (53) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016)

(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302Note).

__ (54) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov2007) (42 U.S.C. 5150).

__ (55) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov2007)

(42 U.S.C. 5150).

__ (56) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).

_X_ (57) 52.232-29, Terms for Financing of Purchases of Commercial Items (NOV

2021) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

_X_ (58) 52.232-30, Installment Payments for Commercial Items (NOV 2021)

(41 U.S.C. 4505, 10 U.S.C. 2307(f)).

__ (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award

Management (OCT2018) (31 U.S.C. 3332).

__ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013)

(31 U.S.C. 3332).

__ (61) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

__ (62) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a)

__ (63) 52.242-5, Payments to Small Business Subcontractors (JAN 2017) (15 U.S.C. 637(d)(13)).

__ (64)

(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV

2021) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

__ (ii) Alternate I (APR 2003) of 52.247-64.

__ (iii) Alternate II (NOV 2021) of 52.247-64.

https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053446 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053446 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053446 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053446 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1053648 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1054249 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1054921 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1055038 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1055048 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#id205VI30B0ZS https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1050508 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1050540 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?&searchTerms=%2A#i1050674 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3332&num=0&edition=prelim https://acquisition.gov/content/part-52-solicitation-provisions-and-contract-clauses?

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .