RFQ 2604 GDOT PI 0021596 DeKalb County.pdf
PDF 605 KB Posted
- Solicitation number
- 26-04
- Issued by
- Dekalb County, Georgia
About this file
Summary
This is a Request for Qualifications (RFQ) issued by the City of Dunwoody, Georgia, in coordination with the Georgia Department of Transportation (GDOT), soliciting engineering design consultant services for GDOT Project PI 0021596 on North Peachtree Road in DeKalb County. The project involves designing pedestrian and bicycle accommodations with streetscape elements and operational improvements at key intersections along North Peachtree Road from Dunwoody Crossing to Barclay Drive. The scope encompasses development of environmental documentation, preliminary and final construction plans, signing and marking plans, right-of-way plans, erosion control plans, staging plans, and construction services in accordance with GDOT's Plan Development Process and design standards. The RFQ was published on August 3, 2026, with a deadline for written questions by August 14, 2026, at 2:00 PM Eastern Time, and a Statement of Qualifications submission deadline of September 10, 2026, at 2:00 PM. Finalist notification and Phase II technical approach responses are scheduled for dates to be determined. The proposed project milestones extend from Preliminary Engineering Notice to Proceed in FY 2027 through Construction Contract Award in FY 2031, with intermediate approvals anticipated in FY 2028 through FY 2030.
The City anticipates awarding one project-specific contract to a single qualified firm using a cost-plus-fixed-fee payment method, with the contract amount to be determined through negotiations. The prime consultant must be prequalified by GDOT in Area Classes 3.13 (Facilities for Bicycles and Pedestrians) and 3.02 (Two-Lane or Multi-lane Urban Roadway Design), while the overall team must include prequalification across numerous technical disciplines including NEPA documentation, environmental studies, traffic analysis, surveying, utilities engineering, and landscape architecture. The selection process includes a two-phase evaluation: Phase I evaluates experience and qualifications (30%) and resources and workload capacity (20%), while Phase II evaluates technical approach (40%) and past performance (10%). The City reserves the right to negotiate with the highest-ranked firm and successively lower-ranked firms until a mutually acceptable agreement is reached. All submissions must comply with strict page limitations, formatting requirements, and administrative certifications, including notarized certification forms and Georgia Security and Immigration Compliance Act affidavits.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date of publication: 08/03/2026
Request for Qualifications
To Provide
Engineering Design Services GDOT PI 0021596, DeKalb County
North Peachtree Road from Dunwoody Crossing to Barclay Drive
RFQ 26-04
Qualifications Due: September 10, 2026, at 2:00PM
City of Dunwoody 4800 Ashford Dunwoody Road
Dunwoody, GA, 30338
REQUEST FOR QUALIFICATIONS
RFQ 26-04, PI 0021596
Engineering Design Services
I. General Project Information
A. Overview
The City of Dunwoody (City) is soliciting Statement of Qualifications (SOQs) from qualified firm(s) to provide Engineering Design Consultant Services to design pedestrian and bicycle accommodations with streetscape elements and operational improvements at key intersections along North Peachtree Road from Dunwoody Crossing to Barclay Drive.
This Request for Qualifications (RFQ) seeks to identify potential providers for the Scope of Services for the project/contract listed in Exhibit I. Firms that respond to this RFQ and are determined by the City to be sufficiently qualified may be deemed eligible and invited to offer a technical approach and/or possibly present and/or interview for these services. All respondents to this RFQ are subject to instructions communicated in this document and are cautioned to completely review the entire RFQ and follow instructions carefully. The City, at its discretion, reserves the right to reject any or all SOQs or Technical Approach, and to waive technicalities and informalities at the discretion of the City.
B. IMPORTANT- A RESTRICTION OF COMMUNICATION IS IN EFFECT FOR THIS PROJECT.
From the advertisement date of this solicitation until successful respondents are selected and the award is made official and announced, firms are not allowed to communicate about this solicitation or scope with any staff of the City including the Mayor and Council Members, except for the submission of questions as instructed in the RFQ, or with the contact designated in RFQ Section VIII.C., or as provided by any existing work agreement(s). For violation of this provision, the City reserves the right to reject the submittal of the offending respondent.
C. Reserved
D. Scope of Services
Under the terms of the resulting Agreement, the selected consultant will provide engineering design services, for the Project identified. The anticipated scope of work for the project/contract is included in Exhibit I.
In addition, the City desires that the Consultant have the ability to provide, either with its own forces or through a sub-consultant team member, comprehensive services necessary to fulfill all preliminary engineering services, which may arise during the project cycle.
E. Contract Term and Type
The City anticipates one (1) Project Specific contract to be awarded to one (1) firm, for the project/contract identified.
The City anticipates that the payment method will be Cost Plus Fixed Fee. As a Project Specific contract, it is the City’s intention that the Agreement will remain in effect until successful completion of the Preliminary Engineering (PE) phase of the projects. The City may choose to utilize the selected consultant for construction revisions, administration, engineering and inspection. These items may be included in the contract scope.
F. Contract Amount
The Project Specific contract amount will be determined via negotiations with the City. If the City is unable to reach a satisfactory agreement and at reasonable rates to be paid for the services to be provided, the City reserves the right to terminate negotiations with the highest scoring finalist and begin negotiations with the next highest scoring finalist.
II. Selection Method
A. Method of Communication
All general communication of relevant information regarding this solicitation will be made via the Georgia Procurement Registry (GPR) under RFQ 26-04. All firms are responsible for checking the GPR on a regular basis for updates, clarifications, and announcements. The City reserves the right to communicate via electronic mail with the primary contact listed in the SOQ. Other specific communications will be made as indicated in the remainder of this RFQ.
B. Phase I - Selection of Finalists
Based on the SOQ submitted in response to the project/contract listed in this RFQ, the Selection Committee will review the Experience and Qualifications and Resources and Workload Capacity listed in Section IV, Selection Criteria for Phase I. The Selection Committee will discuss the top submittals and the final rankings of the top submittals will be determined. From the final rankings of the top submittals, the Selection Committee will identify three (3) to five (5) firms which will be shortlisted.
All firms must meet the minimum requirements as listed in Section IV.A. below.
C. Finalist Notification for Phase II
Firms selected and shortlisted as finalists will receive notification and final instructions from the City regarding the Phase II – Technical Approach response.
D. Phase II - Finalists Response on Technical Approach and Past Performance
The City will request a Technical Approach of the three (3) to five (5) finalist firms for the project/contract. The City reserves the right to request a presentation/interview on any project/contract as determined in its best interest;
however, this additional requirement shall typically be reserved for the most complex projects. Each finalist firm shall be notified in writing and informed of the Technical Approach due date. Any additional detailed Technical Approach instructions and requirements, beyond that provided in Section V. Selection Criteria for Phase II, for the finalists will be provided in the Finalist Notification. All members of the Selection Committee will review the Technical Approach (and will attend the presentation/interview if so chosen). Firms shall not address any questions, prior to the award announcement, to anyone other than the designated contact.
E. Final Selection
Final selection will be determined by carrying the scores from Phase I forward for each Finalist and by evaluating the Technical Approach and Past Performance criteria for Phase II. The Selection Committee will discuss the Finalist’s Phase II Responses and the final rankings will be determined.
Negotiations will then be initiated with the top-ranked firm to finalize the terms and conditions of the contract, including the fees to be paid. In the event a satisfactory agreement cannot be reached with the highest-ranking firm, the City will formally terminate the negotiations and possibly enter into negotiations with the second highest-ranking firm, and so on in turn until a mutual agreement is established and the City awards a contract. The final form of the contract shall be developed by the City.
III. Schedule of Events
The following Schedule of Events represents the City’s best estimate of the Schedule that will be followed. All times indicated are prevailing times in Atlanta, Georgia. The City reserves the right to adjust the Schedule as deemed necessary.
PHASE I DATE TIME
a. City issues public advertisement of RFQ 26-04 8/3/2026 4:00 PM
b. Deadline for submission of written questions and requests for clarification 8/14/2026 2:00 PM
IV. Selection Criteria for Phase I - Criteria for Evaluation of Statements of Qualifications
A. Area Class Requirements and Certification
Presented teams must be prequalified in the indicated Area Class(es) in order to be evaluated. Required proof of prequalification shall be submitted as indicated in Section VI.B.4 below. All Submittals will be pre-screened to verify that the Prime consultant has the required Area Class(es) and that the overall team has the required Area Class(es).
Any submittal in which the Prime consultant or the overall team area class requirements are not met will be disqualified from further consideration.
Each submittal will require a certification to allow the City to analyze risks in determining if any Firm should be ineligible for award. The certification shall cover a wide variety of information. Any firm which responds in any potentially concerning manner must provide additional information as directed herein for consideration by the City to determine if Firm is eligible for award.
B. Project Manager, Key Team Leader(s) and Prime’s Experience, and Qualifications – 30%
The Selection Committee will evaluate all firms on their Experience and Qualifications, which shall account for a total of thirty (30%) percent of the total evaluation. The following criteria for scoring Phase I of the evaluation will be utilized to determine which firms are shortlisted:
1. Project Manager education, registration, relevant engineering experience, relevant project management experience, experience in utilizing GDOT specific processes, manuals, or guidance.
2. Key Team Leaders’ education, registration, relevant technical experience, and relevant experience in utilizing
GDOT specific processes, manuals, or guidance.
3. Prime Consultant’s experience in delivering projects of similar complexity, size, scope, and function.
C. Project Manager, Key Team Leader(s) and Prime’s Resources, and Workload Capacity – 20%
The Selection Committee will evaluate all firms on their Resources availability and Workload Capacity which shall account for a total of twenty (20%) percent of the total evaluation. The following criteria for scoring the Resources and Workload Capacity will be utilized to determine which firms are shortlisted:
1. Project Manager Workload.
2. Workload capacity of Key Team Leader(s).
3. Resources dedicated to delivering project.
4. Ability to Meet Project Schedule.
V. Selection Criteria for Phase II - Criteria for Evaluation of Technical Approach and Past Performance
A. Technical Approach – 40%
The Selection Committee will evaluate the shortlisted firms (Finalists) on their Technical Approach, which shall account for a total of forty (40%) percent. The Selection Committee shall utilize the following additional criteria for
c. Deadline for submission of Statements of Qualifications
9/10/2026 2:00 PM
d. City completes evaluation and issues notification and other information to finalist firms TBD
PHASE II
e. Deadline for submission of written questions from finalists TBD 2:00 PM
f. Phase II Response of Finalist firms due TBD 2:00 PM scoring Phase II of the evaluation to determine the highest ranked/most qualified (NOTE: Scores from Phase I will be carried forward and combined with the scores from the Phase II to determine the final ranking of Finalists):
1. Provide any unique technical approaches your firm offers relative to addressing anticipated design concepts, use of any alternative methods for delivery (if applicable), and/or management of the project.
2. Identify any unique challenges of the project and how your firm intends to mitigate these challenges, including quality control, quality assurance procedures.
3. Provide any specific qualifications, skills, knowledge of the project and project area which may uniquely benefit the project, and project team’s ability and willingness to meet time requirements.
B. Past Performance – 10%
The Selection Committee may consider information provided via references for relevant projects, knowledge any selection committee member has of performance on relevant projects, and performance evaluations or knowledge presented on GDOT projects. The Selection Committee will consider all factors in their totality and score from 0 to 10 when arriving at a final score for the Past Performance.
VI. Instructions for Content and Preparation of Statements of Qualifications – Phase I Response
The Statements of Qualifications submittal must be submitted in accordance with the instructions provided in Section VIII, and must be organized, categorized using the same headings (in red), numbered, and lettered exactly as outlined below, and must be responsive to all requested information.
For the sections in which page number limits are stated, each section with a stated limit must begin on a new page and end on the last page allowed for the section. It is not allowed to begin new sections on a page allowed for a previous section, if applicable. This will enable the City to ensure compliance with the page limitations.
Cover page – Each project/contract submittal must have a separate cover page for each required copy of the submittal and must include the RFQ#, RFQ Title, Proposing firm’s full legal name, Specific project contract being submitted including the PI Number, County, City of Dunwoody RFQ No., Project Description.
A. Administrative Requirements
It is required to submit the information below for each required copy of the submittal. This is general information and will not be scored but may be used to determine eligibility for selection. Under Administrative Requirements section, only submit the information requested; additional information will be subject to disqualification of your firm.
1. Basic company information:
a. Company name.
b. Company Headquarter Address.
c. Contact Information - Name and all contact information (telephone number(s) and e-mail address) of primary proposing contact (this will be the individual who will receive all communications).
d. Company website (if available).
e. Georgia Address(es)
f. Staff - List the disciplines and associated number of staff members employed in each office in the State of
Georgia.
g. Ownership - Provide form of ownership, including state of residency or incorporation, and number of years in business. Is the Offeror a sole proprietorship, partnership, corporation, limited liability Corporation, or other structure?
2. Certification Form - Complete the Certification Form (Exhibit “II” enclosed with RFQ) and provide a notarized original within the firm’s Statement of Qualifications. This is to be submitted for the Prime ONLY.
3. Georgia Security and Immigration Compliance Act Affidavit – Complete the form (Exhibit “III” enclosed with RFQ) and provide a notarized original within the firm’s Statement of Qualifications. This is to be submitted for the Prime
ONLY.
4. Addenda - Signed cover page of any Addenda issued by the Prime ONLY.
B. Experience and Qualifications
1. Project Manager - Provide information pertaining to the project manager, including but not limited to:
a. Education
b. Registration (if necessary and applicable)
c. Relevant engineering experience
d. Relevant project management experience for projects of similar complexity, size, scope, and function.
e. Relevant experience utilizing all applicable processes, manuals, or guidance, including but not limited to
GDOT’s Plan Development Process, GDOT’s Design Policy Manual, GDOT’s Environmental Procedures Manual, GDOT’s Utility Accommodations Policy and Standards Manual etc.
This information is limited to two (2) pages maximum. Respondents submitting more than two (2) pages for Project Manager will be subject to disqualification.
2. Key Team Leaders - Provide experience of Key Team Leaders (defined as those individuals who oversee project areas determined as particularly important to each specific project, refer to the Project Description in Exhibit I, specifically Section 6 for the list of Key Team Leaders for each Project). For each Key Team Leader identified provide:
a. Education
b. Registration (if necessary and applicable.)
c. Relevant experience in the applicable resource area of the most relevant projects.
d. Relevant experience utilizing all applicable processes, manuals, or guidance, including but not limited to
GDOT’s Plan Development Process, GDOT’s Design Policy Manual, GDOT’s Environmental Procedures Manual, GDOT’s Utility Accommodations Policy and Standards Manual etc. which are specific to the key team leader’s area.
This information is limited to one (1) page maximum for each Key Team Leader identified in Section 6 of Exhibit I. Respondents submitting more than one (1) page for each Key Team Leader identified will be subject to disqualification. Respondents who provide more Key Team Leaders than what is outlined in the requirement will be subject to disqualification as this would provide an advantage over firms who complied with the requirement and had the required number of Key Team Leaders. Respondents who do not provide the required Key Team Leaders will be subject to disqualification as this does not meet the requirements of the project and therefore would deem the respondent and its team unqualified for the award.
3. Prime Experience - Provide information on the prime’s experience and ability in delivering effective services for projects of similar complexity, size, scope, and function, which demonstrate the firm's capabilities to provide services for the City. For each project, the following information should be provided:
a. Client name, project location and dates during which services were performed.
b. Description of overall project and services performed by your firm.
c. Duration of project services provided by your firm, and overall project budget.
d. Experience utilizing GDOT specific processes, manuals, or guidance (Plan Development Process, Design
Policy Manual, Environmental Procedures Manual, etc.)
e. Client(s) current contact information including contact names, telephone numbers and email address.
f. Involvement of Key Team Leaders on the projects.
This information is limited to two (2) pages maximum.
4. Area Class Summary Form and Notice of Professional Consultant Qualifications - Prime Consultants are defined as the firm submitting the Statement of Qualifications and the firm with whom the City will contract. The Team is defined as the Prime Consultant and their sub-consultants, who are considered team members. Prime Consultants and their sub-consultant team members must meet the Area Class requirements listed in Exhibit I Section 4 for each project on which they apply. In regard to the required Area Classes, for each project/contract on which they apply, respondents should submit a summary form (example provided in Exhibit IV) which details the required area classes for the Prime Consultant and all sub-consultants or joint-venture of consultants on the team listed in the Statement of Qualifications (SOQs). The area classes and firm’s meeting the area classes listed on the summary form must meet all required area classes or the team will be disqualified. If a team member’s prequalification will expire prior to the due date of the SOQs, documentation must be provided which shows that the firm has submitted its application for prequalification prior to the SOQ due date. The team must maintain its prequalification certification in order to be considered eligible for award if selected. Additionally, respondents should submit the Notice of Professional Consultant Qualifications (for the Prime Consultant and all sub-consultants for each project) issued by GDOT and attach it after the Area Class summary form.
This information is limited to the one (1) page for the Area Class table (unless the project requires an extensive list of area classes, which may exceed the one page) and the required Notice of Professional Consultant Qualifications.
C. Resources/Workload Capacity
1. Overall Resources - Provide information regarding the overall resources dedicated to delivering the project, including:
a. Organizational chart which identifies the project manager, prime, Key Team Leaders, support personnel, and reporting structure. This chart may be submitted on a 11” x 17” page. (Excluded from the page count)
b. Primary Office - Identify and discuss the primary office which will be responsible for handling the specific project and the number and types of staff within the office and how this office could benefit the project and promote efficiency. This information to be included on the one (1) page with the Narrative on Additional Resource Areas and Ability.
c. Narrative on Additional Resource Areas and Ability – Respondents are to provide information regarding additional resource areas identified as important to the project, to discuss how the key areas will integrate and work together on the project, to discuss any information which is pertinent to these areas, to provide a narrative regarding how the organization of the team, including the PM and Key Team Leaders can deliver the project on schedule given their workload capacity. (The City recognizes that some individuals may be able to meet the schedule while carrying heavier project loads.) Respondents may discuss the advantages of your team and the abilities of the team members which will enable the project to meet the proposed schedule as identified in Exhibit I (where applicable). If there is no proposed schedule, discuss the advantages of the team and the abilities of the team members which will enable the project to move as expeditiously as possible. Respondents submitting more than the one (1) page allowed (combined for C1.b. and C1.c.), will be subject to disqualification.
2. Project Manager Commitment Table - Provide a list of ALL projects (GDOT, other governments and private contracts. NOTE: Information may be validated, any firm determined not to be listing all projects may be subject to disqualification) on which the proposed project manager is currently committed, to enable the City to ascertain the project manager’s availability. Utilize a table similar to the following format with a minimum of all criteria indicated to provide the requested information:
Project Manager
PI/Project # for GDOT Projects/Name of Customer for Non-GDOT Projects
Role of PM on Project
Project Description
Current Phase of Project
Current Status of Project
Monthly Time Commitment in Hours
3. Key Team Leader Project Commitment Table - Provide a table similar to following format below, with a minimum of all criteria indicated, which identifies ALL projects for the Key Team Leaders (refer to the Project Description in Exhibit I, specifically Section 6 for the list of Key Team Leaders for each Project) are committed on to enable the City to ascertain the available capacity.
Key Team
Leader
PI/Project # for GDOT Projects/Name of Customer for Non-GDOT Projects
Role of Key Team Leader on Project
Project Description
Current Phase of Project
Current Status of Project
Monthly Time Commitment in Hours
This information is limited to the organization chart (excluded from page count), [one (1) page of text to include both C1.b. Primary Office and C1.c. Narrative on Additional Resource Areas and Ability], and the tables.
VII. Instructions for Preparing Technical Approach and Past Performance Response – Phase II Response
The following information will only be requested of the shortlisted firms. The Selection Committee will evaluate the shortlisted firms using the information provided as requested below (NOTE: Scores from Phase I will be carried forward to Phase II):
The Phase II response must be submitted in accordance with the instructions provided in Section IX, and must be organized, categorized using the same headings (in red), numbered, and lettered exactly as outlined below, and must be responsive to all requested information. For the sections in which page number limits are stated, each section with a stated limit must begin on a new page and end on the last page allowed for the section. It is not allowed to begin new sections on a page allowed for a previous section, if applicable. This will enable the City to ensure compliance with the page limitations.
Phase II Cover page – Each submittal must have a separate cover page for required copy of the Phase II submittal and each must indicate the response is for Phase II Submittal and include the RFQ#, RFQ Title, Proposing firm’s full legal name, Specific project contract being submitted including the PI Number(s), County(ies), and Project Description.
A. Technical Approach
1. Provide any unique technical approaches your firm offers relative to addressing anticipated design concepts, use of any alternative methods for delivery (if applicable), and/or management of the project.
2. Identify any unique challenges of the project and how your firm intends to mitigate these challenges, including quality control, quality assurance procedures.
3. Provide any specific qualifications, skills, knowledge of the project and project area which may uniquely benefit the firm and project, and your ability and willingness to meet time requirements.
This information will be limited to a maximum of three (3) pages.
B. Past Performance
No additional information should be submitted to fulfill this requirement. Information from the relevant projects listed as well as information on file with the City will be used to fulfill this requirement.
Past performance may be evaluated through the checking of project references for the proposed project manager as well as the firm. The City will check these references at random. For this reason, attention should be paid to the references provided to ensure that the contact information provided is accurate and the individual references are reachable. Other past performance information which may be utilized includes knowledge that any member of the Selection Committee has pertaining to the past performance of the firm on any project.
VIII. Instructions for Submittal for Phase I - Statements of Qualifications
A. There is one (1) electronic version submittal required. The Submittal must follow the format and meet the content requirements identified in Section VI, entitled Instructions for Content and Preparation of Statements of Qualifications – Phase I Response. See Attachment 1 for a summary of how the submittals should be prepared.
B. Submittals must be typed on standard (8½” x 11”) paper. The pages should be numbered, however, submittal pages will be counted by section to determine compliance with page limits. Responses are limited to the page counts indicated in each section using a minimum of size 11 font. Page counts will be determined by pages with print on them, not by the physical piece of paper. Each Statement of Qualifications shall be prepared simply and economically as indicated above. Colored displays, and promotional materials are not desired. Emphasis must be on completeness, relevance, and clarity of content.
NOTE: Additional pages other than what has been specified above in each section should not be included and will be grounds for disqualification. Submittals are limited to the information requested in Section VI.
Instructions for Content and Preparation of Statements of Qualifications - Phase I Response only. Hyperlinks or embedded video are not allowed.
Statements of Qualifications submittals must be a PDF document for each project/contract. Each PDF document must follow the naming convention for electronic records as follows: the proposing firm’s full legal name, RFQ#, and RFQ Title. Submit one (1) PDF electronic version on a thumb drive to:
City of Dunwoody Purchasing Department Attn: John Gates 4800 Ashford Dunwoody Road Dunwoody, GA 30338 john.gates@dunwoodyga.gov
Statements of Qualifications package must be received by the City prior to the deadline indicated in the Schedule of Events (Section III of RFQ).
No submittals will be accepted after the time and date set for receipt.
All expenses for preparing and submitting responses are the sole cost of the party submitting the response. GDOT is not obligated to any party to reimburse such expenses. All submittals upon receipt become the property of GDOT.
Labeling information provided in submittals “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until final award.
The City reserves the right, in its sole discretion, to waive any technicalities associated with this submittal if deemed in the best interest of the State.
C. Questions and Requests for Clarification
Questions about any aspect of the RFQ, or the project, shall be submitted in writing via e-mail to --- John Gates at john.gates@dunwoodyga.gov. The deadlines for submission of questions relating to the RFQ are the times and dates shown in the Schedule of Events (Section III). From the issue date of this solicitation until a successful proposer is selected and the award is made official and announced, respondents are subject to the Restriction of Communication in Section I.B.
IX. Instructions for Submittal for Phase II – Technical Approach and Past Performance Response
THESE INSTRUCTIONS ARE INTENDED SOLELY FOR THOSE FIRMS IDENTIFIED AND NOTIFIED AS FINALISTS. Final Instructions will be provided to the Finalists in the notification.
Please note that each project/contract will follow an individual schedule which meets the availability of each Selection Committee. For this reason, the Notice to Selected Finalists and resulting Phase II responses may be on different schedules for each project/contract.
A. There is one (1) electronic version submittal required. The Submittal must follow the format and meet the content requirements identified in Section VII, entitled Instructions for Preparing Technical Approach and Past Performance Response - Phase II Response. See Attachment 1 for a summary of how the submittals should be prepared.
mailto:john.gates@dunwoodyga.gov
B. Submittals must be typed on standard (8½” x 11”) paper. The pages should be numbered, however, submittal pages will be counted by section to determine compliance with page limits. Responses are limited to the page counts indicated in each section using a minimum of size 11 font. Page counts will be determined by pages with print on them, not by the physical piece of paper. Each Statement of Qualifications shall be prepared simply and economically as indicated above. Colored displays, and promotional materials are not desired. Emphasis must be on completeness, relevance, and clarity of content.
NOTE: Additional pages other than what has been specified above in each section should not be included and will be grounds for disqualification. Submittals are limited to the information requested in Section VII. Instructions for Preparing Technical Approach and Past Performance Response-Phase II Response only. Hyperlinks or embedded video are not allowed.
C. Technical Approach submittal must be a PDF document for each project/contract. Each PDF document must follow the naming convention for electronic records as follows: the proposing firm’s full legal name, RFQ#, and RFQ Title.
Submit one (1) PDF electronic version on a thumb drive to:
City of Dunwoody Purchasing Department Attn: John Gates 4800 Ashford Dunwoody Road Dunwoody, GA 30338 john.gates@dunwoodyga.gov
If a firm is responding to multiple projects/contracts, each submittal must be separately submitted using the naming convention for electronic records.
Technical Approach must be received by the City prior to the deadline indicated in Notice to Selected Finalists.
No submittals will be accepted after the time and date set for receipt.
All expenses for preparing and submitting responses are the sole cost of the party submitting the response. The City is not obligated to any party to reimburse such expenses. All submittals upon receipt become the property of the City. Labeling information provided in submittals “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until final award.
The City reserves the right, in its sole discretion, to waive any technicalities associated with this submittal if deemed in the best interest of the City.
D. Questions and Requests for Clarification
Questions about any aspect of the RFQ, or the project, shall be submitted in writing via e-mail to --- John Gates at john.gates@dunwoodyga.gov. The deadlines for submission of questions relating to the RFQ are the times and dates shown in the Schedule of Events (Section III). From the issue date of this solicitation until a successful proposer is selected and the award is made official and announced, respondents are subject to the Restriction of Communication in Section I.B.
X. Terms and Conditions
A. Statement of Agreement
With the submission of a SOQ, the respondent agrees that they have carefully examined the Request for Qualifications, and agrees that it is the respondent’s responsibility to request clarification on any issues in any section of the Request for Qualifications with which the respondent disagrees or needs clarified. The respondent also understands that failure to mention these items during the question period or in the SOQ will be interpreted to mean that the respondent is in full agreement with the terms, conditions, specifications and requirements in the therein. With submission of a SOQ, the respondent hereby certifies: (a) that this SOQ is genuine and is not made in the interest or on behalf of any undisclosed person, firm, or corporation; (b) that respondent has not directly or mailto:john.gates@dunwoodyga.gov indirectly included or solicited any other respondent to put in a false or insincere SOQ; (c) that respondent has not solicited or induced any person, firm, or corporation to refrain from sending a SOQ.
The respondent also understands that failure to provide required information may result in disqualification. Failure to provide administrative information may not result in disqualification. At the City’s discretion, the City may notify the respondent that administrative information is not provided or there was an error in the information provided, and the City will allow a respondent to provide an update to the administrative information. However, the exception to this is the provision of the required GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT, which by Georgia Law requires disqualification of the response. The above changes mentioned to administrative information would be considered allowable as these would be limited to changes which do not affect the information which the evaluators use to score the respondents. Failure of a respondent to provide the specific administrative information as required in the notice will result in disqualification. Any respondent who provides changes in addition to the information requested in the notice shall be subject to disqualification. Failure of a respondent’s SOQ to provide any information pertaining to a respondent and its team’s qualifications, of any type, will subject the SOQ to disqualification. The City will not allow updates to qualifications to be provided to avoid disqualification as this would allow a respondent to modify its SOQ and alter the information which evaluators would score. The above changes related to qualifications would not be allowable as these would allow changes which do affect the information which the evaluators use to score the respondents SOQ.
B. Joint-Venture Proposals, Sub-Consultants, and Vendors
The City does not generally desire to enter into “joint-venture” agreements with multiple firms. In the event two or more firms desire to “joint-venture”, it is strongly recommended that one incorporated firm propose and maintain status as the Program Management firm with the remaining firms participating as major firms. Any joint-venture, proposed and established as a separate business entity, should have its own set of books and supporting documentation sufficient for an audit trail. Transactions should be recorded consistent with the joint-venture agreement, and care must be taken to ensure that the joint-venture bears its equitable share of the costs. Therefore, “unpopulated joint-ventures” would not have an adequate accounting system suitable for cost reimbursement contracts.
However more traditional “populated joint-ventures” are welcomed. A populated joint-venture is where an alliance is brought to life by infusing it with working capital, employees, and control systems. The alliance implements all necessary business systems, including payroll processing, purchasing, property control, etc. The alliance will develop its own indirect rate structure and calculates its own indirect cost rates, based on the direct and indirect costs it incurs.
Sub-Consultants shall generally be considered any team member which is performing any service which typically requires prequalification, which is subject to the Audit and Accounting System Requirements, and whose services are billed as costs. Sub-Consultant Team Members must be written into the resulting Agreement and are subject to all terms and conditions in the Agreement. Vendors shall be considered any team member which is performing any service which typically does not require prequalification, which is not subject to the Audit and Accounting System Requirements, and whose services are billed as direct expenses. Vendors may not be written into the resulting Agreement and may not be subject to all terms and conditions in the Agreement.
C. Audit and Accounting System Requirements
The City reserves the right to reject any proposal with firms that do not meet the following requirements:
1. Firm(s) should have an accounting system in place to meet requirements of 48 CFR Part 31 and, in the case of non-profit organizations, OMB Circular A-122.
2. Any firm that currently has an aggregate contract amount exceeding $250,000 should have submitted their yearly CPA overhead audit.
3. Firm(s) should have no significant outstanding deficient audit findings from previous contracts with GDOT or the City that have not been resolved.
4. The prime is responsible for being reasonably assured that all sub-consultant(s) presented as a part of the proposed team are similarly in compliance with the above requirements.
D. Submittal Costs and Confidentiality
All expenses for preparing and submitting responses are the sole cost of the respondent submitting the response.
The City is not obligated to any respondent to reimburse such expenses. All submittals upon receipt become the property of the City. Labeling information provided in submittals as “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until a final award.
E. Award Conditions
This request is not an offer to contract or a solicitation of bids. This request and any proposal submitted in response, regardless of whether the proposal is determined to be the best proposal, is not binding upon the City and does not obligate the City to procure or contract for any services. Neither the City nor any respondent submitting a response will be bound unless and until a written contract mutually accepted by both parties is negotiated as to its terms and conditions and is signed by the City and a respondent containing such terms and conditions as are negotiated between those parties. The City reserves the right to waive non-compliance with any requirements of this Request for Qualifications and to reject any or all proposals submitted in responses. Upon review of responses, the City will determine the respondent(s) proposal that in the sole judgment of the City is in the best interest of the City (if any is so determined), with respect to the evaluation criteria stated herein. The City then intends to conduct negotiations with such respondent(s) to determine if an acceptable contract may be reached.
F. Right to Cancel or Change RFQ
The City reserves the right to cancel any and all Request for Qualifications where it is determined to be in the best interest of the Department to do so. GDOT reserves the right to increase, reduce, add or delete any item in this solicitation as deemed necessary.
It is the responsibility of all firms interested in submitting Statement of Qualifications (SOQs) for this advertisement to routinely check the posting on the Georgia Procurement Registry for any revisions to this RFQ.
G. Substitutions, Alternates, Exceptions, and Extensions
No substitutions or alternates will be accepted for this solicitation. Any respondent submitting substitutions or alternates will be considered non-responsive and will not be considered for award.
H. Conduct Pertaining to Conflict of Interest in the Award and Administration of Contracts
Respondents warrants and represents that:
• The Services to be performed hereunder will not create an actual or apparent conflict of interest with any other work currently being performed,
• The respondent is not presently subject to any agreement with a competitor or with any other party that will prevent the firm from performing in full accord with this Agreement,
• The respondent is not subject to any statute, regulation, ordinance, or rule that will limit its ability to perform its obligations under this Agreement,
• The respondent shall be free to accept other work during the term hereof; provided, however, that such other work shall not interfere with the provision of Services hereunder.
EXHIBIT I
North Peachtree Road from Dunwoody Crossing to Barclay Drive
1. PI Number: 0021596
2. County(ies): DeKalb County
3. Description: North Peachtree Road Path. The project consists of one travel lane in each direction with a twelve (12) foot shared use path and a five (5) foot landscape buffer on the west side from Dunwoody Crossing to Barclay Road.
The east side of the corridor has a six (6) foot sidewalk with a two (2) to five (5) foot landscape buffer that is currently in design as a local project. In addition to the pedestrian facilities and bike accommodations, the project will include operation improvements at key intersections along with corridor lighting, stormwater improvements, and landscaping.
North Peachtree Road serves as a main walking route for Chesnut Elementary School and Peachtree Middle School, which are located on the west side of North Peachtree Road. The corridor also provides a key connection for adjacent neighborhoods to Brook Run Park, Pernoshal Park, and the Georgetown commercial district.
4. Required Area Classes:
Prime Consultants are defined as the firm submitting the Statement of Qualifications and the firm with whom the City will contract. The Team is defined as the Prime Consultant and their sub-consultants, who are considered team members. The Prime Consultant must be prequalified in the Area Classes identified below in Section 4.A. The Prime Consultant or sub-consultant team members must be prequalified in the Area Classes identified below in Section 4.B.
Respondents should submit a summary form (example provided in Exhibit IV) which details the required area classes for the Prime Consultant and all sub-consultants or joint-venture of consultants on the team listed in the Statement of Qualifications. The area classes listed on the summary form must meet all required area classes or the team will be disqualified. The Prequalification Expiration Date must be current by the deadline stated for this RFQ.
A. The Prime Consultant MUST be prequalified by GDOT in the area classes listed below:
Number Area Class
3.13 Facilities for Bicycles and Pedestrians
3.02 Two-Lane or Multi-lane Urban Roadway Design
B. The Team (either the Prime Consultant and/or one or more of their sub-consultant team members) MUST be prequalified by GDOT in the area classes listed below:
Number Area Class 1.06(a) NEPA Documentation 1.06(b) History 1.06(c) Air 1.06(d) Noise 1.06(e) Ecology 1.06(f) Archaeology 1.06(h) Bat Surveys
1.07 Attitude, Opinion, and Community Value Studies (Public Involvement)
1.10 Traffic Projections
3.02 Two-Lane or Multi-lane Urban Roadway Design
3.06 Traffic Operations Studies
3.07 Traffic Operations Design
3.08 Landscape Architecture Design
3.12 Hydraulic and Hydrological Studies (Roadway)
3.15 Highway and Outdoor Lighting
5.01 Land Surveying
5.02 Engineering Surveying
5.08 Overhead/Subsurface Utility Engineering (SUE)
6.01(a) Soil Survey Studies
6.02 Bridge Foundation Studies
6.05 Hazardous Waste Site Assessment Studies
9.01 Erosion, Sedimentation, and Pollution Control Plan
5. The Consultant shall provide development of the environmental document including all required special studies (Air, Noise, Ecology, and NEPA), preliminary construction plans, signing and marking plans, final right-of-way plans (including revisions), erosion control plans, preliminary and final roadway plans, staging plans and final construction plans (including revisions through project final acceptance) and construction services. All required engineering studies are considered part of the scope of services. All deliverables shall be in accordance with but not limited to the Plan Development Process (PDP), Electronic Data Guidelines (EDG), GDOT Design Policy Manual, GDOT Drainage Manual, GDOT Bridge and Structures Design Manual, Plan Presentation Guide, National Environmental Policy Act (NEPA) and the GDOT Environmental Procedures Manual.
The Consultant shall provide:
A. Concept Report
1. Public Involvement Plan (for GDOT’s approval)
2. Traffic Counts and Forecasting
3. Traffic Studies
4. Traffic Diagrams
5. Cost estimates
a. Conceptual Construction cost estimate
b. Conceptual right of way cost estimate utilizing vendor from GDOT’s Right-of-Way services prequalified contractor list
6. Prepare concept layouts and alignment alternatives
7. Prepare Intersection Control Evaluation (ICE) or waiver
8. Approved Concept Report
9. Concept Design Data Book
10. Concept Meeting Preparation and Attendance
11. Determine potential logical termini and submit form for approval
12. Concept-level MS4 report (as needed)
13. Mail out Right of Entry Letter (Survey and Environmental)
B. Survey Database Preparation:
1. Update Property Information and Owners for 23 parcels.
2. Survey Enhancements
3. Extended Survey limits (if necessary)
4. Survey Control
5. Complete Survey Database
a. Field ties all front property corners and ROW markers if possible. Tie back property corners, if possible, with minimal effort. Perform property resolution holding to as many property corners as possible using professional judgement.
b. Gather septic tank locations and drain lines within defined project limits using information is available from the DeKalb County Health Department.
c. Collect pipe conditions for all cross drains
6. Survey package report
C. Environmental Document
All work shall be done in accordance with the current edition of the GDOT Plan Development Process (PDP) and the GDOT Environmental Procedures Manual (EPM), particularly Chapter III NEPA Documents, and Chapter V Environmental Studies.
1. Perform Environmental Project Management including early coordination.
2. A3M Meeting.
3. Provide Schedule updates in Primavera (P6) and TPro twice a month.
4. Public Involvement Coordination
5. Activities necessary to Plan, Attend, and Document Public Information Open House (PIOH).
6. Targeted public outreach activities including the
a. Preparation and distribution of project flyers, legal advertisement, and postcards
b. Attend dry run,
c. Preparation and distribution of PIOH synopsis, summary of comments, and comment response letter,
7. Survey for Parks, Land Use, Farmland, Communities/Community Resources, USTs, Cemeteries.
8. Ecology- Field Survey and Resources Survey Report.
9. Ecology- Assessment of Effects Report.
10. NEPA Management including Early Coordination, Project Meetings, Meeting Notes, Schedule Updates.
11. Assess Impacts to Land Use, Parks, Communities, Community Resources, Cemeteries, Farmlands, USTs.
12. Prepare Categorical Exclusion or Programmatic Categorical Exclusion and Reevals for ROW and Let.
13. Prepare the Environmental Commitments Table (ECT).
14. Prepare Programmatic Section 4(f) Evaluation, if needed.
15. Protected Species Survey Report.
16. Historic Resource Survey and reports including Cultural Resources Assessment of Effects (AOE).
17. Conduct Archaeological Survey and prepare reports.
18. Prepare Section 404 General Permit Application, if needed.
19. Prepare Buffer Variance Application, if needed.
20. Memorandum of Agreement (if necessary).
21. Noise survey and reports (including Noise Barrier Analysis, if needed).
22. Air survey and reports.
23. Preparation for and attendance of Preliminary Field Plan Review (PFPR) including:
a. Prepare Environmental Resource Impact Table (ERIT) and other materials for Field Plan Review.
b. Attend Field Plan Review.
c. Review PFPR Report and provide written responses to any environmental comments.
24. Certification - for ROW and Let authorizations.
25. Prepare Special studies addenda or memos, as needed, for ROW and LET authorizations.
26. Agency coordination including multiple meetings to ensure consistency of expectation, design, and clearance limits.
27. NEPA Document
28. NEPA Reevaluations, as required.
D. Preliminary Plans:
1. Complete Preliminary Plans, meeting the requirements of GDOT’s PDP, Plan Presentation Guide (PPG), Electronic Data Guidelines (EDG), and the Preliminary Field Plan Review (PFPR) checklist.
2. Project Datasheet
3. Preliminary Signing and Marking Plans
4. Preliminary Signal Plans
5. Preliminary Drainage Plans with identified utility locations.
6. Preliminary Landscaping Plans with sight distance delineated.
7. Preliminary Retaining Walls and Envelopes with identified utility locations and drainage.
8. Preliminary Cross Sections with delineated ROW and easements and identified utility locations and drainage.
9. Preliminary Utility Plans.
10. Preliminary Staging & Erosion Control Plans
11. Underground Storage Task (UST)/Hazardous Wast Studies (Phase 1 & Phase 2, if recommended)
12. Location and Design Report
13. PFPR participation, report, and responses (all plan sets and other information requested by Engineering
Services)
14. Traffic Studies
15. Preliminary Construction Plans
16. SUE Plans (Quality Level B)
17. SUE Plans (Quality Level A, as needed)
18. Utilities First Submission. Verifying utility locations. The city will be responsible for submission to the utility companies and coordination throughout the project.
19. Approved Soil Survey
20. WQv Stormwater Treatment Near Bat Habitat
21. City of Dunwoody Linear Transportation Feasibility…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .