RFQ - 4-B170-Q-00395-00.doc

DOC document 259 KB Posted

Attached to
19-ID ACT MOTION SYSTEM
Solicitation number
4-B170-Q-00395-00
Issued by

About this file

This document is a Request for Quotation (RFQ) for 4-axis drives, power cables, and a SPiiPLUSEC panel in support of the Advanced Photon Source Upgrade at Argonne National Laboratory. The RFQ requests firm fixed-price proposals in U.S. Dollars, FOB Destination to Lemont, Illinois. The requested items include: 4 Axis Drives (qty 6), 2M Power Cables (qty 6), and 1 OPS SPiiPLUSEC Panel. Responses to the RFQ are due by April 18, 2024, and the resulting Purchase Order will be subject to Argonne's Terms and Conditions. The RFQ also includes instructions to complete and return the Argonne Representations and Certifications form. Pricing and delivery details are to be provided as specified in the RFQ.

View the file

Other files

File Type Posted
Appendix A-71COM-13-FEB-2023.PDF PDF
RepsCerts ANL-70B (Long).doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANL-70 (February 22, 2013)

UCHICAGO ARGONNE, LLC

OPERATOR OF

ARGONNE NATIONAL LABORATORY

BLDG. 201 OCF, 9700 S. Cass Ave., Lemont, IL 60439

(CONTRACT NO. DE-AC02-06CH11357)

REQUEST FOR QUOTATION

ALL PROSPECTIVE OFFERORS
THIS IS NOT AN ORDER

NOTICE:

1. The right is reserved to accept or reject quotations on each item separately unless your quotation states otherwise.

2. The right is reserved to accept minor deviations from specifications herein listed or referenced.

3. Firm prices are requested. If other than firm prices are quoted, conditions of escalation are to be stated.

4. If material is packaged in returnable containers the amount of deposit, if any, is to be stated together with instructions for returning.

5. Terms and Conditions referenced below will apply to any resulting Purchase Order.

Address Reply To:
Kelly L. West
PHONE:
630-252-6553
Date
04/11/2024
Inquiry No.
4-B170-Q-00395-00
Quotation must be received by:
04/18/2024

DESCRIPTION

THE ENCLOSED BOOKLET OF Argonne Representations and Certifications FORMDROPDOWN is included as part of this request and must be completed, signed, and returned with your quotation.

Please furnish quotation to supply the materials and/or services indicated on page two(2)

Please furnish a firm fixed-priced proposal in U.S. Dollars, FOB

Destination, Lemont, Illinois for the items detailed on page 2 of this RFQ in support of Argonne National Laboratory.

Any resulting Purchase Order will be subject to the Argonne Terms and Conditions attached hereto and made part of hereof and will be exempt from Illinois Occupation and Use Taxes and from Manufacturers and Retailers Excise Taxes.

We quote you F.O.B. Destination. Shipment can be made in days from receipt of order.

Cash Terms
Net 30 days
Will Ship Via*

Date

*If Shipment will not be made via FedEX, UPS, or USPS, Please provide estimate of weight and volume _________________________________________ cft

COMPLETE AND RETURN ONE COPY

PLEASE MARK “NO BID” IF YOU CANNOT QUOTE

AUTHORIZED SIGNATURE

ITEM
NAME
MODEL/PART#
QTY
UNIT
UNIT PRICE
EXTENDED PRICE
DESCRIPTION
DELIVERY DUE DATE
0001
4 AXIS DRIVE
UDMmc4D4U4NNA
4
Each
$
$
4 AXIS DRIVE
0002
OPS 4 AXIS DRIVE
UDMmc4D4U4NNA
2
Each
$
$
4 AXIS DRIVE
0003
2M POWER CABLE
UDMmc&NPXpm-ACC2
4
Each
$
$
2M POWER CABLE
0004
OPS 2M POWER CABLE
UDMmc&NPXpm-ACC2
2
Each
$
$
2M POWER CABLE
0005
OPS SPiiPLUSEC PNL
SP+EC-32323264NNN4NDNN
1
Each
$
$
SPiiPLUSEC PNL
TOTAL
$

APPLICABLE DOCUMENTATION:

The following documents are attached hereto and made a part hereof:

1) PROPOSAL INSTRUCTIONS:

2) Pre-Award Information (Reps & Certs) – ANL-70B, dated June 6, 2022 – (FILL OUT AND RETURN)

3) Quote to include pricing in accordance with Table above, and Delivery Schedule – (REQUIRED)

TERMS AND CONDITIONS/SPECIAL CLAUSES

1) Appendix A-71COM, Argonne Terms and Conditions for Commercial Items – February 13, 2023

2) Payment by Electronic Funds Transfer – September 8, 2016

*****THIS PAGE LEFT INTENTIONALLY BLANK*****

PAGE

File details come from the government source that posted it. Updated .