This document is a Basin Data and Calculations report for the Jetty Park Stormwater project, prepared by engineer Cydney Sims in January 2021 for the Canaveral Port Authority. The report details stormwater management calculations for a development site, specifically focusing on post-development basin data, treatment volume requirements, and storage calculations for multiple basins (Basin01, Basin02, and Basin05). The technical document provides comprehensive hydrological measurements, including area breakdowns of impervious (3.18 acres) and pervious (5.39 acres) surfaces, totaling 8.57 acres.

The calculations demonstrate that the project meets and slightly exceeds required treatment volume specifications. The total required treatment volume is 25,755 cubic feet, while the total provided treatment volume is 25,903 cubic feet. The calculations include detailed measurements at different elevations (6.00 feet and 5.00 feet), with specific computations for runoff volumes from total and impervious areas. The document shows meticulous engineering analysis of stormwater management strategies, ensuring appropriate water treatment and volume management for the Jetty Park development site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT: JETTY PARK STORMWATER

DATE: Jan-21

ENGINEER: Cydney Sims

Elevations: Finished floor NA feet

Pond top of bank 6.00 feet

Pond bottom 5.00 feet

Overflow weir invert 6.00 feet

Post-Development Basin Data:

Type Area (acres)

Impervious 3.18

Pervious 5.39

Total 8.57

Elevation Area Avg. Area Volume Sum. Volume

(Feet) (Sq. Ft.) (Sq. Ft.) (Cu. Ft.) (Cu. Ft.)

6.00 28,429 25,903

25,903 25,903

5.00 23,376 0

Treatment Volume:

1) Volume from 0.5 inch of runoff from total area

(0.5 in.)(total area)(43,560 sf/ac) = 15,555 cu. ft.

12 in/ft

2) Volume from 1.25 inches of runoff from impervious area

(1.25 in.)(imperv. area)(43,560 sf/ac) = 14,429 cu. ft.

12 in/ft

3) Therefore, greater volume = 15,555 cu. ft.

Total Required Treatment Volume Basin01 and Basin05 = 15,555 cu. ft.

Total Required Treatment Volume Basin02 = 10,200 cu. ft.

Total Required Treatment Volume = 25,755 cu. ft.

Total Provided Treatment Volume = 25,903 cu. ft.

BASIN DATA AND CALCULATIONS

Stage/Storage Volume:

Basin01 & Basin05

BASIN DATA AND CALCULATIONS

3.45 ac /11,761 sf

Future Allowed Area (acre/sf)

(1.25 in.)*(3.45 ac)*(43560 sf/ac)

12 in/ft 2a)Future

Allowed = 15,655 cu. ft. Total Required Treatment Volume Basin 01 and Basin 05

= 10,200 cu. ft. Total Required Treatment Volume Basin 02 = 25,855 cu. ft. Total Provided Treatment Volume Basin 01, 02 & 05