RFQ-25-4_Addendum_1.pdf

PDF 97 KB Posted

Attached to
Jetty Park Improvements Design and Permitting Services
Solicitation number
RFQ-25-4
Issued by
Florida

About this file

This document is Addendum #1 for RFQ-25-4, issued by the Canaveral Port Authority on March 12, 2025, for the Jetty Park Improvements Design and Permitting Services project (PN-25-029). The addendum provides supplemental reference documents for the bidding process, including a Port Boundary Map Aerial, Exterior Light Management Plan, Permitted Stormwater Map, Basin Data and Calculations, Stormwater Management System Calculations, and an SJRWMD As-Built Certification Approval. The addendum instructs bidders to carefully coordinate modifications with all trades and disciplines related to the work and warns that failure to acknowledge receipt of the addendum on the Bid Form may result in disqualification.

The addendum was released via VendorLink and comprises a total of 42 pages, including attachments. It emphasizes that the changes incorporated shall be considered part of the Bidding Documents and shall supersede, amend, add to, clarify, or subtract from the original conditions. Bidders are required to carefully review and integrate the supplemental documents into their proposal, ensuring comprehensive understanding of the project requirements and technical specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ-25-4 Page 1 Addendum #1

CANAVERAL PORT AUTHORITY

JETTY PARK IMPROVEMENTS DESIGN AND PERMITTING SERVICES

PN-25-029

RFQ-25-4

Addendum #1

March 12, 2025

This addendum is issued as part of the Bidding Documents for the above-described project. The changes incorporated in this addendum shall be considered as a part of the Bidding Documents and shall supersede, amend, add to, clarify, or subtract from those conditions shown in the original Bidding Documents. The Bidder shall take care to coordinate modifications herein with all trades and disciplines related to the work. The Bidder shall acknowledge receipt of this addendum on their Bid Form by addendum number and date. Failure to do so may subject Bidder to disqualification.

Released Via VendorLink

42 Pages Total (including attachments)

GENERAL

SPECIFICATIONS

DRAWINGS

OTHER DOCUMENTS ISSUED WITH ADDENDUM

Documents provided for reference: Port Boundary Map Aerial (1 page) Exterior Light Management Plan (26 pages) Permitted Stormwater Map (1 page) Basin Data and Calculations (1 page) Stormwater Management System Calculations (11 pages) SJRWMD As-Built Certification Approval (1 page)

END OF ADDENDUM #1

Issued via VendorLink

By Authority of the Canaveral Port Authority

March 12, 2025
Issued via VendorLink
By
Authority of the Canaveral Port Authority

File details come from the government source that posted it. Updated .