RFQ - Sanitary Line D14~3.docx
DOCX document 19 KB Posted
- Contract number
- 27-444DHS-DEVDI-P-101650
- Issued by
- Illinois
About this file
RFQ - Sanitary Line D14~3 Summary
This is a Request for Quotation (RFQ) document for sanitary line infrastructure work designated as D14~3. The document involves a state or local government entity seeking quotations from qualified contractors for the specified project. The RFQ establishes the formal procurement process through which interested vendors can submit bids to provide the required goods and services associated with sanitary line construction or rehabilitation.
The RFQ outlines the technical specifications, scope of work, and conditions for the sanitary line D14~3 project, including requirements for materials, labor, timeline, and compliance standards. Pricing terms, payment conditions, and any applicable set-asides or preferences are defined within the solicitation parameters. The document serves as the basis for competitive bidding, allowing multiple contractors to submit proposals with their respective pricing and delivery terms. Any option periods, renewal provisions, contract amounts, and funding sources would be specified in the detailed terms and conditions sections of the RFQ.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Terms And Cond~4.pdf | ||
| CU150~17.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois Department of Human Services Ann Kiley Center
R E Q U E S T F O R Q U O T E
| Facility: | Ann Kiley Center | |
| Address: | 1401 Dugdale Rd | |
| City: | Waukegan, IL 60085 | |
| Contact: | Delourdes Roney, Office Administrator III | |
| Phone: | 847-249-0605 | |
| Fax: | 847-249-4587 | |
| E-Mail: | delourdes.roney@illinois.gov |
B-53484
| Item |
| Specifications and Requirements: |
| Qty. |
Replace Building D14 Sanitary Line
In crawl space, excavate 4” cast iron sewer line below footing and remove pipe from crawl space to back patio.
Saw cut patio and excavate sewer line exiting from crawl space to fence.
Remove sewer pipe from crawl space to existing clean-out at fence.
Install new 4” pipe (ensuring proper pitch) from existing 4” overhead PVC in crawl space to sanitary line clean-out at fence to existing in accordance with Plumbing industry standards, particularly ensuring line is sloped properly.
Notes:
· Plumbing Contractor must be licensed by the State of Illinois, bonded and insured.
· All work shall be completed in accordance with State of Illinois Plumbing Code.
· All Construction debris and other materials generated by repairs shall be removed from premises.
File details come from the government source that posted it. Updated .