RFQ_PERS - Long Range Facility Plan - Addendum 2.pdf

PDF 548 KB Posted

Attached to
PERS HQ Long Range Facilities Plan
Solicitation number
S-45900-00016237
Issued by
Oregon

About this file

This is an Addendum 2 to a Request for Quotes (RFQ) issued by the Oregon Public Employees Retirement System (PERS) for professional consulting services to develop a comprehensive Long-Range Facilities Plan for its headquarters building located at 11410 SW 68th Parkway, Tigard, Oregon. The scope of work includes facility condition assessments, stakeholder engagement sessions, and analysis to support development of a Long-Range Facilities Plan addressing seismic resilience, sustainability, climate compliance, ADA accessibility, and hybrid workforce space utilization across three planning horizons. A mandatory pre-bid conference and site walk was scheduled for March 31, 2026, at 10:00 AM Pacific Time, with quotes due on Tuesday, April 14, 2026, at 4:00 PM PST. The contract is anticipated to commence in early May 2026 with project completion targeted for June 2026, requiring work to be completed within approximately 10-12 weeks.

This addendum addresses two key clarifications submitted by prospective bidders. First, an arc flash study referenced on the price quote page was confirmed to be a typographical error and is not required in the scope of work or deliverables. Second, PERS confirmed that all submittals must include all items listed in RFQ section 4.5 in addition to Attachment A and Attachment B, with the Mandatory Pre-Conference Form being mandatory for all responses and only shared with those who have confirmed attendance at the in-person meeting. Contractors must demonstrate a minimum of five years of relevant Long-Range Facilities Plan experience and public sector experience. Insurance requirements include Commercial General Liability coverage of $1,000,000 per occurrence and $2,000,000 annual aggregate, plus Automobile Liability insurance of $1,000,000. All pricing must be inclusive of travel and expenses with monthly invoicing, and pricing must remain valid for 60 days from the closing date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTES (RFQ)

Best Value Analysis (BVA)

Informal Request for Quote (RFQ)

PERS # S-45900-00016237

Headquarters Building Long Range Facilities Plan

Addendum # 2

Addendum Issue Date: March 27, 2026

Issuing Office: Public Employees Retirement System (PERS)

RFQ Contact Information (Authorized Representative): Ryan Ellis, Procurement & Contracts Specialist Address: 11410 SW 68th Parkway Tigard, OR 97223 Phone: (503) 603-7505 E-mail: ryan.ellis@pers.oregon.gov

Offer Due Date and Time: Tuesday, April 14, 2026, 4:00PM PST.

Questions Received

The following questions have been received. PERS has reviewed and has provided the following answers:

Q1: Is an arc flash study included in the scope? It’s required on the price quote on page 4 but I do not see it mentioned in either the scope of work or the deliverables?

A1: No arch flash. That was a typo.

Q2: Please clarify if the submittal requires more than Attachment A and Attachment B?

A2: Yes, each submittal must include all items listed in the RFQ section 4.5. In addition, the Mandatory Pre-Conference Form. This form is mandatory to be included in all responses and will only be shared with those that have confirmed attendance at this in-person meeting.

File details come from the government source that posted it. Updated .